Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Andhra Pradesh
|
FP/AP/IRRIG/36514/2018
|
G.O.Ms.No.134
|
Providing drinking water and irrigation facilities to 68 tanks in the upland areas of Kurnool District from left side of HNSS main canal phase-i in Kurnool District
|
Irrigation
|
WATER RESOURCES DEPARTMENT
|
4.73
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Oct 2018
|
Stage-I Approval on
|
:
|
05 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
12 Aug 2021
|
|
|
|
|
2
|
Andhra Pradesh
|
FP/AP/OFC/81411/2020
|
4-APB178/2022-VIJ
|
Execution of Optical Fiber Network(IPI) Project Nellore District in the State of Andhra Pradesh for the favour of Vindhya Telelinks Limited.
|
Optical Fibre Cable
|
M/S VINDHYA TELELINKS LTD
|
0.45
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Dec 2020
|
Stage-I Approval on
|
:
|
12 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
29 Apr 2025
|
|
|
|
|
3
|
Andhra Pradesh
|
FP/AP/QRY/155444/2022
|
4-APB189/2022-VIJ
|
Proposal for diversion of 4.84 ha of forest land in compartment no.102, Janapadu RF, Guntur Division for quarry lease for limestone (Minor) filed by Sri G. Pavan Kumar Reddy.
|
Quarrying
|
PAVAN KUMAR REDDY GOTTIMUKKALA
|
4.84
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2022
|
Stage-I Approval on
|
:
|
07 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
18 Mar 2024
|
|
|
|
|
4
|
Andhra Pradesh
|
FP/AP/QRY/37852/2018
|
4-APB096/2019-CHNpart
|
Brahmananda Reddy QuarryLease
|
Quarrying
|
KUNAM BRAHMANANDA REDDY
|
4.78
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Dec 2018
|
Stage-I Approval on
|
:
|
13 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
23 May 2025
|
|
|
|
|
5
|
Andhra Pradesh
|
FP/AP/RAIL/149334/2021
|
4-APB167/2022-VIJ
|
Proposal for Diversion of 1.36 Ha. Forest Land for Construction of new double line and electrification of track between Guntur and Guntakal stations at Dhone (Rly Km.325/4 to 329/2) in Comp.No. 238 & 239 of North Dhone RF, in Dhone Range, Kurnool Division in favour of S.C. Railway, under FC Act 1980.
|
Railway
|
SOUTH CENTRAL RAILWAY,GUNTAKAL.
|
2.21
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Nov 2021
|
Stage-I Approval on
|
:
|
21 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2025
|
|
|
|
|
6
|
Andhra Pradesh
|
FP/AP/RAIL/154617/2022
|
4-APB213/2023-VIJ
|
Proposal for Diversion of 3.21 Ha. Forest land for construction of New Double line and Electrification of track between Guntur and Guntakal stations at Konided & Panyam (Rly.Km.275-281 & 285-288) in Comp.No.145, 147, 137 & 138 of Panyam RF in Kurnool Range, Kurnool Division in favour of S.C.Railway under FC Act 1980.
|
Railway
|
SOUTH CENTRAL RAILWAY,GUNTAKAL.
|
3.21
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2022
|
Stage-I Approval on
|
:
|
26 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2025
|
|
|
|
|
7
|
Andhra Pradesh
|
FP/AP/ROAD/12568/2015
|
G.O.Ms.No.2
|
Karakavalasa Road to Marika
|
Road
|
EXICUTIVE ENGINEER
|
4.38
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Sep 2015
|
Stage-I Approval on
|
:
|
02 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
23 Aug 2023
|
|
|
|
|
8
|
Andhra Pradesh
|
FP/AP/ROAD/33878/2018
|
G.O.Ms No.133
|
Diversion of 1.79 Ha in Giddalur Forest Division for Upgradation of NH-167B from Km 43/097 to 99/103 i.e from Porumamilla to Chandrasekhara Puram to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
1.79
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2018
|
Stage-I Approval on
|
:
|
30 Nov 2018
|
Compliance Report Submitted by User Agency on
|
:
|
25 Oct 2023
|
|
|
|
|
9
|
Andhra Pradesh
|
FP/AP/ROAD/33887/2018
|
4-APC134/2021-VIJ
|
Diversion of 11.03 Ha in Kadapa Forest Division for Upgradation of NH-167B from Km 43/097 to 99/103 i.e from Porumamilla to Chandrasekhara Puram to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
11.03
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2018
|
Stage-I Approval on
|
:
|
11 Dec 2024
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jul 2025
|
|
|
|
|
10
|
Andhra Pradesh
|
FP/AP/ROAD/33887/2018
|
4-APC134/2021-VIJ
|
Diversion of 11.03 Ha in Kadapa Forest Division for Upgradation of NH-167B from Km 43/097 to 99/103 i.e from Porumamilla to Chandrasekhara Puram to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
11.03
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2018
|
Stage-I Approval on
|
:
|
11 Dec 2024
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jul 2025
|
|
|
|
|
11
|
Andhra Pradesh
|
FP/AP/ROAD/36092/2018
|
G.O.Ms.No.03
|
Formation and Providing BT to the road from Vinayakapuram to Irkampeta of Chinturu mandal
|
Road
|
EEPIUKKD
|
1.54
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2018
|
Stage-I Approval on
|
:
|
25 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
08 Nov 2023
|
|
|
|
|
12
|
Andhra Pradesh
|
FP/AP/ROAD/37747/2018
|
G.O.Ms.No.34
|
Road from Vanjari to Korrapadu
|
Road
|
Executive Engineer PR Paderu
|
1.88
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2018
|
Stage-I Approval on
|
:
|
03 Oct 2019
|
Compliance Report Submitted by User Agency on
|
:
|
09 Nov 2023
|
|
|
|
|
13
|
Arunachal Pradesh
|
FP/AR/MIN/23213/2016
|
3 AN B 053/2018-SHI
|
Diversion of 3.60 ha of forestland for OIL’s drilling location DML-3/1 in Namsang USF, Deomali in Tirap District of Arunachal Pradesh
|
Mining
|
OIL INDIA LIMITED NEF PROJECT
|
3.6
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jul 2017
|
Stage-I Approval on
|
:
|
31 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
10 Sep 2021
|
|
|
|
|
14
|
Assam
|
FP/AS/MIN/23425/2017
|
3-AS-B-112-2020 - GHY
|
Drilling Location DHD
|
Mining
|
OIL INDIA LIMITED
|
2.696
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jan 2017
|
Stage-I Approval on
|
:
|
28 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Aug 2024
|
|
|
|
|
15
|
Assam
|
FP/AS/Pipeline/49586/2020
|
F. NO 3 AS C 089/2022/GHY
|
Laying of Proposed 18" Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Guwahati to Panisagar.
|
Pipeline
|
INDRADHANUSH GAS GRID LIMITED
|
9.2755
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Sep 2020
|
Stage-I Approval on
|
:
|
24 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jul 2022
|
|
|
|
|
16
|
Assam
|
FP/AS/TRANS/9060/2015
|
3-AS B 034/2016-SHI
|
132KV S/C Transmission Line from 220KV Salakati Grid S/S to 132KV/33KV Kokrajhar S/S
|
Transmission Line
|
ASSAM ELECTRICITY GRID CORPORATION LINITED
|
1.82
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2015
|
Stage-I Approval on
|
:
|
25 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
24 Feb 2022
|
|
|
|
|
17
|
Bihar
|
FP/BR/Others/32115/2018
|
FP/BR/Others/32115/2018
|
Establishment of retail out-let (Petrol Pump) dealership of HPCL
|
Others
|
SMT SULEKHA KUMARI
|
0.012
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Feb 2018
|
Stage-I Approval on
|
:
|
30 May 2019
|
Compliance Report Submitted by User Agency on
|
:
|
22 Sep 2020
|
|
|
|
|
18
|
Bihar
|
FP/BR/Others/43758/2020
|
FP/BR/Others/43758/2020
|
Diversion of 0.0195 ha of forest land for construction of approach road for opening retail outlet of BPCL on SH-56 Road in Darbhanga district of Bihar.
|
Others
|
AJAY KUMAR PASWAN
|
0.0195
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2020
|
Stage-I Approval on
|
:
|
29 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
17 Sep 2021
|
|
|
|
|
19
|
Bihar
|
FP/BR/Others/44447/2020
|
FP/BR/Others/44447/2020
|
Diversion of 0.02025 ha of forest land for construction of approach road for opening retail outlet of HPCL on Samastipur-Patori Road in Samastipur district of Bihar.
|
Others
|
DINESH PASWAN
|
0.02025
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2020
|
Stage-I Approval on
|
:
|
15 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
20 Mar 2025
|
|
|
|
|
20
|
Chhattisgarh
|
FP/CG/OFC/43521/2019
|
F 5-17/2023/10-2
|
JIO DIGITAL FIBRE PRIVATE LIMITED, Manendragarh Forest Division, Laying of OFC along with RoW (Road Corridor) under Network strengthening and Providing Connecting to Rural Areas in Korea District of Chhattisgarh State
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
9.406
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Dec 2019
|
Stage-I Approval on
|
:
|
16 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2025
|
|
|
|
|
21
|
Chhattisgarh
|
FP/CG/OFC/45153/2020
|
F 5-28/2022/10-2
|
JIO DIGITAL FIBRE PRIVATE LIMITED, Dhamtari Forest Division, Laying of OFC along with RoW (Road Corridor) under Network strengthening and Providing Connecting to Rural Areas in Dhamtari District of Chhattisgarh
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
3.786
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 May 2020
|
Stage-I Approval on
|
:
|
04 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jul 2025
|
|
|
|
|
22
|
Chhattisgarh
|
FP/CG/OFC/46941/2020
|
F 5-20/2022/10-2
|
JIO DIGITAL FIBRE PRIVATE LIMITED, Balod Forest Division, Laying of OFC along with RoW (Road Corridor) under Network strengthening and Providing Connectivity to Rural Areas in Balod District of Chhattisgarh
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
2.895
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Oct 2020
|
Stage-I Approval on
|
:
|
29 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2025
|
|
|
|
|
23
|
Chhattisgarh
|
FP/CG/OFC/54970/2020
|
F 5-50/2023/10-2
|
JIO DIGITAL FIBRE PRIVATE LIMITED, Balrampur Forest Division, Laying of OFC along with RoW (Road Corridor) under Network strengthening and Providing Connecting to Rural Areas in Balrampur District of Chhattisgarh State
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
11.198
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jan 2021
|
Stage-I Approval on
|
:
|
29 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jul 2025
|
|
|
|
|
24
|
Chhattisgarh
|
FP/CG/OFC/87496/2020
|
F 5-22/2023/10-2
|
JIO DIGITAL FIBRE PRIVATE LIMITED, Kanker Forest Division along with RoW (Road Corridor) under Chhattisgarh Sanchar Kranti Yojana (SKY)
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
2.119
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2021
|
Stage-I Approval on
|
:
|
25 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2025
|
|
|
|
|
25
|
Chhattisgarh
|
FP/CG/SubStation/145951/2021
|
FC-II/IROCH-17/2023
|
220/132/33 KV SUBSTATION DHARAMJAIGARH AT VILLAGE HATI, AREA 6.823 HECTARE
|
Sub Station
|
CSPTCL
|
6.823
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Aug 2021
|
Stage-I Approval on
|
:
|
04 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jan 2025
|
|
|
|
|
26
|
Dadar & Nagar Haveli
|
FP/DN/IND/28625/2017
|
6-DNB049/2017-BHO
|
Laying of 11 KV Underground Electricity Line
|
Industry
|
UNOVEL INDUSTRIES PRIVATE LIMITED
|
0.61
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Aug 2017
|
Stage-I Approval on
|
:
|
19 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2024
|
|
|
|
|
27
|
Dadar & Nagar Haveli
|
FP/DN/Others/32569/2018
|
6-DNB029/2018-BHO
|
M/s. Shri Khatu Shyam Pvt. Ltd. power line connectivity
|
Others
|
DATT INDUSTRIAL SERVICES
|
0.425547
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Mar 2018
|
Stage-I Approval on
|
:
|
01 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2024
|
|
|
|
|
28
|
Daman and Diu
|
FP/DD/ROAD/26759/2017
|
6-DNB050/2017-BHO
|
Seafront Road Development at Jampore Beach at Moti Daman
|
Road
|
EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT WD I DAMAN
|
0.97
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jun 2017
|
Stage-I Approval on
|
:
|
22 Jan 2018
|
Compliance Report Submitted by User Agency on
|
:
|
06 Mar 2025
|
|
|
|
|
29
|
Gujarat
|
FP/GJ/Canal/121289/2021
|
6-GJB003/2022-FC
|
Construction of Karjan Right Bank High Level Recharge Canal, its Head Regulator & approach channel
|
Canal
|
EXECUTIVE ENGINEER, IRRIGATION PROJECT DIVISION NO. 4
|
3.2512
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Feb 2021
|
Stage-I Approval on
|
:
|
05 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Sep 2025
|
|
|
|
|
30
|
Gujarat
|
FP/GJ/Canal/147318/2021
|
FCA-1021/4-16/21/SF-249/F
|
Diversion of 0.36 Ha. Reserved Forest Land for Panam High Level 1-L Distributory of Right Bank Canal, Village: Mithapur, Ta. Shehera, District: Panchmahal In Gujarat State.
|
Canal
|
EXECUTIVE ENGINEER, PANAM PROJECT DIVISION, GODHRA
|
0.36
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Sep 2021
|
Stage-I Approval on
|
:
|
11 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Sep 2025
|
|
|
|
|
31
|
Gujarat
|
FP/GJ/IRRIG/40453/2019
|
FC-6/GJC-62/2022-GNR
|
Diversion of 10.19 ha. R.F. Land for construction of Barrage and approach road on Sabarmati River in Village: Hirpura, Dist. Mehsana.
|
Irrigation
|
DHAROI CANAL DIVISION NO.3, VISNAGAR
|
10.19
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 May 2019
|
Stage-I Approval on
|
:
|
21 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Aug 2023
|
|
|
|
|
32
|
Gujarat
|
FP/GJ/OFC/48577/2020
|
6-GJB031/2021-BHO
|
Proposal for Diversion of 1.9 ha. Reserved forest land (ESZ) for the grant permission for laying GFGNL Optical Fiber Cable line along the Shoolpaneshwar sanctuary area in Ta. Dediyapada and Nandod, Dist. Narmada
|
Optical Fibre Cable
|
GFGNL
|
1.9
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Aug 2020
|
Stage-I Approval on
|
:
|
22 Apr 2021
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2024
|
|
|
|
|
33
|
Gujarat
|
FP/GJ/OFC/49234/2020
|
6-GJB045/2021-BHO
|
Grant permission for optical fiber cable along the route mention here (Purna wildlife sanctuary Area)
|
Optical Fibre Cable
|
GFGNL
|
0.6895
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Aug 2020
|
Stage-I Approval on
|
:
|
30 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
13 Aug 2024
|
|
|
|
|
34
|
Gujarat
|
FP/GJ/OFC/49946/2020
|
6-GJB101/2021-BHO
|
GFGNL (BBNL Phase-II) Project Dhrangadhra Gudhkhar forest area
|
Optical Fibre Cable
|
GUJARAT FIBER GRID NETWORK LTD
|
0.0333
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2020
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
21 Feb 2023
|
|
|
|
|
35
|
Gujarat
|
FP/GJ/Others/149710/2021
|
FC-6/GJB-43/2022-GNR
|
Gandhinagar Metro Rail Phase-II, Package 2
|
Others
|
GUJARAT METRO RAIL CORPORATION (GMRC) LIMITED
|
1.5324
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Dec 2021
|
Stage-I Approval on
|
:
|
19 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Mar 2025
|
|
|
|
|
36
|
Gujarat
|
FP/GJ/Others/19176/2016
|
6-GJB05/2017-BHO
|
PVC Pipe Line For Sea Water
|
Others
|
OCEANBLUE HATCHERIES
|
0.108
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 May 2016
|
Stage-I Approval on
|
:
|
08 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
04 Apr 2025
|
|
|
|
|
37
|
Gujarat
|
FP/GJ/Others/25303/2017
|
6-GJB021/2018-BHO
|
Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Gir West Distriect
|
Others
|
RELIANCE JIO INFOCOMM LTD
|
1.6143
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Mar 2017
|
Stage-I Approval on
|
:
|
25 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
27 Sep 2023
|
|
|
|
|
38
|
Gujarat
|
FP/GJ/Others/33231/2018
|
6-GJB08/2019-BHO
|
Proposal for grant of permission for laying of 300 mm Ø DI RAW Water Supply Pipeline from Intake Well at Variav to Adani Wilmar Limited at Sunvali in Dist. Surat
|
Others
|
ADANI WILMAR LIMITED
|
0.8357
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2018
|
Stage-I Approval on
|
:
|
24 May 2019
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jul 2019
|
|
|
|
|
39
|
Gujarat
|
FP/GJ/Others/35053/2018
|
6-GJB043/2019-BHO
|
Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Banaskantha District
|
Others
|
RELIANCE JIO INFOCOMM LTD
|
0.25
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2018
|
Stage-I Approval on
|
:
|
06 Dec 2019
|
Compliance Report Submitted by User Agency on
|
:
|
10 Aug 2022
|
|
|
|
|
40
|
Gujarat
|
FP/GJ/Others/39304/2019
|
6-GJB054/2021-BHO
|
NOFN
|
Others
|
RailTel Corporation of India limited
|
0.286785
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2019
|
Stage-I Approval on
|
:
|
10 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
06 May 2022
|
|
|
|
|
41
|
Gujarat
|
FP/GJ/Others/42615/2019
|
6-GJB020/2020-BHO
|
Laying of underground power cable for electrification of ropeway project on girnar hill
|
Others
|
PGVCL JUNAGADH
|
2
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Nov 2019
|
Stage-I Approval on
|
:
|
30 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2023
|
|
|
|
|
42
|
Gujarat
|
FP/GJ/Pipeline/144112/2021
|
6-GJB006/2022-FC
|
Diversion of 4.97 ha of Reserve Forest Land of Laying Irrigation Underground Water pipeline under Tapi- Karanj link pipeline Lift Irrigation Project.
|
Pipeline
|
NWRWS KALPSAR DEPARTMENT VER II PROJECT DIVISION VYARA
|
4.97
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2021
|
Stage-I Approval on
|
:
|
28 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 May 2022
|
|
|
|
|
43
|
Gujarat
|
FP/GJ/Pipeline/154945/2022
|
FCA-1022/5-17/22/SF-133/F
|
125 mm Dia MDPE Gas Pipeline Connectivity For Scoda Tubes ltd. Kadi Dist:Mehsana
|
Pipeline
|
SABARMATI GAS LIMITED
|
0.068
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Apr 2022
|
Stage-I Approval on
|
:
|
27 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Sep 2024
|
|
|
|
|
44
|
Gujarat
|
FP/GJ/RAIL/41178/2019
|
FC-6/GJC-79/2023-GNR
|
New Rail Line between Bhimnath and Dholera Special Investment Region
|
Railway
|
DHOLERA SPECIAL INVESTMENT REGIONAL DEVELOPMENT AUTHORITY
|
15.5
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jul 2019
|
Stage-I Approval on
|
:
|
05 Nov 2024
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jul 2025
|
|
|
|
|
45
|
Gujarat
|
FP/GJ/RAIL/65579/2020
|
6-GJB057/2021-BHO
|
WDFC (ROB 12-PCL)
|
Railway
|
DFCCIL AHMEDABAD
|
2.35
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2020
|
Stage-I Approval on
|
:
|
04 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jul 2021
|
|
|
|
|
46
|
Gujarat
|
FP/GJ/ROAD/123854/2021
|
6-GJC041/2021-BHO
|
Widening & Strengthening of Naswadi - Bhakha - Kawant Road Km. 0/0 to 38/400
|
Road
|
DISTRICT R & B SUB DIVISION
|
10.7445
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Feb 2021
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jul 2024
|
|
|
|
|
47
|
Gujarat
|
FP/GJ/ROAD/140444/2021
|
FC-6/GJB-33/2022-GNR
|
Reconstruction of Sukhpur Dalkhaniya Road
|
Road
|
R AND B PANCHAYAT DIVISION AMRELI
|
0.98
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Apr 2021
|
Stage-I Approval on
|
:
|
01 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2023
|
|
|
|
|
48
|
Gujarat
|
FP/GJ/ROAD/140541/2021
|
FCA-1022/7-32/21/SF-42/F
|
Construction of Amabaradi Safari Park to Gadadhara Mandir Road (Village Road)
|
Road
|
R AND B PANCHAYAT DIVISION AMRELI
|
0.48
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jul 2021
|
Stage-I Approval on
|
:
|
22 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jul 2022
|
|
|
|
|
49
|
Gujarat
|
FP/GJ/ROAD/148923/2021
|
FC-6/GJC-58/2022-GNR
|
Widening & Strengthening of Junagadh-Bhesan-Parab Vavdi Road
|
Road
|
DEPUTY EXECUTIVE ENGINEER-R&B CITY SUB DIVISION-JUNAGADH
|
17.24625
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2021
|
Stage-I Approval on
|
:
|
30 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2024
|
|
|
|
|
50
|
Gujarat
|
FP/GJ/ROAD/14898/2015
|
6-GJB05/2016-BHO
|
R.O.B. on Pansora-BhalejAnand Roa r and Bhalej-Ahima Road
|
Road
|
EXECUTIVE ENGINEER
|
0.99375
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2015
|
Stage-I Approval on
|
:
|
18 Mar 2016
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2023
|
|
|
|
|
|