Ministry of Environment,Forest and Climate Change
Government of India
Online Submission & Monitoring
of Forests and Wildlife Clearance Proposals
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Andhra Pradesh FP/AP/TRANS/37314/2018 G.O.Ms.No.30 Making LILO arrangement of 132KV Tadepalli -Tadikonda line to the proposed 132/33KV AIIMS SS at Mangalagiri in Guntur district. Transmission Line EXECUTIVE ENGINEER CONSTRUCTION CRDA DIVISION GUNTUR 0.82 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 29 Aug 2019
Compliance Report Submitted by User Agency on : 08 Jul 2020
2 Andhra Pradesh FP/AP/MIN/10909/2015 4-APB047/2017-CHN Quarry lease of Black granite over an extent of 4.83 Ha in Compt.No. 212 of Paradarami RF in favour of M/s Sai Joshitha Granites, Piler. Mining SAI JOSHITHA GRANITES 4.83 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Mar 2015
Stage-I Approval on : 27 Mar 2018
Compliance Report Submitted by User Agency on : 13 Nov 2018
3 Arunachal Pradesh FP/AR/TRANS/40221/2019 3-ANC 082/2019-SHI Revised proposal for diversion of 48.987 ha Forest land for construction of 132 kV D/C Transmission Line from Biswanath Chariali to Itanagar. Transmission Line NER II TRANSMISSION LIMITED 48.987 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 May 2019
Stage-I Approval on : 23 Sep 2019
Compliance Report Submitted by User Agency on : 25 Nov 2020
4 Haryana FP/HR/Approach/32461/2018 9-HRB171-2018-CHA Warehousing at village Patauda, Jhajjar Approach Access PARAG AGROTECH PVT LTD 0.0095 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 09 Mar 2018
Stage-I Approval on : 18 Dec 2018
Compliance Report Submitted by User Agency on : 26 Jun 2019
5 Haryana FP/HR/Approach/31400/2018 6185 Access to Proposed site for IOCL at Village- Sirohi on Ballabgarh-Sohna Road (MDR-133), Tehsil - Ballabgarh, District- Faridabad, State - Haryana Approach Access Indian Oil Corporation Limited 0.0089 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 16 Jan 2018
Stage-I Approval on : 14 May 2018
Compliance Report Submitted by User Agency on : 10 Jul 2018
6 Haryana FP/HR/Others/19674/2016 D-III-7067 NOC FOR ESTABLISHMENT OF NEW RETAIL OUTLET (KSK) AT CHAUTALA ON CHAUTALA-RATANPURA ROAD (WITHIN 1 KM FROM RAJASTHAN BORDER), DISTT-SIRSA Others INDIAN OIL CORPORATION LTD 0.087 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 May 2016
Stage-I Approval on : 22 Feb 2018
Compliance Report Submitted by User Agency on : 08 May 2018
7 Haryana FP/HR/Approach/33616/2018 6259 PROPOSED RETAIL OUTLET ON ROHTAK-BHIWANI ROAD(NH-709E) AT CHAINAGE 84.782(LHS) CENTRE OF PLOT VILLAGE BANIANI,TEHSIL-KALANAUR, DISTT. ROHTAK (HARYANA) Approach Access HINDUSTAN PETROLEUM CORPORATION LIMITED 0.0952 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 May 2018
Stage-I Approval on : 11 Jul 2018
Compliance Report Submitted by User Agency on : 23 Jul 2018
8 Haryana FP/HR/ROAD/41177/2019 D-III-9019 Construction of one way ramp Road PWD KURUKSHETRA 0.17 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Jul 2019
Stage-I Approval on : 05 Oct 2019
Compliance Report Submitted by User Agency on : 10 Dec 2019
9 Haryana FP/HR/Approach/34107/2018 9-HRB172-2018-CHA Middle School belonging to Aurora Foundation Approach Access AURORA FOUNDATION 0.0091 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 10 Jun 2018
Stage-I Approval on : 25 Sep 2018
Compliance Report Submitted by User Agency on : 26 Nov 2018
10 Haryana FP/HR/Others/18922/2016 5387 PROPOSED HPCL RETAIL OUTLET ON HODAL-PUNHANA-NAGINA ROAD (MDR-131), AT RD.12226M(LHS) AT VILLAGE SINGAR,TEHSIL PUNHANA, DISTT. MEWAT (HARYANA) Others HINDUSTAN PETROLEUM CORPORATION LIMITED 0.012 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Apr 2016
Stage-I Approval on : 12 Jul 2016
Compliance Report Submitted by User Agency on : 02 Dec 2019
11 Haryana FP/HR/ROAD/19835/2016 5510 Construction of New HL Bridge Road EXECUTIVE ENGINEER 0.288 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 03 Jun 2016
Stage-I Approval on : 02 Nov 2016
Compliance Report Submitted by User Agency on : 29 May 2019
12 Jammu and Kashmir FP/JK/Others/153389/2022 9-JKA-057/2022 -Jammu Construction of Cafeteria and Public Convenience along with Mughal Road Others DIRECTOR TOURISM JAMMU 0.025 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Mar 2022
Stage-I Approval on : 07 Jan 2023
Compliance Report Submitted by User Agency on : 09 Aug 2023
13 Jammu and Kashmir FP/JK/HYD/47466/2020 9-JKC-005/2021-Jammu 8.50MW LASHPATHRI-I Small Hydro Power (SHP) Project Hydel JAMMU AND KASHMIR ENERGY DEVELOPMENT AGENCY (JAKEDA), S&T DEPTT. J&K 3.1 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Jul 2020
Stage-I Approval on : 17 Dec 2021
Compliance Report Submitted by User Agency on : 14 May 2025
14 Jammu and Kashmir FP/JK/ROAD/154608/2022 9-JKA-041/2022-Jammu Construction of Road Hari Katha to Moh Sheikhan Road RURAL DEVELOPMENT DEPARTMENT POONCH 0.1375 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Apr 2022
Stage-I Approval on : 16 Sep 2022
Compliance Report Submitted by User Agency on : 05 Aug 2023
15 Jammu and Kashmir FP/JK/ROAD/146187/2021 9-JKB-092/2021-Jammu Construction and Upgradation to 2 lane with paved Shoulder of road from design Chainage 31.449 (Khellani, Pariyot) to Km 51.700 (Prem Nagar) (Design length 20.251 Km.) in the Union territory of Jammu and Kashmir Package-1 of NH-24 Road NHIDCL PMU DODA 3.2549356 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Aug 2021
Stage-I Approval on : 10 Mar 2022
Compliance Report Submitted by User Agency on : 23 Jun 2022
16 Karnataka FP/KA/Others/25957/2017 FEE 4 FLL 2019 e Laying of OFC Cable Under Central Govt. NOFN Project Others BSNL GLB 0.9215 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 May 2017
Stage-I Approval on : 16 Sep 2020
Compliance Report Submitted by User Agency on : 05 Dec 2020
01 Jan 1900
17 Karnataka FP/KA/Others/25957/2017 FEE 4 FLL 2019 e Laying of OFC Cable Under Central Govt. NOFN Project Others BSNL GLB 0.9215 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 May 2017
Stage-I Approval on : 16 Sep 2020
Compliance Report Submitted by User Agency on : 05 Dec 2020
01 Jan 1900
18 Karnataka FP/KA/WATER/25499/2017 FEE 88 FLL 2017 For laying of pipeline to supply of Drinking Water form Ramapura Village to Halagavadi in Chitradurga District , Davanagere Division, in favour of the Panchayath Development Officer, Halagavadi. Drinking Water PANCHAYATH RAJ ENGINEERING DEPARTMENT 0.17 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 03 Apr 2017
Stage-I Approval on : 11 Oct 2017
Compliance Report Submitted by User Agency on : 03 Mar 2018
19 Karnataka FP/KA/Approach/43337/2019 F.No.4-KRB1365/2022-BAN Diversion of 3.4744 Hectares of forest land in Virje village of Ghadasai Hobli,Karwar taluk, Uttara Kannada district for Approach road from SH-66 to Kaiga township in favour of Nuclear Power Corporation of India Limited, Kaiga site,Karwar taluk, Uttara Kannada district. Approach Access NPCILKGS 3.4744 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 01 Jan 2020
Stage-I Approval on : 25 Nov 2022
Compliance Report Submitted by User Agency on : 14 Feb 2023
20 Karnataka FP/KA/WATER/43710/2020 F.No.4-KRB1295/2021-BAN/ Providing drinking water supply scheme to Navile,Thoreshettihalli and other 53 villages of Maddur Taluk in Mandya District. Drinking Water EE_RWS_DIV_MANDYA 0.391 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 Jan 2020
Stage-I Approval on : 29 Oct 2021
Compliance Report Submitted by User Agency on : 15 Jul 2023
21 Karnataka FP/KA/Others/36295/2018 F.No.4-KRB1288/2021-BAN/ Construction of Solid Waste Unit and Faecal Sludge treatment Plant at Gokarna Others GRAMA PANCHAYAT GOKARNA 0.98 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 Oct 2018
Stage-I Approval on : 25 Feb 2022
Compliance Report Submitted by User Agency on : 25 Jun 2024
22 Karnataka FP/KA/ROAD/40747/2019 F.No.KRB1305/2021-BAN 2 Laning of Gadag to Honnali Section of SH-57 and SH-26 in the State of Karnataka Road KSHIP 5.1564 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Jun 2019
Stage-I Approval on : 04 May 2022
Compliance Report Submitted by User Agency on : 17 Nov 2022
23 Karnataka FP/KA/ROAD/40347/2019 F.No.KRC1321/2021-BAN Two Laning with Paved Shoulder of Chintamani to AP Border (length 39.8 kms), on Hybrid Annuity (DBFOMT) basis under Project KSHIP-III in Chikkaballapura & Kolar District of Karnataka State . Road KSHIP-TUMKUR 16.8014 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 May 2019
Stage-I Approval on : 28 Feb 2022
Compliance Report Submitted by User Agency on : 05 Aug 2022
24 Karnataka FP/KA/WATER/46525/2020 FEE 109 FLL 2021 e For construction of Raising & Gravity Main Pipeline, Storage & Distributor Tank, Inspection path in forest land, Bellatti, Devihala, Etagi & other Villages for providing drinking water and recharging ground water to fill 20 tanks in Shirahatti (T), Gadag (D) under Shirahatti Lift Irrigation Scheme in favour of the EE, SLI Division, KNNL, Mundaragi. Drinking Water MANAGING DIRECTOR, KNNL, DR.B.R. AMBEDKAR VEEDHI, BANGALORE 0.8311 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Jun 2020
Stage-I Approval on : 03 Feb 2022
Compliance Report Submitted by User Agency on : 01 Feb 2025
25 Karnataka FP/KA/SCH/83641/2020 FEE 79 FLL 2022 Diversion of forest land in Gutaguddi Village, Hukkeri Taluk, Belagavi District for Construction of High School and other amenities in favour of Deputy Director of Public instructions, Chikkodi School DDPI CHIKODI 1 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 03 Jan 2021
Stage-I Approval on : 03 Sep 2022
Compliance Report Submitted by User Agency on : 01 Dec 2023
26 Karnataka FP/KA/ROAD/41019/2019 F.No.4-KRC1359/2022-BAN Diversion of 5.724414 Ha of forest land for work of “Widening to Two Lane with Paved Shoulders from km 24.600 to km 70.063 (45.463kms) of Mudigere - Kadur Section of NH-173 on EPC mode in the State of Karnataka” Job No. KNT-NH-173-2017-18-873 Road NATIONAL HIGHWAY DIVISION HASSAN 5.724414 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 20 Jul 2019
Stage-I Approval on : 30 Jan 2023
Compliance Report Submitted by User Agency on : 27 Jul 2023
27 Kerala FP/KL/ROAD/156404/2022 C3/195/2022/F&WLD Hill Highway in Wayanad District – Kuttiyadi Churam Stretch Road EXECUTIVE ENGINEER, KRFB-PMU, KOZHIKKODE 0.00918 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Jun 2022
Stage-I Approval on : 25 Aug 2022
Compliance Report Submitted by User Agency on : 22 Oct 2024
28 Kerala FP/KL/ROAD/21739/2016 145/2017/F&WLD Reconstruction of Kazhuthuruthy Bridge at Kilometer 69/950 at NH 744 Road PWD NH SUB DIVISION PUNALUR 0.018 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 05 Oct 2016
Stage-I Approval on : 12 Apr 2017
Compliance Report Submitted by User Agency on : 03 Sep 2024
29 Kerala FP/KL/Pipeline/153543/2022 F.No.4-KLB1439/2023-BAN Rehabilitation of Muppini LI Scheme in Chungathara GP Pipeline ASSISTANT ENGINEER, MINOR IRRIGATION SECTION NILAMBUR 0.0077 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Mar 2022
Stage-I Approval on : 19 Oct 2023
Compliance Report Submitted by User Agency on : 06 Apr 2024
30 Kerala FP/KL/ROAD/151269/2022 C3/93/2022/F&WLD Black spot rectification work at vazhakkod curve km.62/805 of kodungallur shornoor road SH 22 Road ASSISTANT ENGINEER PWD ROADS SECTION CHELAKKARA 0.0254 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Jan 2022
Stage-I Approval on : 06 Jun 2022
Compliance Report Submitted by User Agency on : 17 Jan 2024
31 Kerala FP/KL/ROAD/19720/2016 GO(Rt)146/2017/F&WLD Re Construction of Murugan Panchal Bridge at Kilometer 76/00 Road PWD NH SUB DIVISION PUNALUR 0.016 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 May 2016
Stage-I Approval on : 12 Apr 2017
Compliance Report Submitted by User Agency on : 03 Sep 2024
32 Madhya Pradesh FP/MP/Others/33117/2018 F-5/2018/10-11 Malwani-Mayapur-Rajapur-Rannod OFC Line Others BHARTI AIRTEL LIMITED 0.369 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 Apr 2018
Stage-I Approval on : 24 Jun 2018
Compliance Report Submitted by User Agency on : 05 Sep 2020
33 Madhya Pradesh FP/MP/Others/32738/2018 F-5/2018/10-11 Kolaras to Rannod OFC line Others BHARTI AIRTEL LIMITED. 0.1 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Mar 2018
Stage-I Approval on : 29 Jun 2018
Compliance Report Submitted by User Agency on : 16 Dec 2020
34 Maharashtra FP/MH/ROAD/18824/2016 FC-I/MH-47/2016-NGP DIVERSION OF FOREST LAND INVNOLVED UNDER THE PROJECT OF CONST. OF ROAD & MNOR BRIDGE ON POLADPUR-MAHABALESHWAR-PANCHGANI-WAI ROAD S.H.139 AT KM 43/380 TO PETRIT VENNA LAKE (DIVERSION RAOD) V.R. 137 TAL MAHABALESHWAR DIST SATARA Road PUBLIC WORK DEPARTMENT 0.51 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Apr 2016
Stage-I Approval on : 04 Aug 2017
Compliance Report Submitted by User Agency on : 06 May 2023
35 Manipur FP/MN/ROAD/36696/2018 3-MN C 030/2019-SHI Widening and improvement of main alignment of NH-39 (Imphal-Moreh) of 29.516 km from Khongkhang to Moreh in the state of Manipur Road NHIDCL BO IMPHAL 48.288 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 Oct 2018
Stage-I Approval on : 05 Mar 2019
Compliance Report Submitted by User Agency on : 04 Feb 2022
36 Punjab FP/PB/Approach/40115/2019 FCA/1980/127/2019 RETAIL OUTLET HPCL Approach Access RETAIL OUTLET HPCL SULTANWIND 0.0614 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 May 2019
Stage-I Approval on : 26 Aug 2019
Compliance Report Submitted by User Agency on : 05 Dec 2019
37 Punjab FP/PB/Others/32642/2018 FCA/1980/108/2018 Permission for laying Sewerage pipeline in Sirhind City and surrounding area distt Fatehgarh Sahib under forest division Patiala Others EXECUTIVE ENGINNER PUNJAB WATER SUPPLY AND SEWERAGE DIVISION NO TWO PATIALA 0.81 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 20 Mar 2018
Stage-I Approval on : 24 Aug 2018
Compliance Report Submitted by User Agency on : 13 Nov 2018
38 Rajasthan FP/RJ/IRRIG/23175/2016 8B/RAJ/02/23/2020/FC Ahamdi Minor Irrigation Project Irrigation WATER RESOURCES DEPARTMENT 5.232 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Jul 2017
Stage-I Approval on : 22 Dec 2022
Compliance Report Submitted by User Agency on : 18 Dec 2023
39 Rajasthan FP/RJ/ROAD/149560/2021 8B/RAJ017/2023-JPR “Construction of Widening ,Strengthening on SH-32A From Jhameshwarji to Jagat Road KM Stone No-67/0 to 80/0, Tehsil–Girwa, District -Udaipur (Rajasthan)” Road PUBLIC WORKS DEPARTMENT RAJASTHAN 6.75 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Dec 2021
Stage-I Approval on : 30 Aug 2023
Compliance Report Submitted by User Agency on : 08 Jan 2025
40 Rajasthan FP/RJ/OFC/45025/2020 8B/RAJ003/2024-JPR Underground OFC along PWD road within existing ROW from Udaipurwati - Kot from Lat/long point 27.70724°/ 75.47414° to 27.66962°/ 75.43614° for total length of 6.349 KM and forest area – 0.2857 ha, within ROW Limits in Jhunjhunu District, Rajasthan. Optical Fibre Cable JIO DIGITAL FIBER PVT LTD 0.06 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 May 2020
Stage-I Approval on : 05 Nov 2024
Compliance Report Submitted by User Agency on : 29 Jul 2025
41 Rajasthan FP/RJ/ROAD/11683/2015 F.1(68)Forest/2017 Road from Beenaganj road to Balwatpura Road EXECUTIVE ENGINEER 0.936 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Apr 2015
Stage-I Approval on : 04 Feb 2018
Compliance Report Submitted by User Agency on : 20 Dec 2024
42 Tamil Nadu FP/TN/Others/45417/2020 TN 044 2021 Erection of 11 KV Feeder (HT) EB Posts from Ayyur to Vallam and Idayakurichi villages across Ayyur RF and Kuvagam RF. Others TANGEDCO RII/SENDURAI ARIYALUR DISTRICT 0.3996 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 16 May 2020
Stage-I Approval on : 22 Apr 2022
Compliance Report Submitted by User Agency on : 05 May 2025
43 Tamil Nadu FP/TN/Others/30206/2017 4-TNB098/2022-CHN Laying OFC of Dharmapuri Anchetti route Hogenakkal stretch Others Jio Digital Fibre Private Limited 0.792 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Nov 2017
Stage-I Approval on : 24 Nov 2022
Compliance Report Submitted by User Agency on : 24 Jun 2025
44 Tamil Nadu FP/TN/OFC/38837/2019 4-TNB121/2024-CHN BSNL Optical Fibre Cable BBHARAT SANCHAR NIGAM LIMITED 0.045 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Feb 2019
Stage-I Approval on : 04 Apr 2024
Compliance Report Submitted by User Agency on : 15 Jul 2025
45 Tamil Nadu FP/TN/ROAD/34073/2018 4-TNB125/2024-CHN Formation of new Black Top road from Vikkiramangalam - Kadupatti village Road BLOCK DEVELOPMENT OFFICER VADIPATTI 0.1275 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Jun 2018
Stage-I Approval on : 11 Sep 2024
Compliance Report Submitted by User Agency on : 29 Jan 2025
46 Tamil Nadu FP/TN/Others/24406/2017 4-TNB095/2022-CHN Laying Optical Fiber Cable from Theppakkadu to Moyar via Masinagudi in Mudumalai Tiger Reserve Others Jio Digital Fibre Private Limited 0.426 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Feb 2017
Stage-I Approval on : 31 Oct 2022
Compliance Report Submitted by User Agency on : 19 Sep 2023
47 Tamil Nadu FP/TN/Others/20328/2016 4-TNB015/2017-CHN Fish Landing Centre at Periyamangodu Village Others FISHERIES DEPARTMENT 0.38 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 05 Jul 2016
Stage-I Approval on : 07 Aug 2017
Compliance Report Submitted by User Agency on : 30 Nov 2018
48 Telangana FP/TG/ROAD/49729/2020 4-TSC187/2021-HYD Upgradation and Improvement of existing road to BT standards R/F Muthnoor to Fakeernaik Thanda of Sirikonda Mandal of Adilabad district - 6.3099 Ha Road PANCHAYAT RAJ ENGINEERING DEPARTMENT 6.3099 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Sep 2020
Stage-I Approval on : 16 Jul 2021
Compliance Report Submitted by User Agency on : 23 Jun 2023
49 Telangana FP/TG/ROAD/49733/2020 4-TSB189/2021-HYD Upgradation and Improvement of existing road to BT standards L054 -PR road to Lachimpur B village of Sirikonda Mandal of Adilabad district - 2.12 Ha Road PANCHAYAT RAJ ENGINEERING DEPARTMENT 2.12 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Sep 2020
Stage-I Approval on : 30 Jul 2021
Compliance Report Submitted by User Agency on : 28 Jun 2023
50 Uttarakhand FP/UK/ROAD/44536/2020 8B/UCP/06/61/2021/FC Construction of Village Jaishal motor road from Kodiya-Siyasain motor road. Under CMGSY Road PUBLIC WORK DEPARTMENT 1.472 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Feb 2020
Stage-I Approval on : 07 Jan 2022
Compliance Report Submitted by User Agency on : 04 Jul 2024
12
Please wait ...