Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Uttarakhand FP/UK/ROAD/10467/2015 8B/UCP/06/58/2015/FC the construction of this new road will facilitates villagers by education,medical, and time saving.It will also resist unwanted activities in the reserve forest area and facilitates forest deptt also. Road PUBLIC WORKS DEPARTMENT GHANSALI 4.697 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 02 Mar 2015
Stage-I Approval on : 14 Aug 2015
Compliance Report Submitted by User Agency on : 30 Sep 2016
2 Uttarakhand FP/UK/ROAD/8840/2014 8B/UCP/06/47/2015/FC Kaintholi Naikhri Motor Road Road PUBLIC WORK DEPARTMENT 1.47 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 25 Dec 2014
Stage-I Approval on : 17 Aug 2015
Compliance Report Submitted by User Agency on : 20 Aug 2016
3 Uttarakhand FP/UK/ROAD/11558/2015 8B/UCP/06/38/2015-FC Construction of New Road Road PMGSY 1.901 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 09 Apr 2015
Stage-I Approval on : 23 Oct 2015
Compliance Report Submitted by User Agency on : 23 Feb 2018
4 Uttarakhand FP/UK/ROAD/9030/2014 8B/UCP/06/57/2015 Munsyari to Harkot Motor Road under PMGSY PWD Dharchula Road PMGSY 6.011 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 01 Jan 2015
Stage-I Approval on : 08 Dec 2015
Compliance Report Submitted by User Agency on : 29 Jun 2018
5 Uttarakhand FP/UK/ROAD/9015/2014 8B/UCP/06/80/2015 Diversion of 4.97 Hactare of forest land for construction of Gauchar to Damhdama Motor road under PMGSY serving villages angodha, dua, kanda, bartoli, majkhola,taulsain, damdama with a total population of 1520. Road PMGSY 4.97 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 02 Jan 2015
Stage-I Approval on : 03 Feb 2016
Compliance Report Submitted by User Agency on : 16 Jul 2018
6 Uttarakhand FP/UK/ROAD/10924/2015 8B/UCP/06/105/2015-FC After Construction of this Motor Road, Students & Teachers will get beneficiary of Communication. Which will help in time saving of them. Road PUBLIC WORK DEPARTMENT 0.708 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 15 Mar 2015
Stage-I Approval on : 22 Feb 2016
Compliance Report Submitted by User Agency on : 18 Aug 2017
7 Uttarakhand FP/UK/ROAD/11200/2015 8B/UCP/06/216/2015/FC construction of jakh to garau darimi motor road (length 5.00 km.) Road EXECUTIVE ENGINEER 0.98 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 24 Mar 2015
Stage-I Approval on : 22 Feb 2016
Compliance Report Submitted by User Agency on : 19 Jun 2018
8 Uttarakhand FP/UK/ROAD/9654/2015 8B/UCP/06/27/2015 Gasku jimafi (jaykoy) to Kureela motor road under PMGSY PWD Dharchula Road PMGSY 12.035 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 27 Jan 2015
Stage-I Approval on : 25 Feb 2016
Compliance Report Submitted by User Agency on : 06 Jul 2018
9 Uttarakhand FP/UK/ROAD/11496/2015 8B/UCP/06/113/2015-FC the objective connected to gaol, sukan ,fooldhar,syalab,kursil gaon Road PMGSYID PUROLA 1.129 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 06 Apr 2015
Stage-I Approval on : 04 Mar 2016
Compliance Report Submitted by User Agency on : 06 Sep 2018
10 Uttarakhand FP/UK/ROAD/10123/2015 8B/UCP/06/116/2015 The project has been sanctioned under PMGSY by letter no. 3378/p-1-26 (XII)/ urrda/14 dated 05.3.2014 for connecting the villages Bamanthala with population 350 and Tali Kansari with population 339 as per 2001 census. Presently villagers are these villages have to go around 4 kms. on foot to reach t Road PMGSY DIVISION PWD POKHARI 2.45 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 18 Feb 2015
Stage-I Approval on : 04 Mar 2016
Compliance Report Submitted by User Agency on : 22 Oct 2018
11 Uttarakhand FP/UK/ROAD/14124/2015 8B/UCP/06/186/2015/FC Road connecting village jaikandi(Pop-299) and Javri Road PMGSY 3.15 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 23 Jul 2015
Stage-I Approval on : 14 Mar 2016
Compliance Report Submitted by User Agency on : 04 Feb 2017
12 Uttarakhand FP/UK/ROAD/9657/2015 8B/UCP/06/29/2015 Tanakpur Tawaghat NH to Ranthi Motor Road.Under PMGSY,PWD,Dharchula Road PMGSY 10.8 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 27 Jan 2015
Stage-I Approval on : 15 Apr 2016
Compliance Report Submitted by User Agency on : 06 Jul 2018
13 Uttarakhand FP/UK/ROAD/15186/2015 8B/UCP/06/12/2016 This Road connect the village kanda and Gandiyali this is the only option to connect the villages. Their are no other option without going in forest land to connect the villages. hence the forest land is required for the development of village and villagers and the construction of the motor road. Road PWD 1.865 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 04 Sep 2015
Stage-I Approval on : 03 Jun 2016
Compliance Report Submitted by User Agency on : 17 Jul 2017
14 Uttarakhand FP/UK/ROAD/11378/2015 8B/UCP/06/255/2015/FC Construction of Jainti - Banzdhar - Malli Binola to Talli Binola Motor Road in Jageswer constituency,Distt Almora.Construction of Jainti - Banzdhar - Malli Binola to Talli Binola Motor Road is proposed as a extension of Jainti – Banzdhar motor road the sention lenth of proposed motor road is 3.00 k Road EXECUTIVE ENGINEER 0.45 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 30 Mar 2015
Stage-I Approval on : 06 Jul 2016
Compliance Report Submitted by User Agency on : 22 Aug 2017
15 Uttarakhand FP/UK/ROAD/14471/2015 8B/UCP/06/6/2016/FC/914 Construction of motor road for connecting remote villages like Dang, Basola, Bagdiyalgaoun, Maniyargaoun, Kimoj of Thalisain Block, constituency Shreenagar State Uttrakhand. These villages are not benefited by road. Road PWD 3.132 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 05 Aug 2015
Stage-I Approval on : 06 Sep 2016
Compliance Report Submitted by User Agency on : 19 Sep 2018
16 Uttarakhand FP/UK/ROAD/8986/2014 8B/UCP/06/118/2015-FC/934 This is a Road Project of length 2Km,(Joining the Kumaon and Garwal mandals) in Almora District in Uttarakhand. Road PUBLIC WORK DEPARTMENT 1.35 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 30 Dec 2014
Stage-I Approval on : 09 Sep 2016
Compliance Report Submitted by User Agency on : 06 Oct 2018
17 Uttarakhand FP/UK/ROAD/9399/2015 8B/UCP/06/50/2016/FC Construction of 7.00 km long motor road to connect village of Kargil shaheed Anand singh rawat i.e. Giwaipani vide Govt. order no. 2454/III-2/05-07(Pra. Aa.)/05 TC-1 dated 28-10-05.by the construction of above said road 3 villages would be benefitted.since a long time villagers and local representat Road EXECUTIVE ENGINEER 1.68 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 17 Jan 2015
Stage-I Approval on : 21 Sep 2016
Compliance Report Submitted by User Agency on : 11 Jun 2018
18 Uttarakhand FP/UK/ROAD/8483/2014 8B/UCP/06/184/2015/ FC This is a road project of length 7.00km joining the villages Rikhar and Kotiyag in Bhikiyasen Block in Almora District, Uttarakhand. Road PUBLIC WORK DEPARTMENT 2.7 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 08 Dec 2014
Stage-I Approval on : 18 Oct 2016
Compliance Report Submitted by User Agency on : 06 Oct 2018
19 Uttarakhand FP/UK/ROAD/16539/2015 8B/UCP/06/131/2016-FC construction of 10 km motor road in Thalisain block, constituency Shrinagar in District Pauri Garhwal for connecting rural villages which are yet not benefited by road. Road PWD 3.078 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 23 Nov 2015
Stage-I Approval on : 19 Oct 2016
Compliance Report Submitted by User Agency on : 19 Sep 2018
20 Uttarakhand FP/UK/MIN/20542/2016 8B/UCP/05/166/2016 The proposal is situated on Swarna River under Jhajra range of the Dehradun forest division, Dehradun district. During monsoon RBM got collected in the river coerse which leads to flooding of the river. By extracting this RBM from the river bed, flooding can be prevented. It is to be mention here that the working plane of Dehradun forest division also prescribed removal of RBM from river bed as part of Silvicultural activity under chapter VII para 7.21. Mining UTTARAKHAND FOREST DEVELOPMENT CORPORATION (UAFDC) 23.75 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 19 Jul 2016
Stage-I Approval on : 18 Nov 2016
Compliance Report Submitted by User Agency on : 30 Jan 2017
21 Uttarakhand FP/UK/ROAD/9407/2015 8B/UCP/06/84/2015/FC Extension of Mandoli-parinda-bountha motor road upto deriyakhal Road PWD LANSDOWNE 1.8 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 19 Jan 2015
Stage-I Approval on : 09 Dec 2016
Compliance Report Submitted by User Agency on : 31 May 2018
22 Uttarakhand FP/UK/ROAD/10177/2015 8B/UCP/06/62/2016/FC Construction of Tefna Kandara (Chatingyala-Koti-Nauli-Hindoli) Motor Road in District Chamoli (Length 7.70). The proposed road is for providing connectivity to village Tefna, Bantoli, Chatingyala, koti, Kandara, Sunali, Hindoli, Nouli with a population 1901 numbers. The road is located in Block-Kara Road PUBLIC WORKS DEPARTMENT 1.307 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 16 Feb 2015
Stage-I Approval on : 16 Dec 2016
Compliance Report Submitted by User Agency on : 08 Jun 2018
23 Uttarakhand FP/UK/ROAD/11576/2015 8B/UCP/06/271/2015/FC The road is required for providing connectivity to Village - Main situated in Block-Thalisen of District Pauri with a population of 904 numbers. The total length of the road is 5.50 km. Road PMGSY BAIJRO 4.968 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 11 Apr 2015
Stage-I Approval on : 14 Mar 2017
Compliance Report Submitted by User Agency on : 09 May 2018
24 Uttarakhand FP/UK/ROAD/9612/2015 8B/UCP/06/38/2016/FC Proposed road providing connectivity to Satikhola(Ghandiyal),Chinkudali,Phooldungi Talli-Malli,Ramda,Pramghat incidentally other surrounding villages also get the benefit of this road having approximate population more than 2000.Presently those villages walk 3 to 8 km to get there daily needs from n Road PWD CD GAIRSAIN 1.988 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 27 Jan 2015
Stage-I Approval on : 14 Mar 2017
Compliance Report Submitted by User Agency on : 01 Nov 2018
25 Uttarakhand FP/UK/Others/10660/2015 8B/UCP/09/63/2016 this substation is required to be constructed to give good quality of electric supply to this remote area of narendra nagar block Others EE EDD TEHRI UPCL 0.12 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 03 Mar 2015
Stage-I Approval on : 30 Mar 2017
Compliance Report Submitted by User Agency on : 03 Jul 2018
26 Uttarakhand FP/UK/ROAD/10684/2015 8B/UCP/06/114/2015/FC Jwainari to Basgaon Motor Road Length 11.550 under PMGSY in Distt. Almora. Road PMGSY 4.767 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 09 Mar 2015
Stage-I Approval on : 04 Jul 2017
Compliance Report Submitted by User Agency on : 23 May 2018
27 Uttarakhand FP/UK/TRANS/11824/2015 8B/UCP/04/88/2016 Rishikesh – Karanprayag Railway Line is proposed in Uttarakhand state for which new railway station is proposed at Rishikesh in the forest area between Gumaniwala and Natraj Chowk. Therefore RVNL (Rail Vikas Nigam Ltd.) desires relocation of 220 & 132 KV transmission lines and towers which comes und Transmission Line POWER AND ELECTRICITY DEPARTMENT 34.6153 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 19 Apr 2015
Stage-I Approval on : 19 Jul 2017
Compliance Report Submitted by User Agency on : 17 Dec 2017
28 Uttarakhand FP/UK/ROAD/9514/2015 8B/UCP/06/215/2015/FC The above proposed motor road start from Patlot Devali Motor Road Km. 3 and Starting point from 0.000 to ch 1.025 km. become reserve forest. The village Talli Pokhari to Connect to motor road required this forest land, therefore it is essential to connect the village. Road PUBLIC WORKS DEPARTMENT 1.26 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 23 Jan 2015
Stage-I Approval on : 04 Aug 2017
Compliance Report Submitted by User Agency on : 15 Feb 2018
29 Uttarakhand FP/UK/ROAD/12648/2015 8B/UCP/06/39/2016 Construction of Bangapani to jarajibli bani motor road.the Prominent point of target habitation jarajibli bani sach as Primary School, Primary Health Center, Maternity and Child Welfare centers and Post Office will be connected by this road.length 19.800 Km.Project cost 1400.57 lac Road PMGSY 11.225 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 12 Jun 2015
Stage-I Approval on : 17 Aug 2017
Compliance Report Submitted by User Agency on : 02 Aug 2018
30 Uttarakhand FP/UK/ROAD/20521/2016 8B/UCP/06/23/2017 The project sanctioned under the Chardham Mahamarg Vikas Pariyojna is an ambitious initiative by GoI to improve connectivity to the Char Dham pilgrimage centers in the Himalayas. The project involves Forest diversion for upgradation&rehabilitation of NH-94 from Km28.600(Agar)to Km59.420(Dikhol Gaon) Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS 61.2689 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 18 Jul 2016
Stage-I Approval on : 25 Aug 2017
Compliance Report Submitted by User Agency on : 23 Feb 2018
31 Uttarakhand FP/UK/ROAD/9364/2015 8B/UCP/06/112/2015/FC This is a Road Project of length 8km joining the villages Bayela, Khagreti,& Nad in Almora District, Uttarakhand. Road PUBLIC WORK DEPARTMENT 4.417 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 16 Jan 2015
Stage-I Approval on : 07 Sep 2017
Compliance Report Submitted by User Agency on : 13 Sep 2018
32 Uttarakhand FP/UK/ROAD/9786/2015 8B/UCP/06/217/2016/FC Construction of Baniyash Motor Road from Simli Chulakot Motor Road in Km 11. The proposed road is for providing connectivity to village Baniyash, Khandura, Airwadi and Ghandiyal with a population of 1151 numbers. The road is located in Block-Karanprayag of District Chamoli Road PUBLIC WORKS DEPARTMENT 1.449 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 Jan 2015
Stage-I Approval on : 07 Sep 2017
Compliance Report Submitted by User Agency on : 04 Oct 2018
33 Uttarakhand FP/UK/ROAD/9783/2015 8B/UCP/06/119/2016/FC The proposed road is for providing connectivity to village Koti, Ghatora with a population 892 numbers. The road is located in Block-Karanprayag of District Chamoli Road PUBLIC WORKS DEPARTMENT 1.099 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 Jan 2015
Stage-I Approval on : 07 Sep 2017
Compliance Report Submitted by User Agency on : 08 Jun 2018
34 Uttarakhand FP/UK/ROAD/10075/2015 8B/UCP/06/258/2015/FC Construction of 16.200km long Motor Road via Uttarakhand Govt. order no. 2491/III(2)/06-36(Pra. Aaa)/06 dated 19-09-06 Road EXECUTIVE ENGINEER 3.24 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 12 Feb 2015
Stage-I Approval on : 11 Sep 2017
Compliance Report Submitted by User Agency on : 11 Jun 2019
35 Uttarakhand FP/UK/ROAD/8757/2014 8B/UCP/06/177/2015/FC CONSTRUCTION OF 5 KM MOTOR ROAD FROM Sironiya to Dalakot UNDER PMGSY Road PMGSY 3.204 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 18 Dec 2014
Stage-I Approval on : 15 Sep 2017
Compliance Report Submitted by User Agency on : 24 Aug 2018
36 Uttarakhand FP/UK/ROAD/18066/2016 8B/UCP/06/175/2016/FC CConstruction of Kandai Bridge to Khadgoli Kameda Motor Road. (Length 4.00). The proposed road is for providing connectivity to village Khadgoli & Kameda with a population of 768 numbers. The road is located in Block-Karanprayag of District Chamoli Road PUBLIC WORKS DEPARTMENT 1.725 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 18 Feb 2016
Stage-I Approval on : 15 Sep 2017
Compliance Report Submitted by User Agency on : 20 Sep 2018
37 Uttarakhand FP/UK/ROAD/24549/2017 8B/UCP/06/34/2017/FC DPR for rehabilitation & upgradation to 2 lane /2 lane with paved shoulders configuration & strengthening of NH-94 from Km 122.000 (Dharasu Bend) to Km 147.000(Silkyara Bend) in the state of Uttarakhand. Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS 16.971 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 28 Feb 2017
Stage-I Approval on : 22 Sep 2017
Compliance Report Submitted by User Agency on : 28 May 2018
38 Uttarakhand FP/UK/VELEC/28564/2017 8B/UCP/09/62/2017 This is one of the revenue village which is left out from electrification due to non- avalability of forest clearance this time village has been selected for electrification central funded scheme in DDUGJY Village Electricity UPCL 1.5 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 09 Aug 2017
Stage-I Approval on : 11 Oct 2017
Compliance Report Submitted by User Agency on : 20 Oct 2018
39 Uttarakhand FP/UK/VELEC/28604/2017 8B/UCP/09/63/2017 This is one of the revenue village which is left out from electrification due to non clreance of forest.in this time this village has been selected for eletrification central funded scheme under DDUGJY of block bhilangna distt tehri garhwal Village Electricity UPCL 4.06 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 10 Aug 2017
Stage-I Approval on : 11 Oct 2017
Compliance Report Submitted by User Agency on : 20 Oct 2018
40 Uttarakhand FP/UK/ROAD/10583/2015 8B/UCP/06/202/2015 under the state sector, construction of new motor road of name baula to srikot in district chamoli of lenghth .875 km Road PUBLIC WORKS DEPARTMENT GOPESHWAR UTTARAKHAND 0.32 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 01 Mar 2015
Stage-I Approval on : 11 Oct 2017
Compliance Report Submitted by User Agency on : 23 Oct 2018
41 Uttarakhand FP/UK/ROAD/16879/2015 8B/UCP/06/172/2016/FCA Tuini chandani to pivnal motor road under PMGSY scheme under phase XIV of length 23.325 km. This road will connect the four villages which are under one gram panchayat pivnal having population of 1800 approx. Road EXECUTIVE ENGINEER 4.94 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 14 Jan 2016
Stage-I Approval on : 12 Oct 2017
Compliance Report Submitted by User Agency on : 08 Jun 2018
42 Uttarakhand FP/UK/ROAD/26823/2017 8B/UCP/06/54/2017/FC Construction of Tunnel at Silkyara bend from Km. 24.300 to Km.51.900 on NH-134 (Dharasu-Yamunotri road)of district Uttarkashi in the state of Uttarakhand (Chardham Rajmarg Vikas Priyojna) Road NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED 25.825 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 30 Jun 2017
Stage-I Approval on : 23 Oct 2017
Compliance Report Submitted by User Agency on : 23 Dec 2017
43 Uttarakhand FP/UK/ROAD/8884/2014 8B/UCP/06/150/2015/FC construction of kharsi to khatwa motor road under PMGSY of length 9.825. from this road population of approx 800 will be benefited. Road EXECUTIVE ENGINEER 5.6 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 24 Dec 2014
Stage-I Approval on : 27 Oct 2017
Compliance Report Submitted by User Agency on : 16 Mar 2018
44 Uttarakhand FP/UK/ROAD/13419/2015 8B/UCP/06/254/2016/FC This Motor Road starts from 13th KM of Ukhimath-Mansoona-Ransi Motor Road and connects the village Burwa having 294 population. It will provide Basic facilities to the residents of the village like Medical facility, connectivity to the tehsil, Block, Nearby Market etc. Road EECDPWDUKM 0.358 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 22 Jun 2015
Stage-I Approval on : 06 Nov 2017
Compliance Report Submitted by User Agency on : 20 Feb 2019
45 Uttarakhand FP/UK/ROAD/27443/2017 8B/UCP/06/55/2017/FC Diversion of Forest Land of 2 lane with paved shoulders configuration from Km 50.900 to Km 97.900 on Dharasu - Yamunotri Section of NH-134 (New NH-94) in the State of Uttarakhand Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS 47.944 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 27 Jul 2017
Stage-I Approval on : 16 Nov 2017
Compliance Report Submitted by User Agency on : 28 May 2018
46 Uttarakhand FP/UK/ROAD/24063/2017 8B/UCP/06/28/2017/FC This forest proposal is prepared for reconstruction with geometric improvement of existing single / intermediate lane to 2 lane with paved shoulder configuration from Existing km 228.800 (Muni ki reti) to 277.650 (Sakinidhar) & 277.900 (Sakinidhar) to 297.080 (Devprayag) & 297.315 (Devprayag ) to 3 Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS 104.7891 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 09 Feb 2017
Stage-I Approval on : 16 Nov 2017
Compliance Report Submitted by User Agency on : 09 Jan 2018
47 Uttarakhand FP/UK/ROAD/17662/2016 8B/UCP/06/236/2016/FC Forest Clearance Proposal of Bhujan to Pakhora Motor Road 12.500 Km Under PMGSY. This road will serve the total population of 794 directly and this alignment has less number of Trees (108) and this alignment is Geologically Stable . Road PMGSY 4.877 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 27 Jan 2016
Stage-I Approval on : 19 Dec 2017
Compliance Report Submitted by User Agency on : 19 Jul 2018
48 Uttarakhand FP/UK/ROAD/13753/2015 8B/UCP/06/99/2016/FC In district chamoli, under the state sector, construction of new motor road name nauti chatauli kalyani bhatgwali chourasain motor road of length 5 K.M. (from K.M 2.00 to K.M. 7.00) Road TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR 2.67 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 10 Jul 2015
Stage-I Approval on : 28 Dec 2017
Compliance Report Submitted by User Agency on : 31 Jul 2018
49 Uttarakhand FP/UK/ROAD/10553/2015 8B/UCP/06/83/2015/FC Sharfatak to Taraini Damar is located at Almora's Lamgara Block. The Proposed length of Road is 4.875 Km. Road PMGSY 0.9306 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 28 Feb 2015
Stage-I Approval on : 28 Dec 2017
Compliance Report Submitted by User Agency on : 02 Jun 2018
50 Uttarakhand FP/UK/ROAD/14357/2015 8B/UCP/06/264/2015/FC Construction of Nishni to Katyari Motor Road in Jageswer constituency,Distt Almora.Construction of Nishni to Katyari Motor Road is proposed as a extension of Banga Palna Nisani motor road the sention lenth of proposed motor road is 2.00 km. The benifited village of this Road are. Nisani and Katyar Road EXECUTIVE ENGINEER 0.925 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 01 Aug 2015
Stage-I Approval on : 15 Jan 2018
Compliance Report Submitted by User Agency on : 06 Feb 2019