List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Haryana FP/HR/ROAD/7808/2014 9-HRC055-2015-CHA Diversion of 5.17 ha of forest land for widening of 2 lane on NH-709 (E) from KM. 123.520 to 146.500 under forest division and distt. Bhiwani Road Executive Engineer, PD-III, PWD B&R Br. Rohtak 5.17 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 Oct 2014
Stage-I Approval on : 28 Sep 2015
Compliance Report Submitted by User Agency on : 04 Nov 2015
2 Haryana FP/HR/Others/9720/2015 9-HRB097-2015-CHA Diversion of 0.0086 hect. of forest land for proposed path for M/s Ansal Properties & Infrastructure Ltd. situated at G.T. Road, KM. Stone 118.290, Right Side, Sector-36, Karnal Others ANASAL PROPERTIES INFRASTRUCTURE 0.0086 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 29 Jan 2015
Stage-I Approval on : 05 Jan 2016
Compliance Report Submitted by User Agency on : 01 Jul 2016
3 Haryana FP/HR/Others/17607/2016 9-HRB064-2016-CHA Green Park Bar & Restaurant main Gurgaon - Pataudi road, Village-Jori Sanpaka, Gurgaon-122503 Others GREEN PARK BAR AND RESTAURANT 0.005 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 19 Jan 2016
Stage-I Approval on : 30 Aug 2016
Compliance Report Submitted by User Agency on : 05 Jan 2017
4 Haryana FP/HR/Others/20357/2016 9-HRB120-2016-CHA Diversion of forest land 0.1013 Hac. for access to the Proposed Petrol Pump of Essar Oil Ltd. Along at KM Stone No 14 (LHS) Chainage 13+849 at Khasra No. 389//1/1 , Village – Dhanana, Tehsil & District -Bhiwani, Haryana Others Essar Oil Limited 0.1013 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 06 Jul 2016
Stage-I Approval on : 19 Oct 2016
Compliance Report Submitted by User Agency on : 13 Dec 2016
5 Haryana FP/HR/Others/13505/2015 9-HRB130-2015-CHA Diversion of 0.0142 ha of forest land for access for Ware House of Transport Corporation of India Ltd. along Saha-Shabad Road, Two access road between 59 to 60 KMs RHS (SH-31) at Village Bihta, Tehsil Barara, Distt. Ambala (haryana) Others TRANSPORT CORPORATION OF INDIA LTD 0.0142 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 26 Jun 2015
Stage-I Approval on : 06 Dec 2016
Compliance Report Submitted by User Agency on : 08 Feb 2017
6 Haryana FP/HR/Others/19557/2016 9-HRB116-2016-CHA Khewat / Khatoni No. 156//144-186, Mustkil No. 11, Killa No.- 11/2(1-13), 20/1/2(3-8), Village- Jhamuwas, on Tauru – Bilaspur/NH-8 Road (RHS), Tehsil –Tauru & Disrict – Mewat, State - Haryana Others Essar Oil Limited 0.0122 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 20 May 2016
Stage-I Approval on : 04 Nov 2016
Compliance Report Submitted by User Agency on : 03 Jan 2017
7 Haryana FP/HR/ROAD/20363/2016 9-HRB160-2016-CHA Diversion of 0.2764 Ha of forest land for const. of ROB on Bhattu ludesar road between km 1.00 to 2.00 under forest division and Distt. Fatehabad Road PWD 0.2764 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 06 Jul 2016
Stage-I Approval on : 14 Dec 2016
Compliance Report Submitted by User Agency on : 17 Jan 2017
8 Himachal Pradesh FP/HP/ROAD/9663/2015 8B/HPB/06/76/2015 This road is being constructed to provide the motor link to villages Kuni & Shahdhar. The road will cater the needs of population of about 600 and will give a boost to the local economy. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 2.3809 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 28 Jan 2015
Stage-I Approval on : 17 Nov 2016
Compliance Report Submitted by User Agency on : 18 Jan 2017
9 Himachal Pradesh FP/HP/Others/10961/2015 8B/HPB/09/12/2016 The proposal involves construction of Himachal Road Transport Corporation in village Gujrehra, near Nagrota Bagwan town of district Kangra. The proposal requires 0.9036 Hactare of forest land for construction of different components viz., Washing Room, Workshop, Canteen / Rest Room, RM Office, Garag Others HP BUS STANDS MANAGEMENT AND DEVELOPMENT AUTHORITY 0.9036 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 16 Mar 2015
Stage-I Approval on : 01 Dec 2016
Compliance Report Submitted by User Agency on : 06 Feb 2017
10 Himachal Pradesh FP/HP/Others/10017/2015 8B/HPB/09/59/2015 Sub Market Yard Tutu Others AGRICULTURAL PRODUCE MARKET COMMITTEE SHIMLA AND KINNAUR DHALLI SHIMLA 1.0897 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 10 Feb 2015
Stage-I Approval on : 15 Apr 2016
Compliance Report Submitted by User Agency on : 09 Sep 2016
11 Himachal Pradesh FP/HP/QRY/10914/2015 8B/HPB/08/47/2015/108 diversion of 0-99-12 ha. of forest land for establishment of stone crusher and quiry at khasra No. muhal Pashada out of this area 0.4550 ha. was already diverted in favour of the user agency. Now the area enhanced upto 0.9912 ha. as per the requirement of local public and mining plan. Quarrying SATYA SURYA SHIV SHAKTI STONE CRUSHER 0.9912 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 19 Mar 2015
Stage-I Approval on : 19 Apr 2016
Compliance Report Submitted by User Agency on : 29 Apr 2016
12 Himachal Pradesh FP/HP/Others/18885/2016 8B/HPB/09/22/2016 Daughter Booster Station for supply of CNG to the vehicles as per direction of the Hon'ble National Green Tribunal Others DIRECTORATE OF TRANSPORT OF HP 0.7783 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 11 Apr 2016
Stage-I Approval on : 05 Jul 2016
Compliance Report Submitted by User Agency on : 04 Feb 2017
13 Himachal Pradesh FP/HP/ROAD/7615/2014 8B/HPB/06/92/2015 The forest land is required for the C/o Shinti Kanchi to Dharala road. The total length of the road is 6.177 kms which will passes through the forest land. This road is being constructed to provide motor link to the vill. Dharala. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 2.1251 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 07 Nov 2014
Stage-I Approval on : 02 Aug 2016
Compliance Report Submitted by User Agency on : 24 Nov 2016
14 Punjab FP/PB/Others/18157/2016 9-PBB364-2016-CHA Diversion of 0.0037 ha of forest land for approach road to Century Plyboards India Ltd. at village Daulowal (Hoshiarpur) Others CENTURY PLYBOARDS IND LTD 0.0037 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 25 Feb 2016
Stage-I Approval on : 19 Aug 2016
Compliance Report Submitted by User Agency on : 22 Feb 2017
15 Punjab FP/PB/TRANS/17210/2015 9-PBB389-2016-CHA 220KV line from 220 KV Focal Point Nabha to 220 KV Bhawanigarh SC on DC Towers Transmission Line PSTCL TLSC 0.1575 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 23 Dec 2015
Stage-I Approval on : 07 Sep 2016
Compliance Report Submitted by User Agency on : 30 Sep 2016
16 Punjab FP/PB/Others/15525/2015 9-PBB423-2016-CHA There is 0.00422 Ha. Forest Land Proposed for approach road to resort & There is no trees effected in this case. Others TAJ RESORT UDYOG SAMITI 0.00422 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 19 Sep 2015
Stage-I Approval on : 30 Sep 2016
Compliance Report Submitted by User Agency on : 06 Feb 2017
17 Punjab FP/PB/ROAD/15445/2015 9-PBC459-2015-CHA Construction of Additional Structure & Service Road from Km. 448.510 to Km. 473.068 on NH-1 (Amritsar Bypass) has been necessitated due to the multiple junctions & crossings which interrupt the smooth flow of traffic on the road. To mitigate these problems, the constructions of Additional Structure Road National Highways Authority of India 12.736 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 15 Sep 2015
Stage-I Approval on : 09 Feb 2016
Compliance Report Submitted by User Agency on : 22 Mar 2016
18 Punjab FP/PB/Others/10803/2015 9-PBB414-2015-CHA Diversion of 0.096288 ha. forest land ( All ready approved area 0.0170 Ha + Additional Area 0.079288 ha ) for approach road for setting up a retail outlet of Indian Oil Corporation Ltd at village Kaunterpur on Jalandhar to Pathankot road , km Stone 95 L/Side Existing NH 1A (New NH 44) district Others NEERAJ GUPTA DY MANAGER (RETAIL SALES) INDIAN OIL CORPORATION LIMITED PATHANKOT 0.079288 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 13 Mar 2015
Stage-I Approval on : 12 Oct 2015
Compliance Report Submitted by User Agency on : 04 Aug 2016
19 Punjab FP/PB/Others/15623/2015 9-PBB439-2015-CHA Diversion of 0.0788 ha forest land for access to retail Outlet of BPCL at Village Bondli & no trees are affected in this case. Others BHARAT PETROLEUM CORPORATION LIMITED 0.0788 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 23 Sep 2015
Stage-I Approval on : 20 Oct 2015
Compliance Report Submitted by User Agency on : 18 Aug 2016
20 Punjab FP/PB/Others/19491/2016 9-PBB421-2016-CHA Diversion of 0.0416 Ha. of Forest Land for Access road to the Proposed retail outlet of Essar Oil Limited Situated at Village Chalheri on Ambala - rajpura road, Between KM Stone No 221 - 222 LHS, Tehsil Rajpura Distt, Patiala. Others ESSAR OIL LIMITED MOHALI 0.0416 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 19 May 2016
Stage-I Approval on : 17 Nov 2016
Compliance Report Submitted by User Agency on : 15 Jan 2017
21 Punjab FP/PB/Others/19830/2016 9-PBB449-2016-CHA Diversion of 0.0142 hec. of forest area for approach road to Proposed retail outlet Essar Oil Ltd at village Sardulgarh Existing SH-13 (NEW NH-703) CH. 227.222 To 227.248(LHS) on Mansa-Sirsa Road ,Tehsil Sardulgarh Distt Mansa ( Punjab Others ESSAR OIL LTD 0.0142 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 02 Jun 2016
Stage-I Approval on : 06 Jan 2017
Compliance Report Submitted by User Agency on : 07 Feb 2017
22 Punjab FP/PB/ROAD/18813/2016 9-PBB366-2016-CHA Diversion of 14.02 hec of Forest area in favor of PWD( B & R) Central Works Division No.2 Bathinda for Widening of Road Vill. Rampura to Maur Mandi( UP to Maur ROB ) KM 82.40 To 104.200 Under forest Division Bathinda Distt. Bathinda Punjab Road PWD 14.02 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 06 Apr 2016
Stage-I Approval on : 10 Aug 2016
Compliance Report Submitted by User Agency on : 23 Feb 2017
23 Punjab FP/PB/ROAD/20054/2016 9-PBB397-2016-CHA Diversion of 0.18 hec.of Forest area in favor of Executive Engineer, PWD ( B & R) Const. Div Sangrur for Widening of Bridge on canal between KM 53.940 to KM 54.040 (RHS) and Widening of Bridge on Canal (Kotla Branch) between KM 73.350 To 73.565 ( RHS) On Bhawanigarh-Sunam-Bhikhi-Kotshami Road PWD 4.9026 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 18 Jun 2016
Stage-I Approval on : 21 Dec 2016
Compliance Report Submitted by User Agency on : 02 Feb 2017
24 Punjab FP/PB/ROAD/22117/2016 9-PBC463-2016-CHA DIVERSION OF 9.28 HA OF FOREST LAND FOR CONSTRUCTION OF ROAD WIDENING FROM AMRITSAR-CHOWGAWAN RANIAN ROAD RD KM 0.00 TO 14.00 KM TO BOTH SIDE, TEHSIL AMRITSAR & AJNALA, DISTRICT & DIVISION AMRITSAR. Road PWD 9.28 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 01 Nov 2016
Stage-I Approval on : 28 Dec 2016
Compliance Report Submitted by User Agency on : 06 Feb 2017
25 Punjab FP/PB/Others/19410/2016 9-PBB424-2016-CHA Permission for Passage to Retail Outlet By Essar Oil Ltd on GT road NH-1 Km 231-232 R/S Tehsil: Rajpura, Distt: Patiala Others ESSAR OIL LTD RAJPURA 0.0286 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 14 May 2016
Stage-I Approval on : 29 Dec 2016
Compliance Report Submitted by User Agency on : 23 Feb 2017
26 Punjab FP/PB/ROAD/18634/2016 9-PBC405-2016-CHA permission for road widening of NH-64 Zirakpura patiala Section Km 0-50 b/s under forest division Pataial & SAS nagar Road CENTRAL WORKS DIVISION PB PWD BRANCH PATIALA 9.5876 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 22 Mar 2016
Stage-I Approval on : 02 Nov 2016
Compliance Report Submitted by User Agency on : 22 Feb 2017
27 Punjab FP/PB/Others/11331/2015 9-PBB363-2016-CHA Diversion of 0.0096 ha of forest land in favour of Bathinda Indane Bottling Plant, IOCL (M.D.), Bathinda for approach way to said indane bottling plant on Phoosmandi-Talwandi Road towards Jassi Chowk to Left Hand side at Village Phoosmandi Falling under forest division and distt. Bathinda, Punjab Others INDIAN OIL CORPORATION LIMITED 0.0096 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 27 Mar 2015
Stage-I Approval on : 17 Oct 2016
Compliance Report Submitted by User Agency on : 18 Jan 2017
28 Punjab FP/PB/Others/18076/2016 9-PBB438-2016-CHA Laying of 12" dia natural gas pipeline to set up city gas distribution in Amritsar City, Punjab State Others GUJARAT STATE PETRONET LIMITED 0.6329 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 19 Feb 2016
Stage-I Approval on : 17 Oct 2016
Compliance Report Submitted by User Agency on : 11 Feb 2017
29 Uttarakhand FP/UK/ROAD/10467/2015 8B/UCP/06/58/2015/FC the construction of this new road will facilitates villagers by education,medical, and time saving.It will also resist unwanted activities in the reserve forest area and facilitates forest deptt also. Road PUBLIC WORKS DEPARTMENT GHANSALI 4.697 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 02 Mar 2015
Stage-I Approval on : 14 Aug 2015
Compliance Report Submitted by User Agency on : 30 Sep 2016
30 Uttarakhand FP/UK/ROAD/8840/2014 8B/UCP/06/47/2015/FC Kaintholi Naikhri Motor Road Road PUBLIC WORK DEPARTMENT 1.47 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 25 Dec 2014
Stage-I Approval on : 17 Aug 2015
Compliance Report Submitted by User Agency on : 20 Aug 2016
31 Uttarakhand FP/UK/ROAD/9767/2015 8B/UCP/06/71/2015-FC kimi band to rashtari billa biruntha kandau mr Road PUBLIC WORK DEPARTMENT 3.15 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 Jan 2015
Stage-I Approval on : 15 Mar 2016
Compliance Report Submitted by User Agency on : 16 Sep 2016
32 Uttarakhand FP/UK/ROAD/8442/2014 8B/UCP/06/245/2015/FC Bhowali is a junction of routes Bhimtal Nainital, Haldwani-Jeolikote-Almora, Haldwani-Bhimtal-Almora and Bhimtal-Ramgarh. All vehicles to the hilly Distts runs via Bhowali. The width of road at Bhowali is not sufficient to cross two vehicles at a time, which results mostly traffic jam at Bhowali. Road PUBLIC WORKS DEPARTMENT 3.92 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 09 Dec 2014
Stage-I Approval on : 04 Apr 2016
Compliance Report Submitted by User Agency on : 09 Nov 2016
33 Uttarakhand FP/UK/RAIL/14375/2015 8B/UCP/07/196/2015-FC The diversion of Forest land proposal in favour of Indian Railways for the entire project is being submitted in two parts. In Part-I, from Km 0 to Km 6 falling in Dehradun F.D. and in Part-II from Km 6 to Km 126 falling in various other F.D. Railway RAIL VIKAS NIGAM LIMITED 63.422 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 03 Aug 2015
Stage-I Approval on : 10 Oct 2016
Compliance Report Submitted by User Agency on : 12 Jan 2017