| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Andhra Pradesh
|
FP/AP/RAIL/149334/2021
|
4-APB167/2022-VIJ
|
Proposal for Diversion of 1.36 Ha. Forest Land for Construction of new double line and electrification of track between Guntur and Guntakal stations at Dhone (Rly Km.325/4 to 329/2) in Comp.No. 238 & 239 of North Dhone RF, in Dhone Range, Kurnool Division in favour of S.C. Railway, under FC Act 1980.
|
Railway
|
SOUTH CENTRAL RAILWAY,GUNTAKAL.
|
2.21
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Nov 2021
|
|
Stage-I Approval on
|
:
|
21 Jun 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2025
|
|
|
|
|
|
2
|
Andhra Pradesh
|
FP/AP/RAIL/154617/2022
|
4-APB213/2023-VIJ
|
Proposal for Diversion of 3.21 Ha. Forest land for construction of New Double line and Electrification of track between Guntur and Guntakal stations at Konided & Panyam (Rly.Km.275-281 & 285-288) in Comp.No.145, 147, 137 & 138 of Panyam RF in Kurnool Range, Kurnool Division in favour of S.C.Railway under FC Act 1980.
|
Railway
|
SOUTH CENTRAL RAILWAY,GUNTAKAL.
|
3.21
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2022
|
|
Stage-I Approval on
|
:
|
26 Jun 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2025
|
|
|
|
|
|
3
|
Andhra Pradesh
|
FP/AP/ROAD/33887/2018
|
4-APC134/2021-VIJ
|
Diversion of 11.03 Ha in Kadapa Forest Division for Upgradation of NH-167B from Km 43/097 to 99/103 i.e from Porumamilla to Chandrasekhara Puram to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
11.03
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2018
|
|
Stage-I Approval on
|
:
|
11 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jul 2025
|
|
|
|
|
|
4
|
Andhra Pradesh
|
FP/AP/ROAD/33887/2018
|
4-APC134/2021-VIJ
|
Diversion of 11.03 Ha in Kadapa Forest Division for Upgradation of NH-167B from Km 43/097 to 99/103 i.e from Porumamilla to Chandrasekhara Puram to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
11.03
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2018
|
|
Stage-I Approval on
|
:
|
11 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jul 2025
|
|
|
|
|
|
5
|
Bihar
|
FP/BR/Others/42268/2019
|
FP/BR/Others/42268/2019
|
The Tourism Department , Govt. of Bihar has been promoting tourist for ritual worship in the Maa Mundeshwari Devi temple situated at the top of Mundeshwari Hill in Bhagwanpur Block under Kaimur Distri
|
Others
|
BIHAR RAJYA PUL NIRMAN NIGAM LTD WORKS DIVISION ARA
|
1.3094
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Sep 2019
|
|
Stage-I Approval on
|
:
|
30 Aug 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Sep 2025
|
|
|
|
|
|
6
|
Bihar
|
FP/BR/Others/44447/2020
|
FP/BR/Others/44447/2020
|
Diversion of 0.02025 ha of forest land for construction of approach road for opening retail outlet of HPCL on Samastipur-Patori Road in Samastipur district of Bihar.
|
Others
|
DINESH PASWAN
|
0.02025
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2020
|
|
Stage-I Approval on
|
:
|
15 Jun 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Mar 2025
|
|
|
|
|
|
7
|
Bihar
|
FP/BR/ROAD/148190/2021
|
FP/BR/ROAD/148190/2021
|
development of Economic Corridor, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Package-7) from Sherpur to Dighwara Part o
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA, PIU PATNA-II
|
0.065
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Oct 2021
|
|
Stage-I Approval on
|
:
|
27 Dec 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2025
|
|
|
|
|
|
8
|
Delhi
|
FP/DL/RAIL/49562/2020
|
8B/DLI006/2022-JPR
|
Construction of underground station at Krishna Park and Elevated corridor between Keshopur to Mukarba Chowk for Janakpuri to RK Ashram Corridor of MRTS phase-IV
|
Railway
|
DMRC CPM2 OFFICE
|
5.2187
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Oct 2020
|
|
Stage-I Approval on
|
:
|
22 Feb 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 May 2022
|
|
|
|
|
|
9
|
Delhi
|
FP/DL/ROAD/142233/2021
|
8B/DLI029/2022-JPR
|
Development of Six- lane access controlled in Delhi portion of Delhi Saharanpur Highway from Akshardham NH-9 junction to Delhi/UP Border in the state of Delhi.
|
Road
|
NHAI
|
9.58
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 May 2021
|
|
Stage-I Approval on
|
:
|
13 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Mar 2024
|
|
|
|
|
|
10
|
Delhi
|
FP/DL/ROAD/154223/2022
|
8B/DLI044/2022-JPR
|
Construction of 6 Lane access controlled Highway from DND Maharani Bagh to Junction with Jaitpur-Pushta Road Section of NH-148 NA (Design Ch. 2+900 to 6+700) in the NCR of Delhi (PKG – I) under Bharat
|
Road
|
CMU, MATHURA, NHAI
|
3.0955
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Apr 2022
|
|
Stage-I Approval on
|
:
|
30 Aug 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2025
|
|
|
|
|
|
11
|
Haryana
|
FP/HR/Approach/145032/2021
|
9-HRB169-2023-CHA
|
M/s BKB MFERT Pvt. LTD.
|
Approach Access
|
M/S BKB MFERT PVT. LTD.
|
0.005
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jul 2021
|
|
Stage-I Approval on
|
:
|
02 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jun 2025
|
|
|
|
|
|
12
|
Haryana
|
FP/HR/Approach/149450/2021
|
9-HRB154-2023-CHA
|
M/s Panchkula Foils
|
Approach Access
|
M/S PANCHKULA FOILS
|
0.0084
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Nov 2021
|
|
Stage-I Approval on
|
:
|
10 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Oct 2024
|
|
|
|
|
|
13
|
Haryana
|
FP/HR/ROAD/27251/2017
|
9-HRB062-2018-CHA
|
construction of Ring road from Tauru road to Alwar road via Engineering College, Medical College and Navodaya School Bai in Nuh Distt. (C.M. Announcement 15242)
|
Road
|
PWD BANDR MEWAT
|
1.8239232
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Aug 2017
|
|
Stage-I Approval on
|
:
|
20 Aug 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Sep 2025
|
|
|
|
|
|
14
|
Haryana
|
FP/HR/ROAD/33752/2018
|
9-HRB209-2018-CHA
|
M/s SHIV JYOTI PLYWOOD
|
Road
|
SHIV JYOTI PLYWOOD
|
0.00989
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 May 2018
|
|
Stage-I Approval on
|
:
|
01 May 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Aug 2025
|
|
|
|
|
|
15
|
Haryana
|
FP/HR/ROAD/48568/2020
|
9-HRB076-2021-CHA
|
Construction of 6 Lane access controlled Highway from DND- Faridabad-Ballabhgarh Bypass Junction with Delhi-Vadodara Expressway KMP- Interchange (NH-148 NA) under Bharatmala Pariyojana (Lot-4/Pkg-I)
|
Road
|
CMU, MATHURA, NHAI
|
3.9
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2020
|
|
Stage-I Approval on
|
:
|
22 Jun 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Nov 2025
|
|
|
|
|
|
16
|
Haryana
|
FP/HR/TRANS/41327/2019
|
9-HRB001-2020-CHA
|
Construction of 220 KV D/C Kaithal (PGCIL)
|
Transmission Line
|
HVPNL KAITHAL
|
0.457
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jul 2019
|
|
Stage-I Approval on
|
:
|
24 Jul 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Nov 2025
|
|
|
|
|
|
17
|
Himachal Pradesh
|
FP/HP/HYD/37189/2018
|
8B/HP/01/71/2020/FC
|
Kasol Hydro Power Project
|
Hydel
|
MS BEENA BUTAIL PALMPUR
|
1.496448
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Nov 2018
|
|
Stage-I Approval on
|
:
|
12 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Nov 2025
|
|
|
|
|
|
18
|
Karnataka
|
FP/KA/ROAD/142140/2021
|
F.No.4-KRB1347/2022-BAN/
|
Dviersion of 0.06 Ha of forest land in sy no 14 of Benavalli, Village, Kerehalli Hobali, Hosanagara taluk Shivamogga dist, (Shivamogga forest division) for construction of low cost ROB and Birur-Talguppa section great seperator at Km 105/100-200 and Km 133/700-800 in favour of Assistant divisional engineer, Shivmaogga
|
Road
|
ASSISTANT DIVISIONAL ENGINEER SHIVAMOGGA
|
0.06
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 May 2021
|
|
Stage-I Approval on
|
:
|
24 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2025
|
|
|
|
|
|
19
|
Kerala
|
FP/KL/ROAD/38879/2019
|
F.No.4-KLB1255/2020-BAN/
|
REHABILITATION & UPGRADATION of NH 85 from Km 119/017 to 161/300(Design chainage Km 119/017 to 160/800) Bodimettu to Munnar on EPC mode in the State of Kerala
|
Road
|
ASSISTANT EXECUTIVE ENGINEER NH SUBDIVISION
|
1.495
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Sep 2019
|
|
Stage-I Approval on
|
:
|
09 Apr 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Aug 2025
|
|
|
|
|
|
20
|
Madhya Pradesh
|
FP/MP/IRRIG/150918/2022
|
6-MPR002/2024-BHO
|
Kuwajhagar Tank Project
|
Irrigation
|
Madhya Pradesh Water Resources Department
|
20.512
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2022
|
|
Stage-I Approval on
|
:
|
26 Jul 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Nov 2025
|
|
|
|
|
|
21
|
Madhya Pradesh
|
FP/MP/IRRIG/33438/2018
|
6-MPC014/2019-BHO
|
Prabhudhana Tank..
|
Irrigation
|
EXECUTIVE ENGINEER WATER RESOURCES DIVISION NO II BETUL
|
7.002
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 May 2018
|
|
Stage-I Approval on
|
:
|
30 May 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 Nov 2025
|
|
|
|
|
|
22
|
Madhya Pradesh
|
FP/MP/IRRIG/35140/2018
|
6-MPC041/2020-BHO
|
Pipariya Jasraj Minor Irrigation Tank Project
|
Irrigation
|
WATER RESOURCES DIVISION NO ONE SAGAR
|
10.62
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Aug 2018
|
|
Stage-I Approval on
|
:
|
31 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Sep 2025
|
|
|
|
|
|
23
|
Madhya Pradesh
|
FP/MP/IRRIG/38634/2019
|
6-MPB005/2022-BHO
|
Bahuti Canal Scheme
|
Irrigation
|
Madhya Pradesh Water Resources Department
|
1.4002
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Mar 2019
|
|
Stage-I Approval on
|
:
|
05 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Sep 2022
|
|
|
|
|
|
24
|
Madhya Pradesh
|
FP/MP/Others/38197/2019
|
6-MPB060/2020-BHO
|
Neoteric Education Society Institute & Rehabilitation Center for Paralysis & Paraplegic
|
Others
|
NEOTERIC EDUCATION AND SERVICE SOCIETY
|
0.99
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2019
|
|
Stage-I Approval on
|
:
|
18 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Aug 2025
|
|
|
|
|
|
25
|
Madhya Pradesh
|
FP/MP/ROAD/121709/2021
|
6-MPR011/2023-BHO
|
Gulganj - Amanganj (NH-43Ext.) KM 43.00 to KM 77.00 under Panna Reserve Tiger Buffer Zone
|
Road
|
NHPWD DIV SAGAR (MORTH)
|
31.9
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Feb 2021
|
|
Stage-I Approval on
|
:
|
23 Sep 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Nov 2025
|
|
|
|
|
|
26
|
Madhya Pradesh
|
FP/MP/ROAD/152685/2022
|
6-MPB015/2022-BHO
|
Suktanawad-Jhirpanjariya road
|
Road
|
PWD DIVISION BURHANPUR
|
2.38
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Feb 2022
|
|
Stage-I Approval on
|
:
|
01 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2023
|
|
|
|
|
|
27
|
Madhya Pradesh
|
FP/MP/ROAD/155399/2022
|
6-MPB031/2023-BHO
|
Construction of road from KM28 of T01 to Banjaritola under RCPLWEA scheme
|
Road
|
MPRRDA PIU-1 BALAGHAT
|
1.523
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 May 2022
|
|
Stage-I Approval on
|
:
|
22 Nov 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
|
|
28
|
Madhya Pradesh
|
FP/MP/ROAD/155479/2022
|
6-MPR025/2023-BHO
|
Benegaon sitapar nandora Borban road construction under RCPLWEA scheme
|
Road
|
MPRRDA PIU-1 BALAGHAT
|
7.29
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2022
|
|
Stage-I Approval on
|
:
|
14 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Mar 2024
|
|
|
|
|
|
29
|
Madhya Pradesh
|
FP/MP/ROAD/156133/2022
|
6-MPR020/2023-BHO
|
Godri Harranala Via Dugali road under RCPLWEA Scheme
|
Road
|
MPRRDA PIU ONE BALAGHAT
|
7.56
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jun 2022
|
|
Stage-I Approval on
|
:
|
13 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Mar 2024
|
|
|
|
|
|
30
|
Maharashtra
|
FP/MH/MIN/17443/2016
|
FC-I/MH-341/2023-NGP
|
Bhatadi Expansion open cast mine
|
Mining
|
Western Coalfields Ltd
|
0.2
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Feb 2016
|
|
Stage-I Approval on
|
:
|
14 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Nov 2025
|
|
|
|
|
|
31
|
Maharashtra
|
FP/MH/MIN/17443/2016
|
FC-I/MH-341/2023-NGP
|
Bhatadi Expansion open cast mine
|
Mining
|
Western Coalfields Ltd
|
0.2
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Feb 2016
|
|
Stage-I Approval on
|
:
|
14 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Nov 2025
|
|
|
|
|
|
32
|
Maharashtra
|
FP/MH/ROAD/145871/2021
|
FC-I/MH-248/2021-NGP
|
Service Road from Kolshet to Bhaindarpada in Thana Municipal Corporation – Maharashtra.
|
Road
|
Thane Municipal Corporation
|
0.9984
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Aug 2021
|
|
Stage-I Approval on
|
:
|
20 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2024
|
|
|
|
|
|
33
|
Maharashtra
|
FP/MH/TRANS/48241/2020
|
FC-II/MH-201-2022-NGP
|
220kv DC Line Padghe _ Wada & Kolshet - Wada To Kudus S/S Electrical Transmission line
|
Transmission Line
|
MAHATRANSCO
|
12.0225
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Aug 2020
|
|
Stage-I Approval on
|
:
|
29 Aug 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Nov 2025
|
|
|
|
|
|
34
|
Rajasthan
|
FP/RJ/ROAD/149560/2021
|
8B/RAJ017/2023-JPR
|
“Construction of Widening ,Strengthening on SH-32A From Jhameshwarji to Jagat Road KM Stone No-67/0 to 80/0, Tehsil–Girwa, District -Udaipur (Rajasthan)”
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN
|
6.75
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Dec 2021
|
|
Stage-I Approval on
|
:
|
30 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jan 2025
|
|
|
|
|
|
35
|
Rajasthan
|
FP/RJ/TRANS/153699/2022
|
8B/RAJ012/2023-JPR
|
Construction of 220kV S/C Transmission line on D/C towers laying between proposed ABCSIPL 300MW Solar Power Plant to PGCIL 765/400/220kV GSS at Near Village - Badi Sird, Tehsil-BAP, District – Jodhpur in the State of Rajasthan ((Total Length 11.540 km)
|
Transmission Line
|
ABC SOLAR (INDIA) PRIVATE LIMITED
|
0.175
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Mar 2022
|
|
Stage-I Approval on
|
:
|
14 Oct 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Sep 2025
|
|
|
|
|
|
36
|
Telangana
|
FP/TG/ROAD/18615/2016
|
4-TSC105/2017-CHN
|
Construction of Pankena to Kanakanur Road from km 0/0 to 12/600 in Karimnagar District - 17.5 Ha
|
Road
|
ROADS AND BUILDINGS DEPARTMENT
|
17.5
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Mar 2016
|
|
Stage-I Approval on
|
:
|
06 Oct 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Sep 2023
|
|
|
|
|
|
37
|
Telangana
|
FP/TG/ROAD/47266/2020
|
4-TSB226/2021-HYD
|
Improvement of existing road from earthen road to BT standards from Laxmipur to Baddampally in Mancherial District - 4.8408 Ha
|
Road
|
PANCHAYAT RAJ ENGINEERING DEPARTMENT
|
4.8408
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jul 2020
|
|
Stage-I Approval on
|
:
|
15 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2023
|
|
|
|
|
|
38
|
Uttar Pradesh
|
FP/UP/ROAD/41235/2019
|
8B/UP/06/38/2020
|
Protected Forest Land Proposed to be diverted for 4-Laning and Strengthening of Bilraya-Panwari Road(SH21) From Ch..399.600 to 427.00, in District:Hamirpur
|
Road
|
EXECUTIVE ENGINEER CONSTRUCTION DIVISION TWO PWD HAMIRPUR
|
49.32
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jul 2019
|
|
Stage-I Approval on
|
:
|
20 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2025
|
|
|
|
|
|
39
|
Uttarakhand
|
FP/UK/ROAD/11142/2015
|
8B/UCP/06/201/2019/FC/06
|
Naudkhal Malakota Road to Sirasu M R
|
Road
|
EXECUTIVE ENGINEER
|
9.541
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Mar 2015
|
|
Stage-I Approval on
|
:
|
29 Apr 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Sep 2025
|
|
|
|
|
|
40
|
Uttarakhand
|
FP/UK/ROAD/11292/2015
|
8B/UCP/06/222/2015
|
Construction of Farsali Palli To Kharkanatoli
|
Road
|
PMGSY
|
8.931
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Mar 2015
|
|
Stage-I Approval on
|
:
|
14 Mar 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2025
|
|
|
|
|
|
41
|
Uttarakhand
|
FP/UK/ROAD/11303/2015
|
8B/UCP/06/111/2017/FC
|
semalsari to gair
|
Road
|
PMGSYID PUROLA
|
4.165
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Mar 2015
|
|
Stage-I Approval on
|
:
|
25 Sep 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jul 2025
|
|
|
|
|
|
42
|
Uttarakhand
|
FP/UK/ROAD/12313/2015
|
8B/UCP/06/180/2016/FC
|
Construction of Ghurshal to Saikot motor road. Under State Sector
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.772
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2015
|
|
Stage-I Approval on
|
:
|
17 Jan 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2024
|
|
|
|
|
|
43
|
Uttarakhand
|
FP/UK/ROAD/15461/2015
|
8B/UCP/06/04/2017
|
Jaulkandey-Sisakhani motor road in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
2.2354
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2015
|
|
Stage-I Approval on
|
:
|
29 Nov 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
|
|
44
|
Uttarakhand
|
FP/UK/ROAD/16996/2015
|
8B/UCP/06/179/2016
|
Construction of Jalna to TRC Toli Motor Road.(length-3.00KM)
|
Road
|
EXECUTIVE ENGINEER
|
0.858
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2016
|
|
Stage-I Approval on
|
:
|
31 Oct 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2025
|
|
|
|
|
|
45
|
Uttarakhand
|
FP/UK/ROAD/18605/2016
|
8B/UCP/06/154/2016/FC
|
Construction of motor road from Km. 4 of Rampur-Gawana motor road to village Surari in district Pauri.
|
Road
|
PUBLIC WORK DEPARTMENT
|
2.25
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Mar 2016
|
|
Stage-I Approval on
|
:
|
06 Dec 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2024
|
|
|
|
|
|
46
|
Uttarakhand
|
FP/UK/ROAD/19460/2016
|
8B/UCP/06/166/2020/FC
|
Construction of Motor Road for connecting of Nadgal Village under CM Scheme at District Nainital
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.33
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2016
|
|
Stage-I Approval on
|
:
|
25 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 May 2025
|
|
|
|
|
|
47
|
Uttarakhand
|
FP/UK/ROAD/21140/2016
|
8B/UCP/06/118/2018/FC
|
Sahid Hari Singh Tuolbudhand to Ratkhal Motor Road Sanction Under CM Ghosana no. 492/201
|
Road
|
EXECUTIVE ENGINEER
|
2.52
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Aug 2016
|
|
Stage-I Approval on
|
:
|
29 Sep 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Aug 2025
|
|
|
|
|
|
48
|
Uttarakhand
|
FP/UK/ROAD/29640/2017
|
8B/UCP/06/26/2020/FC
|
Construction of Banas to Durbil Motor Road.
|
Road
|
PMGSYID PUROLA
|
2.16
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Oct 2017
|
|
Stage-I Approval on
|
:
|
21 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Nov 2025
|
|
|
|
|
|
49
|
Uttarakhand
|
FP/UK/ROAD/30064/2017
|
8B/UCP/06/04/2018
|
Under state sector in district Chamoli , constituency Karanprayag construction of new motor road "Khet Gadhera to Kheti Jakhet Chaurasen "
|
Road
|
TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR
|
1.41
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Nov 2017
|
|
Stage-I Approval on
|
:
|
07 Mar 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jul 2025
|
|
|
|
|
|
50
|
Uttarakhand
|
FP/UK/ROAD/38305/2019
|
8B/UCP/06/52/2020/FC
|
Construction of Ghansali Ghuttu km 13 to Kothar village M/R
|
Road
|
EEPMGSYTEHRI
|
1.818
|
Pending at RO for Stage-II
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2019
|
|
Stage-I Approval on
|
:
|
28 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Sep 2025
|
|
|
|
|
|