| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Andhra Pradesh
|
FP/AP/ROAD/36092/2018
|
G.O.Ms.No.03
|
Formation and Providing BT to the road from Vinayakapuram to Irkampeta of Chinturu mandal
|
Road
|
EEPIUKKD
|
1.54
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2018
|
|
Stage-I Approval on
|
:
|
25 Feb 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Nov 2023
|
|
|
|
|
|
2
|
Andhra Pradesh
|
FP/AP/ROAD/37747/2018
|
G.O.Ms.No.34
|
Road from Vanjari to Korrapadu
|
Road
|
Executive Engineer PR Paderu
|
1.88
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2018
|
|
Stage-I Approval on
|
:
|
03 Oct 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
|
3
|
Andhra Pradesh
|
FP/AP/QRY/155444/2022
|
4-APB189/2022-VIJ
|
Proposal for diversion of 4.84 ha of forest land in compartment no.102, Janapadu RF, Guntur Division for quarry lease for limestone (Minor) filed by Sri G. Pavan Kumar Reddy.
|
Quarrying
|
PAVAN KUMAR REDDY GOTTIMUKKALA
|
4.84
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2022
|
|
Stage-I Approval on
|
:
|
07 Apr 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Mar 2024
|
|
|
|
|
|
4
|
Andhra Pradesh
|
FP/AP/OFC/81411/2020
|
4-APB178/2022-VIJ
|
Execution of Optical Fiber Network(IPI) Project Nellore District in the State of Andhra Pradesh for the favour of Vindhya Telelinks Limited.
|
Optical Fibre Cable
|
M/S VINDHYA TELELINKS LTD
|
0.45
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Dec 2020
|
|
Stage-I Approval on
|
:
|
12 Dec 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Apr 2025
|
|
|
|
|
|
5
|
Andhra Pradesh
|
FP/AP/ROAD/33878/2018
|
G.O.Ms No.133
|
Diversion of 1.79 Ha in Giddalur Forest Division for Upgradation of NH-167B from Km 43/097 to 99/103 i.e from Porumamilla to Chandrasekhara Puram to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
1.79
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2018
|
|
Stage-I Approval on
|
:
|
30 Nov 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Oct 2023
|
|
|
|
|
|
6
|
Andhra Pradesh
|
FP/AP/IRRIG/36514/2018
|
G.O.Ms.No.134
|
Providing drinking water and irrigation facilities to 68 tanks in the upland areas of Kurnool District from left side of HNSS main canal phase-i in Kurnool District
|
Irrigation
|
WATER RESOURCES DEPARTMENT
|
4.73
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Oct 2018
|
|
Stage-I Approval on
|
:
|
05 Dec 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Aug 2021
|
|
|
|
|
|
7
|
Andhra Pradesh
|
FP/AP/ROAD/12568/2015
|
G.O.Ms.No.2
|
Karakavalasa Road to Marika
|
Road
|
EXICUTIVE ENGINEER
|
4.38
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Sep 2015
|
|
Stage-I Approval on
|
:
|
02 Jan 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 Aug 2023
|
|
|
|
|
|
8
|
Arunachal Pradesh
|
FP/AR/Others/154344/2022
|
3-ANC081/2022-GHY
|
Proposal for diversion of 19.52 ha forest land for the diversion of forest land on which Golden Pagoda Buddhist religious site is located
|
Others
|
DISTRICT ADMINISTRATION NAMSAI
|
19.52
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Apr 2022
|
|
Stage-I Approval on
|
:
|
15 Mar 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
02 Dec 2025
|
|
|
|
|
|
9
|
Arunachal Pradesh
|
FP/AR/MIN/23213/2016
|
3 AN B 053/2018-SHI
|
Diversion of 3.60 ha of forestland for OIL’s drilling location DML-3/1 in Namsang USF, Deomali in Tirap District of Arunachal Pradesh
|
Mining
|
OIL INDIA LIMITED NEF PROJECT
|
3.6
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jul 2017
|
|
Stage-I Approval on
|
:
|
31 Aug 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Sep 2021
|
|
|
|
|
|
10
|
Assam
|
FP/AS/MIN/23425/2017
|
3-AS-B-112-2020 - GHY
|
Drilling Location DHD
|
Mining
|
OIL INDIA LIMITED
|
2.696
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jan 2017
|
|
Stage-I Approval on
|
:
|
28 Jul 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Aug 2024
|
|
|
|
|
|
11
|
Assam
|
FP/AS/TRANS/9060/2015
|
3-AS B 034/2016-SHI
|
132KV S/C Transmission Line from 220KV Salakati Grid S/S to 132KV/33KV Kokrajhar S/S
|
Transmission Line
|
ASSAM ELECTRICITY GRID CORPORATION LINITED
|
1.82
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2015
|
|
Stage-I Approval on
|
:
|
25 Jan 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Feb 2022
|
|
|
|
|
|
12
|
Bihar
|
FP/BR/Others/32115/2018
|
FP/BR/Others/32115/2018
|
Establishment of retail out-let (Petrol Pump) dealership of HPCL
|
Others
|
SMT SULEKHA KUMARI
|
0.012
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Feb 2018
|
|
Stage-I Approval on
|
:
|
30 May 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Sep 2020
|
|
|
|
|
|
13
|
Bihar
|
FP/BR/Pipeline/154538/2022
|
FP/BR/Pipeline/154538/2022
|
Paradip - Numaligarh Crude Oil Pipeline (PNCPL) Project
|
Pipeline
|
NUMALIGARH REFINERY LIMITED
|
0.42541
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Apr 2022
|
|
Stage-I Approval on
|
:
|
21 Oct 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Dec 2025
|
|
|
|
|
|
14
|
Bihar
|
FP/BR/ROAD/148190/2021
|
FP/BR/ROAD/148190/2021
|
development of Economic Corridor, Inter Corridors and Feeder Routes to improve the efficiency of freight movement in India under Bharatmala Pariyojana (Lot-5/Package-7) from Sherpur to Dighwara Part o
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA, PIU PATNA-II
|
0.065
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Oct 2021
|
|
Stage-I Approval on
|
:
|
27 Dec 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2025
|
|
|
|
|
|
15
|
Bihar
|
FP/BR/Others/43758/2020
|
FP/BR/Others/43758/2020
|
Diversion of 0.0195 ha of forest land for construction of approach road for opening retail outlet of BPCL on SH-56 Road in Darbhanga district of Bihar.
|
Others
|
AJAY KUMAR PASWAN
|
0.0195
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2020
|
|
Stage-I Approval on
|
:
|
29 Jun 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Sep 2021
|
|
|
|
|
|
16
|
Chhattisgarh
|
FP/CG/SubStation/145951/2021
|
FC-II/IROCH-17/2023
|
220/132/33 KV SUBSTATION DHARAMJAIGARH AT VILLAGE HATI, AREA 6.823 HECTARE
|
Sub Station
|
CSPTCL
|
6.823
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Aug 2021
|
|
Stage-I Approval on
|
:
|
04 Jul 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jan 2025
|
|
|
|
|
|
17
|
Dadar & Nagar Haveli
|
FP/DN/IND/28625/2017
|
6-DNB049/2017-BHO
|
Laying of 11 KV Underground Electricity Line
|
Industry
|
UNOVEL INDUSTRIES PRIVATE LIMITED
|
0.61
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Aug 2017
|
|
Stage-I Approval on
|
:
|
19 Jan 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2024
|
|
|
|
|
|
18
|
Dadar & Nagar Haveli
|
FP/DN/Others/32569/2018
|
6-DNB029/2018-BHO
|
M/s. Shri Khatu Shyam Pvt. Ltd. power line connectivity
|
Others
|
DATT INDUSTRIAL SERVICES
|
0.425547
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Mar 2018
|
|
Stage-I Approval on
|
:
|
01 Jun 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2024
|
|
|
|
|
|
19
|
Delhi
|
FP/DL/ROAD/142829/2021
|
8B-RAJ041/2022-JPR
|
Construction of 6 Lane access controlled Highway from DND Maharani Bagh to Junction with Jaitpur-Pushta Road Section of NH-148 NA in the NCR of Delhi (PKG – I) under Bharatmala Pariyojana
|
Road
|
CMU, MATHURA, NHAI
|
0.35
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 May 2021
|
|
Stage-I Approval on
|
:
|
26 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2025
|
|
|
|
|
|
20
|
Delhi
|
FP/DL/ROAD/154223/2022
|
8B/DLI044/2022-JPR
|
Construction of 6 Lane access controlled Highway from DND Maharani Bagh to Junction with Jaitpur-Pushta Road Section of NH-148 NA (Design Ch. 2+900 to 6+700) in the NCR of Delhi (PKG – I) under Bharat
|
Road
|
CMU, MATHURA, NHAI
|
3.0955
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Apr 2022
|
|
Stage-I Approval on
|
:
|
30 Aug 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
31 Oct 2025
|
|
|
|
|
|
21
|
Delhi
|
FP/DL/ROAD/142233/2021
|
8B/DLI029/2022-JPR
|
Development of Six- lane access controlled in Delhi portion of Delhi Saharanpur Highway from Akshardham NH-9 junction to Delhi/UP Border in the state of Delhi.
|
Road
|
NHAI
|
9.58
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 May 2021
|
|
Stage-I Approval on
|
:
|
13 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Mar 2024
|
|
|
|
|
|
22
|
Gujarat
|
FP/GJ/TRANS/54160/2020
|
6-GJB060/2021-BHO
|
Bhaniya village 24 *7 hour 3-ph JGY power supply (Bhaniya – khishari ag electric link line (0.0595 Ha)) ta. Khambha dist. Amreli in Gujarat State
|
Transmission Line
|
PGVCL KHAMBHA SDN
|
0.0595
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Nov 2020
|
|
Stage-I Approval on
|
:
|
17 Jun 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
31 May 2022
|
|
|
|
|
|
23
|
Gujarat
|
FP/GJ/ROAD/8847/2014
|
6-GJB018/2015-BHO
|
Bharuch-Ankleshwar-sixline Road NH 8 Km 190/08 to 192/040
|
Road
|
EXICUTIVE ENGINEER
|
0.992
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Dec 2014
|
|
Stage-I Approval on
|
:
|
27 Feb 2015
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Oct 2025
|
|
|
|
|
|
24
|
Gujarat
|
FP/GJ/TRANS/41280/2019
|
6-GJC040/2021-BHO
|
Submission of 21.6360 Hac. Forest land proposal for Diversion for Forest Land proposal for forest clearance for 66KV LILO line for 66kv Jirval sub-station - 2.1690 Hec, & 66KV LILO line for 66KV Nandg
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
21.636
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jul 2019
|
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2024
|
|
|
|
|
|
25
|
Gujarat
|
FP/GJ/Others/50281/2020
|
FC-6/GJB-40/2022-GNR
|
Proposal for laying OFC for Jio Digital Fibre Pvt. Ltd. Patan District
|
Others
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
0.2934
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Sep 2020
|
|
Stage-I Approval on
|
:
|
05 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jan 2026
|
|
|
|
|
|
26
|
Gujarat
|
FP/GJ/ROAD/148923/2021
|
FC-6/GJC-58/2022-GNR
|
Widening & Strengthening of Junagadh-Bhesan-Parab Vavdi Road
|
Road
|
DEPUTY EXECUTIVE ENGINEER-R&B CITY SUB DIVISION-JUNAGADH
|
17.24625
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2021
|
|
Stage-I Approval on
|
:
|
30 Oct 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2024
|
|
|
|
|
|
27
|
Gujarat
|
FP/GJ/IRRIG/156615/2022
|
FED/FLP/e-file/6/2023/0174/F
|
Grant Permission of Lift Irrigation U/G Pipeline project for diversion of 0.3754 ha Reserved Forest land for Transmission of water from Panam High level canal and Right Bank Main Canal(RBMC) of PHLC t
|
Irrigation
|
EXECUTIVE ENGINEER, PANAM PROJECT DIVISION, GODHRA
|
0.3754
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jun 2022
|
|
Stage-I Approval on
|
:
|
14 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Dec 2025
|
|
|
|
|
|
28
|
Gujarat
|
FP/GJ/IRRIG/40453/2019
|
FC-6/GJC-62/2022-GNR
|
Diversion of 10.19 ha. R.F. Land for construction of Barrage and approach road on Sabarmati River in Village: Hirpura, Dist. Mehsana.
|
Irrigation
|
DHAROI CANAL DIVISION NO.3, VISNAGAR
|
10.19
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 May 2019
|
|
Stage-I Approval on
|
:
|
21 Apr 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Aug 2023
|
|
|
|
|
|
29
|
Gujarat
|
FP/GJ/RAIL/65579/2020
|
6-GJB057/2021-BHO
|
WDFC (ROB 12-PCL)
|
Railway
|
DFCCIL AHMEDABAD
|
2.35
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2020
|
|
Stage-I Approval on
|
:
|
04 Jun 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jul 2021
|
|
|
|
|
|
30
|
Gujarat
|
FP/GJ/Others/149710/2021
|
FC-6/GJB-43/2022-GNR
|
Gandhinagar Metro Rail Phase-II, Package 2
|
Others
|
GUJARAT METRO RAIL CORPORATION (GMRC) LIMITED
|
1.5324
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Dec 2021
|
|
Stage-I Approval on
|
:
|
19 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Mar 2025
|
|
|
|
|
|
31
|
Gujarat
|
FP/GJ/ROAD/45736/2020
|
FC-6/GJB-68/2022-GNR
|
WIDENING AND STRENGTHENING OF KHAMBHALA-KOTDAPITHA-THORKHAN ROAD (MDR) KM. 0/0 TO 29/6, DIST. AMRELI
|
Road
|
EXECUTIVE ENGINEER R&B DIVISION AMRELI
|
2.34
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2020
|
|
Stage-I Approval on
|
:
|
08 Feb 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 May 2024
|
|
|
|
|
|
32
|
Gujarat
|
FP/GJ/TRANS/146196/2021
|
FCA-1021/3-30/21/SF-246/F
|
66KV S/C (3+1) 630Sq.mm, underground cable from 220KV Otha Sub-station to 66KV Mahuva (Neswad) Sub-station.
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
0.43252
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2021
|
|
Stage-I Approval on
|
:
|
06 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2024
|
|
|
|
|
|
33
|
Gujarat
|
FP/GJ/TRANS/37923/2018
|
6-GJC042/2021-BHO
|
Erection of 66kV Tower line for 66kV Kalibel substation LILO from exist 66kV Waghai-Ahwa line
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
6.642
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Dec 2018
|
|
Stage-I Approval on
|
:
|
25 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2024
|
|
|
|
|
|
34
|
Gujarat
|
FP/GJ/Canal/150953/2022
|
FCA-1022/4-04/22/SF-95/F
|
Grant Permission of Gravity Pipeline project for diversion of 0.1170 ha Reserved Forest land (Village: Isrodiya & Vavdi khurd) for Transmission of water from 8R Distributory Canal and Ambali Lake to V
|
Canal
|
EXECUTIVE ENGINEER, PANAM PROJECT DIVISION, GODHRA
|
0.117
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jan 2022
|
|
Stage-I Approval on
|
:
|
17 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Dec 2025
|
|
|
|
|
|
35
|
Gujarat
|
FP/GJ/ROAD/25954/2017
|
FC-6/GJA-83/2023-GNR
|
Rehabilitation and up-gradation of Mahuva- Savarkundla- Amreli- Bagasara-Jetpur section of NH-351 to two/four lane with paved shoulder configuration in the State of Gujarat
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION
|
112.736
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 May 2017
|
|
Stage-I Approval on
|
:
|
21 Dec 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2025
|
|
|
|
|
|
36
|
Gujarat
|
FP/GJ/Canal/147318/2021
|
FCA-1021/4-16/21/SF-249/F
|
Diversion of 0.36 Ha. Reserved Forest Land for Panam High Level 1-L Distributory of Right Bank Canal, Village: Mithapur, Ta. Shehera, District: Panchmahal In Gujarat State.
|
Canal
|
EXECUTIVE ENGINEER, PANAM PROJECT DIVISION, GODHRA
|
0.36
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Sep 2021
|
|
Stage-I Approval on
|
:
|
11 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Sep 2025
|
|
|
|
|
|
37
|
Gujarat
|
FP/GJ/ROAD/43099/2019
|
FC-6/GJC-17/2022-GNR
|
Widening & Strengthening of existing B.T. Surface and reconstruction of cross drainage structure of Deshalpar Mandvi Naliya Narayansarovar road. (NH – 8A-Ext) Section : KM 226/200 to 242/500
|
Road
|
NATIONAL HIGHWAY DIVISION GANDHIDHAM
|
6.52
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Dec 2019
|
|
Stage-I Approval on
|
:
|
21 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Feb 2025
|
|
|
|
|
|
38
|
Gujarat
|
FP/GJ/OFC/48577/2020
|
6-GJB031/2021-BHO
|
Proposal for Diversion of 1.9 ha. Reserved forest land (ESZ) for the grant permission for laying GFGNL Optical Fiber Cable line along the Shoolpaneshwar sanctuary area in Ta. Dediyapada and Nandod, Dist. Narmada
|
Optical Fibre Cable
|
GFGNL
|
1.9
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Aug 2020
|
|
Stage-I Approval on
|
:
|
22 Apr 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2024
|
|
|
|
|
|
39
|
Gujarat
|
FP/GJ/Pipeline/154945/2022
|
FCA-1022/5-17/22/SF-133/F
|
125 mm Dia MDPE Gas Pipeline Connectivity For Scoda Tubes ltd. Kadi Dist:Mehsana
|
Pipeline
|
SABARMATI GAS LIMITED
|
0.068
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Apr 2022
|
|
Stage-I Approval on
|
:
|
27 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Sep 2024
|
|
|
|
|
|
40
|
Gujarat
|
FP/GJ/TRANS/145120/2021
|
FCA-1021/3-20/21/SF-188/F
|
66KV S/C (3+1) 630 Sq. mm, UG Cable from 66KV Ghanghali – 3 S/S (GETCO S/S) to M/s.Prabodh steel Pvt. Ltd. village-Ghanghali,Ta. Sihor,Dist.Bhavnagar.
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
0.15
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jul 2021
|
|
Stage-I Approval on
|
:
|
06 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2024
|
|
|
|
|
|
41
|
Gujarat
|
FP/GJ/OFC/49946/2020
|
6-GJB101/2021-BHO
|
GFGNL (BBNL Phase-II) Project Dhrangadhra Gudhkhar forest area
|
Optical Fibre Cable
|
GUJARAT FIBER GRID NETWORK LTD
|
0.0333
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2020
|
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 Feb 2023
|
|
|
|
|
|
42
|
Gujarat
|
FP/GJ/Others/19176/2016
|
6-GJB05/2017-BHO
|
PVC Pipe Line For Sea Water
|
Others
|
OCEANBLUE HATCHERIES
|
0.108
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 May 2016
|
|
Stage-I Approval on
|
:
|
08 Sep 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Apr 2025
|
|
|
|
|
|
43
|
Gujarat
|
FP/GJ/ROAD/25121/2017
|
FCA-1019/7-05/19/SF-100/F
|
Proposal for diversion of 0.6750 ha. Reserved forest land for the project of Widening and Strengthening Construction of Kubada-Shivad Road (Village Road) K.M. 0/00 to 3/500 (Working Section 1/000 to 1/900) Village : Kubda Dist. Amreli in Gujarat State.
|
Road
|
R N B PANCHAYAT DIVISION AMRELI
|
0.675
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2017
|
|
Stage-I Approval on
|
:
|
07 Sep 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2024
|
|
|
|
|
|
44
|
Gujarat
|
FP/GJ/ROAD/140444/2021
|
FC-6/GJB-33/2022-GNR
|
Reconstruction of Sukhpur Dalkhaniya Road
|
Road
|
R AND B PANCHAYAT DIVISION AMRELI
|
0.98
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Apr 2021
|
|
Stage-I Approval on
|
:
|
01 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2023
|
|
|
|
|
|
45
|
Gujarat
|
FP/GJ/Others/25303/2017
|
6-GJB021/2018-BHO
|
Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Gir West Distriect
|
Others
|
RELIANCE JIO INFOCOMM LTD
|
1.6143
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Mar 2017
|
|
Stage-I Approval on
|
:
|
25 May 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Sep 2023
|
|
|
|
|
|
46
|
Gujarat
|
FP/GJ/TRANS/44390/2020
|
FCA-1020/3-18/20/SF-224/F
|
66KV D/c Rabarika - Umrali (M/S Powerica Wind Power Generation) line
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
0.02
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Feb 2020
|
|
Stage-I Approval on
|
:
|
01 Jan 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2024
|
|
|
|
|
|
47
|
Gujarat
|
FP/GJ/Others/42615/2019
|
6-GJB020/2020-BHO
|
Laying of underground power cable for electrification of ropeway project on girnar hill
|
Others
|
PGVCL JUNAGADH
|
2
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Nov 2019
|
|
Stage-I Approval on
|
:
|
30 Jun 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2023
|
|
|
|
|
|
48
|
Gujarat
|
FP/GJ/ROAD/14898/2015
|
6-GJB05/2016-BHO
|
R.O.B. on Pansora-BhalejAnand Roa r and Bhalej-Ahima Road
|
Road
|
EXECUTIVE ENGINEER
|
0.99375
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2015
|
|
Stage-I Approval on
|
:
|
18 Mar 2016
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2023
|
|
|
|
|
|
49
|
Gujarat
|
FP/GJ/ROAD/123854/2021
|
6-GJC041/2021-BHO
|
Widening & Strengthening of Naswadi - Bhakha - Kawant Road Km. 0/0 to 38/400
|
Road
|
DISTRICT R & B SUB DIVISION
|
10.7445
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Feb 2021
|
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jul 2024
|
|
|
|
|
|
50
|
Gujarat
|
FP/GJ/ROAD/27083/2017
|
FC-6/GJB-25/2023-GNR
|
Four laning of Kalavad-Jamnagar section of NH-927D in the State of Gujarat
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION
|
4.7732
|
Pending With-SG for verifying Compliance of Conditions
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Nov 2017
|
|
Stage-I Approval on
|
:
|
06 Nov 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jul 2025
|
|
|
|
|
|