| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Andhra Pradesh
|
FP/AP/MIN/10909/2015
|
4-APB047/2017-CHN
|
Quarry lease of Black granite over an extent of 4.83 Ha in Compt.No. 212 of Paradarami RF in favour of M/s Sai Joshitha Granites, Piler.
|
Mining
|
SAI JOSHITHA GRANITES
|
4.83
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Mar 2015
|
|
Stage-I Approval on
|
:
|
27 Mar 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2018
|
|
|
|
|
|
2
|
Andhra Pradesh
|
FP/AP/TRANS/37314/2018
|
G.O.Ms.No.30
|
Making LILO arrangement of 132KV Tadepalli -Tadikonda line to the proposed 132/33KV AIIMS SS at Mangalagiri in Guntur district.
|
Transmission Line
|
EXECUTIVE ENGINEER CONSTRUCTION CRDA DIVISION GUNTUR
|
0.82
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2018
|
|
Stage-I Approval on
|
:
|
29 Aug 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2020
|
|
|
|
|
|
3
|
Arunachal Pradesh
|
FP/AR/TRANS/40221/2019
|
3-ANC 082/2019-SHI
|
Revised proposal for diversion of 48.987 ha Forest land for construction of 132 kV D/C Transmission Line from Biswanath Chariali to Itanagar.
|
Transmission Line
|
NER II TRANSMISSION LIMITED
|
48.987
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 May 2019
|
|
Stage-I Approval on
|
:
|
23 Sep 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Nov 2020
|
|
|
|
|
|
4
|
Bihar
|
FP/BR/RAIL/153523/2022
|
FP/BR/RAIL/153523/2022
|
Araria Galgalia New BG Railway Line
|
Railway
|
CHIEF ENGINEER CONSTRUCTION III, N.F RAILWAY MALIGAON
|
8.243
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2022
|
|
Stage-I Approval on
|
:
|
10 Apr 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Aug 2023
|
|
|
|
|
|
5
|
Bihar
|
FP/BR/ROAD/157210/2022
|
FP/BR/ROAD/157210/2022
|
Improvement to two lane with paved shoulder of National Highway No. 327AD from km. 0.000 to km. 10.672 Saraigarh starting from its junctions with NH 327A Lalganj Ganpatganj terminating at its junction
|
Road
|
PUBLIC WORK DEPARTMENT (NATIONAL HIGHWAY)PATNA BIHAR
|
0.1799
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jun 2022
|
|
Stage-I Approval on
|
:
|
22 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Nov 2024
|
|
|
|
|
|
6
|
Jammu and Kashmir
|
FP/JK/Others/153389/2022
|
9-JKA-057/2022 -Jammu
|
Construction of Cafeteria and Public Convenience along with Mughal Road
|
Others
|
DIRECTOR TOURISM JAMMU
|
0.025
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Mar 2022
|
|
Stage-I Approval on
|
:
|
07 Jan 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Aug 2023
|
|
|
|
|
|
7
|
Jammu and Kashmir
|
FP/JK/ROAD/117800/2020
|
9-JKC-055/2021-Jammu
|
Construction of Road From Shikari To Bhaller, Package No. JK14-441, Stage 1st,Phase Xth.
|
Road
|
CHIEF ENGINEER PMGSY JAMMU
|
6.05
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Dec 2020
|
|
Stage-I Approval on
|
:
|
22 Jul 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Apr 2026
|
|
|
|
|
|
8
|
Jammu and Kashmir
|
FP/JK/ROAD/119464/2021
|
9-JKB048/2021-JAMMU
|
bhaboor to jigote
|
Road
|
EXECUTIVE ENGINEER (PIU) PMGSY DIVISION DODA
|
0.72
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Jan 2021
|
|
Stage-I Approval on
|
:
|
03 Jun 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Apr 2026
|
|
|
|
|
|
9
|
Jammu and Kashmir
|
FP/JK/ROAD/140656/2021
|
9-JKA-021/2022-Jammu
|
Construction of 130 mtr span Balini Bridge
|
Road
|
52 RCC (GREF)
|
0.39
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Apr 2021
|
|
Stage-I Approval on
|
:
|
25 May 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Apr 2026
|
|
|
|
|
|
10
|
Jammu and Kashmir
|
FP/JK/ROAD/141843/2021
|
9-JKC-096/2021-Jammu
|
Widening of road from Phiter to Billawar road alongwith Balance work of Billawar to Sukralla road
|
Road
|
XEN PWD BASOHLI
|
0.15
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Apr 2021
|
|
Stage-I Approval on
|
:
|
07 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Mar 2026
|
|
|
|
|
|
11
|
Jammu and Kashmir
|
FP/JK/ROAD/143554/2021
|
9-JKB-094/2021-Jammu
|
Construction of road from Ramnagar to Basantgarh Phase- II (l= 11.0 Km )
|
Road
|
EXECUTIVE ENGINEER PWD(R AND B) DIVISION UDHAMPUR
|
1.982
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jun 2021
|
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2024
|
|
|
|
|
|
12
|
Jammu and Kashmir
|
FP/JK/ROAD/143554/2021
|
9-JKB-094/2021-Jammu
|
Construction of road from Ramnagar to Basantgarh Phase- II (l= 11.0 Km )
|
Road
|
EXECUTIVE ENGINEER PWD(R AND B) DIVISION UDHAMPUR
|
1.982
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jun 2021
|
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2024
|
|
|
|
|
|
13
|
Jammu and Kashmir
|
FP/JK/ROAD/149044/2021
|
9-JKA-007/2023-Jammu
|
Construction of road from Kaldi to Khurrian alongwith drainage
|
Road
|
ASSISTANT EXECUTIVE ENGINEER PWD UDHAMPUR
|
0.96
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2022
|
|
Stage-I Approval on
|
:
|
31 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Mar 2024
|
|
|
|
|
|
14
|
Jammu and Kashmir
|
FP/JK/ROAD/44451/2020
|
9-JKB039/2021-JAMMU
|
Khellani Dranga Hud to Saras
|
Road
|
EXECUTIVE ENGINEER (PIU) PMGSY DIVISION DODA
|
3.122
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jun 2020
|
|
Stage-I Approval on
|
:
|
15 Jun 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Apr 2026
|
|
|
|
|
|
15
|
Jammu and Kashmir
|
FP/JK/ROAD/45122/2020
|
9-JKA-087/2021-Jammu
|
construction of link road Panditgam to Chanseri
|
Road
|
R&B DEPARTMENT JAMMU
|
0.4178
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jun 2020
|
|
Stage-I Approval on
|
:
|
01 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2026
|
|
|
|
|
|
16
|
Jammu and Kashmir
|
FP/JK/ROAD/45422/2020
|
FSt/Land/parivesh/06/2021
|
Construction of road from Dhanu (Dhanwalt) to Barigairian (forol) via Gaihar Ramnagar
|
Road
|
AEE PWD (R&B) SUB DIVISION MAJALTA
|
0.645
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 May 2020
|
|
Stage-I Approval on
|
:
|
16 Mar 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2024
|
|
|
|
|
|
17
|
Jammu and Kashmir
|
FP/JK/ROAD/45508/2020
|
FST/Land/Parivesh/32/2020
|
Construction of Parmaz link road
|
Road
|
PWD R&B SPL SUB DIVISION DODA
|
0.03
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jun 2020
|
|
Stage-I Approval on
|
:
|
17 Feb 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Apr 2026
|
|
|
|
|
|
18
|
Jammu and Kashmir
|
FP/JK/ROAD/45770/2020
|
9-JKB-076-2021-JAMMU
|
Construction of link road from Gai Dessa to Bhatta via Mangal Thatha and Dewal Kund.
|
Road
|
PWD R&B SPL SUB DIVISION DODA
|
2.557
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jun 2020
|
|
Stage-I Approval on
|
:
|
30 Dec 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Apr 2026
|
|
|
|
|
|
19
|
Jammu and Kashmir
|
FP/JK/ROAD/46463/2020
|
9-JKC-073/2021-Jammu
|
Construction and Upgradation of Bharath to Keshwan link road upto Ingwan Gali Km 1st to 13th.
|
Road
|
PWD R&B SPL SUB DIVISION DODA
|
6.77
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jun 2020
|
|
Stage-I Approval on
|
:
|
28 Apr 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Apr 2026
|
|
|
|
|
|
20
|
Jammu and Kashmir
|
FP/JK/ROAD/46486/2020
|
9-JKB028/2021-JAMMU
|
Bhara to Mandhir Mohalla Godha road package IV
|
Road
|
EXECUTIVE ENGINEER (PIU) PMGSY DIVISION DODA
|
0.815
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jun 2020
|
|
Stage-I Approval on
|
:
|
11 May 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Mar 2026
|
|
|
|
|
|
21
|
Jammu and Kashmir
|
FP/JK/ROAD/46769/2020
|
9-JKC-027/2021-Jammu
|
Road from Trembli to Dheota (JK07-87)
|
Road
|
PIU KATHUA
|
10.385
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jun 2020
|
|
Stage-I Approval on
|
:
|
13 Jul 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Apr 2026
|
|
|
|
|
|
22
|
Jammu and Kashmir
|
FP/JK/ROAD/46939/2020
|
9-JKA-075/2021-Jammu
|
Road from Amira nagar Via Kharoti Bhelan linking Hanga link Road at Gatthi More
|
Road
|
R&B DEPARTMENT JAMMU
|
0.305
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jul 2020
|
|
Stage-I Approval on
|
:
|
30 Dec 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Apr 2026
|
|
|
|
|
|
23
|
Jammu and Kashmir
|
FP/JK/ROAD/46980/2020
|
9-JKC-035/2021-Jammu
|
PMGSY ROAD MARI TO DHAKIKOT PART-II
|
Road
|
CHIEF ENGINEER PMGSY JAMMU
|
12.052
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Aug 2020
|
|
Stage-I Approval on
|
:
|
27 May 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Feb 2026
|
|
|
|
|
|
24
|
Jammu and Kashmir
|
FP/JK/ROAD/47242/2020
|
9-JKB050-2021-JAMMU
|
Harog to Halla
|
Road
|
CHIEF ENGINEER PMGSY (JKRRDA) JAMMU
|
0.9
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jul 2020
|
|
Stage-I Approval on
|
:
|
24 May 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Apr 2026
|
|
|
|
|
|
25
|
Jammu and Kashmir
|
FP/JK/ROAD/47888/2020
|
9-JKC-004/2021-Jammu
|
Khourgali to Radnote
|
Road
|
PMGSY DIVISION REASI
|
5.029
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jul 2020
|
|
Stage-I Approval on
|
:
|
10 May 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2026
|
|
|
|
|
|
26
|
Jammu and Kashmir
|
FP/JK/ROAD/48666/2020
|
9-JKB-019/2021-Jammu
|
KANTHAN TO SAWALKOT-II
|
Road
|
CHIEF ENGINEER PMGSY JAMMU
|
13.962
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Aug 2020
|
|
Stage-I Approval on
|
:
|
28 Jun 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Apr 2026
|
|
|
|
|
|
27
|
Jammu and Kashmir
|
FP/JK/ROAD/48915/2020
|
9-JKB034-2021-JAMMU
|
Upgradtion and Maintenance of Road from Km 4th of T02 To Madam
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
1.27
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Sep 2020
|
|
Stage-I Approval on
|
:
|
18 May 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Apr 2026
|
|
|
|
|
|
28
|
Jammu and Kashmir
|
FP/JK/ROAD/65427/2020
|
9-JKB025-2021-CHA
|
Upgradation and Maintenance of road from MRL01-Tarathpora to Waisa via Shenpora cherpawa Kulwari Lilam Stage -U ( Batch -I, 2019-20) Package No JK08-2012, Length = 8.5kms, Block Ramhal
|
Road
|
CHIEF ENGINEER, PMGSY, KASHMIR
|
1.184
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Dec 2020
|
|
Stage-I Approval on
|
:
|
16 Apr 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Apr 2026
|
|
|
|
|
|
29
|
Jammu and Kashmir
|
FP/JK/TRANS/145320/2021
|
9-JKB-052/2022-Jammu
|
CONSTRUCTION OF 132 KV D/C RAMBAN SANGALDAN TRANSMISSION LINE FOR PROVIDING POWER SUPPLY TO KONKAN RAILWAY
|
Transmission Line
|
EXECUTIVE ENGINEER TLMD 3 UDHAMPUR
|
4.37
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jul 2021
|
|
Stage-I Approval on
|
:
|
14 Jan 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Apr 2026
|
|
|
|
|
|
30
|
Jammu and Kashmir
|
FP/JK/TRANS/44649/2020
|
9-JKB-003/2020-Jammu
|
Re alignment of 220Kv KPTL Line KP175 KP176 Near Baggu nallah Batote
|
Transmission Line
|
EXECUTIVE ENGINEER TLMD 3 UDHAMPUR
|
1.47
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Feb 2020
|
|
Stage-I Approval on
|
:
|
29 Apr 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Apr 2026
|
|
|
|
|
|
31
|
Jammu and Kashmir
|
FP/JK/WATER/144892/2021
|
FST-land0FC/46/2022-02
|
WSS Phalata
|
Drinking Water
|
CHIEF ENGINEER JAL SHAKTI (PHE) JAMMU
|
0.187
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jul 2021
|
|
Stage-I Approval on
|
:
|
21 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2026
|
|
|
|
|
|
32
|
Karnataka
|
FP/KA/Others/25957/2017
|
FEE 4 FLL 2019 e
|
Laying of OFC Cable Under Central Govt. NOFN Project
|
Others
|
BSNL GLB
|
0.9215
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 May 2017
|
|
Stage-I Approval on
|
:
|
16 Sep 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Dec 2020
|
|
|
|
01 Jan 1900
|
|
33
|
Karnataka
|
FP/KA/Others/25957/2017
|
FEE 4 FLL 2019 e
|
Laying of OFC Cable Under Central Govt. NOFN Project
|
Others
|
BSNL GLB
|
0.9215
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 May 2017
|
|
Stage-I Approval on
|
:
|
16 Sep 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Dec 2020
|
|
|
|
01 Jan 1900
|
|
34
|
Karnataka
|
FP/KA/ROAD/40347/2019
|
F.No.KRC1321/2021-BAN
|
Two Laning with Paved Shoulder of Chintamani to AP Border (length 39.8 kms), on Hybrid Annuity (DBFOMT) basis under Project KSHIP-III in Chikkaballapura & Kolar District of Karnataka State .
|
Road
|
KSHIP-TUMKUR
|
16.8014
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 May 2019
|
|
Stage-I Approval on
|
:
|
28 Feb 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2022
|
|
|
|
|
|
35
|
Karnataka
|
FP/KA/ROAD/40747/2019
|
F.No.KRB1305/2021-BAN
|
2 Laning of Gadag to Honnali Section of SH-57 and SH-26 in the State of Karnataka
|
Road
|
KSHIP
|
5.1564
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2019
|
|
Stage-I Approval on
|
:
|
04 May 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Nov 2022
|
|
|
|
|
|
36
|
Karnataka
|
FP/KA/ROAD/41019/2019
|
F.No.4-KRC1359/2022-BAN
|
Diversion of 5.724414 Ha of forest land for work of “Widening to Two Lane with Paved Shoulders from km 24.600 to km 70.063 (45.463kms) of Mudigere - Kadur Section of NH-173 on EPC mode in the State of Karnataka” Job No. KNT-NH-173-2017-18-873
|
Road
|
NATIONAL HIGHWAY DIVISION HASSAN
|
5.724414
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jul 2019
|
|
Stage-I Approval on
|
:
|
30 Jan 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jul 2023
|
|
|
|
|
|
37
|
Karnataka
|
FP/KA/SCH/83641/2020
|
FEE 79 FLL 2022
|
Diversion of forest land in Gutaguddi Village, Hukkeri Taluk, Belagavi District for Construction of High School and other amenities in favour of Deputy Director of Public instructions, Chikkodi
|
School
|
DDPI CHIKODI
|
1
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jan 2021
|
|
Stage-I Approval on
|
:
|
03 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Dec 2023
|
|
|
|
|
|
38
|
Karnataka
|
FP/KA/WATER/25499/2017
|
FEE 88 FLL 2017
|
For laying of pipeline to supply of Drinking Water form Ramapura Village to Halagavadi in Chitradurga District , Davanagere Division, in favour of the Panchayath Development Officer, Halagavadi.
|
Drinking Water
|
PANCHAYATH RAJ ENGINEERING DEPARTMENT
|
0.17
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Apr 2017
|
|
Stage-I Approval on
|
:
|
11 Oct 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Mar 2018
|
|
|
|
|
|
39
|
Karnataka
|
FP/KA/WATER/41470/2019
|
F.No.KRC1373/2022-BAN
|
Laying of Water Pipe line and Water Tanks in the Bellary Forest Division, Chitradurga Forest Division and Tumakuru Forest Division for Drinking Water Supply Scheme To Rural Habitations And Town Of Pavagada Taluk In Tumkur District, Rural Habitations And Town Of Molakalmuru Taluk In Chitradurga District, Rural Habitations Of Challaker
|
Drinking Water
|
SUPERINTENDING ENGINEER RURAL WATER AND SANITATION DEPARTMENT BANGALORE CIRCLE BANGALORE
|
8.49
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2019
|
|
Stage-I Approval on
|
:
|
07 Oct 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2025
|
|
|
|
|
|
40
|
Karnataka
|
FP/KA/WATER/43710/2020
|
F.No.4-KRB1295/2021-BAN/
|
Providing drinking water supply scheme to Navile,Thoreshettihalli and other 53 villages of Maddur Taluk in Mandya District.
|
Drinking Water
|
EE_RWS_DIV_MANDYA
|
0.391
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jan 2020
|
|
Stage-I Approval on
|
:
|
29 Oct 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2023
|
|
|
|
|
|
41
|
Karnataka
|
FP/KA/WATER/46525/2020
|
FEE 109 FLL 2021 e
|
For construction of Raising & Gravity Main Pipeline, Storage & Distributor Tank, Inspection path in forest land, Bellatti, Devihala, Etagi & other Villages for providing drinking water and recharging ground water to fill 20 tanks in Shirahatti (T), Gadag (D) under Shirahatti Lift Irrigation Scheme in favour of the EE, SLI Division, KNNL, Mundaragi.
|
Drinking Water
|
MANAGING DIRECTOR, KNNL, DR.B.R. AMBEDKAR VEEDHI, BANGALORE
|
0.8311
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jun 2020
|
|
Stage-I Approval on
|
:
|
03 Feb 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2025
|
|
|
|
|
|
42
|
Karnataka
|
FP/KA/Approach/43337/2019
|
F.No.4-KRB1365/2022-BAN
|
Diversion of 3.4744 Hectares of forest land in Virje village of Ghadasai Hobli,Karwar taluk, Uttara Kannada district for Approach road from SH-66 to Kaiga township in favour of Nuclear Power Corporation of India Limited, Kaiga site,Karwar taluk, Uttara Kannada district.
|
Approach Access
|
NPCILKGS
|
3.4744
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jan 2020
|
|
Stage-I Approval on
|
:
|
25 Nov 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Feb 2023
|
|
|
|
|
|
43
|
Kerala
|
FP/KL/Others/150946/2022
|
F.No.4-KLB1350/2022-BAN
|
Land for construction of Mullapperiyar Police Station at Vallakkadavu
|
Others
|
DISTRICT POLICE CHIEF IDUKKI
|
0.2023
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2022
|
|
Stage-I Approval on
|
:
|
22 Mar 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Feb 2026
|
|
|
|
|
|
44
|
Kerala
|
FP/KL/Pipeline/153543/2022
|
F.No.4-KLB1439/2023-BAN
|
Rehabilitation of Muppini LI Scheme in Chungathara GP
|
Pipeline
|
ASSISTANT ENGINEER, MINOR IRRIGATION SECTION NILAMBUR
|
0.0077
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Mar 2022
|
|
Stage-I Approval on
|
:
|
19 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Apr 2024
|
|
|
|
|
|
45
|
Kerala
|
FP/KL/ROAD/151269/2022
|
C3/93/2022/F&WLD
|
Black spot rectification work at vazhakkod curve km.62/805 of kodungallur shornoor road SH 22
|
Road
|
ASSISTANT ENGINEER PWD ROADS SECTION CHELAKKARA
|
0.0254
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jan 2022
|
|
Stage-I Approval on
|
:
|
06 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jan 2024
|
|
|
|
|
|
46
|
Kerala
|
FP/KL/ROAD/156404/2022
|
C3/195/2022/F&WLD
|
Hill Highway in Wayanad District – Kuttiyadi Churam Stretch
|
Road
|
EXECUTIVE ENGINEER, KRFB-PMU, KOZHIKKODE
|
0.00918
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jun 2022
|
|
Stage-I Approval on
|
:
|
25 Aug 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
|
|
47
|
Kerala
|
FP/KL/ROAD/19720/2016
|
GO(Rt)146/2017/F&WLD
|
Re Construction of Murugan Panchal Bridge at Kilometer 76/00
|
Road
|
PWD NH SUB DIVISION PUNALUR
|
0.016
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2016
|
|
Stage-I Approval on
|
:
|
12 Apr 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2024
|
|
|
|
|
|
48
|
Kerala
|
FP/KL/ROAD/21739/2016
|
145/2017/F&WLD
|
Reconstruction of Kazhuthuruthy Bridge at Kilometer 69/950 at NH 744
|
Road
|
PWD NH SUB DIVISION PUNALUR
|
0.018
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Oct 2016
|
|
Stage-I Approval on
|
:
|
12 Apr 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2024
|
|
|
|
|
|
49
|
Madhya Pradesh
|
FP/MP/Others/32738/2018
|
F-5/2018/10-11
|
Kolaras to Rannod OFC line
|
Others
|
BHARTI AIRTEL LIMITED.
|
0.1
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Mar 2018
|
|
Stage-I Approval on
|
:
|
29 Jun 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Dec 2020
|
|
|
|
|
|
50
|
Madhya Pradesh
|
FP/MP/Others/33117/2018
|
F-5/2018/10-11
|
Malwani-Mayapur-Rajapur-Rannod OFC Line
|
Others
|
BHARTI AIRTEL LIMITED
|
0.369
|
Pending at DFO for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Apr 2018
|
|
Stage-I Approval on
|
:
|
24 Jun 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Sep 2020
|
|
|
|
|
|