Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Andhra Pradesh
|
FP/AP/TRANS/25855/2017
|
G.O.Rt.No.127
|
132KV DC/SC line from 132/33KV SS Vengalayapalem to 25KV RTSS, Nallapadu
|
Transmission Line
|
EXECUTIVE ENGINEER CONSTRUCTION DIVISION APTRANSCO GUNTUR
|
0.51
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Apr 2017
|
Stage-I Approval on
|
:
|
22 Jun 2017
|
Compliance Report Submitted by User Agency on
|
:
|
20 Nov 2019
|
|
|
|
|
2
|
Bihar
|
FP/BR/ROAD/21381/2016
|
FP/BR/ROAD/21381/2016
|
Baysi-Bahadurganj-Dighalbank section of SH-99
|
Road
|
BIHAR STATE ROAD DEVELOPMENT CORPORATION
|
69.178
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Sep 2016
|
Stage-I Approval on
|
:
|
04 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
14 Nov 2023
|
|
|
|
|
3
|
Chhattisgarh
|
FP/CG/ROAD/119866/2021
|
FC-III/IROCH-04/2022
|
Development of Economic Corridors, Inter-corridors, feeder routes and Coastal Road to improve the efficiency of freight movement in India (Lot-3/Odisha & Jharkhand/Package-2) Raipur-Vishakhapatnam (Ch. 0.000 - Ch. 124.661) in the State of Chhattisgarh under Bharatmala Pariyojana. (Forest Proposal is for between km 42+844 to Km 124.661)
|
Road
|
NHAI PIU DHAMTARI
|
228.0425
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jan 2021
|
Stage-I Approval on
|
:
|
12 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2025
|
|
|
|
|
4
|
Goa
|
FP/GA/ROAD/19984/2016
|
F.No.GOC1237/2020-BAN
|
FDP:NH-17, Goa
|
Road
|
PUBLIC WORKS DEPARTMENT
|
29.836
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jun 2016
|
Stage-I Approval on
|
:
|
10 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 Dec 2024
|
|
|
|
|
5
|
Gujarat
|
FP/GJ/TRANS/143615/2021
|
FC-6/GJB-47/2022-GNR
|
Construction of 33 kV transmission line from Ratadiya PSS to WTG locations of Adani Wind Energy Kutchh Five Limited
|
Transmission Line
|
ADANI WIND ENERGY KUTCH FIVE LIMITED
|
0.0346
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jun 2021
|
Stage-I Approval on
|
:
|
21 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 Dec 2022
|
|
|
|
|
6
|
Gujarat
|
FP/GJ/ROAD/47665/2020
|
8-108/1993-FC Vol.
|
Construction of Ambaji Bypass Road ( k.m. 2/950 to 5/150 ) on himmatnagar-Kheroj-Ambaji-Aburoad Road S.H.-9
|
Road
|
PUBLIC WORK DEPARTMENT
|
9.9
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jul 2020
|
Stage-I Approval on
|
:
|
21 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
14 Dec 2022
|
|
|
|
|
7
|
Gujarat
|
FP/GJ/ROAD/140444/2021
|
FC-6/GJB-33/2022-GNR
|
Reconstruction of Sukhpur Dalkhaniya Road
|
Road
|
R AND B PANCHAYAT DIVISION AMRELI
|
0.98
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Apr 2021
|
Stage-I Approval on
|
:
|
01 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jan 2023
|
|
|
|
|
8
|
Gujarat
|
FP/GJ/ROAD/156679/2022
|
FC-6/GJA-74/2023-GNR
|
Div of 78.1014 Ha Protected Forest land for four laning of existing section of Dudhrej-Vana-Malvan Road on SH-19 in Surendranagar district. (4/00 Km to 43/00 Km)
|
Road
|
DEPUTY EXECUTIVE ENGINEER
|
78.1014
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jun 2022
|
Stage-I Approval on
|
:
|
31 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jun 2024
|
|
|
|
|
9
|
Gujarat
|
FP/GJ/ROAD/153185/2022
|
FC-6/GJC-54/2023-GNR
|
Proposal for diversion of protected forest land for the project of Widening & strengthening four lane with paved shoulder of Vadodara - Dabhoi Road Km. 8/300 to 29/600
|
Road
|
EXECUTIVE ENGINEER
|
17.04
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Mar 2022
|
Stage-I Approval on
|
:
|
31 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jun 2025
|
|
|
|
|
10
|
Gujarat
|
FP/GJ/ROAD/157025/2022
|
FC-6/GJA-81/2023-GNR
|
Div of 68.0884 Ha Protected Forest land for four laning of existing section of Malvan Patdi Zainabad Dasada Road on SH-19 in Surendranagar district. (43/00 Km to 77/00 Km)
|
Road
|
DEPUTY EXECUTIVE ENGINEER
|
68.0884
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2022
|
Stage-I Approval on
|
:
|
21 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jun 2024
|
|
|
|
|
11
|
Gujarat
|
FP/GJ/IRRIG/40453/2019
|
FC-6/GJC-62/2022-GNR
|
Diversion of 10.19 ha. R.F. Land for construction of Barrage and approach road on Sabarmati River in Village: Hirpura, Dist. Mehsana.
|
Irrigation
|
DHAROI CANAL DIVISION NO.3, VISNAGAR
|
10.19
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 May 2019
|
Stage-I Approval on
|
:
|
21 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Aug 2023
|
|
|
|
|
12
|
Gujarat
|
FP/GJ/WATER/82029/2020
|
6-GJB051/2021-BHO
|
Diversion of 0.098 Ha. Forest land for laying Two 6" (inch) dia PVC pipeline for irrigation and drinking water
|
Drinking Water
|
KHUNTI RANMALBHAI
|
0.098
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Dec 2020
|
Stage-I Approval on
|
:
|
13 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2022
|
|
|
|
|
13
|
Gujarat
|
FP/GJ/RAIL/65579/2020
|
6-GJB057/2021-BHO
|
WDFC (ROB 12-PCL)
|
Railway
|
DFCCIL AHMEDABAD
|
2.35
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2020
|
Stage-I Approval on
|
:
|
04 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jul 2021
|
|
|
|
|
14
|
Gujarat
|
FP/GJ/TRANS/54160/2020
|
6-GJB060/2021-BHO
|
Bhaniya village 24 *7 hour 3-ph JGY power supply (Bhaniya – khishari ag electric link line (0.0595 Ha)) ta. Khambha dist. Amreli in Gujarat State
|
Transmission Line
|
PGVCL KHAMBHA SDN
|
0.0595
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Nov 2020
|
Stage-I Approval on
|
:
|
17 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
31 May 2022
|
|
|
|
|
15
|
Gujarat
|
FP/GJ/TRANS/44390/2020
|
FCA-1020/3-18/20/SF-224/F
|
66KV D/c Rabarika - Umrali (M/S Powerica Wind Power Generation) line
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
0.02
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Feb 2020
|
Stage-I Approval on
|
:
|
01 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2024
|
|
|
|
|
16
|
Gujarat
|
FP/GJ/OFC/49234/2020
|
6-GJB045/2021-BHO
|
Grant permission for optical fiber cable along the route mention here (Purna wildlife sanctuary Area)
|
Optical Fibre Cable
|
GFGNL
|
0.6895
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Aug 2020
|
Stage-I Approval on
|
:
|
30 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
13 Aug 2024
|
|
|
|
|
17
|
Gujarat
|
FP/GJ/ROAD/44056/2020
|
6-GJB093/2021-BHO
|
Bilimora Chikhli Vansda Waghai Road Km. 53/400 to 56/600 ( Only For Left Side Of The Road ) & Km. 56/600 to 59/600 ( For Both Side Of The Road )
|
Road
|
NAVSARI RNB DIVISION
|
3.76
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jan 2020
|
Stage-I Approval on
|
:
|
30 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jan 2022
|
|
|
|
|
18
|
Gujarat
|
FP/GJ/TRANS/140743/2021
|
6-GJB096/2021-BHO
|
66KV S/C Kangashiyali (220KV) (GETCO) - Siddheshwar underground cable line with 1C x 630 sq mm (3+1 spare) XLPE power cable line
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
0.427
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Apr 2021
|
Stage-I Approval on
|
:
|
03 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jan 2022
|
|
|
|
|
19
|
Gujarat
|
FP/GJ/TRANS/41280/2019
|
6-GJC040/2021-BHO
|
Submission of 21.6360 Hac. Forest land proposal for Diversion for Forest Land proposal for forest clearance for 66KV LILO line for 66kv Jirval sub-station - 2.1690 Hec, & 66KV LILO line for 66KV Nandg
|
Transmission Line
|
GUJARAT ENERGY TRANSMISSION CORP LTD
|
21.636
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jul 2019
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2024
|
|
|
|
|
20
|
Gujarat
|
FP/GJ/ROAD/123854/2021
|
6-GJC041/2021-BHO
|
Widening & Strengthening of Naswadi - Bhakha - Kawant Road Km. 0/0 to 38/400
|
Road
|
DISTRICT R & B SUB DIVISION
|
10.7445
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Feb 2021
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jul 2024
|
|
|
|
|
21
|
Gujarat
|
FP/GJ/ROAD/48671/2020
|
6-GJC043/2021-BHO
|
Diversion of 10.80 Ha. Protected Forest Land of Road Side For Construction of Pagdandi on Ahmedabad-Viramgam-Mandal-Dasada-Panchasar-Shankheshwar road, District: Patan in Gujarat State.
|
Road
|
EXECUTIVE ENGINEER ROAD AND BUILDING DIVISION (STATE) PATAN
|
10.8
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Aug 2020
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jun 2024
|
|
|
|
|
22
|
Gujarat
|
FP/GJ/OFC/49946/2020
|
6-GJB101/2021-BHO
|
GFGNL (BBNL Phase-II) Project Dhrangadhra Gudhkhar forest area
|
Optical Fibre Cable
|
GUJARAT FIBER GRID NETWORK LTD
|
0.0333
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2020
|
Stage-I Approval on
|
:
|
24 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
21 Feb 2023
|
|
|
|
|
23
|
Gujarat
|
FP/GJ/Others/39408/2019
|
FC-6/GJB-2/2022-GNR
|
Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Kutch District
|
Others
|
RELIANCE JIO INFOCOMM LTD
|
0.2138
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Mar 2019
|
Stage-I Approval on
|
:
|
25 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
09 May 2025
|
|
|
|
|
24
|
Gujarat
|
FP/GJ/Pipeline/144112/2021
|
6-GJB006/2022-FC
|
Diversion of 4.97 ha of Reserve Forest Land of Laying Irrigation Underground Water pipeline under Tapi- Karanj link pipeline Lift Irrigation Project.
|
Pipeline
|
NWRWS KALPSAR DEPARTMENT VER II PROJECT DIVISION VYARA
|
4.97
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2021
|
Stage-I Approval on
|
:
|
28 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 May 2022
|
|
|
|
|
25
|
Gujarat
|
FP/GJ/ROAD/140541/2021
|
FCA-1022/7-32/21/SF-42/F
|
Construction of Amabaradi Safari Park to Gadadhara Mandir Road (Village Road)
|
Road
|
R AND B PANCHAYAT DIVISION AMRELI
|
0.48
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jul 2021
|
Stage-I Approval on
|
:
|
22 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jul 2022
|
|
|
|
|
26
|
Gujarat
|
FP/GJ/Others/19176/2016
|
6-GJB05/2017-BHO
|
PVC Pipe Line For Sea Water
|
Others
|
OCEANBLUE HATCHERIES
|
0.108
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 May 2016
|
Stage-I Approval on
|
:
|
08 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
04 Apr 2025
|
|
|
|
|
27
|
Gujarat
|
FP/GJ/ROAD/14898/2015
|
6-GJB05/2016-BHO
|
R.O.B. on Pansora-BhalejAnand Roa r and Bhalej-Ahima Road
|
Road
|
EXECUTIVE ENGINEER
|
0.99375
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2015
|
Stage-I Approval on
|
:
|
18 Mar 2016
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2023
|
|
|
|
|
28
|
Gujarat
|
FP/GJ/ROAD/17511/2016
|
6-GJB012/2016-BHO
|
Tuwa-Mehlol-Vejalpur Road Km. 16/100 to 16/450 and 17/150 to 17/500 (L.C. No. 41 Railway Crossing)
|
Road
|
EX. ENGINEER, R & B, DIV. GODHARA
|
0.42
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jan 2016
|
Stage-I Approval on
|
:
|
31 Mar 2016
|
Compliance Report Submitted by User Agency on
|
:
|
18 Dec 2023
|
|
|
|
|
29
|
Gujarat
|
FP/GJ/ROAD/38381/2019
|
6-GJC059/2019-BHO
|
Proposal for diversion of protected forest land for the project of Four laning of Pragatipath section Suigam - Limbuni - Masali - Madhpura - Boru - Dudhosan road Ch. 0/00 to 20/750
|
Road
|
EXECUTIVE ENGINEER, BANASKANTHA
|
22.44375
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jan 2019
|
Stage-I Approval on
|
:
|
30 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
16 Feb 2024
|
|
|
|
|
30
|
Gujarat
|
FP/GJ/ROAD/37871/2018
|
6-GJC022/2020-BHO
|
Widening & Strengthening Four lane of Rajpipla To Poicha Road Km. 1/350 to 12/840
|
Road
|
RNBDIVISION,NARMADA
|
16.37325
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Dec 2018
|
Stage-I Approval on
|
:
|
17 Nov 2020
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2025
|
|
|
|
|
31
|
Gujarat
|
FP/GJ/ROAD/47661/2020
|
6-GJC039/2020-BHO
|
Construction of ambaji bypass road ( k.m. 0/00 to 2/950 ) on himmatanagar-kheroj-ambaji-aburoad Road S.H.-9
|
Road
|
PUBLIC WORK DEPARTMENT
|
13.275
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jul 2020
|
Stage-I Approval on
|
:
|
30 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jul 2022
|
|
|
|
|
32
|
Haryana
|
FP/HR/WATER/36116/2018
|
9-HRB002-2019-CHA
|
Masitan Water Works
|
Drinking Water
|
EXECUTIVE ENGINEER PUBLIC HEALTH
|
0.5548
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Sep 2018
|
Stage-I Approval on
|
:
|
17 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jun 2025
|
|
|
|
|
33
|
Haryana
|
FP/HR/WATER/37285/2018
|
9045
|
DRINKING WATER PIPELINE FROM JANAULI TO ASAOTI
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DIVISION PALWAL
|
0.702
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2018
|
Stage-I Approval on
|
:
|
16 Nov 2019
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2024
|
|
|
|
|
34
|
Haryana
|
FP/HR/ROAD/145587/2021
|
10152
|
Widening and strengthening of road from Narwana to Tohana MDR-111 district Jind Haryana.
|
Road
|
SDE PWD B&R NARWANA
|
0.85
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Aug 2021
|
Stage-I Approval on
|
:
|
15 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 May 2024
|
|
|
|
|
35
|
Haryana
|
FP/HR/ROAD/151320/2022
|
D-III-10324
|
Diversion of 0.7934 hac. of Forest Land for construction of 2 Lane ROB on LC No. – 114 on Mandi Adampur to Daroli Road at Adampur in Distt. - Hisar (HR).
|
Road
|
PROVINCIAL DIVISION PWD B&R BR., HISAR
|
0.7934
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jan 2022
|
Stage-I Approval on
|
:
|
06 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jan 2025
|
|
|
|
|
36
|
Himachal Pradesh
|
FP/HP/ROAD/150698/2021
|
FC/HPB/06/118/2022
|
C/O PANCHVEER TO DOCHA VIA BION ROAD KM 0/0 TO 3/00
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.433
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2021
|
Stage-I Approval on
|
:
|
29 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2025
|
|
|
|
|
37
|
Karnataka
|
FP/KA/IRRIG/35763/2018
|
4-KRB1221/2020
|
Laying of pipeline to fill 60 tanks of Harpanahalli Taluk from Tungabhadra River
|
Irrigation
|
EXECUTIVE ENGINEER KNNL BHADRA CANAL DIVISION DAVANGERE
|
0.54
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Sep 2018
|
Stage-I Approval on
|
:
|
29 Jan 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Nov 2021
|
|
|
|
|
38
|
Kerala
|
FP/KL/ROAD/148616/2021
|
4-KLC1368/2022-BAN
|
Construction of Twin Tunnel (2+2 lane) with Four Lane Approaches (from existing roads) for providing direct connectivity between Aanakampoyil Kalladi-Meppadi in Kozhikode and Wayanad Districts of Ker
|
Road
|
EXECUTIVE ENGINEER KERALA PUBLIC WORKS DEPARTMENT ROADS DIVISION, KOZHIKODE
|
17.263
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Oct 2021
|
Stage-I Approval on
|
:
|
31 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
10 Feb 2025
|
|
|
|
|
39
|
Ladakh
|
FP/LA/ROAD/152696/2022
|
o 9-JKA-001/2024-Jammu
|
Construction of Re-Alignment Of Various Stretches Between Pandrass - Pashkyum (Net Length – 31.00 Kms) on Road Zozila – Kargil – Leh (NH-1) To NHDL Specifications Through EPC Mode Under Project Vijay
|
Road
|
HQ 762 BRTF C/O 56 APO
|
0.3625
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2022
|
Stage-I Approval on
|
:
|
04 Oct 2024
|
Compliance Report Submitted by User Agency on
|
:
|
29 May 2025
|
|
|
|
|
40
|
Maharashtra
|
FP/MH/ROAD/118805/2021
|
FC-III/MH-51/2022-NGP
|
Upgradation of NH 353 C From Ashti to Sironcha in Section Allaplli to Sironcha
|
Road
|
NATIONAL HIGHWAY DIVISION GADCHIROLI
|
132.102
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2021
|
Stage-I Approval on
|
:
|
30 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2025
|
|
|
|
|
41
|
Maharashtra
|
FP/MH/RAIL/43265/2019
|
FC-II/MH-156/2021-NGP
|
Diversion Of Forest Land For Panvel - Karjat Doubling Railway Line (Panvel - Karjat Section) In Raigad Dist
|
Railway
|
MUMBAI RAILWAY VIKAS CORPORATION LIMITED
|
9.1321
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Dec 2019
|
Stage-I Approval on
|
:
|
30 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2025
|
|
|
|
|
42
|
Maharashtra
|
FP/MH/ROAD/50280/2020
|
FC-II/MH-145/2021-NGP
|
Diversion of 11.8639ha. area Reserved Forest, Protected Forest and Private Forest land for Rehabilitation and Up-gradation of two lane with paved shoulders Pune - Mulshi - Mangaon - Mhalsa -Dighi Por
|
Road
|
MSRDC BANDRA MUMBAI
|
11.8639
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Sep 2020
|
Stage-I Approval on
|
:
|
22 Apr 2021
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2025
|
|
|
|
|
43
|
Orissa
|
FP/OR/ROAD/7575/2014
|
5-ORC259/2015-BHU
|
Bankibahal to kanika Railway siding Road
|
Road
|
EXECUTIVE ENGINEER
|
39.98
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Oct 2014
|
Stage-I Approval on
|
:
|
14 Oct 2015
|
Compliance Report Submitted by User Agency on
|
:
|
06 Dec 2024
|
|
|
|
|
44
|
Rajasthan
|
FP/RJ/ROAD/7000/2014
|
8B/RJ/06/19/2015
|
Road from Gordhanpura to Kali mati
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.98
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Sep 2014
|
Stage-I Approval on
|
:
|
04 Aug 2016
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jun 2025
|
|
|
|
|
45
|
Rajasthan
|
FP/RJ/ROAD/6954/2014
|
8B/RJ/06/04/2015/FC
|
Road Work from Jalwara to Kishanpura
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.96
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Sep 2014
|
Stage-I Approval on
|
:
|
23 Aug 2016
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jun 2025
|
|
|
|
|
46
|
Rajasthan
|
FP/RJ/ROAD/10911/2015
|
8B/Raj/06/35/2015/FC
|
Construction of road from Hinglot to madnakheri
|
Road
|
EXECUTIVE ENGINEER PWD DIV CHHABRA
|
2.27
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Mar 2015
|
Stage-I Approval on
|
:
|
03 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jun 2025
|
|
|
|
|
47
|
Rajasthan
|
FP/RJ/WATER/26264/2017
|
8B/RAJ/08/26/2017/FC
|
Trambay station Harizan Basti OHSR
|
Drinking Water
|
EXECUTIVE ENGINEER PHED CITY DN I AJMER
|
0.0225
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 May 2017
|
Stage-I Approval on
|
:
|
09 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jun 2025
|
|
|
|
|
48
|
Rajasthan
|
FP/RJ/ROAD/11683/2015
|
F.1(68)Forest/2017
|
Road from Beenaganj road to Balwatpura
|
Road
|
EXECUTIVE ENGINEER
|
0.936
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Apr 2015
|
Stage-I Approval on
|
:
|
04 Feb 2018
|
Compliance Report Submitted by User Agency on
|
:
|
20 Dec 2024
|
|
|
|
|
49
|
Rajasthan
|
FP/RJ/ROAD/149560/2021
|
8B/RAJ017/2023-JPR
|
“Construction of Widening ,Strengthening on SH-32A From Jhameshwarji to Jagat Road KM Stone No-67/0 to 80/0, Tehsil–Girwa, District -Udaipur (Rajasthan)”
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN
|
6.75
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Dec 2021
|
Stage-I Approval on
|
:
|
30 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jan 2025
|
|
|
|
|
50
|
Tamil Nadu
|
FP/TN/OFC/117896/2020
|
4-TNB130/2024-CHN
|
laying underground OFC along Arimalam Rayavaram road stretch along sengirai forest area
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.165
|
Pending at Nodal Officer after receiving Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Dec 2020
|
Stage-I Approval on
|
:
|
23 Oct 2024
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2025
|
|
|
|
|
|