Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Haryana FP/HR/ROAD/7808/2014 9-HRC055-2015-CHA Diversion of 5.17 ha of forest land for widening of 2 lane on NH-709 (E) from KM. 123.520 to 146.500 under forest division and distt. Bhiwani Road Executive Engineer, PD-III, PWD B&R Br. Rohtak 5.17 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 Oct 2014
Stage-I Approval on : 28 Sep 2015
Compliance Report Submitted by User Agency on : 04 Nov 2015
2 Haryana FP/HR/Others/9464/2015 9-HRB013-2016-CHA Diversion of 0.0168 Hect. of forest land for access of Affordable group housing project at sector 69-70 Gurgaon Haryana Others PREMIUM INFRATECH PVT LTD 0.0168 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 20 Jan 2015
Stage-I Approval on : 04 Jul 2016
Compliance Report Submitted by User Agency on : 31 May 2017
3 Haryana FP/HR/ROAD/19083/2016 9-HRB130-2016-CHA Const. of 2 lne ROB at LC No. 39 at KM 48/9-49/1 on road from Neerpur to Mandhana road. Road PWD B AND R NARNAUL 0.609 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 23 Apr 2016
Stage-I Approval on : 23 Nov 2016
Compliance Report Submitted by User Agency on : 27 Jan 2017
4 Haryana FP/HR/ROAD/13913/2015 9-HRB156-2016-CHA This is with regard to development of 72m wide HUDA Sector Road (including service road) adjoining sector 63A in revenue village of Behrampur. The acquisition proceedings for construction of this Sector Roads, in accordance with the HUDA approved Sectoral Plan, has already been initiated. The acquis Road IREO PVT. LTD. 0.121406 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 05 Aug 2015
Stage-I Approval on : 30 Dec 2016
Compliance Report Submitted by User Agency on : 29 May 2017
5 Haryana FP/HR/ROAD/19139/2016 9-HRC153-2016-CHA Diversion of 5.94 ha of forest land for construction of 4 lane of 3 Km. Dhand Pundri road KM. 4.20 to 7.20 KM in Village Pharal alongwith lightning (ID 6837) (CM Announcement Code NO) 10681) Road EXECUTIVE ENGINEER 5.94 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 28 Apr 2016
Stage-I Approval on : 30 Dec 2016
Compliance Report Submitted by User Agency on : 03 Mar 2017
6 Haryana FP/HR/ROAD/19277/2016 9-HRB171-2016-CHA Kala Amb Barara Shahabad road Road PWD B AND R HARYANA 3.95 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 10 May 2016
Stage-I Approval on : 03 Mar 2017
Compliance Report Submitted by User Agency on : 17 Apr 2017
7 Haryana FP/HR/ROAD/19097/2016 9-HRC128-2016-CHA Diversion of 12.00 ha of forest land for improvement by providing 4 lane by wdg. of 2 km on each side from the main crossing from Saheed Udam Singh Chowk, Cheeka in Kaithal Distt (ID 6917, 699,7022) Road EXECUTIVE ENGINEER 12 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 25 Apr 2016
Stage-I Approval on : 03 Mar 2017
Compliance Report Submitted by User Agency on : 19 Apr 2017
8 Haryana FP/HR/ROAD/22537/2016 9-HRB051-2017-CHA Diversion of 3.95 ha of forest land for Widening and Strengthening of Rewari Dahina Kanina Mohindergarh Satnali Loharu road (SH No. 24) (Section Mohindergarh Satnali Loharu road from km 84.88 to 94.18 in Provincial Divsion, PWD B&R Charkhi Dadri in Bhiwani Distt. Road EXECUTIVE ENGIREER PWD (B&R) 3.95 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 23 Nov 2016
Stage-I Approval on : 22 Mar 2017
Compliance Report Submitted by User Agency on : 19 Apr 2017
9 Haryana FP/HR/ROAD/21228/2016 9-HRB196-2016-CHA Diversion of extra forest strip land of 0.603 hectares for construction of junctions & canal structures falling in Pehowa bypass under Kurukshetra Forest Division from Existing Km. 46+500 to Existing Km. 55+400 Road NHAI PIU AMBALA 0.603 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 01 Sep 2016
Stage-I Approval on : 18 Apr 2017
Compliance Report Submitted by User Agency on : 30 May 2017
10 Haryana FP/HR/Others/17791/2016 9-HRB131-2016-CHA Up-Gradation of Strom Water System in Pundri Town Teh.& Distt Kaithal (CM Announcement Code No. 10321) Others PHED 0.3128 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 30 Jan 2016
Stage-I Approval on : 12 May 2017
Compliance Report Submitted by User Agency on : 16 Jun 2017
11 Haryana FP/HR/Others/13505/2015 9-HRB130-2015-CHA Diversion of 0.0142 ha of forest land for access for Ware House of Transport Corporation of India Ltd. along Saha-Shabad Road, Two access road between 59 to 60 KMs RHS (SH-31) at Village Bihta, Tehsil Barara, Distt. Ambala (haryana) Others TRANSPORT CORPORATION OF INDIA LTD 0.0142 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 26 Jun 2015
Stage-I Approval on : 06 Dec 2016
Compliance Report Submitted by User Agency on : 08 Feb 2017
12 Haryana FP/HR/Others/20057/2016 9-HRB197-2016-CHA Diversion of 0.0155 Hectare forest land for our new Essar Oil Limited Retail Outlet on Kala Aamb-Sadhaura-Shahabad Road (SH-04),Near KM. Stone 23 at Village Zaffarpur, Tehsil Barara, Distt. Ambala (Haryana). Others Essar Oil Limited 0.0155 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 17 Jun 2016
Stage-I Approval on : 06 Jun 2017
Compliance Report Submitted by User Agency on : 15 Jun 2017
13 Himachal Pradesh FP/HP/SCH/17832/2016 8B/HPB/09/68/2016 Construction of Building and Campus of Govt. Degree College Lad Bharol Distt. Mandi H.P. involving diversion of 2.02 ha of forest land at Banandar - 102 in Forest Division Joginder Nagar. It will provide opportunity of higher education to 21 Panchayats with population of fifty thousand. School DIRECTOR OF HIGHER EDUCATION 2.02 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 02 Feb 2016
Stage-I Approval on : 04 May 2017
Compliance Report Submitted by User Agency on : 02 Jun 2017
14 Himachal Pradesh FP/HP/ROAD/15485/2015 8B/HPB/06/48/2016 Rajpura Darshal area under Rampur Tehsil is a remote area hitherto unconnected by road. The villagers have to take uphill journey to reach their villages. Rajpura to Darshal road is being constructed to provide motor link to the villages Darshal, Matalni & Batheda. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 1.9772 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 17 Sep 2015
Stage-I Approval on : 27 Jan 2017
Compliance Report Submitted by User Agency on : 05 Jun 2017
15 Himachal Pradesh FP/HP/ROAD/10512/2015 8B/HPB/06/90/2015 Construction of Sundar Nagar Bypass from Km 167.160 to Km 172.950 under NH-21 Project Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU SHIMLA 3.34 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 28 Feb 2015
Stage-I Approval on : 24 Oct 2016
Compliance Report Submitted by User Agency on : 28 Feb 2017
16 Himachal Pradesh FP/HP/ROAD/7615/2014 8B/HPB/06/92/2015 The forest land is required for the C/o Shinti Kanchi to Dharala road. The total length of the road is 6.177 kms which will passes through the forest land. This road is being constructed to provide motor link to the vill. Dharala. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 2.1251 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 07 Nov 2014
Stage-I Approval on : 02 Aug 2016
Compliance Report Submitted by User Agency on : 24 Nov 2016
17 Himachal Pradesh FP/HP/ROAD/8051/2014 8B/HPB/06/23/2016/964 C/o Link road to Village Ayog Km 0/0 to 3/500 Under PMGSY (World Bank Funded) Gram Panchayat Neen Block Basantpur Tehsil Suni Distt. Shimla HP Enclosed as Annexure A 12-13 Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 2.5421 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 14 Nov 2014
Stage-I Approval on : 15 Sep 2016
Compliance Report Submitted by User Agency on : 07 Jun 2017
18 Himachal Pradesh FP/HP/Others/10017/2015 8B/HPB/09/59/2015 Sub Market Yard Tutu Others AGRICULTURAL PRODUCE MARKET COMMITTEE SHIMLA AND KINNAUR DHALLI SHIMLA 1.0897 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 10 Feb 2015
Stage-I Approval on : 15 Apr 2016
Compliance Report Submitted by User Agency on : 09 Sep 2016
19 Karnataka FP/KA/TRANS/10659/2015 4-KRB 1068/ 2015-BAN Forest land is required for Construction of 66KV SC link line from existing 66/33/11KV Madikeri Substation to 66/33/11KV Virajapete Substation to a distance of 1.569 KMs. In the existing idle 33KV line corridor passing through in the Madikeri East Reserve Forest Area with COYOTE ACSR Conductor. Transmission Line EXECUTIVE ENGINEER 2.3535 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 04 Mar 2015
Stage-I Approval on : 12 Oct 2015
Compliance Report Submitted by User Agency on : 03 Mar 2017
20 Punjab FP/PB/Others/8557/2014 9-PBB392-2015-CHA Passage to site for acceleration and deceleration Lanes for Logistic Park of M/s.Gupta Builders & Promotors Pvt. Ltd. Others GUPTA BUILDERS 0.0833 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 13 Feb 2015
Stage-I Approval on : 12 Oct 2015
Compliance Report Submitted by User Agency on : 23 May 2017
21 Punjab FP/PB/ROAD/15445/2015 9-PBC459-2015-CHA Construction of Additional Structure & Service Road from Km. 448.510 to Km. 473.068 on NH-1 (Amritsar Bypass) has been necessitated due to the multiple junctions & crossings which interrupt the smooth flow of traffic on the road. To mitigate these problems, the constructions of Additional Structure Road National Highways Authority of India 12.736 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 15 Sep 2015
Stage-I Approval on : 09 Feb 2016
Compliance Report Submitted by User Agency on : 22 Mar 2016
22 Punjab FP/PB/TRANS/10234/2015 9-PBB367-2016-CHA Construction of 400 kV D/C Transmission line from PGCIL Substation at Malerkotla to PGCIL Substation at Amritsar Transmission Line NRSS XXXIB TRANSMISSION LIMITED 4.83 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 18 Feb 2015
Stage-I Approval on : 16 Sep 2016
Compliance Report Submitted by User Agency on : 05 Apr 2017
23 Punjab FP/PB/TRANS/16803/2015 9-PBB361-2016-CHA 400 kV DC Transmission Line from PGCIL substation at Kurukshetra to PGCIL substation at Malerkotla under Northern Region System Strengthening Scheme XXXI(B) Transmission Line NRSS XXXIB TRANSMISSION LIMITED 3.308 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 02 Dec 2015
Stage-I Approval on : 28 Sep 2016
Compliance Report Submitted by User Agency on : 22 Feb 2017
24 Punjab FP/PB/ROAD/14577/2015 9-PBC357-2016-CHA NHAI is undertaking the project of 4/6-laning of Kharar to Ludhiana Section of NH-95 (New NH-5) starting from Kharar Km 10+185 to Samrala Chowk Ludhiana Km 86+199 in the State of Punjab. This project is of economical importance. Road NHAI PIU CHANDIGARH 84.084 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 11 Aug 2015
Stage-I Approval on : 02 Nov 2016
Compliance Report Submitted by User Agency on : 02 Mar 2017
25 Punjab FP/PB/Others/8958/2014 9-PBB-359-2016-CHA Diversion of 0.0862 ha of forest land for access of Essar Oil pump in village Chabba on Amritsar-Tarantarn road under forest division and distt. Amritsar Punjab Others ESSAR OIL LIMITED 0.0862 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 29 Dec 2014
Stage-I Approval on : 16 Nov 2016
Compliance Report Submitted by User Agency on : 12 Apr 2017
26 Punjab FP/PB/RAIL/22028/2016 9-PBB435-437-2016-CHA Diversion of 2.9814 HA.(Patiala Forest Division 2.876 HA + Ludhiana Forest Division 0.1054 HA) of Forest Land for construction of Eastern Dedicated Freight Corridor starting from Ludhiana in Punjab to Dhankuni in West Bengal and from Dadri to Mumbai. (Section of CPM/Ambala: Sahnewal to Talheri Via A Railway DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA LIMITED 2.9814 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 25 Oct 2016
Stage-I Approval on : 12 May 2017
Compliance Report Submitted by User Agency on : 02 Jun 2017
27 Punjab FP/PB/ROAD/18813/2016 9-PBB366-2016-CHA Diversion of 14.02 hec of Forest area in favor of PWD( B & R) Central Works Division No.2 Bathinda for Widening of Road Vill. Rampura to Maur Mandi( UP to Maur ROB ) KM 82.40 To 104.200 Under forest Division Bathinda Distt. Bathinda Punjab Road PWD 14.02 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 06 Apr 2016
Stage-I Approval on : 10 Aug 2016
Compliance Report Submitted by User Agency on : 23 Feb 2017
28 Punjab FP/PB/ROAD/20054/2016 9-PBB397-2016-CHA Diversion of 0.18 hec.of Forest area in favor of Executive Engineer, PWD ( B & R) Const. Div Sangrur for Widening of Bridge on canal between KM 53.940 to KM 54.040 (RHS) and Widening of Bridge on Canal (Kotla Branch) between KM 73.350 To 73.565 ( RHS) On Bhawanigarh-Sunam-Bhikhi-Kotshami Road PWD 4.9026 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 18 Jun 2016
Stage-I Approval on : 21 Dec 2016
Compliance Report Submitted by User Agency on : 02 Feb 2017
29 Punjab FP/PB/Others/21104/2016 9-PBB305-2017-CHA Diversion of 0.01104 Ha. of Forest land for approach road to the proposed Retail outlet of Essar Oil Ltd. Situated at Village Thikriwala A, on Thikriwala to Barnala road, ODR - 17, Tehsil & Distt. Barnala. Others ESSAR OIL LIMITED MOHALI 0.01104 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 24 Aug 2016
Stage-I Approval on : 18 May 2017
Compliance Report Submitted by User Agency on : 16 Jun 2017
30 Punjab FP/PB/IND/22264/2016 9-PBB312-2017-CHA Diversion of 0.006967 hectare of forest land for approach road to M/s MRS. BECTORS FOOD SPECIALITIES LIMITED on Ghanaur to Shambu Road Km. 21 to 22 L.H.S at village Gobindgarh Dhakli Kammi Kalan, Tehsil Rajpura under Forest Division & Distt. Patiala, Punjab Industry MRS BECTORS FOOD SPECIALITIES LIMITED 0.006967 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 10 Nov 2016
Stage-I Approval on : 24 May 2017
Compliance Report Submitted by User Agency on : 12 Jun 2017
31 Punjab FP/PB/ROAD/20158/2016 9-PBB481-2016-CHA Road Widening Badal-Mehna Road KM Stone 2-6 LHS Teh. Malout Distt Muktsar Road EXECUTIVE ENGINEER CONSTRUCTION DIVISION PWD B R GIDDERBAHA 1.87 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 23 Jun 2016
Stage-I Approval on : 24 May 2017
Compliance Report Submitted by User Agency on : 22 Jun 2017
32 Punjab FP/PB/Others/20193/2016 9-PBB341-2017-CHA Diversion of 0.0297 Ha. of forest Land for Approach road to the Proposed Retail Outlet of Essar Oil Ltd. Situated at Village Ramnagar. Between KM Stone No 87.000 - 88.000 RHS, on SH - 12 A, on Bathinda - Maur Mandi Road , Tehsil Maur Mandi Distt. Bathinda Others ESSAR OIL LIMITED MOHALI 0.0297 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 25 Jun 2016
Stage-I Approval on : 22 May 2017
Compliance Report Submitted by User Agency on : 22 Jun 2017
33 Punjab FP/PB/ROAD/19601/2016 9-PBB316-2017-CHA diversion of 2.18535 hec. of forest land for widening of barnala mansa sardulgarh road Road P.W.D.(B & R), BATHINDA 2.18535 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 24 May 2016
Stage-I Approval on : 31 May 2017
Compliance Report Submitted by User Agency on : 21 Jun 2017
34 Rajasthan FP/RJ/TRANS/17459/2016 8B/Raj/04/05/2016/FC 220 KV Double Circuit Pratapgarh-Chittorgarh line with one circuit via 220 KV GSS Nimbahera Transmission Line RVPN 19.824 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 08 Jan 2016
Stage-I Approval on : 15 Feb 2017
Compliance Report Submitted by User Agency on : 17 Mar 2017
35 Rajasthan FP/RJ/TRANS/15665/2015 8B/Raj/04/9/2016/FC Total Length of Line i.e Double circuit & single circuit for Bijaipur & kanera GSS is 59.302km. From cut point diverts towsrd Kanera length of line is 11.462Km & From cut point diverts to Bijaipur line length is 12.66Km Transmission Line RAJASTHAN RAJYA VIDYUT PRASARAN NIGAM LIMITED 9.7659 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 05 Oct 2015
Stage-I Approval on : 17 Feb 2017
Compliance Report Submitted by User Agency on : 17 Mar 2017
36 Rajasthan FP/RJ/ROAD/14011/2015 8B/Raj/06/38/2015/FC WIDENING TO 4 LANE ALONG WITH GEOMETRIC IMPROVEMENT FROM KM 256/550 TO KM 289/500 KOTA DARA SECTION ON NH 12 IN THE STATE OF RAJASTHAN Road EXECUTIVE ENGINEER PWD NH DIVISION KOTA 65.45 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 20 Jul 2015
Stage-I Approval on : 01 Feb 2016
Compliance Report Submitted by User Agency on : 25 Apr 2017
37 Uttarakhand FP/UK/ROAD/14124/2015 8B/UCP/06/186/2015/FC Road connecting village jaikandi(Pop-299) and Javri Road PMGSY 3.15 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 23 Jul 2015
Stage-I Approval on : 14 Mar 2016
Compliance Report Submitted by User Agency on : 04 Feb 2017
38 Uttarakhand FP/UK/ROAD/8579/2014 8B/UCP/06/161/2015-FC Construction of Badgal rotela To Kafchone Motor Road in Someswer constituency,Distt Almora.Construction of Badgal rotela To Kafchone Motor Road is proposed as a extension of Sitalakhet-Kathpuriya To Badgal Rotela motor road the sention lenth of proposed motor road is 1.00 km. The benifited village Road EXECUTIVE ENGINEER 0.36 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 11 Dec 2014
Stage-I Approval on : 15 Mar 2016
Compliance Report Submitted by User Agency on : 06 Apr 2017
39 Uttarakhand FP/UK/ROAD/9767/2015 8B/UCP/06/71/2015-FC kimi band to rashtari billa biruntha kandau mr Road PUBLIC WORK DEPARTMENT 3.15 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 Jan 2015
Stage-I Approval on : 15 Mar 2016
Compliance Report Submitted by User Agency on : 16 Sep 2016
40 Uttarakhand FP/UK/ROAD/8442/2014 8B/UCP/06/245/2015/FC Bhowali is a junction of routes Bhimtal Nainital, Haldwani-Jeolikote-Almora, Haldwani-Bhimtal-Almora and Bhimtal-Ramgarh. All vehicles to the hilly Distts runs via Bhowali. The width of road at Bhowali is not sufficient to cross two vehicles at a time, which results mostly traffic jam at Bhowali. Road PUBLIC WORKS DEPARTMENT 3.92 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 09 Dec 2014
Stage-I Approval on : 04 Apr 2016
Compliance Report Submitted by User Agency on : 09 Nov 2016
41 Uttarakhand FP/UK/ROAD/18011/2016 8B/UCP/06/67/2016 A new road of 6 km long is sanction to connect Pandhar, Sajgodi, Doni etc. Road EXECUTIVE ENGINEER 0.54 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 15 Feb 2016
Stage-I Approval on : 10 May 2016
Compliance Report Submitted by User Agency on : 22 Apr 2017
42 Uttarakhand FP/UK/ROAD/10061/2015 8B/UCP/06/265/2015 construction of Itharna to Devli MR Road PUBLIC WORK DEPARTMENT 1.505 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 12 Feb 2015
Stage-I Approval on : 21 May 2016
Compliance Report Submitted by User Agency on : 01 Jun 2017
43 Uttarakhand FP/UK/ROAD/7730/2014 8B/UCP/06/288/2015/FC Construction of Roorkee-Chutmalpur -saharanpur - yamunanagar- UP ? Haryana border section of NH-73 from KM.0.00 to 71.775 & Chutmalpur -Ganeshpur section of NH- 72 A from Km. 0.000 to 16.00 under NHDP- IV Road NATIONAL HIGHWAY AUTHORTY OF INDIA PIU DEHRADUN 46.745 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 04 Nov 2014
Stage-I Approval on : 30 Jun 2016
Compliance Report Submitted by User Agency on : 31 May 2017
44 Uttarakhand FP/UK/ROAD/10404/2015 8B/UCP/06/238/2015/FC The road connected various villages Nyangarh Dungri and other villages to main roads.the villages are highly benefited constructions of this road. Road PWD 2.902 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 24 Feb 2015
Stage-I Approval on : 15 Jul 2016
Compliance Report Submitted by User Agency on : 24 Mar 2017
45 Uttarakhand FP/UK/ROAD/10467/2015 8B/UCP/06/58/2015/FC the construction of this new road will facilitates villagers by education,medical, and time saving.It will also resist unwanted activities in the reserve forest area and facilitates forest deptt also. Road PUBLIC WORKS DEPARTMENT GHANSALI 4.697 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 02 Mar 2015
Stage-I Approval on : 14 Aug 2015
Compliance Report Submitted by User Agency on : 30 Sep 2016
46 Uttarakhand FP/UK/ROAD/8840/2014 8B/UCP/06/47/2015/FC Kaintholi Naikhri Motor Road Road PUBLIC WORK DEPARTMENT 1.47 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 25 Dec 2014
Stage-I Approval on : 17 Aug 2015
Compliance Report Submitted by User Agency on : 20 Aug 2016
47 Uttarakhand FP/UK/MIN/20542/2016 8B/UCP/05/166/2016 The proposal is situated on Swarna River under Jhajra range of the Dehradun forest division, Dehradun district. During monsoon RBM got collected in the river coerse which leads to flooding of the river. By extracting this RBM from the river bed, flooding can be prevented. It is to be mention here that the working plane of Dehradun forest division also prescribed removal of RBM from river bed as part of Silvicultural activity under chapter VII para 7.21. Mining UTTARAKHAND FOREST DEVELOPMENT CORPORATION (UAFDC) 23.75 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 19 Jul 2016
Stage-I Approval on : 18 Nov 2016
Compliance Report Submitted by User Agency on : 30 Jan 2017
48 Uttarakhand FP/UK/Others/18185/2016 8B/UCP/09/61/2016/FC Diversion of Forest land for Landslide traetment of Nalupani from km. 123.080 to 123.970 of NH-34 Gangotri to Dharasu road section Others NATIONAL HIGHWAYS AND INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED 2.714 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 26 Feb 2016
Stage-I Approval on : 19 Oct 2016
Compliance Report Submitted by User Agency on : 10 Apr 2017