Ministry of Environment,Forest and Climate Change
Government of India
Online Submission & Monitoring
of Forests and Wildlife Clearance Proposals
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Andhra Pradesh FP/AP/MIN/10909/2015 4-APB047/2017-CHN Quarry lease of Black granite over an extent of 4.83 Ha in Compt.No. 212 of Paradarami RF in favour of M/s Sai Joshitha Granites, Piler. Mining SAI JOSHITHA GRANITES 4.83 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Mar 2015
Stage-I Approval on : 27 Mar 2018
Compliance Report Submitted by User Agency on : 13 Nov 2018
2 Andhra Pradesh FP/AP/TRANS/37314/2018 G.O.Ms.No.30 Making LILO arrangement of 132KV Tadepalli -Tadikonda line to the proposed 132/33KV AIIMS SS at Mangalagiri in Guntur district. Transmission Line EXECUTIVE ENGINEER CONSTRUCTION CRDA DIVISION GUNTUR 0.82 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 29 Aug 2019
Compliance Report Submitted by User Agency on : 08 Jul 2020
3 Arunachal Pradesh FP/AR/TRANS/40221/2019 3-ANC 082/2019-SHI Revised proposal for diversion of 48.987 ha Forest land for construction of 132 kV D/C Transmission Line from Biswanath Chariali to Itanagar. Transmission Line NER II TRANSMISSION LIMITED 48.987 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 May 2019
Stage-I Approval on : 23 Sep 2019
Compliance Report Submitted by User Agency on : 25 Nov 2020
4 Bihar FP/BR/RAIL/153523/2022 FP/BR/RAIL/153523/2022 Araria Galgalia New BG Railway Line Railway CHIEF ENGINEER CONSTRUCTION III, N.F RAILWAY MALIGAON 8.243 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Mar 2022
Stage-I Approval on : 10 Apr 2023
Compliance Report Submitted by User Agency on : 14 Aug 2023
5 Bihar FP/BR/ROAD/157210/2022 FP/BR/ROAD/157210/2022 Improvement to two lane with paved shoulder of National Highway No. 327AD from km. 0.000 to km. 10.672 Saraigarh starting from its junctions with NH 327A Lalganj Ganpatganj terminating at its junction Road PUBLIC WORK DEPARTMENT (NATIONAL HIGHWAY)PATNA BIHAR 0.1799 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 27 Jun 2022
Stage-I Approval on : 22 Aug 2023
Compliance Report Submitted by User Agency on : 20 Nov 2024
6 Jammu and Kashmir FP/JK/Others/153389/2022 9-JKA-057/2022 -Jammu Construction of Cafeteria and Public Convenience along with Mughal Road Others DIRECTOR TOURISM JAMMU 0.025 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Mar 2022
Stage-I Approval on : 07 Jan 2023
Compliance Report Submitted by User Agency on : 09 Aug 2023
7 Jammu and Kashmir FP/JK/ROAD/117800/2020 9-JKC-055/2021-Jammu Construction of Road From Shikari To Bhaller, Package No. JK14-441, Stage 1st,Phase Xth. Road CHIEF ENGINEER PMGSY JAMMU 6.05 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Dec 2020
Stage-I Approval on : 22 Jul 2021
Compliance Report Submitted by User Agency on : 07 Apr 2026
8 Jammu and Kashmir FP/JK/ROAD/119464/2021 9-JKB048/2021-JAMMU bhaboor to jigote Road EXECUTIVE ENGINEER (PIU) PMGSY DIVISION DODA 0.72 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Jan 2021
Stage-I Approval on : 03 Jun 2021
Compliance Report Submitted by User Agency on : 07 Apr 2026
9 Jammu and Kashmir FP/JK/ROAD/140656/2021 9-JKA-021/2022-Jammu Construction of 130 mtr span Balini Bridge Road 52 RCC (GREF) 0.39 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 Apr 2021
Stage-I Approval on : 25 May 2022
Compliance Report Submitted by User Agency on : 01 Apr 2026
10 Jammu and Kashmir FP/JK/ROAD/141843/2021 9-JKC-096/2021-Jammu Widening of road from Phiter to Billawar road alongwith Balance work of Billawar to Sukralla road Road XEN PWD BASOHLI 0.15 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Apr 2021
Stage-I Approval on : 07 Jan 2022
Compliance Report Submitted by User Agency on : 25 Mar 2026
11 Jammu and Kashmir FP/JK/ROAD/143554/2021 9-JKB-094/2021-Jammu Construction of road from Ramnagar to Basantgarh Phase- II (l= 11.0 Km ) Road EXECUTIVE ENGINEER PWD(R AND B) DIVISION UDHAMPUR 1.982 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Jun 2021
Stage-I Approval on : 24 Jan 2022
Compliance Report Submitted by User Agency on : 22 Nov 2024
12 Jammu and Kashmir FP/JK/ROAD/143554/2021 9-JKB-094/2021-Jammu Construction of road from Ramnagar to Basantgarh Phase- II (l= 11.0 Km ) Road EXECUTIVE ENGINEER PWD(R AND B) DIVISION UDHAMPUR 1.982 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Jun 2021
Stage-I Approval on : 24 Jan 2022
Compliance Report Submitted by User Agency on : 22 Nov 2024
13 Jammu and Kashmir FP/JK/ROAD/149044/2021 9-JKA-007/2023-Jammu Construction of road from Kaldi to Khurrian alongwith drainage Road ASSISTANT EXECUTIVE ENGINEER PWD UDHAMPUR 0.96 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Jan 2022
Stage-I Approval on : 31 Mar 2023
Compliance Report Submitted by User Agency on : 04 Mar 2024
14 Jammu and Kashmir FP/JK/ROAD/44451/2020 9-JKB039/2021-JAMMU Khellani Dranga Hud to Saras Road EXECUTIVE ENGINEER (PIU) PMGSY DIVISION DODA 3.122 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 23 Jun 2020
Stage-I Approval on : 15 Jun 2021
Compliance Report Submitted by User Agency on : 06 Apr 2026
15 Jammu and Kashmir FP/JK/ROAD/45122/2020 9-JKA-087/2021-Jammu construction of link road Panditgam to Chanseri Road R&B DEPARTMENT JAMMU 0.4178 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Jun 2020
Stage-I Approval on : 01 Mar 2023
Compliance Report Submitted by User Agency on : 16 Apr 2026
16 Jammu and Kashmir FP/JK/ROAD/45422/2020 FSt/Land/parivesh/06/2021 Construction of road from Dhanu (Dhanwalt) to Barigairian (forol) via Gaihar Ramnagar Road AEE PWD (R&B) SUB DIVISION MAJALTA 0.645 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 May 2020
Stage-I Approval on : 16 Mar 2021
Compliance Report Submitted by User Agency on : 22 Nov 2024
17 Jammu and Kashmir FP/JK/ROAD/45508/2020 FST/Land/Parivesh/32/2020 Construction of Parmaz link road Road PWD R&B SPL SUB DIVISION DODA 0.03 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Jun 2020
Stage-I Approval on : 17 Feb 2021
Compliance Report Submitted by User Agency on : 11 Apr 2026
18 Jammu and Kashmir FP/JK/ROAD/45770/2020 9-JKB-076-2021-JAMMU Construction of link road from Gai Dessa to Bhatta via Mangal Thatha and Dewal Kund. Road PWD R&B SPL SUB DIVISION DODA 2.557 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Jun 2020
Stage-I Approval on : 30 Dec 2021
Compliance Report Submitted by User Agency on : 11 Apr 2026
19 Jammu and Kashmir FP/JK/ROAD/46463/2020 9-JKC-073/2021-Jammu Construction and Upgradation of Bharath to Keshwan link road upto Ingwan Gali Km 1st to 13th. Road PWD R&B SPL SUB DIVISION DODA 6.77 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Jun 2020
Stage-I Approval on : 28 Apr 2022
Compliance Report Submitted by User Agency on : 11 Apr 2026
20 Jammu and Kashmir FP/JK/ROAD/46486/2020 9-JKB028/2021-JAMMU Bhara to Mandhir Mohalla Godha road package IV Road EXECUTIVE ENGINEER (PIU) PMGSY DIVISION DODA 0.815 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Jun 2020
Stage-I Approval on : 11 May 2021
Compliance Report Submitted by User Agency on : 07 Mar 2026
21 Jammu and Kashmir FP/JK/ROAD/46769/2020 9-JKC-027/2021-Jammu Road from Trembli to Dheota (JK07-87) Road PIU KATHUA 10.385 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 Jun 2020
Stage-I Approval on : 13 Jul 2021
Compliance Report Submitted by User Agency on : 10 Apr 2026
22 Jammu and Kashmir FP/JK/ROAD/46939/2020 9-JKA-075/2021-Jammu Road from Amira nagar Via Kharoti Bhelan linking Hanga link Road at Gatthi More Road R&B DEPARTMENT JAMMU 0.305 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Jul 2020
Stage-I Approval on : 30 Dec 2021
Compliance Report Submitted by User Agency on : 09 Apr 2026
23 Jammu and Kashmir FP/JK/ROAD/46980/2020 9-JKC-035/2021-Jammu PMGSY ROAD MARI TO DHAKIKOT PART-II Road CHIEF ENGINEER PMGSY JAMMU 12.052 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Aug 2020
Stage-I Approval on : 27 May 2022
Compliance Report Submitted by User Agency on : 24 Feb 2026
24 Jammu and Kashmir FP/JK/ROAD/47242/2020 9-JKB050-2021-JAMMU Harog to Halla Road CHIEF ENGINEER PMGSY (JKRRDA) JAMMU 0.9 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 09 Jul 2020
Stage-I Approval on : 24 May 2021
Compliance Report Submitted by User Agency on : 17 Apr 2026
25 Jammu and Kashmir FP/JK/ROAD/47888/2020 9-JKC-004/2021-Jammu Khourgali to Radnote Road PMGSY DIVISION REASI 5.029 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Jul 2020
Stage-I Approval on : 10 May 2021
Compliance Report Submitted by User Agency on : 16 Apr 2026
26 Jammu and Kashmir FP/JK/ROAD/48666/2020 9-JKB-019/2021-Jammu KANTHAN TO SAWALKOT-II Road CHIEF ENGINEER PMGSY JAMMU 13.962 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Aug 2020
Stage-I Approval on : 28 Jun 2021
Compliance Report Submitted by User Agency on : 10 Apr 2026
27 Jammu and Kashmir FP/JK/ROAD/48915/2020 9-JKB034-2021-JAMMU Upgradtion and Maintenance of Road from Km 4th of T02 To Madam Road CHIEF ENGINEER, PMGSY, KASHMIR 1.27 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Sep 2020
Stage-I Approval on : 18 May 2021
Compliance Report Submitted by User Agency on : 12 Apr 2026
28 Jammu and Kashmir FP/JK/ROAD/65427/2020 9-JKB025-2021-CHA Upgradation and Maintenance of road from MRL01-Tarathpora to Waisa via Shenpora cherpawa Kulwari Lilam Stage -U ( Batch -I, 2019-20) Package No JK08-2012, Length = 8.5kms, Block Ramhal Road CHIEF ENGINEER, PMGSY, KASHMIR 1.184 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 01 Dec 2020
Stage-I Approval on : 16 Apr 2021
Compliance Report Submitted by User Agency on : 09 Apr 2026
29 Jammu and Kashmir FP/JK/TRANS/145320/2021 9-JKB-052/2022-Jammu CONSTRUCTION OF 132 KV D/C RAMBAN SANGALDAN TRANSMISSION LINE FOR PROVIDING POWER SUPPLY TO KONKAN RAILWAY Transmission Line EXECUTIVE ENGINEER TLMD 3 UDHAMPUR 4.37 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 27 Jul 2021
Stage-I Approval on : 14 Jan 2023
Compliance Report Submitted by User Agency on : 13 Apr 2026
30 Jammu and Kashmir FP/JK/TRANS/44649/2020 9-JKB-003/2020-Jammu Re alignment of 220Kv KPTL Line KP175 KP176 Near Baggu nallah Batote Transmission Line EXECUTIVE ENGINEER TLMD 3 UDHAMPUR 1.47 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 20 Feb 2020
Stage-I Approval on : 29 Apr 2022
Compliance Report Submitted by User Agency on : 13 Apr 2026
31 Jammu and Kashmir FP/JK/WATER/144892/2021 FST-land0FC/46/2022-02 WSS Phalata Drinking Water CHIEF ENGINEER JAL SHAKTI (PHE) JAMMU 0.187 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Jul 2021
Stage-I Approval on : 21 Jul 2022
Compliance Report Submitted by User Agency on : 16 Apr 2026
32 Karnataka FP/KA/Others/25957/2017 FEE 4 FLL 2019 e Laying of OFC Cable Under Central Govt. NOFN Project Others BSNL GLB 0.9215 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 May 2017
Stage-I Approval on : 16 Sep 2020
Compliance Report Submitted by User Agency on : 05 Dec 2020
01 Jan 1900
33 Karnataka FP/KA/Others/25957/2017 FEE 4 FLL 2019 e Laying of OFC Cable Under Central Govt. NOFN Project Others BSNL GLB 0.9215 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 May 2017
Stage-I Approval on : 16 Sep 2020
Compliance Report Submitted by User Agency on : 05 Dec 2020
01 Jan 1900
34 Karnataka FP/KA/ROAD/40347/2019 F.No.KRC1321/2021-BAN Two Laning with Paved Shoulder of Chintamani to AP Border (length 39.8 kms), on Hybrid Annuity (DBFOMT) basis under Project KSHIP-III in Chikkaballapura & Kolar District of Karnataka State . Road KSHIP-TUMKUR 16.8014 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 May 2019
Stage-I Approval on : 28 Feb 2022
Compliance Report Submitted by User Agency on : 05 Aug 2022
35 Karnataka FP/KA/ROAD/40747/2019 F.No.KRB1305/2021-BAN 2 Laning of Gadag to Honnali Section of SH-57 and SH-26 in the State of Karnataka Road KSHIP 5.1564 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Jun 2019
Stage-I Approval on : 04 May 2022
Compliance Report Submitted by User Agency on : 17 Nov 2022
36 Karnataka FP/KA/ROAD/41019/2019 F.No.4-KRC1359/2022-BAN Diversion of 5.724414 Ha of forest land for work of “Widening to Two Lane with Paved Shoulders from km 24.600 to km 70.063 (45.463kms) of Mudigere - Kadur Section of NH-173 on EPC mode in the State of Karnataka” Job No. KNT-NH-173-2017-18-873 Road NATIONAL HIGHWAY DIVISION HASSAN 5.724414 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 20 Jul 2019
Stage-I Approval on : 30 Jan 2023
Compliance Report Submitted by User Agency on : 27 Jul 2023
37 Karnataka FP/KA/SCH/83641/2020 FEE 79 FLL 2022 Diversion of forest land in Gutaguddi Village, Hukkeri Taluk, Belagavi District for Construction of High School and other amenities in favour of Deputy Director of Public instructions, Chikkodi School DDPI CHIKODI 1 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 03 Jan 2021
Stage-I Approval on : 03 Sep 2022
Compliance Report Submitted by User Agency on : 01 Dec 2023
38 Karnataka FP/KA/WATER/25499/2017 FEE 88 FLL 2017 For laying of pipeline to supply of Drinking Water form Ramapura Village to Halagavadi in Chitradurga District , Davanagere Division, in favour of the Panchayath Development Officer, Halagavadi. Drinking Water PANCHAYATH RAJ ENGINEERING DEPARTMENT 0.17 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 03 Apr 2017
Stage-I Approval on : 11 Oct 2017
Compliance Report Submitted by User Agency on : 03 Mar 2018
39 Karnataka FP/KA/WATER/41470/2019 F.No.KRC1373/2022-BAN Laying of Water Pipe line and Water Tanks in the Bellary Forest Division, Chitradurga Forest Division and Tumakuru Forest Division for Drinking Water Supply Scheme To Rural Habitations And Town Of Pavagada Taluk In Tumkur District, Rural Habitations And Town Of Molakalmuru Taluk In Chitradurga District, Rural Habitations Of Challaker Drinking Water SUPERINTENDING ENGINEER RURAL WATER AND SANITATION DEPARTMENT BANGALORE CIRCLE BANGALORE 8.49 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Aug 2019
Stage-I Approval on : 07 Oct 2022
Compliance Report Submitted by User Agency on : 07 Aug 2025
40 Karnataka FP/KA/WATER/43710/2020 F.No.4-KRB1295/2021-BAN/ Providing drinking water supply scheme to Navile,Thoreshettihalli and other 53 villages of Maddur Taluk in Mandya District. Drinking Water EE_RWS_DIV_MANDYA 0.391 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 Jan 2020
Stage-I Approval on : 29 Oct 2021
Compliance Report Submitted by User Agency on : 15 Jul 2023
41 Karnataka FP/KA/WATER/46525/2020 FEE 109 FLL 2021 e For construction of Raising & Gravity Main Pipeline, Storage & Distributor Tank, Inspection path in forest land, Bellatti, Devihala, Etagi & other Villages for providing drinking water and recharging ground water to fill 20 tanks in Shirahatti (T), Gadag (D) under Shirahatti Lift Irrigation Scheme in favour of the EE, SLI Division, KNNL, Mundaragi. Drinking Water MANAGING DIRECTOR, KNNL, DR.B.R. AMBEDKAR VEEDHI, BANGALORE 0.8311 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Jun 2020
Stage-I Approval on : 03 Feb 2022
Compliance Report Submitted by User Agency on : 01 Feb 2025
42 Karnataka FP/KA/Approach/43337/2019 F.No.4-KRB1365/2022-BAN Diversion of 3.4744 Hectares of forest land in Virje village of Ghadasai Hobli,Karwar taluk, Uttara Kannada district for Approach road from SH-66 to Kaiga township in favour of Nuclear Power Corporation of India Limited, Kaiga site,Karwar taluk, Uttara Kannada district. Approach Access NPCILKGS 3.4744 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 01 Jan 2020
Stage-I Approval on : 25 Nov 2022
Compliance Report Submitted by User Agency on : 14 Feb 2023
43 Kerala FP/KL/Others/150946/2022 F.No.4-KLB1350/2022-BAN Land for construction of Mullapperiyar Police Station at Vallakkadavu Others DISTRICT POLICE CHIEF IDUKKI 0.2023 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Jan 2022
Stage-I Approval on : 22 Mar 2024
Compliance Report Submitted by User Agency on : 10 Feb 2026
44 Kerala FP/KL/Pipeline/153543/2022 F.No.4-KLB1439/2023-BAN Rehabilitation of Muppini LI Scheme in Chungathara GP Pipeline ASSISTANT ENGINEER, MINOR IRRIGATION SECTION NILAMBUR 0.0077 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Mar 2022
Stage-I Approval on : 19 Oct 2023
Compliance Report Submitted by User Agency on : 06 Apr 2024
45 Kerala FP/KL/ROAD/151269/2022 C3/93/2022/F&WLD Black spot rectification work at vazhakkod curve km.62/805 of kodungallur shornoor road SH 22 Road ASSISTANT ENGINEER PWD ROADS SECTION CHELAKKARA 0.0254 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Jan 2022
Stage-I Approval on : 06 Jun 2022
Compliance Report Submitted by User Agency on : 17 Jan 2024
46 Kerala FP/KL/ROAD/156404/2022 C3/195/2022/F&WLD Hill Highway in Wayanad District – Kuttiyadi Churam Stretch Road EXECUTIVE ENGINEER, KRFB-PMU, KOZHIKKODE 0.00918 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Jun 2022
Stage-I Approval on : 25 Aug 2022
Compliance Report Submitted by User Agency on : 22 Oct 2024
47 Kerala FP/KL/ROAD/19720/2016 GO(Rt)146/2017/F&WLD Re Construction of Murugan Panchal Bridge at Kilometer 76/00 Road PWD NH SUB DIVISION PUNALUR 0.016 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 May 2016
Stage-I Approval on : 12 Apr 2017
Compliance Report Submitted by User Agency on : 03 Sep 2024
48 Kerala FP/KL/ROAD/21739/2016 145/2017/F&WLD Reconstruction of Kazhuthuruthy Bridge at Kilometer 69/950 at NH 744 Road PWD NH SUB DIVISION PUNALUR 0.018 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 05 Oct 2016
Stage-I Approval on : 12 Apr 2017
Compliance Report Submitted by User Agency on : 03 Sep 2024
49 Madhya Pradesh FP/MP/Others/32738/2018 F-5/2018/10-11 Kolaras to Rannod OFC line Others BHARTI AIRTEL LIMITED. 0.1 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Mar 2018
Stage-I Approval on : 29 Jun 2018
Compliance Report Submitted by User Agency on : 16 Dec 2020
50 Madhya Pradesh FP/MP/Others/33117/2018 F-5/2018/10-11 Malwani-Mayapur-Rajapur-Rannod OFC Line Others BHARTI AIRTEL LIMITED 0.369 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 Apr 2018
Stage-I Approval on : 24 Jun 2018
Compliance Report Submitted by User Agency on : 05 Sep 2020
12