Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Gujarat FP/GJ/Others/29982/2017 C/LND/T.8/143-47/2017-18 Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Dev Bhumi Dwarka District Others RELIANCE JIO INFOCOMM LTD 0.4347 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2017
Stage-I Approval on : 28 Jan 2020
Compliance Report Submitted by User Agency on : 26 May 2020
27 May 2020
2 Gujarat FP/GJ/Others/30000/2017 C/FCA/8/652-55/2017-18 Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Surendranagar District Others RELIANCE JIO INFOCOMM LTD 2.4354 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2017
Stage-I Approval on : 28 Jan 2020
Compliance Report Submitted by User Agency on : 25 Feb 2020
13 Mar 2020
3 Gujarat FP/GJ/Others/29998/2017 FCA-1018/5-40/SF-162/F Hill View Residency Connectivity in Taluka Umargam - Valsad GA 2017-18 Others GUJARAT GAS LIMITED 0.002 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2017
Stage-I Approval on : 06 Nov 2018
Compliance Report Submitted by User Agency on : 30 Jan 2019
30 May 2019
4 Gujarat FP/GJ/OFC/156068/2022 B/FCA/T-7/478-82/2022-23 GFGNL Bharatnet Phase II Project Mendarda to Alidhara Road Junagadh Optical Fibre Cable GFGNL 0.0315 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2022
Stage-I Approval on : 21 Jul 2022
Compliance Report Submitted by User Agency on : 09 Nov 2022
16 Nov 2022
5 Gujarat FP/GJ/ROAD/26230/2017 6-GJC014/2020-BHO Unai Madhi Road Road EXECUTIVE ENGINEER TAPI DIVISION 27.485 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2017
Stage-I Approval on : 31 Oct 2020
Compliance Report Submitted by User Agency on : 12 Feb 2021
23 Apr 2021
6 Gujarat FP/GJ/ROAD/32884/2018 6-GJC069/2018-BHO Proposal of Deforesting for widening & Strenthning Of Gariyadhar Paravdi Palitana Road Road EXICUTIVE ENGINEER BHAVNAGAR 17.759 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Mar 2018
Stage-I Approval on : 01 Mar 2019
Compliance Report Submitted by User Agency on : 17 Jul 2020
18 Sep 2020
7 Gujarat FP/GJ/Others/18765/2016 B/Land/T-9/4029-32/2016-17 To develop Gas Distribution Network in Surat GA Others GUJARAT GAS LIMITED 1.7546 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Mar 2016
Stage-I Approval on : 29 Jun 2016
Compliance Report Submitted by User Agency on : 11 Jun 2021
20 Jul 2021
8 Gujarat FP/GJ/Others/18722/2016 C/LND/T.165-69/2016-17 Gas Distribution Network in Bharuch GA Others GUJARAT GAS LIMITED 4.3892 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Mar 2016
Stage-I Approval on : 09 Jun 2016
Compliance Report Submitted by User Agency on : 28 May 2021
23 Jun 2021
9 Gujarat FP/GJ/Pipeline/145511/2021 FCA-1022/5-93/21/SF-27/F 90mm Dia MDPE Gas Pipeline Connectivity For Vaibhav Society Aspa, Dehgam Dist:Gandhinagar. Pipeline SABARMTI GAS LIMITED GANDHINAGAR 0.00252 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2021
Stage-I Approval on : 10 Mar 2022
Compliance Report Submitted by User Agency on : 10 Nov 2023
21 Nov 2023
10 Gujarat FP/GJ/Pipeline/145514/2021 FCA-1021/5-57/21/SF-200/F Proposed 125mmØ/90mmØ/63mmØ/32mmØ PE Gas Pipeline Along/Across SH-2 (Ahmedabad-Santrampur) in Jhalod town and surrounding areas (CA-02) to supply Natural Gas in Tal. Jhalod of Dist. Dahod. Pipeline GUJARAT GAS LIMITED 0.4508 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2021
Stage-I Approval on : 25 Nov 2021
Compliance Report Submitted by User Agency on : 06 Aug 2022
05 Sep 2022
11 Gujarat FP/GJ/Others/145515/2021 C/FCA/T-7/156-60/2021-22 Proposal for laying OFC for Jio Digital Fibre Pvt. Ltd. 4G/5G Junagadh District ( Junagadh city) Others JIO DIGITAL FIBER PRIVATE LIMITED 0.04558 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2021
Stage-I Approval on : 15 Sep 2021
Compliance Report Submitted by User Agency on : 26 Oct 2021
28 Oct 2021
12 Gujarat FP/GJ/Pipeline/48181/2020 FCA-1021/5-63/21/SF-192/F Permission for laying 4” Ø Steel / 125 mm Ø MDPE Natural Gas Pipeline Along/Across NH-27 , NH-58 & Along Asp. Road (To Jagana) for Lokaniketan Vidhyalay & Jagana Village Connectivity in Palanpur Tal. Pipeline IRM ENERGY PRIVATE LIMITED 0.2894 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 24 Nov 2021
Compliance Report Submitted by User Agency on : 25 Jan 2023
06 Mar 2023
13 Gujarat FP/GJ/Pipeline/48214/2020 FCA-1021/5-73/20/SF-41/F Gas Distribution Network in Gandhinagar & Surrounding Area in Gandhinagar District (NV Petroleum Connectivity & Chiloda Connectivity) Pipeline SABARMTI GAS LIMITED GANDHINAGAR 0.1594 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 12 Apr 2021
Compliance Report Submitted by User Agency on : 09 Jul 2021
04 Aug 2021
14 Gujarat FP/GJ/Others/48206/2020 C/FCA/T-7/323-26/20-21 NOFN Rajula Block Others RailTel Corporation of India limited 0.315 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 28 Sep 2020
Compliance Report Submitted by User Agency on : 01 Jan 2021
07 Jan 2021
15 Gujarat FP/GJ/Others/48137/2020 C/FCA/T-8/343-46/20-21 NOFN Dhari block Others RailTel Corporation of India limited 0.675 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 02 Oct 2020
Compliance Report Submitted by User Agency on : 01 Jan 2021
07 Jan 2021
16 Gujarat FP/GJ/Others/48211/2020 C/FCA/T-8/331-34/20-21 NOFN Kunkavav block Others RailTel Corporation of India limited 0.315 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 30 Sep 2020
Compliance Report Submitted by User Agency on : 01 Jan 2021
07 Jan 2021
17 Gujarat FP/GJ/Others/48215/2020 C/FCA/T-8/319-22/20-21 NOFN Savarkundla block Others RailTel Corporation of India limited 1.188 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 28 Sep 2020
Compliance Report Submitted by User Agency on : 01 Jan 2021
07 Jan 2021
18 Gujarat FP/GJ/Others/48187/2020 C/FCA/T-8/327-30/20-21 NOFN Lilia block Others RailTel Corporation of India limited 0.522 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 30 Sep 2020
Compliance Report Submitted by User Agency on : 01 Jan 2021
07 Jan 2021
19 Gujarat FP/GJ/Others/35078/2018 FCA-1018/5-54/18/SF-199/F Permission for laying proposed pipeline from Bhuj (Prince Residence) To Mankuva in Bhuj City & Its surrounding Area of Kutch(West) GA. Others GUJARAT GAS LIMITED 0.0067 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2018
Stage-I Approval on : 03 Jun 2019
Compliance Report Submitted by User Agency on : 31 Jul 2019
30 Sep 2019
20 Gujarat FP/GJ/Others/35075/2018 FCA/8/C/3427-30/2018-19 Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Nadiad District Others RELIANCE JIO INFOCOMM LTD 0.0747 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2018
Stage-I Approval on : 29 Jan 2020
Compliance Report Submitted by User Agency on : 29 Feb 2020
13 Mar 2020
21 Gujarat FP/GJ/Others/35076/2018 FCA/5/C/710-14/2018-19 Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Anand District Others RELIANCE JIO INFOCOMM LTD 0.2489 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2018
Stage-I Approval on : 29 Jan 2020
Compliance Report Submitted by User Agency on : 03 Mar 2020
13 Mar 2020
22 Gujarat FP/GJ/Pipeline/151781/2022 FCA-1022/5-09/22/SF-116/F Proposed 125mm Dia. PE Gas pipeline Along/Across NH-51 (Old SH-25) (Rajkot-Bhavnagar) from Nanadanvan Hotel to Acrysil Industries Unit-2 in Taluka Bhavnagar of Dist. Bhavnagar. Pipeline GUJARAT GAS LIMITED 0.0943 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2022
Stage-I Approval on : 30 Jun 2022
Compliance Report Submitted by User Agency on : 21 Jul 2023
10 Aug 2023
23 Gujarat FP/GJ/Pipeline/44301/2020 FCA-1020/5-12/20/SF-129/F Gujarat Gas Limited - City Gas Distribution project in Narmada District and CNG Connectivity to Ganesh Petroleum by laying 125mm PE and 6" Dia Steel Gas Pipeline Pipeline GUJARAT GAS LIMITED 0.3983 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2020
Stage-I Approval on : 17 Aug 2020
Compliance Report Submitted by User Agency on : 05 Oct 2020
06 Nov 2020
24 Gujarat FP/GJ/Others/31614/2018 C/FCA/8/35-38/2018-19 Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Surendranagar District Others RELIANCE JIO INFOCOMM LTD 0.7425 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2018
Stage-I Approval on : 28 Jan 2020
Compliance Report Submitted by User Agency on : 01 Feb 2020
03 Feb 2020
25 Gujarat FP/GJ/Others/31616/2018 Survey/JMN/15/B/455-58/2018-19 Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Godhra District Others RELIANCE JIO INFOCOMM LTD 1.7325 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2018
Stage-I Approval on : 28 Jan 2020
Compliance Report Submitted by User Agency on : 03 Jun 2020
05 Jun 2020
26 Gujarat FP/GJ/Others/31615/2018 C/FCA/8/1623-26/2018-19 Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Surendrangar District Others RELIANCE JIO INFOCOMM LTD 0.687 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2018
Stage-I Approval on : 28 Jan 2020
Compliance Report Submitted by User Agency on : 03 Jun 2020
04 Jun 2020
27 Gujarat FP/GJ/Pipeline/118124/2020 FCA-1021/5-86/20/SF-61/F Chandarda CNG Connectivity Pipeline SABARMTI GAS LIMITED GANDHINAGAR 0.005 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2020
Stage-I Approval on : 26 Apr 2021
Compliance Report Submitted by User Agency on : 28 Jul 2021
31 Aug 2021
28 Gujarat FP/GJ/TRANS/43674/2019 6-GJB083/2021-BHO Adani Green Energy (MP) Limited Ratadiya PS - Bhuj PS 220 kV D/C line Transmission Line ADANI GREEN ENERGY (MP) LIMITED 3.8089 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2019
Stage-I Approval on : 30 Oct 2022
Compliance Report Submitted by User Agency on : 03 Jul 2023
30 Dec 2023
29 Gujarat FP/GJ/TRANS/43664/2019 6-GJC047/2020-BHO 765 kV D/C Lakadia to Banaskantha Transmission Line Transmission Line LAKADIA BANASKANTHA TRANSCO LIMITED 25.1315 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2019
Stage-I Approval on : 30 Dec 2020
Compliance Report Submitted by User Agency on : 27 Apr 2021
30 Sep 2021
30 Gujarat FP/GJ/Pipeline/49253/2020 FCA-1021/5-67/20/SF-19/F Proposed 125mm Dia. PE Gas Pipeline from MES colony to Palara Jail through NH-341 of Khavda Road of Kutch GA. Pipeline GUJARAT GAS LIMITED 0.12 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2020
Stage-I Approval on : 12 Feb 2021
Compliance Report Submitted by User Agency on : 18 Mar 2021
21 May 2021
31 Gujarat FP/GJ/WATER/41796/2019 FCA-1020/10-01/20/SF-121/F Ground Level Drinking Water Tank Drinking Water BHUJ NAGAR SEWA SADAN 0.49 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2019
Stage-I Approval on : 10 Jul 2020
Compliance Report Submitted by User Agency on : 08 Mar 2021
04 May 2021
32 Gujarat FP/GJ/Pipeline/41792/2019 FCA-1019/5-76/19/SF-187/F Gas Distribution Network in Umargam Taluka of Valsad GA (Krishna Industrial Park (Tiny Girl) Connectivity & Papro Industries Connectivity) Pipeline GUJARAT GAS LIMITED 0.002 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2019
Stage-I Approval on : 24 Jan 2020
Compliance Report Submitted by User Agency on : 11 Mar 2020
01 Jun 2020
33 Gujarat FP/GJ/Pipeline/35519/2018 6-GJB030/2021-BHO Underground Pipeline for Archean Chemicals Pvt. Ltd. Pipeline ARCHEAN CHEMICAL INDUSTRIES PRIVATE LIMITED 0.3053 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2018
Stage-I Approval on : 05 Jul 2021
Compliance Report Submitted by User Agency on : 18 Sep 2021
07 Feb 2022
34 Gujarat FP/GJ/Pipeline/147882/2021 FCA-1022/5-95/21/SF-22/F 125/90 mm Dia MDPE Gas Pipeline Connectivity For Reinforcement Kadi Part-I,II&III. Dist:Mehsana Pipeline SABARMTI GAS LIMITED GANDHINAGAR 0.09308 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 07 Mar 2022
Compliance Report Submitted by User Agency on : 19 Oct 2022
09 Dec 2022
35 Gujarat FP/GJ/OFC/147876/2021 C/FCA/T-8/473-75/21-22 NOFN (ABDASA) Optical Fibre Cable RailTel Corporation of India limited 1.02564 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 23 Dec 2021
Compliance Report Submitted by User Agency on : 12 Apr 2022
16 Apr 2022
36 Gujarat FP/GJ/Pipeline/147882/2021 FCA-1022/5-95/21/SF-22/F 125/90 mm Dia MDPE Gas Pipeline Connectivity For Reinforcement Kadi Part-I,II&III. Dist:Mehsana Pipeline SABARMTI GAS LIMITED GANDHINAGAR 0.09308 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 07 Mar 2022
Compliance Report Submitted by User Agency on : 19 Oct 2022
09 Dec 2022
37 Gujarat FP/GJ/Others/50281/2020 FC-6/GJB-40/2022-GNR Proposal for laying OFC for Jio Digital Fibre Pvt. Ltd. Patan District Others JIO DIGITAL FIBER PRIVATE LIMITED 0.2934 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Sep 2020
Stage-I Approval on : 05 Sep 2022
Compliance Report Submitted by User Agency on : 26 Apr 2024
38 Gujarat FP/GJ/Others/50278/2020 C/Land/T-6/268-73/2020-21 Proposal for laying OFC for Jio Digital Fibre Private Limited 4G Botad SF District (Bhavnagar, Botad) Others JIO DIGITAL FIBER PRIVATE LIMITED 1.8585 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2020
Stage-I Approval on : 07 Jan 2021
Compliance Report Submitted by User Agency on : 12 Mar 2022
15 Mar 2022
39 Gujarat FP/GJ/Pipeline/50285/2020 FCA-1020/5-50/20/SF-227/F Permission for laying 90/125 mm PE Gas Pipeline Along/Across Old NH-56 (Dahod-Jhalod) & Along SH-62 in Limdi Village of Taluka Jhalod, Dist. Dahod. Pipeline GUJARAT GAS LIMITED 0.1732 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2020
Stage-I Approval on : 01 Jan 2021
Compliance Report Submitted by User Agency on : 02 Jul 2021
04 Aug 2021
40 Gujarat FP/GJ/ROAD/50207/2020 FC-6/GJC-38/2022-GNR Development of Trumpet Interchange for Hirasar International Airport intersection with NH-27 Road EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION 8.5033 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2020
Stage-I Approval on : 03 Jun 2022
Compliance Report Submitted by User Agency on : 22 Jun 2022
18 Nov 2024
41 Gujarat FP/GJ/Pipeline/148945/2021 FCA-1022/5-81/21/SF-07/F Permission for laying 90mmø PE Gas Pipeline Along/Across Service Road of NH-56 (Dahod-Alirajpur) in Dahod (CA-07) in Taluka Dahod of Dist. Dahod Pipeline GUJARAT GAS LIMITED 0.0281 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2021
Stage-I Approval on : 10 Mar 2022
Compliance Report Submitted by User Agency on : 27 Oct 2022
09 Dec 2022
42 Gujarat FP/GJ/Others/148939/2021 C/JMN/T-11/2022-23/119-122 Proposal for laying OFC 4G/5G for JIO DIGITAL FIBRE PRIVATE LIMITED Kutch Dist. (Baranda-Vayor-Sanghi) Ha. 0.10935 Others JIO DIGITAL FIBER PRIVATE LIMITED 0.10935 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2021
Stage-I Approval on : 01 Jun 2022
Compliance Report Submitted by User Agency on : 20 Jun 2022
22 Jun 2022
43 Gujarat FP/GJ/ROAD/148923/2021 FC-6/GJC-58/2022-GNR Widening & Strengthening of Junagadh-Bhesan-Parab Vavdi Road Road DEPUTY EXECUTIVE ENGINEER-R&B CITY SUB DIVISION-JUNAGADH 17.24625 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Oct 2021
Stage-I Approval on : 30 Oct 2022
Compliance Report Submitted by User Agency on : 04 Jul 2024
44 Gujarat FP/GJ/Pipeline/52631/2020 FCA-1021/5-62/20/SF-06/F Gas Distribution Network in Rajkot & Paddhari Taluka Surrounding Area in Rajkot District (Ghanteshwar CNG to Jamnagar Road PE Connectivity & Pixon Green Energy Pvt Ltd Connectivity) Pipeline GUJARAT GAS LIMITED 0.99 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2020
Stage-I Approval on : 11 Feb 2021
Compliance Report Submitted by User Agency on : 02 Jul 2021
16 Jul 2021
45 Gujarat FP/GJ/Pipeline/68257/2020 FCA-1021/5-02/21/SF-86/F Permission for laying of Proposed 125mm Ø MDPE Gas Pipeline Along SH-119(Asphalt Road) (Than-Tarnetar) Road from Peeble Ceramic to Oham Ceramic in Kanpar Village of Tal.-Thangadh, Dist. Surendranagar. Pipeline GUJARAT GAS LIMITED 0.0405 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2020
Stage-I Approval on : 20 May 2021
Compliance Report Submitted by User Agency on : 21 Jun 2021
16 Jul 2021
46 Gujarat FP/GJ/Pipeline/43136/2019 FCA-1020/5-118/19/SF-86/F Gas Distribution Network in Navsari Taluka of Navsari GA (Omkar (HPCL) Petroleum Connectivity) Pipeline GUJARAT GAS LIMITED 0.0709 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2019
Stage-I Approval on : 12 Jun 2020
Compliance Report Submitted by User Agency on : 10 Jul 2020
30 Jul 2020
47 Gujarat FP/GJ/Pipeline/43131/2019 FCA-1020/5-98/19/SF-43/F Permission for laying Proposed 12” Ø/6” Ø Steel & 125mm Ø/90mm Ø PE Gas pipeline Along/Across Various SH & NH in Junagadh Dist. to Develop City Gas Distribution Network in Junagadh and its surrounding Pipeline TORRENT GAS PRIVATE LIMITED 3.5235 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2019
Stage-I Approval on : 18 Mar 2020
Compliance Report Submitted by User Agency on : 13 May 2020
26 Jun 2020
48 Gujarat FP/GJ/Others/30531/2017 FCA-1018/5-45/18/SF-170/F Mehsana & Surrounding Area Gas Distribution Network (Dela & Asjol Village Connectivity, Bliss Water Park Connectivity, Mitha Village & Golf Looping Ceramic Connectivity, Bhandu Village Connectivity, Baliyasan Village Connectivity & 99.99 Petroleum Unjha-CNG Connectivity) Others SABARMATI GAS LIMITED GANDHINAGAR 0.7795 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2017
Stage-I Approval on : 06 Nov 2018
Compliance Report Submitted by User Agency on : 04 Feb 2019
31 May 2019
49 Gujarat FP/GJ/Others/22788/2016 FCA/8/C/6086-89/2016-17 proposal for laying OFC for 4G project in Nadiad SF District Others RELIANCE JIO INFOCOMM LTD 1.1925 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2016
Stage-I Approval on : 28 Jan 2020
Compliance Report Submitted by User Agency on : 29 Feb 2020
02 Mar 2020
50 Gujarat FP/GJ/Pipeline/45636/2020 FCA-1020/5-14/20/SF-133/F Gujarat Gas Limited Proposal For Grant Of Permission For Laying Proposed 63 mm Dia PE Gas Pipeline Along & Across SH-76(Bharuch-Ankleshwar) from Tap-Off Point (On EX.90mm Ø PE Gas Pipeline) to Lovely Pipeline GUJARAT GAS LIMITED 0.003 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2020
Stage-I Approval on : 17 Aug 2020
Compliance Report Submitted by User Agency on : 18 Sep 2020
19 Oct 2020