List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Uttar Pradesh FP/UP/Approach/42718/2019 8B/UP/06/122/2020 Proposed BPCL Retail Outlet on Meerut-Baghpat-Sonipath Road(SH-14) in Km.53(Ch.52.500) at Khasra No.586&589 Village:Malyana, District:Meerut Approach Access BHARAT PETROLEUM CORPORATION LIMITED TERRITORY MEERUT 0.055911 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2019
Stage-I Approval on : 13 Jan 2021
Compliance Report Submitted by User Agency on : 23 Feb 2021
08 Mar 2021
2 Uttar Pradesh FP/UP/ROAD/156070/2022 8B/UP/06/290/2022/FC Diverted for 4-Lane Road Widening & Strengthening of Pandeypur Chauraha to Ring Road Azamgarh Marg from CH. No. 0.000 to CH. No. 4.100, in District: Varanasi Road EXECUTIVE ENGINEER PWD PROVINCIAL DIVISION 4.1525 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2022
Stage-I Approval on : 25 Nov 2022
Compliance Report Submitted by User Agency on : 06 Jun 2023
31 Jul 2023
3 Uttar Pradesh FP/UP/Approach/142891/2021 8B/UP/06/03/2022/FC PROPOSAL FOR THE DIVERSION OF ROAD SIDE PROTECTED FOREST LAND (0.048679 HAC.) ON MATHURA-SADABAD-JALESAR ROAD (SH-122 NEW), KM 70 (CH 69.411),KHASRA NO. 1378, VILL –JALESAR BAHAR CHUNGI TEHSEEL- JALESAR DIST- ETAH FOR THE CONSTRUCTION OF APPROACH ROAD TO PROPOSED BPCL FUEL STATION /PETROL PUMP. Approach Access BHARAT PETROLEUM CORPORATION LIMITED 0.048679 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2021
Stage-I Approval on : 04 Feb 2022
Compliance Report Submitted by User Agency on : 16 Jun 2023
08 Aug 2023
4 Uttar Pradesh FP/UP/Approach/142965/2021 8B/UP/06/260/2021/FC Diversion of PF land for construction of Approach Road to Pro. NRO of IOCL on NH-34, CH.175.523RHS, KH. 128/7/2, vill-BIlar, Teh-Sikandra Rao,Hathras,( UP) Approach Access INDIAN OIL CORPORATION LTD (MARKETING DIVISION) 0.120246 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2021
Stage-I Approval on : 28 Dec 2021
Compliance Report Submitted by User Agency on : 28 Jul 2022
31 Aug 2022
5 Uttar Pradesh FP/UP/ROAD/19772/2016 P-142/14-2-2016-800(138)/2016 Proposed Reserve Forest Land for Strengthening & Widening of Kokilavan Road (Total KM 1.993km) in Mathura City Road PRO DIVISION P W D MATHURA 0.9537 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2016
Stage-I Approval on : 14 Oct 2016
Compliance Report Submitted by User Agency on : 17 Sep 2020
12 Oct 2020
6 Uttar Pradesh FP/UP/Approach/48107/2020 8B/UP/06/123/2020 Proposed IOCL Retail Outlet on Banda-Baberu-Rajapur Road(SH-92),in Km.2.00(Ch.1.470-1.500) at Gata No.708, Village:Palhari,District:Banda Approach Access IOCL MARKETING DIVISION ALLAHABAD 0.065348 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 12 Oct 2020
Compliance Report Submitted by User Agency on : 23 Nov 2020
11 Dec 2020
7 Uttar Pradesh FP/UP/ROAD/47893/2020 8B/UP/06/128/2020 “Widening and strengthening work of Vrindavan Chhatikara Radhakund Road (ODR) in District Mathura (U.P)” (Chainage 6.000 to 20.100 KM & Chainage 21.000 to 21.400 KM) (LENGTH-14.500K.M.)' Road PRO DIVISION P W D MATHURA 3.1746 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 24 Nov 2020
Compliance Report Submitted by User Agency on : 05 Jan 2021
27 Jan 2021
8 Uttar Pradesh FP/UP/Others/41410/2019 8B/UP/06/93/2019/FC Protected Forest Land Proposed to be diverted for Exit/Entry of proposed new IOCL Retail Outlet on Lucknow-Faizabad Road(NH-28) New NH-27, In Km.70(Ch.69.562), In Khasra No.1692&1693,Village:Asrafpur Gangrela,District:Ayodhya(Faizabad) Others IOCL GORAKHPUR DIVISIONAL OFFICE 0.151236 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2019
Stage-I Approval on : 25 Oct 2019
Compliance Report Submitted by User Agency on : 11 May 2020
06 Jul 2020
9 Uttar Pradesh FP/UP/Approach/151696/2022 8B/UP/06/196/2022 diverted for Entry/Exit approach to Torrent Gas Private Limited CNG Station on Sultanpur-Lucknow Road (NH-731) in Km No. 167 to 168 (CH. No.- 167.216, LHS) at Khasra No. 1888 & 1889, Village:- Chaubeesi, Tehsil:-Haidergarh, District:-Barabanki Approach Access TORRENT GAS PRIVATE LIMITED 0.221392 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2022
Stage-I Approval on : 23 Jun 2023
Compliance Report Submitted by User Agency on : 14 Sep 2023
10 Nov 2023
10 Uttar Pradesh FP/UP/RAIL/44309/2020 8B/UP/07/93/2021/FC Protected forest land to be diverted for Doubling of Existing Railway Track from (Km No.- 1.000 to 125.000) Bhatni – Aunrihar Railway line in Forest Division -Deoria (From Km. 1.000 to 28.226), Forest Division - Ballia (Km. 28.226 to 52.952 in Ballia district), Forest Division - Mau (Km. 52. 952 to 81.874 in Mau district) and Forest Division - Ghaz Railway RAIL VIKAS NIGAM LIMITED 162.8776 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2020
Stage-I Approval on : 02 Dec 2021
Compliance Report Submitted by User Agency on : 28 Mar 2022
04 May 2022
11 Uttar Pradesh FP/UP/Others/31584/2018 8B/UP/09/40/2019/FC LAYING OF GAS PIPE LINE IN 7300 MTR. LENGTH FROM MAHAVIR DHABA TO BHAGWAN FILLING STATION ON LHS OF AGRA-KANPUR ROAD (NH-2) FROM KM. 206.757 TO 213.960 BY GREEN GAS LIMITED, AGRA.(U.P.) Others GREEN GAS LIMITED AGRA 0.584 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2018
Stage-I Approval on : 21 Aug 2019
Compliance Report Submitted by User Agency on : 10 Jun 2020
01 Oct 2020
12 Uttar Pradesh FP/UP/Others/31597/2018 P-37/14-2-2019-800(53)/2019 Protected Forest Land proposed to be diverted for exit/entry Approach of Reliance Industries Limited, on (SH-14) Garh-Meerut-Bagpat-Sonipat Road in KM.53(Ch.52.540),Khasra No.103 &104 Village: Maliyana,District:Meerut Others MS RELIANCE INDUSTRIES LIMITED 0.079198 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2018
Stage-I Approval on : 04 Jun 2019
Compliance Report Submitted by User Agency on : 05 Nov 2019
03 Dec 2019
13 Uttar Pradesh FP/UP/Approach/43673/2019 8B/UP/06/54/2020/FC PROTECTED FOREST LAND TO BE DIVERTED FOR ENTRY/EXIT OF BPCL RETAIL OUTTET ON DATMAU - UNCHAHAR ROAD (SH-38), Near KM. NO. 181 (CH. NO. 180+935.90 LHS), AT KHASRA NO - 378, VILLAGE:- ALIPUR CHAKRAI, DISTRICT:RAIBARELI Approach Access BPCL TERRITORY LUCKNOW 0.08103 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2019
Stage-I Approval on : 10 Jul 2020
Compliance Report Submitted by User Agency on : 07 Aug 2020
27 Aug 2020
14 Uttar Pradesh FP/UP/Others/143114/2021 P-179/81-2-2022-800(185)/2022 Reliance 4G Project for Laying of OFC along with road on NH-731(Old NH-56) (Lucknow-Sultanpur Road, Left Side) from Km 35.00 to Km 64.00, MDR (Barabanki-Zaidpur-Siddhaur-Deviganj-Bhitariya Road, Left Side) from Km 33.788 to Km 43.788. Total Km 39.00 & 0.4110 Ha. in Social Forestry Division Barabanki-UP. Others Reliance Jeo Infocomm Ltd 0.411 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2021
Stage-I Approval on : 28 Jun 2022
Compliance Report Submitted by User Agency on : 15 Mar 2023
28 Apr 2023
15 Uttar Pradesh FP/UP/Approach/49282/2020 8B/UP/06/186/2021/FC Protected Forest Land For Exit/Entry Approach to Proposed BPCL Retail Outlet on Nahatpur-Noorpur-Amroha-Joya Road(SH-77), In Km.53(CH.52.421),At Khasra No.2958/1,2 Tehsil:Amroha,District:Amroha Approach Access BHARAT PETROLEUM CORPORATION LIMITED TERRITORY MEERUT 0.037025 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2020
Stage-I Approval on : 17 Nov 2021
Compliance Report Submitted by User Agency on : 12 Feb 2022
21 Mar 2022
16 Uttar Pradesh FP/UP/Approach/48634/2020 8B/UP/06/83/2021 Protected Forest Land Proposed Exit/Entry Approach to BPCL Retail Outlet on Sikandrabad-Bulandshahr(Abadi Bhag) Road(ODR) In Km.5(Ch.4.800),At Gata No.1233,Village:Sikandrabad Dehat.Tehsil:Sikandrabad District:Bulandshahr Approach Access BHARAT PETROLEUM CORPORATION LIMITED TERRITORY MEERUT 0.053692 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2020
Stage-I Approval on : 26 Mar 2021
Compliance Report Submitted by User Agency on : 16 Jun 2021
02 Jul 2021
17 Uttar Pradesh FP/UP/Approach/49274/2020 8B/UP/06/124/2020 Proposed HPCL Retail Outlet on Fatehpur-Lalganj Road NH-335(Old NH-232),In Km.81(Ch.80.135), At Khasra No.204,Village:Saripur Bera,Tehsil:Fatehpur,Dist:Fatehpur Approach Access Hindustan Petroleum Corporation Limited 0.1903 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2020
Stage-I Approval on : 13 Jan 2021
Compliance Report Submitted by User Agency on : 30 Jan 2021
11 Feb 2021
18 Uttar Pradesh FP/UP/TRANS/41685/2019 8B/UP/04/62/2020/FC Forest Land Proposed to be diverted for construction 765 kV S/C Agra-Greater Noida Transmission Line passing through Reserve Forest land in Firozabad & Agra Districts and Protected Forest land in Cros Transmission Line GHATAMPUR TRANSMISSION LIMITED 4.3024 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2019
Stage-I Approval on : 30 Jun 2020
Compliance Report Submitted by User Agency on : 05 Jul 2022
16 Aug 2022
19 Uttar Pradesh FP/UP/Approach/147884/2021 8B/UP/06/255/2021/FC Proposed BPCL retail outlet on Etah-Kaimganj-Farrukhabad Road (SH-121) (City Part) in Km No. 100(730) (RHS) at Khasra No.-659, 660Ka & 666Kha, Village:-Kharbandi Bhikhampur, Tehsil:-Farrukhabad, District:Farrukhabad Approach Access BHARAT PETROLEUM CORPORATION LIMITED 0.059033 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 07 Dec 2021
Compliance Report Submitted by User Agency on : 24 Dec 2021
20 Jan 2022
20 Uttar Pradesh FP/UP/ROAD/145614/2021 8B/UP/06/208/2022/FC Diversion of forest land for the development of 6-lane (greenfield) access-controlled spur to Haridwar from Delhi-Saharanpur-Dehradun Economic Corridor Section of NH 344BG from 0.000 to Km19.070 in Saharanpur district of Uttar Pradesh State and Km. 19.070 to Km 50.700 in Haridwar District of Uttarakhand State under Bharatmala Pariyojana Road NATIONAL HIGHWAY AUTHORITY OF INDAI PIU ROORKEE 1.6518 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 31 Oct 2022
Compliance Report Submitted by User Agency on : 10 Feb 2023
28 Mar 2023
21 Uttar Pradesh FP/UP/Others/147545/2021 8B/UP/09/26/2022/FC Constt. of RCC Drain along the Govardhan Parikrama Marg, in 11006.00 Mtr. length at Vill. Annyor, Jatipura & Radhakund in Tah.-Govardhan, Distt. Mathura by D & S Unit, U.P. Jal Nigam, Mathura (U.P.) Others U.P. JAL NIGAM, DRAINAGE AND SEWERAGE UNIT, MATHURA (U.P.) 0.9349 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 01 Sep 2022
Compliance Report Submitted by User Agency on : 19 Apr 2024
18 Jun 2024
22 Uttar Pradesh FP/UP/ROAD/147898/2021 8B/UP/06/73/2022/FC Additional forest land diversion required for Eastern Yamuna canal falling in Shamli District for “Four laning of Panipat ( Start from junction with Existing Km of NH-44 at Panipat) -to Shamli (End at its junction with Existing 39+300 of SH- 12) of NH-709AD in the State of Uttar Pradesh Package -1( 0.000 to 35.580)” Road NHAI BAGHPAT 0.111 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 06 Jan 2023
Compliance Report Submitted by User Agency on : 13 May 2024
16 Aug 2024
23 Uttar Pradesh FP/UP/Approach/50244/2020 8B/UP/06/135/2020 PROPOSAL FOR THE DIVERSION OF ROAD SIDE PROTECTED FOREST LAND (0.179032)HAC.) ON AGRA-BHARATPUR ROAD NH-11(NEW NH-21), KM 42 (CH 41.293), KHASRA NO. 651, VILL - CHAUMA SHAHPUR , TEHSEEL KIRAOLI,DIST- AGRA ,FOR THE CONSTRUCTION OF APPROACH ROAD TO PROPOSED RELIANCE BP MOBILITY FUEL STATION RO /PETROL PUMP Approach Access RELIANCE BP MOBILITY LIMITED 0.1790312 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2020
Stage-I Approval on : 19 Oct 2020
Compliance Report Submitted by User Agency on : 29 Oct 2020
03 Nov 2020
24 Uttar Pradesh FP/UP/Others/42191/2019 8B/UP/06/32/2021 Protected Forest Land to be diverted for entryIexit to BPGL Retail Outlet on Bani - Mohanlalganj Road (MDR- 89C), ln KM Stone No. 4.00 , At Khasra No.268, Village: Dhawapur, Tehsil: Sarojini Nagar, Dist:Lucknow Others BPCL TERRITORY LUCKNOW 0.044014 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2019
Stage-I Approval on : 19 Jul 2021
Compliance Report Submitted by User Agency on : 08 Sep 2021
11 Oct 2021
25 Uttar Pradesh FP/UP/Others/42005/2019 8B/UP/06/130/2020 Proposed Protected Forest Land to be diverted for Entry/Exit of BPCL Retail Outlet on Basti - Dumariyagani Road (SH-26),in KM. Stone No. 397, at Khasra No - 77, 78ka, 79, 80 & 81, Village:- Malpurva, Dist:Basti Others BHARAT PETROLEUM CORPORATION LIMITED 0.075028 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2019
Stage-I Approval on : 21 Oct 2020
Compliance Report Submitted by User Agency on : 01 Jan 2021
15 Jan 2021
26 Uttar Pradesh FP/UP/Others/42318/2019 8B/UP/06/24/2020/FC Proposed IOCL Retail Outlet by Divisional Office IOCL Allahabad on Pratapgarh-Faizabad Road NH-330(Old NH-960 in Km.59(Ch.58.793) at Khasra No.2,Village: Karista,District:Pratapgarh Others IOCL MARKETING DIVISION ALLAHABAD 0.821468 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2019
Stage-I Approval on : 10 Jun 2020
Compliance Report Submitted by User Agency on : 18 Aug 2020
09 Sep 2020
27 Uttar Pradesh FP/UP/Others/21657/2016 8B/UP/06/22/2020/FC Ex-Post Facto Proposal Diversion of 0.097035 Ha. Forest Land for approach road to ""International City"" developed by Competent Builders & Developers at Vill Nariyawal on Bareilly - Shahjahanpur Road Km Stone No 244-245 NH-24 District Bareilly Others COMPETENT BUILDERS AND DEVELOPERS 0.097035 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2016
Stage-I Approval on : 09 Mar 2020
Compliance Report Submitted by User Agency on : 08 Jul 2020
07 Sep 2020
28 Uttar Pradesh FP/UP/ROAD/148376/2021 8B/UP/06/55/2022/FC Improvement and Up-gradation of NH-731 to 2-Lane with Paved Shoulder from Km 40.00 to Km 88.750 under Package 1 in Shahjahanpur District and Forest Division (Total Length-48.75 Km of Package 1) Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BAREILLY 26.408 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2021
Stage-I Approval on : 01 Sep 2022
Compliance Report Submitted by User Agency on : 14 Oct 2022
21 Nov 2022
29 Uttar Pradesh FP/UP/Approach/52653/2020 8B/UP/06/291/2021/FC Proposed IOCL Retail Outlet on Bilrayan-Panwari Road(SH-21) In Km.24(Ch 23.410 to 23.445) at Gata No. No.407,Village:Barotha,Tehsil:Nighasan,District:Lakhimpur Kheri Approach Access INDIAN OIL COPERATION LIMITED 0.086211 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2020
Stage-I Approval on : 14 Nov 2022
Compliance Report Submitted by User Agency on : 18 Jun 2025
26 Jun 2025
30 Uttar Pradesh FP/UP/Pipeline/52656/2020 8B/UP/08/234/2021/FC Protected Forest Land Proposed to be diverted for Laying of Gas Pipeline along Lucknow-Sultanpur Road NH-56(New NH-731) from Ch.64.00 to 77.420 in District:Amethi Pipeline TORRENT GAS PRIVATE LIMITED 0.6689 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2020
Stage-I Approval on : 24 Nov 2021
Compliance Report Submitted by User Agency on : 12 Jan 2022
17 Mar 2022
31 Uttar Pradesh FP/UP/Approach/52607/2020 8B/UP/06/42/2021/FC Proposed BPCL Retail Outlet on Bahraich-Sitapur Road(SH-30B) In Km.78(Ch 77.022 to 77.057) at Khasra No.1447,Village:Govardhanpur,Tehsil:Biswan,District:Sitapur Approach Access BHARAT PETROLEUM CORPORATION LIMITED 0.210572 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2020
Stage-I Approval on : 12 Mar 2021
Compliance Report Submitted by User Agency on : 07 Jun 2021
06 Jul 2021
32 Uttar Pradesh FP/UP/Approach/42689/2019 8B/UP/06/25/2020/FC PROPOSAL FOR THE DIVERSION OF ROAD SIDE PROTECTED FOREST LAND (0.03678 HAC.) ON MATHURA -SADABAD MAARG MDR 102, KM 11 (CH. 10.735), KHASRA NO. 177, VILLAGE - MUBARAKPUR BANGER, TEHSEEL MAHAVAN, DIST- MATHURA FOR THE CONSTRUCTION OF APPROACH ROAD TO PROPOSED BPCL NRO. Approach Access BHARAT PETROLEUM CORPORATION LIMITED 0.03678 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2019
Stage-I Approval on : 18 Mar 2020
Compliance Report Submitted by User Agency on : 03 Jun 2020
22 Jul 2020
33 Uttar Pradesh FP/UP/Approach/149746/2021 8B/UP/06/41/2022/FC Diversion of 0.0412280 hectare of P.F. land under social forestry div. Hardoi for access road to RO of M/S Reliance BP Mobility Ltd at Vill- Shahbad Andar, Khasra No.- 6887 & 6888, in Chainage- 126.654 on RHS of Shahbad-Hardoi Road, NH-731, Tehsil -Shahbad & District- Hardoi, Approach Access M/S RELIANCE BP MOBILITY LIMITED 0.041228 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2021
Stage-I Approval on : 13 Jul 2022
Compliance Report Submitted by User Agency on : 09 Aug 2023
22 Sep 2023
34 Uttar Pradesh FP/UP/ROAD/148569/2021 P-162/81-2-2023-800(159)/2023 Construction of 4 laning of Ghazipur –Ballia- UP/Bihar New Greenfield section from Km. 0.000 to 117.120 of NH-31 and construction of new Buxar Spur connectivity from km 0.000 to km 17.270 in the Ballia district of Uttar Pradeshstate Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU AZAMGARH 0.49 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2021
Stage-I Approval on : 20 Jun 2023
Compliance Report Submitted by User Agency on : 20 Dec 2023
28 Feb 2024
35 Uttar Pradesh FP/UP/RAIL/43121/2019 8B/UP/07/162/2020/FC Protected Forest Proposed for Proposed Railway Track Doubling from Km.847.170 to 868.00 in Jaunpur District, From km.868.00 to 924.00 and From Km.924.00 to 934.450 in Amethi District Under Janghai-Pratapgarh-Amethi Railway Track Doubling Project Railway CONSTRUCTION-V NORTHEN RAILWAY LUCKNOW 47.3031 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2019
Stage-I Approval on : 05 Apr 2021
Compliance Report Submitted by User Agency on : 15 Jul 2021
13 Sep 2021
36 Uttar Pradesh FP/UP/ROAD/37343/2018 8B/UP/06/78/2019/FC Four laning of Panipat ( Start from junction with Existing Km of NH-44 at Panipat) -to Shamli (End at its junction with Existing 39+300 of SH- 12) of NH-709AD in the State of Uttar Pradesh Road NHAI BAGHPAT 19.80775 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 30 Jan 2020
Compliance Report Submitted by User Agency on : 22 Jan 2021
18 Feb 2021
37 Uttar Pradesh FP/UP/ROAD/37286/2018 8B/UP/06/88/2019/FC Four laning of Bijnor ( Part of NH-119) -Kotwali ( End of NH-74) of NH- 709AD in the State of Uttar Pradesh Package-IV (km 111.680 to km 133.300) Road NHAI BAGHPAT 21.286 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 30 Jan 2020
Compliance Report Submitted by User Agency on : 20 Jul 2020
09 Sep 2020
38 Uttar Pradesh FP/UP/ROAD/37341/2018 8B/UP/06/84/2019/FC Four laning of Muzaffarnagar ( Start from existing Km 5+140 of SH 12A)) -to Miranpur (End on existing Km of 60+000 of NH-34) of NH-709AD in the State of Uttar Pradesh Pkg-3-III (km 82.840 to km 110.001) Road NHAI BAGHPAT 31.5323 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 30 Jan 2020
Compliance Report Submitted by User Agency on : 12 Jan 2021
11 Feb 2021
39 Uttar Pradesh FP/UP/Approach/155975/2022 8B/UP/06/20/2023/FC ROPOSAL FOR THE DIVERSION OF ROAD SIDE PROTECTED FOREST LAND (0.179032)HAC.) ON TUNDLA-AWAGAD-ETAH MAARG SH-31, KM 12 (CH 11.888), KHASRA NO. 396,397 VILL - NAGLA MURLI , TEHSEEL TUNDLA ,DIST- FIROZABAD ,FOR THE CONSTRUCTION OF APPROACH ROAD TO PROPOSED RELIANCE BP MOBILITY FUEL STATION/ RO Approach Access RELIANCE BP MOBILITY LIMITED 0.2233847 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2022
Stage-I Approval on : 02 May 2023
Compliance Report Submitted by User Agency on : 30 Jun 2023
14 Jul 2023
40 Uttar Pradesh FP/UP/RAIL/10849/2015 8B/UP/07/92/2016/FC Eastern Dedicated Freight corridor Project Railway DEDICATED FREIGHT CORRIDOR CORPORATION INDIA LIMITED 0.7957 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Mar 2015
Stage-I Approval on : 21 Mar 2017
Compliance Report Submitted by User Agency on : 04 Jan 2020
41 Uttar Pradesh FP/UP/ROAD/144211/2021 8B/UP/06/243/2021/FC Proposed protected forest land to be diverted for construction of Flyover/Viaduct at Entry/Exit of the Loop of Expressway on Prayagraj-Ayodhya Road NH-330 crossing Km. No. 121+870 of Purvanchal Expressway operated by UPEIDA in Forest Division & District:Sultanpur Road UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) 4.8 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jun 2021
Stage-I Approval on : 07 Jan 2022
Compliance Report Submitted by User Agency on : 24 Mar 2022
13 Apr 2022
42 Uttar Pradesh FP/UP/Approach/46930/2020 8B/UP/06/159/2020 Proposal for diversion of protected forest land to construct the approach road to proposed Retail AT KM. CHAINAGE 38.790, RHS, Vill- Naugawana, Tehsil- Sadabad, Distt- Hathras Approach Access BHARAT PETROLEUM CORPORATION LIMITED MATHURA 0.0590172 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jun 2020
Stage-I Approval on : 04 Dec 2020
Compliance Report Submitted by User Agency on : 14 Jun 2021
13 Aug 2021
43 Uttar Pradesh FP/UP/Approach/46630/2020 8B/UP/06/116/2020 Proposed BPCL Retail Outlet on Shivrajpur-Bindki-Lalauli Road(MDR-15) in Km.28(Ch.27.925) at Khara No.48&49 Village:Katra Naraicha,Tehsil:Bindki,Dist:Fatehpur Approach Access BHARAT PETROLEUM CORPORATION LIMITED TERRITORY KANPUR 0.20264 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jun 2020
Stage-I Approval on : 07 Oct 2020
Compliance Report Submitted by User Agency on : 21 Oct 2020
09 Nov 2020
44 Uttar Pradesh FP/UP/WATER/145479/2021 8B/UP/08/266/2021/FC Proposed Laying of Water Distribution Line Along Banda-Baberu Road, Banda-Chilla Road, Banda-Atarra Road, Banda-Naraini Road, Banda-Oran Road, Palara-Pailani Road, Banda-Tindwari Road, Piparhi Mode to Amlore Mode, Under Amlikaur Village ,in Banda District Drinking Water STATE WATER & SANITATION MISSION LUCKNOW (UP) 10.555675 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jul 2021
Stage-I Approval on : 02 May 2022
Compliance Report Submitted by User Agency on : 28 Jun 2022
13 Jul 2022
45 Uttar Pradesh FP/UP/Others/44262/2020 8B/UP/06/178/2020 Construction of Entry &Exit for New Iocl Retail Outlet and protected land is required to be diverted (FCA Act 1980 for Non forestry purpose) Along Rampur –Kemri (District O.D.R. N0-20) Road km.4 Chainage 3.808 (LHS) Site Situated at Village Bhamravva Gata No.31 Tehsil Sadar District Rampur (U.P.). Others INDIAN OIL CORPORATION LIMITED BAREILLY 0.052 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jan 2020
Stage-I Approval on : 20 Jan 2021
Compliance Report Submitted by User Agency on : 05 Mar 2021
12 Jul 2021
46 Uttar Pradesh FP/UP/Approach/118062/2020 8B/UP/06/53/2021 0.2024 Ha. (P.F. land) Forest land proposed to be diverted for approach to BPCL Retail Outlet on Muzaffarnagar-Saharanpur road (Km. chainage 13.200, LHS) within 3 Km. of Rohana Khurd Toll Barrier, Kha Approach Access BPCL KUM 0.2024 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Dec 2020
Stage-I Approval on : 10 Jul 2021
Compliance Report Submitted by User Agency on : 11 Aug 2021
02 Sep 2021
47 Uttar Pradesh FP/UP/RAIL/43640/2019 8B/UP/07/181/2020/FC Proposed Protected forest land to bediverted for Doubling of Railway Track from (Km No.- 823.530 to 906.780) Zafrabad to Akbarpur Railway line ( Km. 823.250 to 874.355 ) in Jaunpur district), ( Km. 874.355 to 884.545 ) in Sultanpur district) and ( Km. 884.545 to 906.780 ) in Ambedkar Nagar distric Railway CONSTRUCTION II NORTHERN RAILWAY LUCKNOW 57.2948 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Dec 2019
Stage-I Approval on : 05 Apr 2021
Compliance Report Submitted by User Agency on : 01 Jul 2021
30 Jul 2021
48 Uttar Pradesh FP/UP/ROAD/146591/2021 8B/UP/06/21/2022/FC Proposal of 1.8970 Ha. (P.F. land) Forest land proposed to be diverted to PubliC Work Department (PWD) Muzaffarnagar for widening and Strengthening of Muzaffarnagr-Jansath-Meerapur Road (SH-12) From Km. Chainage 2.290 to Km. Chainage 5.000[50th Side) in Thehsil & Distt. Muzaffarnagar.(UP) Road EXECUTIVE ENGINEER PUBLIC WORK DEPARTMENT CONSTRCTION DIVISION 1 MUZAFFARNAGAR 1.897 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Aug 2021
Stage-I Approval on : 21 Sep 2022
Compliance Report Submitted by User Agency on : 19 Jan 2023
28 Feb 2023
49 Uttar Pradesh FP/UP/Approach/153915/2022 8B/UP/06/265/2022/FC HPCL Retail Outlet on NH-19 (Old NH-2) , In KM Stone No. 538 Ch.537.955 (RHS), At Gata No.1880, Village: Baraura ,Tehsil: Bindki, District: Fatehpur Uttar Pradesh Approach Access HINDUSTAN PETROLIUM CORPORATION LIMITED 0.1106 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Apr 2022
Stage-I Approval on : 05 Apr 2023
Compliance Report Submitted by User Agency on : 03 May 2023
15 Jun 2023
50 Uttar Pradesh FP/UP/Approach/155008/2022 8B/UP/06/252/2022/FC Proposed IOCL Retail Outlet on Mahoba-Charkhari Road (MDR-15B) in Km. No.- 15 (CH. No. 14.480 to 14.520, LHS) at Gata No.-568 & 577, Village:- Jardin Ganj, Tehsil:- Charkhari, District:-Mahoba. Approach Access INDIAN OIL CORPORATION LIMITD 0.1972 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Apr 2022
Stage-I Approval on : 05 Sep 2022
Compliance Report Submitted by User Agency on : 31 Oct 2022
21 Nov 2022