| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Andhra Pradesh
|
FP/AP/MIN/10909/2015
|
4-APB047/2017-CHN
|
Quarry lease of Black granite over an extent of 4.83 Ha in Compt.No. 212 of Paradarami RF in favour of M/s Sai Joshitha Granites, Piler.
|
Mining
|
SAI JOSHITHA GRANITES
|
4.83
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Mar 2015
|
|
Stage-I Approval on
|
:
|
27 Mar 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2018
|
|
|
|
|
|
2
|
Andhra Pradesh
|
FP/AP/TRANS/37314/2018
|
G.O.Ms.No.30
|
Making LILO arrangement of 132KV Tadepalli -Tadikonda line to the proposed 132/33KV AIIMS SS at Mangalagiri in Guntur district.
|
Transmission Line
|
EXECUTIVE ENGINEER CONSTRUCTION CRDA DIVISION GUNTUR
|
0.82
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2018
|
|
Stage-I Approval on
|
:
|
29 Aug 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2020
|
|
|
|
|
|
3
|
Arunachal Pradesh
|
FP/AR/TRANS/40221/2019
|
3-ANC 082/2019-SHI
|
Revised proposal for diversion of 48.987 ha Forest land for construction of 132 kV D/C Transmission Line from Biswanath Chariali to Itanagar.
|
Transmission Line
|
NER II TRANSMISSION LIMITED
|
48.987
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 May 2019
|
|
Stage-I Approval on
|
:
|
23 Sep 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Nov 2020
|
|
|
|
|
|
4
|
Bihar
|
FP/BR/RAIL/153523/2022
|
FP/BR/RAIL/153523/2022
|
Araria Galgalia New BG Railway Line
|
Railway
|
CHIEF ENGINEER CONSTRUCTION III, N.F RAILWAY MALIGAON
|
8.243
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2022
|
|
Stage-I Approval on
|
:
|
10 Apr 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Aug 2023
|
|
|
|
|
|
5
|
Bihar
|
FP/BR/ROAD/157210/2022
|
FP/BR/ROAD/157210/2022
|
Improvement to two lane with paved shoulder of National Highway No. 327AD from km. 0.000 to km. 10.672 Saraigarh starting from its junctions with NH 327A Lalganj Ganpatganj terminating at its junction
|
Road
|
PUBLIC WORK DEPARTMENT (NATIONAL HIGHWAY)PATNA BIHAR
|
0.1799
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jun 2022
|
|
Stage-I Approval on
|
:
|
22 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Nov 2024
|
|
|
|
|
|
6
|
Haryana
|
FP/HR/Others/19674/2016
|
D-III-7067
|
NOC FOR ESTABLISHMENT OF NEW RETAIL OUTLET (KSK) AT CHAUTALA ON CHAUTALA-RATANPURA ROAD (WITHIN 1 KM FROM RAJASTHAN BORDER), DISTT-SIRSA
|
Others
|
INDIAN OIL CORPORATION LTD
|
0.087
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 May 2016
|
|
Stage-I Approval on
|
:
|
22 Feb 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 May 2018
|
|
|
|
|
|
7
|
Haryana
|
FP/HR/Approach/33616/2018
|
6259
|
PROPOSED RETAIL OUTLET ON ROHTAK-BHIWANI ROAD(NH-709E) AT CHAINAGE 84.782(LHS) CENTRE OF PLOT VILLAGE BANIANI,TEHSIL-KALANAUR, DISTT. ROHTAK (HARYANA)
|
Approach Access
|
HINDUSTAN PETROLEUM CORPORATION LIMITED
|
0.0952
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 May 2018
|
|
Stage-I Approval on
|
:
|
11 Jul 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2018
|
|
|
|
|
|
8
|
Haryana
|
FP/HR/Approach/31400/2018
|
6185
|
Access to Proposed site for IOCL at Village- Sirohi on Ballabgarh-Sohna Road (MDR-133), Tehsil - Ballabgarh, District- Faridabad, State - Haryana
|
Approach Access
|
Indian Oil Corporation Limited
|
0.0089
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jan 2018
|
|
Stage-I Approval on
|
:
|
14 May 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jul 2018
|
|
|
|
|
|
9
|
Haryana
|
FP/HR/ROAD/19835/2016
|
5510
|
Construction of New HL Bridge
|
Road
|
EXECUTIVE ENGINEER
|
0.288
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jun 2016
|
|
Stage-I Approval on
|
:
|
02 Nov 2016
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 May 2019
|
|
|
|
|
|
10
|
Jammu and Kashmir
|
FP/JK/ROAD/45422/2020
|
FSt/Land/parivesh/06/2021
|
Construction of road from Dhanu (Dhanwalt) to Barigairian (forol) via Gaihar Ramnagar
|
Road
|
AEE PWD (R&B) SUB DIVISION MAJALTA
|
0.645
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 May 2020
|
|
Stage-I Approval on
|
:
|
16 Mar 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2024
|
|
|
|
|
|
11
|
Jammu and Kashmir
|
FP/JK/ROAD/45448/2020
|
9-JKB016/2021-JAMMU
|
Upgradation of Road T01 Supply Morh to Kainthgali
|
Road
|
EE PMGSY UDH
|
2.2585
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 May 2020
|
|
Stage-I Approval on
|
:
|
03 May 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jan 2026
|
|
|
|
|
|
12
|
Jammu and Kashmir
|
FP/JK/ROAD/45378/2020
|
9-JKC-032/2021-Jammu
|
Nallah Gouran to Murrara devi
|
Road
|
EE PMGSY UDH
|
8.525
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 May 2020
|
|
Stage-I Approval on
|
:
|
14 Jul 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jan 2026
|
|
|
|
|
|
13
|
Jammu and Kashmir
|
FP/JK/ROAD/143554/2021
|
9-JKB-094/2021-Jammu
|
Construction of road from Ramnagar to Basantgarh Phase- II (l= 11.0 Km )
|
Road
|
EXECUTIVE ENGINEER PWD(R AND B) DIVISION UDHAMPUR
|
1.982
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jun 2021
|
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2024
|
|
|
|
|
|
14
|
Jammu and Kashmir
|
FP/JK/ROAD/143554/2021
|
9-JKB-094/2021-Jammu
|
Construction of road from Ramnagar to Basantgarh Phase- II (l= 11.0 Km )
|
Road
|
EXECUTIVE ENGINEER PWD(R AND B) DIVISION UDHAMPUR
|
1.982
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jun 2021
|
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2024
|
|
|
|
|
|
15
|
Jammu and Kashmir
|
FP/JK/ROAD/46980/2020
|
9-JKC-035/2021-Jammu
|
PMGSY ROAD MARI TO DHAKIKOT PART-II
|
Road
|
CHIEF ENGINEER PMGSY JAMMU
|
12.052
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Aug 2020
|
|
Stage-I Approval on
|
:
|
27 May 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Feb 2026
|
|
|
|
|
|
16
|
Jammu and Kashmir
|
FP/JK/Others/153389/2022
|
9-JKA-057/2022 -Jammu
|
Construction of Cafeteria and Public Convenience along with Mughal Road
|
Others
|
DIRECTOR TOURISM JAMMU
|
0.025
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Mar 2022
|
|
Stage-I Approval on
|
:
|
07 Jan 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Aug 2023
|
|
|
|
|
|
17
|
Jammu and Kashmir
|
FP/JK/ROAD/149044/2021
|
9-JKA-007/2023-Jammu
|
Construction of road from Kaldi to Khurrian alongwith drainage
|
Road
|
ASSISTANT EXECUTIVE ENGINEER PWD UDHAMPUR
|
0.96
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2022
|
|
Stage-I Approval on
|
:
|
31 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Mar 2024
|
|
|
|
|
|
18
|
Karnataka
|
FP/KA/Others/25957/2017
|
FEE 4 FLL 2019 e
|
Laying of OFC Cable Under Central Govt. NOFN Project
|
Others
|
BSNL GLB
|
0.9215
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 May 2017
|
|
Stage-I Approval on
|
:
|
16 Sep 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Dec 2020
|
|
|
|
01 Jan 1900
|
|
19
|
Karnataka
|
FP/KA/Others/25957/2017
|
FEE 4 FLL 2019 e
|
Laying of OFC Cable Under Central Govt. NOFN Project
|
Others
|
BSNL GLB
|
0.9215
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 May 2017
|
|
Stage-I Approval on
|
:
|
16 Sep 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Dec 2020
|
|
|
|
01 Jan 1900
|
|
20
|
Karnataka
|
FP/KA/WATER/43710/2020
|
F.No.4-KRB1295/2021-BAN/
|
Providing drinking water supply scheme to Navile,Thoreshettihalli and other 53 villages of Maddur Taluk in Mandya District.
|
Drinking Water
|
EE_RWS_DIV_MANDYA
|
0.391
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jan 2020
|
|
Stage-I Approval on
|
:
|
29 Oct 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2023
|
|
|
|
|
|
21
|
Karnataka
|
FP/KA/WATER/46525/2020
|
FEE 109 FLL 2021 e
|
For construction of Raising & Gravity Main Pipeline, Storage & Distributor Tank, Inspection path in forest land, Bellatti, Devihala, Etagi & other Villages for providing drinking water and recharging ground water to fill 20 tanks in Shirahatti (T), Gadag (D) under Shirahatti Lift Irrigation Scheme in favour of the EE, SLI Division, KNNL, Mundaragi.
|
Drinking Water
|
MANAGING DIRECTOR, KNNL, DR.B.R. AMBEDKAR VEEDHI, BANGALORE
|
0.8311
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jun 2020
|
|
Stage-I Approval on
|
:
|
03 Feb 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2025
|
|
|
|
|
|
22
|
Karnataka
|
FP/KA/ROAD/40347/2019
|
F.No.KRC1321/2021-BAN
|
Two Laning with Paved Shoulder of Chintamani to AP Border (length 39.8 kms), on Hybrid Annuity (DBFOMT) basis under Project KSHIP-III in Chikkaballapura & Kolar District of Karnataka State .
|
Road
|
KSHIP-TUMKUR
|
16.8014
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 May 2019
|
|
Stage-I Approval on
|
:
|
28 Feb 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2022
|
|
|
|
|
|
23
|
Karnataka
|
FP/KA/ROAD/40747/2019
|
F.No.KRB1305/2021-BAN
|
2 Laning of Gadag to Honnali Section of SH-57 and SH-26 in the State of Karnataka
|
Road
|
KSHIP
|
5.1564
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2019
|
|
Stage-I Approval on
|
:
|
04 May 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Nov 2022
|
|
|
|
|
|
24
|
Karnataka
|
FP/KA/WATER/25499/2017
|
FEE 88 FLL 2017
|
For laying of pipeline to supply of Drinking Water form Ramapura Village to Halagavadi in Chitradurga District , Davanagere Division, in favour of the Panchayath Development Officer, Halagavadi.
|
Drinking Water
|
PANCHAYATH RAJ ENGINEERING DEPARTMENT
|
0.17
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Apr 2017
|
|
Stage-I Approval on
|
:
|
11 Oct 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Mar 2018
|
|
|
|
|
|
25
|
Karnataka
|
FP/KA/SCH/83641/2020
|
FEE 79 FLL 2022
|
Diversion of forest land in Gutaguddi Village, Hukkeri Taluk, Belagavi District for Construction of High School and other amenities in favour of Deputy Director of Public instructions, Chikkodi
|
School
|
DDPI CHIKODI
|
1
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jan 2021
|
|
Stage-I Approval on
|
:
|
03 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Dec 2023
|
|
|
|
|
|
26
|
Karnataka
|
FP/KA/ROAD/41019/2019
|
F.No.4-KRC1359/2022-BAN
|
Diversion of 5.724414 Ha of forest land for work of “Widening to Two Lane with Paved Shoulders from km 24.600 to km 70.063 (45.463kms) of Mudigere - Kadur Section of NH-173 on EPC mode in the State of Karnataka” Job No. KNT-NH-173-2017-18-873
|
Road
|
NATIONAL HIGHWAY DIVISION HASSAN
|
5.724414
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jul 2019
|
|
Stage-I Approval on
|
:
|
30 Jan 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jul 2023
|
|
|
|
|
|
27
|
Karnataka
|
FP/KA/WATER/41470/2019
|
F.No.KRC1373/2022-BAN
|
Laying of Water Pipe line and Water Tanks in the Bellary Forest Division, Chitradurga Forest Division and Tumakuru Forest Division for Drinking Water Supply Scheme To Rural Habitations And Town Of Pavagada Taluk In Tumkur District, Rural Habitations And Town Of Molakalmuru Taluk In Chitradurga District, Rural Habitations Of Challaker
|
Drinking Water
|
SUPERINTENDING ENGINEER RURAL WATER AND SANITATION DEPARTMENT BANGALORE CIRCLE BANGALORE
|
8.49
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2019
|
|
Stage-I Approval on
|
:
|
07 Oct 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2025
|
|
|
|
|
|
28
|
Karnataka
|
FP/KA/Approach/43337/2019
|
F.No.4-KRB1365/2022-BAN
|
Diversion of 3.4744 Hectares of forest land in Virje village of Ghadasai Hobli,Karwar taluk, Uttara Kannada district for Approach road from SH-66 to Kaiga township in favour of Nuclear Power Corporation of India Limited, Kaiga site,Karwar taluk, Uttara Kannada district.
|
Approach Access
|
NPCILKGS
|
3.4744
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jan 2020
|
|
Stage-I Approval on
|
:
|
25 Nov 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Feb 2023
|
|
|
|
|
|
29
|
Kerala
|
FP/KL/Pipeline/153543/2022
|
F.No.4-KLB1439/2023-BAN
|
Rehabilitation of Muppini LI Scheme in Chungathara GP
|
Pipeline
|
ASSISTANT ENGINEER, MINOR IRRIGATION SECTION NILAMBUR
|
0.0077
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Mar 2022
|
|
Stage-I Approval on
|
:
|
19 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Apr 2024
|
|
|
|
|
|
30
|
Kerala
|
FP/KL/Others/150946/2022
|
F.No.4-KLB1350/2022-BAN
|
Land for construction of Mullapperiyar Police Station at Vallakkadavu
|
Others
|
DISTRICT POLICE CHIEF IDUKKI
|
0.2023
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2022
|
|
Stage-I Approval on
|
:
|
22 Mar 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Feb 2026
|
|
|
|
|
|
31
|
Kerala
|
FP/KL/ROAD/19720/2016
|
GO(Rt)146/2017/F&WLD
|
Re Construction of Murugan Panchal Bridge at Kilometer 76/00
|
Road
|
PWD NH SUB DIVISION PUNALUR
|
0.016
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2016
|
|
Stage-I Approval on
|
:
|
12 Apr 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2024
|
|
|
|
|
|
32
|
Kerala
|
FP/KL/ROAD/21739/2016
|
145/2017/F&WLD
|
Reconstruction of Kazhuthuruthy Bridge at Kilometer 69/950 at NH 744
|
Road
|
PWD NH SUB DIVISION PUNALUR
|
0.018
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Oct 2016
|
|
Stage-I Approval on
|
:
|
12 Apr 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2024
|
|
|
|
|
|
33
|
Kerala
|
FP/KL/ROAD/151269/2022
|
C3/93/2022/F&WLD
|
Black spot rectification work at vazhakkod curve km.62/805 of kodungallur shornoor road SH 22
|
Road
|
ASSISTANT ENGINEER PWD ROADS SECTION CHELAKKARA
|
0.0254
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jan 2022
|
|
Stage-I Approval on
|
:
|
06 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jan 2024
|
|
|
|
|
|
34
|
Kerala
|
FP/KL/ROAD/156404/2022
|
C3/195/2022/F&WLD
|
Hill Highway in Wayanad District – Kuttiyadi Churam Stretch
|
Road
|
EXECUTIVE ENGINEER, KRFB-PMU, KOZHIKKODE
|
0.00918
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jun 2022
|
|
Stage-I Approval on
|
:
|
25 Aug 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
|
|
35
|
Madhya Pradesh
|
FP/MP/Others/33117/2018
|
F-5/2018/10-11
|
Malwani-Mayapur-Rajapur-Rannod OFC Line
|
Others
|
BHARTI AIRTEL LIMITED
|
0.369
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Apr 2018
|
|
Stage-I Approval on
|
:
|
24 Jun 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Sep 2020
|
|
|
|
|
|
36
|
Madhya Pradesh
|
FP/MP/Others/32738/2018
|
F-5/2018/10-11
|
Kolaras to Rannod OFC line
|
Others
|
BHARTI AIRTEL LIMITED.
|
0.1
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Mar 2018
|
|
Stage-I Approval on
|
:
|
29 Jun 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Dec 2020
|
|
|
|
|
|
37
|
Maharashtra
|
FP/MH/ROAD/18824/2016
|
FC-I/MH-47/2016-NGP
|
DIVERSION OF FOREST LAND INVNOLVED UNDER THE PROJECT OF CONST. OF ROAD & MNOR BRIDGE ON POLADPUR-MAHABALESHWAR-PANCHGANI-WAI ROAD S.H.139 AT KM 43/380 TO PETRIT VENNA LAKE (DIVERSION RAOD) V.R. 137 TAL MAHABALESHWAR DIST SATARA
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.51
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Apr 2016
|
|
Stage-I Approval on
|
:
|
04 Aug 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 May 2023
|
|
|
|
|
|
38
|
Manipur
|
FP/MN/ROAD/36696/2018
|
3-MN C 030/2019-SHI
|
Widening and improvement of main alignment of NH-39 (Imphal-Moreh) of 29.516 km from Khongkhang to Moreh in the state of Manipur
|
Road
|
NHIDCL BO IMPHAL
|
48.288
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Oct 2018
|
|
Stage-I Approval on
|
:
|
05 Mar 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Feb 2022
|
|
|
|
|
|
39
|
Punjab
|
FP/PB/Others/32642/2018
|
FCA/1980/108/2018
|
Permission for laying Sewerage pipeline in Sirhind City and surrounding area distt Fatehgarh Sahib under forest division Patiala
|
Others
|
EXECUTIVE ENGINNER PUNJAB WATER SUPPLY AND SEWERAGE DIVISION NO TWO PATIALA
|
0.81
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Mar 2018
|
|
Stage-I Approval on
|
:
|
24 Aug 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2018
|
|
|
|
|
|
40
|
Rajasthan
|
FP/RJ/ROAD/7558/2014
|
1(50)Forest/2015
|
Const of A/R to Banikheri
|
Road
|
PWD
|
0.52
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Oct 2014
|
|
Stage-I Approval on
|
:
|
18 Mar 2015
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Dec 2025
|
|
|
|
|
|
41
|
Rajasthan
|
FP/RJ/OFC/45025/2020
|
8B/RAJ003/2024-JPR
|
Underground OFC along PWD road within existing ROW from Udaipurwati - Kot from Lat/long point 27.70724°/ 75.47414° to 27.66962°/ 75.43614° for total length of 6.349 KM and forest area – 0.2857 ha, within ROW Limits in Jhunjhunu District, Rajasthan.
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PVT LTD
|
0.06
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 May 2020
|
|
Stage-I Approval on
|
:
|
05 Nov 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jul 2025
|
|
|
|
|
|
42
|
Rajasthan
|
FP/RJ/ROAD/152647/2022
|
8B/RAJ001/2024-JPR
|
Construction of approach road to foosod mata ji
|
Road
|
P.W.D DISTT DIVISON TAWA
|
0.4425
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Feb 2022
|
|
Stage-I Approval on
|
:
|
13 May 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 Feb 2026
|
|
|
|
|
|
43
|
Tamil Nadu
|
FP/TN/Pipeline/50403/2020
|
4-TNB138/2024-CHN
|
KKBMPL Tamil Nadu Section - Dharmapuri District
|
Pipeline
|
GAIL INDIA LIMITED TN
|
5.94
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Aug 2021
|
|
Stage-I Approval on
|
:
|
21 Feb 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jan 2026
|
|
|
|
|
|
44
|
Tamil Nadu
|
FP/TN/Others/38123/2019
|
4-TNB122/2024-CHN
|
Laying of OFC along road side of Royandapuram-Melsiruvallur road section via Perungolathur in Thandrampattu-Sankarapuram ODR Road across Pavunjipattu R.F. in Villupuram District.
|
Others
|
Jio Digital Fibre Private Limited
|
0.03132
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jan 2019
|
|
Stage-I Approval on
|
:
|
12 Apr 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Sep 2025
|
|
|
|
|
|
45
|
Tamil Nadu
|
FP/TN/ROAD/34073/2018
|
4-TNB125/2024-CHN
|
Formation of new Black Top road from Vikkiramangalam - Kadupatti village
|
Road
|
BLOCK DEVELOPMENT OFFICER VADIPATTI
|
0.1275
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jun 2018
|
|
Stage-I Approval on
|
:
|
11 Sep 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2025
|
|
|
|
|
|
46
|
Tamil Nadu
|
FP/TN/ROAD/150630/2021
|
4-TNB127/2024-CHN
|
WIDENING OF ROAD FROM SINGLE LANE TO DOUBLE LANE AND IMPROVEMENTS OF VRIDHATCHALAM - KATTUKUDALORE ROAD Km. 10/6 - 11/6
|
Road
|
ADE H VRIDHATCHALAM
|
0.9
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Dec 2021
|
|
Stage-I Approval on
|
:
|
17 Oct 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Dec 2025
|
|
|
|
|
|
47
|
Tamil Nadu
|
FP/TN/ROAD/37283/2018
|
4-TNB108/2023-CHN
|
Barigam Konayankadu to Malayurkadu road
|
Road
|
BLOCK DEVELOPMENT OFFICER
|
2.5
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Nov 2018
|
|
Stage-I Approval on
|
:
|
07 Mar 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2025
|
|
|
|
|
|
48
|
Tamil Nadu
|
FP/TN/Others/30206/2017
|
4-TNB098/2022-CHN
|
Laying OFC of Dharmapuri Anchetti route Hogenakkal stretch
|
Others
|
Jio Digital Fibre Private Limited
|
0.792
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Nov 2017
|
|
Stage-I Approval on
|
:
|
24 Nov 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jun 2025
|
|
|
|
|
|
49
|
Tamil Nadu
|
FP/TN/Others/24406/2017
|
4-TNB095/2022-CHN
|
Laying Optical Fiber Cable from Theppakkadu to Moyar via Masinagudi in Mudumalai Tiger Reserve
|
Others
|
Jio Digital Fibre Private Limited
|
0.426
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Feb 2017
|
|
Stage-I Approval on
|
:
|
31 Oct 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Sep 2023
|
|
|
|
|
|
50
|
Tamil Nadu
|
FP/TN/Others/20328/2016
|
4-TNB015/2017-CHN
|
Fish Landing Centre at Periyamangodu Village
|
Others
|
FISHERIES DEPARTMENT
|
0.38
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Jul 2016
|
|
Stage-I Approval on
|
:
|
07 Aug 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Nov 2018
|
|
|
|
|
|