Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Bihar FP/BR/Others/25174/2017 FP/BR/Others/25174/2017 Diversion of 0.00825 ha of forest land for construction of approach road for opening retail outlet of BPCL on Rosra-Samastipur-Dalsinghsarai Road (PWD Road) in Samastipur district of Bihar. Others ABHA SUREKA 0.00825 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 23 Mar 2017
Stage-I Approval on : 11 Aug 2017
Compliance Report Submitted by User Agency on : 08 Jun 2018
2 Haryana FP/HR/ROAD/7808/2014 9-HRC055-2015-CHA Diversion of 5.17 ha of forest land for widening of 2 lane on NH-709 (E) from KM. 123.520 to 146.500 under forest division and distt. Bhiwani Road Executive Engineer, PD-III, PWD B&R Br. Rohtak 5.17 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 Oct 2014
Stage-I Approval on : 28 Sep 2015
Compliance Report Submitted by User Agency on : 04 Nov 2015
3 Haryana FP/HR/ROAD/20949/2016 9-HRB191-2016-CHA The volume of traffic on this road has increased manifold over the years. The existing width is highly inadequate for smooth run of the vehicles. The road is accident prone and traffic jams put travelers to inconvenience. Furthermore, the traffic jams etc. resulting environmental pollution. Hence is Road HSRDC REWARI 2.134 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 11 Aug 2016
Stage-I Approval on : 16 Sep 2017
Compliance Report Submitted by User Agency on : 12 Jun 2018
4 Haryana FP/HR/ROAD/28559/2017 9-HRB129-2017-CHA THIS IS A PROPOSAL FOR DIVERSION OF FOREST LAND IS REQUIRED FOR ACCESS TO GAS GODOWN OF M/s Naina Devi Indane on Bahalgarh-Dipalpur road (ODR), Near Km Stone no.2 (LHS), near at Village Joshi Chauhan, Tehsil & Distt. Sonipat (HR). Road NAINA DEVI INDANE 0.0058 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 08 Aug 2017
Stage-I Approval on : 26 Sep 2017
Compliance Report Submitted by User Agency on : 06 Mar 2018
5 Haryana FP/HR/ROAD/27078/2017 9-HRB174-2017-CHA THIS IS A PROPOSAL OF DIVERSION OF FOREST LAND for UP-Gradation of road from NH-1 TO Bhalsi (Road ID-8696+8179) under Nabard-RIDF-XXII, at RD 3.100 - 5.660, Village Sondapur, Jattal & Binjhol, Tehsil & Distt. Panipat (Haryana). Road PWD (B&R) PANIPAT (HARYANA) 0.9837 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 12 Jul 2017
Stage-I Approval on : 03 Jan 2018
Compliance Report Submitted by User Agency on : 06 Mar 2018
6 Haryana FP/HR/ROAD/29910/2017 9-HRB154-2017-CHA Construction of New Road from Gairatpur Bass to Kharak - Jamalpur via Ansal Retareat road km. 0.20 to 1.90 Road PMGSY 1.71 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 26 Oct 2017
Stage-I Approval on : 05 Jan 2018
Compliance Report Submitted by User Agency on : 30 May 2018
7 Haryana FP/HR/ROAD/26704/2017 9-HRB010-2018-CHA This road is approved by Addl Chief Secretary to Govt. of Haryana PW(B&R) & Architech department Haryana Chandigarh letter no. 9/147/2017-3B&R dated 31/03/2017. This work will be completely during the financial year. Improvement of proposed road is essentially either side of Nangal Chaudhary to Goth Road PWD B AND R NARNAUL 1.287 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 16 Jun 2017
Stage-I Approval on : 31 Jan 2018
Compliance Report Submitted by User Agency on : 20 Mar 2018
8 Haryana FP/HR/ROAD/30074/2017 9-HRB017-2018-CHA R/C/E for 4 lanning of Rewari Narnaul road (NH-11)(NH-352 to Rao Abhey Singh Chowk km 0 to 2 at Rewari. The project approved by ACS, Govt. of Haryana PW (B&R) & Architecture department Chandigarh vide ltr. No.07/27/2017-2 dated 26-10-17. Road HSRDC REWARI 3.6 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 14 Nov 2017
Stage-I Approval on : 08 Feb 2018
Compliance Report Submitted by User Agency on : 30 Mar 2018
9 Haryana FP/HR/Approach/29937/2017 9-HRB028-2018-CHA Proposal for diversion of 0.0228 ha. of forest land for access to Excelsior American School by Shakuntala Devi Exucational Society along Chakarpur Bundh RD 8-9, L/side at Village Wazirabad Distt. Gurgaon Approach Access SHAKUNTALA DEVI EDUCATIONAL SOCIETY 0.0228 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 28 Oct 2017
Stage-I Approval on : 16 Feb 2018
Compliance Report Submitted by User Agency on : 12 Jun 2018
10 Haryana FP/HR/ROAD/30995/2017 9-HRB040-2018-CHA Widening and Strengthening of road from NH 352 to Jatusana via Rohrai Lala villages. The project approved by ACS Govt of Haryana PWD & Archit. deptt.CHD ltr no.09-624/2017-3B&R dated 21-12-17 and CM announcement code no. 20590 dated 8.12.17. Road HSRDC REWARI 4.539 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 25 Dec 2017
Stage-I Approval on : 01 Mar 2018
Compliance Report Submitted by User Agency on : 30 Mar 2018
11 Haryana FP/HR/Approach/31040/2017 9-HRB141-2017-CHA the project has been granted license for development by town & country planning department, Haryana Approach Access STERNAL BUILDCON PRIVATE LIMITED 0.0286 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 27 Dec 2017
Stage-I Approval on : 01 Mar 2018
Compliance Report Submitted by User Agency on : 22 Mar 2018
12 Haryana FP/HR/ROAD/20936/2016 9-HRB164-2016-CHA WIDENING OF PALWAL SOHNA ROAD (NH 71-B) TO IG UNIVERSITY MEERPUR Via PHIDERI, RAMGARH IN REWARI DISTRICT R.D 0-2.300 K.M (ROAD ID 1402) Road HSRDC REWARI 0.558 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 10 Aug 2016
Stage-I Approval on : 10 Apr 2018
Compliance Report Submitted by User Agency on : 25 May 2018
13 Haryana FP/HR/ROAD/30939/2017 9-HRB051-2018-CHA S/R four lanning Barwala Agroha Road km. 81.29 to 84.84 in Hisar Distt. Road PWD B AND R HANSI 3.479 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 21 Dec 2017
Stage-I Approval on : 12 Apr 2018
Compliance Report Submitted by User Agency on : 18 May 2018
14 Haryana FP/HR/ROAD/31422/2018 9-HRB073-2018-CHA Construction of 2 Lane ROB at LC No. 4A on Hisar Sadalpur Railway Line at Km 3/7-8 Crossing Southern Periphery road along Balsamand Distritutory in Hisar. Road EXECUTIVE ENGINEER HISAR 0.48 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 13 Feb 2018
Stage-I Approval on : 12 Apr 2018
Compliance Report Submitted by User Agency on : 30 May 2018
15 Haryana FP/HR/Approach/30863/2017 9-HRB137-2017-CHA Diversion of forest land to Access for CNG filling cum storage facility along Gurgaon-wazirpur-farrukhnagar road km RD 4.40 Side at village khentawas, Tehsil- Farrukhnagar & District Gurgaon,Haryana. Approach Access SARLACNG PUMP 0.012 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 19 Dec 2017
Stage-I Approval on : 08 May 2018
Compliance Report Submitted by User Agency on : 14 Jun 2018
16 Haryana FP/HR/Others/15776/2015 9-HRB031-2017-CHA The licensed area is 2.835 Ha area in which Non forest land is 2.825 Ha and forest land is 0.0097 Ha required for diversion. The forest land applied for the diversion 0.0097 Ha will be used for the access from the road to the project site and for the provision of services. Others RAS DEVELOPMENTS PVT. LTD. 0.0569 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 05 Oct 2015
Stage-I Approval on : 07 May 2018
Compliance Report Submitted by User Agency on : 01 Jun 2018
17 Haryana FP/HR/IND/22086/2016 9-HRB057-2017-CHA For Access to factory for manufacture of Laminates on village Manak Tabra , Distt. Panchkula Industry STYLAM INDUSTRIES LTD 0.011 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 27 Oct 2016
Stage-I Approval on : 29 May 2018
Compliance Report Submitted by User Agency on : 08 Jun 2018
18 Haryana FP/HR/ROAD/30470/2017 9-HRC068-2018-CHA This is a proposal of diversion of forest land for up-gradation of existing Sonipat-Rathdana Narela road from km 2.310 to 14.800 in Sonipat District from ITI chowk to Safiabad Village upto Sonipat District Boundary Road EXECUTIVE ENGINEER PROVINCIAL DIVISION II PWD B AND R BRANCH SONIPAT HARYANA 9.6191 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 11 Dec 2017
Stage-I Approval on : 30 May 2018
Compliance Report Submitted by User Agency on : 21 Jun 2018
19 Haryana FP/HR/ROAD/30540/2017 9-HRC088-2018-CHA Diversion of 11.01 ha. of forest land for Wdg. & Stg. of Karnal Munak road MDR- 115 RD 8.720 to 25.200 ( 5.50 to 10.00 mtr.) in Karnal distt.is required due to increase in traffic volume Road PWD B AND R KARNAL HARYANA 11.01 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 30 Nov 2017
Stage-I Approval on : 06 Jun 2018
Compliance Report Submitted by User Agency on : 18 Jun 2018
20 Haryana FP/HR/WATER/30779/2017 9-HRB056-2018-CHA Purposal of Diversion of Forest Land for non forestry use under forest for construction of RCC channel 600mm i/d at Village Risaliakhera. Drinking Water EXECUTIVE ENGINEER PUBLIC HEALTH 0.27 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 13 Dec 2017
Stage-I Approval on : 28 Mar 2018
Compliance Report Submitted by User Agency on : 11 Jun 2018
21 Himachal Pradesh FP/HP/TRANS/16708/2015 8B/HPB/02/54/2016 Construction of 66 kV D/C Transmission Line from 66/22 kV GIS Switching Sub Station Urni to 66/220 kV 2× 86 MVA and 220/400 kV 2× 315 MVA GIS Pooling Sub Station at Wangtoo,District Kinnaur (Himachal Pradesh). Transmission Line HIMACHAL PRADESH POWER TRANSMISSION CORPORATION LIMITED 20.4874 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 22 Dec 2015
Stage-I Approval on : 25 Sep 2017
Compliance Report Submitted by User Agency on : 01 May 2018
22 Himachal Pradesh FP/HP/SCH/13208/2015 8B/HP/09/74/2016/FC The establishment of this institution will benefit about 40000 residents of surrounding Gram Panchayats and later many future generation to come. School DIRECTOR OF HIGHER EDUCATION 1.3671 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 12 Jun 2015
Stage-I Approval on : 18 Sep 2017
Compliance Report Submitted by User Agency on : 23 May 2018
23 Himachal Pradesh FP/HP/ROAD/18778/2016 8B/HP/06/02/2017 Road from Dokhri Nallah to Rogha Kotgarh via Khobal Nallah km. 0/00 to 2/500 Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 1.2538 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 09 Apr 2016
Stage-I Approval on : 18 Sep 2017
Compliance Report Submitted by User Agency on : 11 Jun 2018
24 Himachal Pradesh FP/HP/Others/17174/2015 8B/HPB/09/15/2016 C/O PROPOSED GOSADAN AT ANTI TEH.JUBBAL DISTT.SHIMLA KH.NO 1258/1 Others ANIMAL HUSBANDRY 0.08 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 22 Dec 2015
Stage-I Approval on : 20 Jul 2016
Compliance Report Submitted by User Agency on : 01 Jun 2018
25 Himachal Pradesh FP/HP/Others/19314/2016 8B/HP/09/61/2016 C/O Office & Workshop H.R.T.C Karsog Others BUS STAND MANAGEMENT AUTHORITY 0.32 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 14 May 2016
Stage-I Approval on : 31 Aug 2017
Compliance Report Submitted by User Agency on : 25 May 2018
26 Himachal Pradesh FP/HP/ROAD/10512/2015 8B/HPB/06/90/2015 Construction of Sundar Nagar Bypass from Km 167.160 to Km 172.950 under NH-21 Project Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU SHIMLA 3.34 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 28 Feb 2015
Stage-I Approval on : 24 Oct 2016
Compliance Report Submitted by User Agency on : 28 Feb 2017
27 Madhya Pradesh FP/MP/IRRIG/7302/2014 6-MPC005/2016-BHO Dhekli Tank ,Block Umarban Dist Dhar(MP) Irrigation EXECUTIVE ENGINEER 12.037 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 09 Oct 2014
Stage-I Approval on : 26 Apr 2017
Compliance Report Submitted by User Agency on : 10 Dec 2017
28 Madhya Pradesh FP/MP/TRANS/22328/2016 6-MPB014/2017-BHO Construction of 400 KV DC TWIN Khandwa - Rajgarh at Khargone TPP for construction Power to 1320 MW Khargone TPP by NTPC in Madhya Predesh. Forest Diversion Proposal for 3.956 Ha. of Forest Land in Barwah Forest Division in Madhya Predesh. Transmission Line KHARGONE TRANSMISSION LIMITED 3.956 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 16 Nov 2016
Stage-I Approval on : 20 Jul 2017
Compliance Report Submitted by User Agency on : 06 Feb 2018
29 Madhya Pradesh FP/MP/IRRIG/22109/2016 6-MPB010/2017-BHO Gopalpura Canal Medium Project Proposed in Banda Range North Sagar Division will increase the irrigation in rural Area. This project will increase 2280.02 ha land of 89 villages. Irrigation EE PANCHANMNAGAR SURVEY DIV HATTA DAMOH 1.905 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 29 Oct 2016
Stage-I Approval on : 02 Aug 2017
Compliance Report Submitted by User Agency on : 01 Jun 2018
30 Madhya Pradesh FP/MP/Others/8689/2014 6-GJB058/2015-BHO Hanumandhara Temple situated at village Nayagaon,Chitrakoot,District-Satna,Madhya Pradesh.Temple ison the top of hill about 110meters height.Devotees have to climb 680nos of stairs to go to the temple.To facilitate smooth passage to temple Ropeway is the best solution for senior citizen,disabled. Others DAMODAR ROPEWAYS AND INFRA LIMITED 0.2394 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 05 Jan 2015
Stage-I Approval on : 17 Dec 2015
Compliance Report Submitted by User Agency on : 16 May 2018
31 Madhya Pradesh FP/MP/ROAD/19946/2016 6-MPC018/2016-BHO Construction of Jabalpur-Mandla -Chilpi road (NH_12A) in KM 21+850 to KM 85+400. Total length is 63.550 KM passing through forest area where land acquisition is 26.245 ha. in Mandla West Road MP ROAD DEVELOPMENT CORPORATION LTD 26.245 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 21 Jun 2016
Stage-I Approval on : 23 Dec 2016
Compliance Report Submitted by User Agency on : 05 Jun 2018
32 Madhya Pradesh FP/MP/ROAD/16510/2015 6-MPA009/2016-BHO Construction of Bhopal -Biaora road (NH-12) Road passing through Narsinghgarh wild life sanctuary area wherein total 45.51 ha. proposed for diversion. Road MP ROAD DEVELOPMENT CORPORATION LTD 45.51 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 19 Nov 2015
Stage-I Approval on : 23 Dec 2016
Compliance Report Submitted by User Agency on : 08 Jun 2018
33 Madhya Pradesh FP/MP/ROAD/19976/2016 6-MPC020/2016-BHO Construction of Jabalpur- Mandla-Chilpi road Road MPRDC 15.31 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 11 Jun 2016
Stage-I Approval on : 23 Dec 2016
Compliance Report Submitted by User Agency on : 12 Jun 2018
34 Madhya Pradesh FP/MP/ROAD/16511/2015 6-MPC019/2016-BH Construction and widening of Bhopal-Jabalpur road (NH-12) from Ch. 255.300 to Ch. 301.800 length is 49.35 Km (Pkg. -5) wherein total 20.500 hac. forest land acquired. Road MP ROAD DEVELOPMENT CORPORATION LTD 20.5 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 19 Nov 2015
Stage-I Approval on : 30 Dec 2016
Compliance Report Submitted by User Agency on : 05 Jun 2018
35 Madhya Pradesh FP/MP/ROAD/15779/2015 6-MPB027/2016-BHO Construction of Biaora-MP/Rajasthan Border Road (NH-12) in Km 2/6 to 67/0. Where in Total 2.79 ha. forest land acquired in Rajgarh District in PF -00066. Road MP ROAD DEVELOPMENT CORPORATION LTD 2.79 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 07 Oct 2015
Stage-I Approval on : 30 Dec 2016
Compliance Report Submitted by User Agency on : 05 Jun 2018
36 Madhya Pradesh FP/MP/ROAD/20012/2016 6-MPC023/2016-BHO CONSTRUCTION OF NH 12A MANDALA TO CHILPI MP/CG BORDER SECTION Road MPRDC 11.926 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 14 Jun 2016
Stage-I Approval on : 30 Dec 2016
Compliance Report Submitted by User Agency on : 09 Mar 2018
37 Madhya Pradesh FP/MP/IRRIG/17753/2016 6-MPC002/2017-BHO Construction of Irrigation Tank. Irrigation Madhya Pradesh Water Resources Department 14.5 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 27 Feb 2016
Stage-I Approval on : 10 Oct 2017
Compliance Report Submitted by User Agency on : 14 May 2018
38 Madhya Pradesh FP/MP/ROAD/24762/2017 6-MPC030/2017-BHO Up-gradation of existing road Majhgawan to Chitrakoot road(Chitrakoot bypass) in 2-lane with paved shoulder under NIDA (NABARD Infrastructure Development Assistance ) wherein total 16.20 hact. forest land required in Km 0.00 to Km 7.930 proposal for diversion forest land. Road MP ROAD DEVELOPMENT CORPORATION LTD 16.2 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 27 Mar 2017
Stage-I Approval on : 17 Nov 2017
Compliance Report Submitted by User Agency on : 05 Feb 2018
39 Madhya Pradesh FP/MP/IRRIG/17911/2016 6-MPC06/2017-BHO Bahuti Canal Scheme has been proposed to Irrigate 65000 Ha. Land of Rewa & Satna Distt. using the water of Bansagar reservoir by flow and Partial lift. The main canal of Scheme will take off the discharge from reservoir near village Gulwar Gujara of Ramnagar Tehsil of Satna Distt. The main canal Irrigation WRD MP 6.728 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 09 Feb 2016
Stage-I Approval on : 27 Oct 2017
Compliance Report Submitted by User Agency on : 01 Jun 2018
40 Madhya Pradesh FP/MP/TRANS/22331/2016 6-MPC031/2017-BHO Proposal for Diversion of 39.437 Ha. Forest Land under Madhya Pradesh for Construction of 765 kV D/C Hexa Khandwa-Dhule Transmission Line. Transmission Line KHARGONE TRANSMISSION LIMITED 39.437 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 30 Nov 2016
Stage-I Approval on : 07 Nov 2017
Compliance Report Submitted by User Agency on : 25 Feb 2018
41 Madhya Pradesh FP/MP/IRRIG/25703/2017 6-MPB040/2017-BHO The proposed Balkunda Irrigation Tank Minor Project in Dhar District, Proposed Total Forest Land Required for Tank 4.5 Ha. Irrigation EXECUTIVE ENGINEER 4.5 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 23 Apr 2017
Stage-I Approval on : 22 Jan 2018
Compliance Report Submitted by User Agency on : 02 Apr 2018
42 Madhya Pradesh FP/MP/IRRIG/22945/2016 6-MPC011/2015-BHO Bhasuda Nalla Project Village Saliwara Block & Tehsil Dhanora Distt. Seoni (M.P.). Construction of storage tank for Rabi Irrigation in tribal area-Dhanora Block. Irrigation WRD MP 21.655 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 14 Dec 2016
Stage-I Approval on : 19 Feb 2018
Compliance Report Submitted by User Agency on : 15 May 2018
43 Madhya Pradesh FP/MP/RAIL/17246/2015 6-MPC032/2017-BHO Sontalai Bagra tawa doubling Railway WEST CENTRAL RAILWAY 13.32 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 26 Dec 2015
Stage-I Approval on : 08 Jan 2018
Compliance Report Submitted by User Agency on : 23 Mar 2018
44 Madhya Pradesh FP/MP/RAIL/16724/2015 6-MPB041/2017-BHO Gauge Conversion of Narrow Gauge to Broad Gauge between Chhindwara to Seoni. Railway SOUTH EAST CENTRAL RAILWAY CHHINDWARA 2.745 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 01 Dec 2015
Stage-I Approval on : 18 Dec 2017
Compliance Report Submitted by User Agency on : 25 Apr 2018
45 Madhya Pradesh FP/MP/Others/26068/2017 6-MPC03/2018-BHO Sewer line for the disposal of Shivpuri Township waste under National Lake Conservation Project. Others EXECUTIVE ENGINEER PUBLIC HEALTH ENGINEERING DIVISION 1.83 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 08 May 2017
Stage-I Approval on : 02 Apr 2018
Compliance Report Submitted by User Agency on : 20 Jun 2018
46 Madhya Pradesh FP/MP/IRRIG/29973/2017 6-MPC019/2018-BHO Alirajpur Lift Irrigation Scheme has been conceived to cater irrigation water to about 35000 Ha of CCA in Alirajpur district MP. Project discription and salient features are attached Irrigation Narmada Valley Development Authority 14.958 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 Oct 2017
Stage-I Approval on : 07 May 2018
Compliance Report Submitted by User Agency on : 31 May 2018
47 Madhya Pradesh FP/MP/ROAD/31273/2018 6-MPC026/2018-BHO Construction of Road Tunnel at Badwar-Mohniya Ghat Section bypass of Rewa-Sidhi of NH-75E Road NATIONAL HIGHWAY AUTHORITY OF INDIA 12.37 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 10 Jan 2018
Stage-I Approval on : 07 May 2018
Compliance Report Submitted by User Agency on : 29 May 2018
48 Punjab FP/PB/Others/27274/2017 9-PBB318-2018-CHA Diversion of 1.9173 Hectare of Forest Land (i.e. parallel / across to the road/canal side strip plantation declared as protected forest) for laying 8" dia Steel Natural Gas Pipeline alongwith OFC to set up City Gas Distribution Network in Rupnagar GA, Others BRARAT PETROLEUM CORPORATION LIMITED 1.9173 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 24 Jul 2017
Stage-I Approval on : 06 Apr 2018
Compliance Report Submitted by User Agency on : 16 May 2018
49 Punjab FP/PB/Others/17488/2016 9-PBB403-2016-CHA Diversion of 0.005 Hectare forest land for construction of approach road for a proposed Commercial colony of M/s H.S. Land developers along the NH-1A(New-44) at Dasuya((WML)) on Pathankot – Jalandhar road, Chainage 407.415(RHS), Tehsil Dasuya, Distt. Hoshiapur Others HS LAND DEVELOPERS 0.005 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 14 Jan 2016
Stage-I Approval on : 23 Mar 2018
Compliance Report Submitted by User Agency on : 05 Jun 2018
50 Punjab FP/PB/TRANS/21942/2016 9-PBB367-2017-CHA 66KV Line from 220KV S/S Patran to 66KV S/S Dirba D/C on D/C Transmission Line ADDL S E TL DIV PSPCL PATIALA 0.07785 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 18 Oct 2016
Stage-I Approval on : 22 Jan 2018
Compliance Report Submitted by User Agency on : 04 May 2018