List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Haryana FP/HR/Approach/30895/2017 9-HRB042-2018-CHA Diversion of 0.0171 Ha of forest land for path to proposed Ric Mill project M/s Shri Bala Ji Rice Mill Village Jagmalwali Teh. Kalanwali Distt. Sirsa. Approach Access MS SHRI BALAJI RICE MILL 0.015652 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Dec 2017
Stage-I Approval on : 28 Feb 2018
Compliance Report Submitted by User Agency on : 21 Nov 2018
2 Haryana FP/HR/Approach/31400/2018 6185 Diversion of forest land 0.0089 Hac. for access to the Proposed Petrol Pump of Indian Oil Corporation Limited. Along at Khewat/Khata No.-173/159, Khatoni No. 199, Mustkil No.- 19 & 20, Killa No.- 25/2/1, 25/2/2, 21/2/1/2, 21/2/2, Village- Sirohi on Ballabgarh-Sohna Road (MDR-133), Tehsil - Ballabgar Approach Access Indian Oil Corporation Limited 0.0089 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 16 Jan 2018
Stage-I Approval on : 14 May 2018
Compliance Report Submitted by User Agency on : 10 Jul 2018
3 Haryana FP/HR/Approach/32303/2018 9-HRB008-2019-CHA Access to M/s Lovely Agro Products at Kalanwali on Kalanwali Singhpura Road Km. 0.80 (L.H.S.) In Sirsa Distt. Approach Access M/S LOVELY AGRO PRODUCTS 0.0069 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 27 Feb 2018
Stage-I Approval on : 24 Jan 2019
Compliance Report Submitted by User Agency on : 16 Dec 2019
4 Haryana FP/HR/Approach/32461/2018 9-HRB171-2018-CHA The proposal is for diversion of forest land for laying means of access to our proposed warehousing project along hodal nuh to pataudi patauda kulana road KM 92-93 left Hand Side. at village Patauda, district Jhajjar (Haryana) Approach Access PARAG AGROTECH PVT LTD 0.0095 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 09 Mar 2018
Stage-I Approval on : 18 Dec 2018
Compliance Report Submitted by User Agency on : 26 Jun 2019
5 Haryana FP/HR/Approach/33604/2018 9-HRB170-2018-CHA This is a proposal of diversion of forest land for access to M/s Bhagat Rice Mill belonging to Sh. Sumit Kumar S/o Sh. Parladh Bhagat situated on Delhi - Ambala Road NH-1(New NH-44), Near Km Stone no. 174 (RHS), Village Teora, Tehsil Shahabad, Distt. Kurukshetra (Haryana). Approach Access M/S BHAGAT RICE MILL 0.0104 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 May 2018
Stage-I Approval on : 27 Sep 2018
Compliance Report Submitted by User Agency on : 08 Mar 2019
6 Haryana FP/HR/Approach/33616/2018 6259 PROPOSED RETAIL OUTLET ON ROHTAK-BHIWANI ROAD(NH-709E) AT CHAINAGE 84.782(LHS) CENTRE OF PLOT VILLAGE BANIANI,TEHSIL-KALANAUR, DISTT. ROHTAK (HARYANA) Approach Access HINDUSTAN PETROLEUM CORPORATION LIMITED 0.0952 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 May 2018
Stage-I Approval on : 11 Jul 2018
Compliance Report Submitted by User Agency on : 23 Jul 2018
7 Haryana FP/HR/Approach/34107/2018 9-HRB172-2018-CHA This is a proposal of diversion of forest land for access to Middle School belonging to Aurora Foundation on Narela - Mandaura road, Near Km Stone no. 02, at Village Nahara, Tehsil & Distt. Sonipat (Haryana). Approach Access AURORA FOUNDATION 0.0091 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 10 Jun 2018
Stage-I Approval on : 25 Sep 2018
Compliance Report Submitted by User Agency on : 26 Nov 2018
8 Haryana FP/HR/Approach/34355/2018 8782 This is a proposal of diversion of forest land for access to M/s Shubh Industries on Pakhana - Galib Kheri road, Near Km Stone no. 01, at Village Pakhana, Tehsil Nilokheri, Distt. Karnal (Haryana). Approach Access M/S SHUBH INDUSTRIES 0.003 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 23 Jun 2018
Stage-I Approval on : 28 Dec 2019
Compliance Report Submitted by User Agency on : 01 Feb 2020
9 Haryana FP/HR/Approach/36087/2018 9-HRB019-2019-CHA Diversion of 0.0129 Ha. of Forest Land for access to proposed School site Belonging to Mahadev Educational Society, Kaithal-Khanori Road, Km. Stone 8, at Village Gari Padla. Approach Access MAHADEV EDUCATIONAL SOCIETY, KAITHAL, HRY. 0.0129 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 21 Sep 2018
Stage-I Approval on : 15 Feb 2019
Compliance Report Submitted by User Agency on : 11 Apr 2019
10 Haryana FP/HR/Approach/36611/2018 8841 Diversion of 0.0059 Hect. of forest land for passage for path for M/s Shiv Ganga Plywood Industries situated at Village Khadri, Tehsil Chhachhrauli, Distt. Yamuna Nagar Approach Access SHIV GANGA PLYWOOD INDUSTRIES 0.0059 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Oct 2018
Stage-I Approval on : 18 Sep 2019
Compliance Report Submitted by User Agency on : 21 Jan 2020
11 Haryana FP/HR/Approach/36734/2018 9-HRB031-2019-CHA Proposal for diversion of forest land for access to M/s Shiv Shakti Furniture along Trilokpur to Raipur Rani Road, R/side at village Kazampur, District Panchkula Approach Access MS SHIV SHAKTI FURNITURE 0.0066 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 Oct 2018
Stage-I Approval on : 04 Apr 2019
Compliance Report Submitted by User Agency on : 07 Jun 2019
12 Haryana FP/HR/Approach/37338/2018 9021 This is a proposal of diversion of forest land for access to Textile factory on Khukhrana - Mor Majra road, near km stone no. 06, at Village Khandra, Tehsil Madlauda, Distt. Panipat (Haryana). Approach Access ANKIT GOEL S/O SH. SATBIR GOEL 0.013 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 21 Nov 2019
Compliance Report Submitted by User Agency on : 20 Feb 2020
13 Haryana FP/HR/Approach/37646/2018 6567 Diversion of 0.0194 Ha of forest Land for Construction of Approach Road to V.K. ENTERPRISES (Red Hut Resorts) in Village Saha, on NH-73, Km 124-125 LHS, Tehsil Ambala Cantt., Distt Ambala Approach Access V K ENTERPRISES RED HUT RESORTS 0.0194 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Dec 2018
Stage-I Approval on : 03 May 2019
Compliance Report Submitted by User Agency on : 28 Jan 2020
14 Haryana FP/HR/Approach/38315/2019 D-III-8762 This is a proposal of diversion of forest land for access to Indraprastha Gas Limited on Karnal – Meerut road, NH-709A), near km stone no. 157.152 (LHS), at Village Sheikhpura, Tehsil &Distt. Karnal(Haryana). Approach Access INDRAPRASTHA GAS LIMITED DELHI 0.112 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Jan 2019
Stage-I Approval on : 04 Apr 2019
Compliance Report Submitted by User Agency on : 17 Jun 2019
15 Haryana FP/HR/Approach/39906/2019 8834 This is a proposal of diversion of forest land for access to Jai Durga International School belonging to Jai Durga Education Society on Safidon-Assandh road to Aftabgarh road (ODR), at Village Aftabgarh, Tehsil Safidon, Distt. Jind (Haryana). Approach Access JAI DURGA EDUCATION SOCIETY 0.0019 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Apr 2019
Stage-I Approval on : 02 Jul 2019
Compliance Report Submitted by User Agency on : 18 Jul 2019
16 Haryana FP/HR/Approach/40037/2019 9006 This is a proposal of Diversion of Forest Land of 0.0061Ha. for access to M/s Jai Bharat Enterprises on NH-709 to Balana road (ODR), near km stone no. 01, at Village Balana, Tehsil & Distt. Panipat (HR). Approach Access JAI BHARAT ENTERPRISES 0.0061 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 29 May 2019
Stage-I Approval on : 15 Oct 2019
Compliance Report Submitted by User Agency on : 12 Mar 2020
17 Haryana FP/HR/Approach/40040/2019 6758 This is a proposal of diversion of forest land for access to M/s G.C. Textile on NH-709 to Balana road (ODR), near km stone no. 01, at Village Balana, Tehsil & Distt. Panipat (Haryana). Approach Access GC TEXTILES 0.0061 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Apr 2019
Stage-I Approval on : 15 Oct 2019
Compliance Report Submitted by User Agency on : 09 Mar 2020
18 Haryana FP/HR/Approach/41090/2019 D-III-8917 PROPOSED HPCL RETAIL OUTLET ON REWARI-JHAJJAR ROAD, OLD NH-71,NEAR KM. STONE-2(RHS) WITH IN MUNICIPAL LIMIT AT VILLAGE GOKALGARH TEHSIL REWARI, DISTT. REWARI (HARYANA) Approach Access Hindustan Petroleum Corporation Limited 0.0089 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 10 Jul 2019
Stage-I Approval on : 10 Aug 2019
Compliance Report Submitted by User Agency on : 20 Aug 2019
19 Haryana FP/HR/Approach/41171/2019 8919 PROPOSED HPCL RETAIL OUTLET ON REWARI-GHARI BOLNI ROAD(ODR-1624), NEAR KM STONE 4 (LHS) AT VILLAGE SHABAJPUR KHALSA, TEHSIL REWARI DISTT. REWARI (HARYANA) Approach Access Hindustan Petroleum Corporation Limited 0.0175 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Jul 2019
Stage-I Approval on : 20 Aug 2019
Compliance Report Submitted by User Agency on : 12 Sep 2019
20 Haryana FP/HR/Approach/41507/2019 D-III-9010 Diversion of forest land 0.0088 Hac. for access to the Proposed Petrol Pump of Indian Oil Corporation Limited. Along at Khewat/Khatoni No. 176/198, Rect. No. 5, Kila No. 16/1/2(0-5), 25/2/2/1(0-19), Village - Jharsetli on Sector-25/NH-2 -Sohna Road, Tehsil - Ballabgarh, District - Faridabad, State - Approach Access Indian Oil Corporation Limited 0.0088 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Aug 2019
Stage-I Approval on : 27 Sep 2019
Compliance Report Submitted by User Agency on : 11 Dec 2019
21 Haryana FP/HR/Approach/42154/2019 9134 Diversion of forest land 0.00686 Hac. for access to the Proposed Petrol Pump of Bharat Petroleum Corporation Limited. Along at Khasra No. 29, AT Village - Aterna, on Fatehpur Billoch - Mohna Road Tehsil - Mohna, Distt.- Faridabad (Haryana) Pin Code- 121004 Approach Access BHARAT PETROLEUM CORPORATION LIMITED 0.00686 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 21 Sep 2019
Stage-I Approval on : 09 Jan 2020
Compliance Report Submitted by User Agency on : 07 Feb 2020
22 Haryana FP/HR/Approach/42516/2019 9190 Purpose of project is form educational society in village prithla in prem vihar colony 711/4, ward. no. 1. Approach Access BEER BATI EDUCATION SOCIETY 0.008 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 20 Oct 2019
Stage-I Approval on : 05 Mar 2020
Compliance Report Submitted by User Agency on : 22 May 2020
23 Haryana FP/HR/Approach/43333/2019 9175 PROPOSED HPCL RETAIL OUTLET ON BAHADURGARH-JHAJJAR ROAD (SH-22)NEAR KM STONE 7 (RHS) AT VILLAGE NUNA MAJRA, TEHSIL BAHADURGARH, DISTT. JHAJJAR (HARYANA) Approach Access HINDUSTAN PETROLEUM COORPERATION LIMITED 0.0072 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Dec 2019
Stage-I Approval on : 19 Feb 2020
Compliance Report Submitted by User Agency on : 11 Mar 2020
24 Haryana FP/HR/Approach/43459/2019 9238 PROPOSED HPCL RETAIL OUTLET ON BAHADURGARH-BADALI- CHANDU ROAD(MDR-136) NEAR KM. STONE-25(RHS), VILLAGE-BADASA, TEHSIL-BAHADURGARH, DISTT- JHAJJAR, (HARYANA) Approach Access HINDUSTAN PETROLEUM COORPERATION LIMITED 0.0096 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Dec 2019
Stage-I Approval on : 19 Mar 2020
Compliance Report Submitted by User Agency on : 19 May 2020
25 Haryana FP/HR/Approach/43672/2019 D-III-9319 Diversion of 0.0101 Hac. Forest land oalong on Siwani-Gurera/Sidhmukh Road(ODR), at village Gurera, tehsil Siwani, Distt. Bhiwani. Approach Access BHARAT PETROLEUM CORPORATION LTD, 0.0101 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 31 Dec 2019
Stage-I Approval on : 22 May 2020
Compliance Report Submitted by User Agency on : 01 Jun 2020
26 Haryana FP/HR/Approach/43941/2020 9266 Diversion of 0.0065 HAC. forest land along on Alika-Malwala Road (ODR), at village Malwala, Tehsil, Ratia, Distt.- Fatehabad. Approach Access INDIAN OIL CORPORATION LTD 0.0065 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Jan 2020
Stage-I Approval on : 01 May 2020
Compliance Report Submitted by User Agency on : 27 May 2020
27 Haryana FP/HR/Others/18922/2016 5387 PROPOSED HPCL RETAIL OUTLET VILLAGE SINGAR,TEHSIL PUNHANA, DISTT. MEWAT (HARYANA) Others HINDUSTAN PETROLEUM CORPORATION LIMITED 0.012 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Apr 2016
Stage-I Approval on : 12 Jul 2016
Compliance Report Submitted by User Agency on : 02 Dec 2019
28 Haryana FP/HR/Others/19674/2016 D-III-7067 NOC FOR ESTABLISHMENT OF NEW RETAIL OUTLET (KSK) OF INDIAN OIL CORPORATION LTD. ON KHASRA NO. 616//8/2 ON CHAUTALA-RATANPURA ROAD (WITHIN 1 KM FROM RAJASTHAN BORDER), VILLAGE CHAUTALA, TEHSIL DABWALI, DISTT-SIRSA Others INDIAN OIL CORPORATION LTD 0.087 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 May 2016
Stage-I Approval on : 22 Feb 2018
Compliance Report Submitted by User Agency on : 08 May 2018
29 Haryana FP/HR/Others/40047/2019 9-HRB094-2019-CHA For Laying of 500 mm i/d RCC pipe trunk sewar line from Hanuman colony in front of Hisar cantt. along NH Delhi-Hisar further along southern bypass up to Hisar-Tosham road, and further along Hisar-Toshan road upto Dabra Minor. Others EXECUTIVE ENGINEER MC HISAR 1.582 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Apr 2019
Stage-I Approval on : 22 Oct 2019
Compliance Report Submitted by User Agency on : 18 Mar 2020
30 Haryana FP/HR/Others/9304/2015 9-HRB074-2016-CHA DIVERSION OF 0.0032 HECT. OF FOREST LAND FOR PASSAGE TO M/S SANDHU MARRIAGE PALACE, ROAD KM 1-2, R/S AT VILL. CHAHARWALA, P.O. HAIBATPUR, TEHSIL JAGADHRI, DISTT. YAMUNA NAGAR Others SANDHU MARRIAGE PALACE 0.0032 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Jun 2015
Stage-I Approval on : 07 May 2018
Compliance Report Submitted by User Agency on : 18 Mar 2020
31 Haryana FP/HR/ROAD/19443/2016 9-HRB048-2017-CHA Proposal for diversion land for Construction of ROB at Level crossing No. C-25 Km 45/5-45/6 on Rohtak Rewari Railway Line crossing NH-334B (Jhajjar Dadri road) at Km 132.850 in Jhajjar District Road PWD 0.448 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 23 Jun 2016
Stage-I Approval on : 09 Oct 2017
Compliance Report Submitted by User Agency on : 20 Mar 2020
32 Haryana FP/HR/ROAD/19835/2016 5510 Diversion of 0.288 ha of forest land for Construction of New HL Bridge down stream side of existing HL Bridge on Ghaggar river at KM. 235 on kaithal Patiala road in Kaithal Distt. Road EXECUTIVE ENGINEER 0.288 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 03 Jun 2016
Stage-I Approval on : 02 Nov 2016
Compliance Report Submitted by User Agency on : 29 May 2019
33 Haryana FP/HR/ROAD/25393/2017 9-HRB072-2018-CHA Widening and Strengthening of road from Narnaul to Mandhana road upto Rajasthan border in Mahondergarh distt (CM Announcement No. 10661) Road PWD B AND R NARNAUL 0.618 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 29 Mar 2017
Stage-I Approval on : 10 Apr 2018
Compliance Report Submitted by User Agency on : 25 Feb 2019
34 Haryana FP/HR/ROAD/25616/2017 9-HRB124-2017-CHA Widening and strengthening of road from Khor Tigra Sagarpur Kuksi upto NH 148B. The project adminstrative approval recd. vide Engineer in Chief, PWD B&R, Narnaul letter 9 dated 27-3-17 Road PWD B AND R NARNAUL 1.7 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Apr 2017
Stage-I Approval on : 05 Oct 2017
Compliance Report Submitted by User Agency on : 22 Feb 2019
35 Haryana FP/HR/ROAD/29222/2017 6137 Diversion of Forest Land For access to the proposed petrol pump of Hindustan Petrolium Corporation Ltd. On BHIWANI-MUNDAL-JIND-KARNAL ROAD,NH-709A,NEAR KM STONE 126(R.H.S.), KHASRA NO-76//21/1, AT VILLAGE-SEIKHUPURA MANCHURI, DISTRICT.-KARNAL, STAE-HARYANA Road Hindustan Petroleum Corporation Limited 0.0894 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Sep 2017
Stage-I Approval on : 22 Mar 2018
Compliance Report Submitted by User Agency on : 11 Nov 2019
36 Haryana FP/HR/ROAD/31377/2018 9-HRB068-2019-CHA Diversion of 0.104 (instead of 0.04) ha. of forest land for Widening & Strengthening of SH-12 now (NH-709-A) to Munak via Paban Hasanpur (Section Seroi Paban Hasanpur) road from RD- Km. 5.920 to RD- Km. 6.200 Tehsil Assandh under Forest Division & Distt. Karnal (Haryana). Road PWD B AND R HARYANA 0.04 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 16 Jan 2018
Stage-I Approval on : 07 Aug 2019
Compliance Report Submitted by User Agency on : 13 Nov 2019
37 Haryana FP/HR/ROAD/32856/2018 9-HRB111-2018-CHA Widening and Strengthening of road from Kanwali to Lisan upto SKNK road. The project already approved by ACS, PWD B&R and Architech dept. Haryana Chd. Ltr no. 09/495/2017-3B&R dated 13-.3-2018. Road HSRDC REWARI 2.456 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 29 Mar 2018
Stage-I Approval on : 02 Aug 2018
Compliance Report Submitted by User Agency on : 08 Oct 2018
38 Haryana FP/HR/ROAD/34621/2018 9-HRB022-2019-CHA Widening of road from Kurukshetra to Amin upto Railway Station Amin Km 0.00 to 9.99 (RD 0.00 to 3.65) under Forest Division Kurukshetra Road JAI PARKASH KAMBOJ 1.616 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 09 Jul 2018
Stage-I Approval on : 25 Jun 2019
Compliance Report Submitted by User Agency on : 20 Nov 2019
39 Haryana FP/HR/ROAD/34625/2018 9-HRB221-2018-CHA Widening of road from Kurukshetra to Amin upto Railway Station Amin Km 0.00 to 9.99 (RD 3.65 to 9.99 under Forest Division Karnal Road JAI PARKASH KAMBOJ 2.813 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 09 Jul 2018
Stage-I Approval on : 16 Jan 2019
Compliance Report Submitted by User Agency on : 20 Nov 2019
40 Haryana FP/HR/ROAD/35922/2018 9-HRC117-2019-CHA National Highways NH-152D between Gangheri to Narnaul four lane with paved shoulder configuration in the state of Haryana under Bharatmala Pariyojna – Pkg-6/lot-6 Road National Highways Authority of India 58.54 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Sep 2018
Stage-I Approval on : 07 Feb 2020
Compliance Report Submitted by User Agency on : 28 Feb 2020
41 Haryana FP/HR/ROAD/37790/2018 8662 This is a proposal of diversion of forest land 0.9612Ha. for Construction of road from Narwana road to Zypsum factory along Julani Minor (RHS) at RD 0 to RD 1350 in Distt. Jind (Haryana). Road MC JIND 0.9612 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Dec 2018
Stage-I Approval on : 23 Jan 2019
Compliance Report Submitted by User Agency on : 01 Feb 2019
42 Haryana FP/HR/ROAD/40712/2019 9-HRB090-2019-CHA Diversion of 0.90 ha of forest land for Wdg. & Stg. of Meerut Sonipat Gohana Assand Kaithal Patiala road (Assand Kaithal Cheeka Patiala road ) S. H. No. 11 Km. Km. 231.44 to 234.21 & RD 234.41 to 234.63 in Kaithal Distt. Road EXECUTIVE ENGINEER 0.9 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 21 Jun 2019
Stage-I Approval on : 22 Oct 2019
Compliance Report Submitted by User Agency on : 01 Feb 2020
43 Haryana FP/HR/ROAD/40850/2019 9-HRC081-2019-CHA Proposal for diversion of forest land for four lanning, widening & Strengthening of Jagadhari-Bilaspur-Sadhaura-Raipur Rani road upto Mouli (SH No. 1) in Km. 54.00 to 67.40 in Punchkula District (CM Announcement Code No. 19811 dated 1.8.2017) Road PWD B AND R BRANCH PANCHKULA HARYANA 7.52 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Jun 2019
Stage-I Approval on : 27 Dec 2019
Compliance Report Submitted by User Agency on : 04 Mar 2020
44 Haryana FP/HR/ROAD/41177/2019 D-III-9019 This is a proposal of diversion of forest land for Construction of one way ramp from existing ROB on Delhi-Ambala Railway line crossing Kurukshetra-Pehowa Road in District Kurukshetra (Haryana). Road PWD KURUKSHETRA 0.17 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Jul 2019
Stage-I Approval on : 05 Oct 2019
Compliance Report Submitted by User Agency on : 10 Dec 2019
45 Haryana FP/HR/TRANS/26678/2017 6142 Diversion of 0.2025 Ha of forest land for construction of 132 KV Transmission line from 220 KV Mehna Khera S/stn to 132 KV Ellenabad S/Stn. crossion various Strips of Protected Forest Land in Sirsa Distt. Transmission Line HVPNL SIRSA 0.2025 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Jun 2017
Stage-I Approval on : 04 Feb 2018
Compliance Report Submitted by User Agency on : 21 Nov 2018
46 Haryana FP/HR/TRANS/36545/2018 8778 Construction of 132 KV S/C line on D/C tower from 132 Kv S/stn Tajpur to 132 KV S/stn Bega crossing various strips of Protected forest land under Forest Division & Distt. Sonipat. Transmission Line HVPNL KURUKSHETRA 0.1296 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Oct 2018
Stage-I Approval on : 02 Jul 2019
Compliance Report Submitted by User Agency on : 06 Jan 2020
47 Haryana FP/HR/TRANS/37595/2018 9-HRB039-2019-CHA Diversion of 3.93 ha of forest land for construction of LILO of both circuit of 220 Kv palla pali Dc line at proposed Sub station in sector 46 under forest division and district faridabad Transmission Line HARYANA VIDYUT PARSARAN NIGAM LIMITED 3.93 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Dec 2018
Stage-I Approval on : 22 Aug 2019
Compliance Report Submitted by User Agency on : 12 Dec 2019
48 Haryana FP/HR/TRANS/40079/2019 8941 Diversion of 0.0684 Hect. of forest land for the construction of 66 KV D/C Line from 220 KV S/Stn Rajokheri to 66 KV S/Stn Mullana, Ambala District Transmission Line HVPNL AMBALA 0.0684 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 May 2019
Stage-I Approval on : 16 Nov 2019
Compliance Report Submitted by User Agency on : 27 Feb 2020
49 Haryana FP/HR/WATER/31326/2018 6115 Diversion of forest land for relaying of RCC Pipe lnletchannel from BMB to existing water works at Village Mathdadu Distt. Sirsa along SORD Road R.H.S. Km 60.40 to 64.24 & SORD to Mathdadu road Km 8.156 to 10.100 in Sirsa Distt. Drinking Water EXECUTIVE ENGINEER PUBLIC HEALTH 0.36 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Jan 2018
Stage-I Approval on : 14 Mar 2018
Compliance Report Submitted by User Agency on : 15 Apr 2019
50 Haryana FP/HR/WATER/33199/2018 9-HRB178-2018-CHA Laying of augmentation water supply pipe line from existing water works Jatuwas group of 8 no villages in distt Rewari.The project approved by EIC,PHE, Deptt Haryana Panchkula vide ltr no. 44604 dt 18-5-17. Drinking Water SDE PHE DHARUHERA 0.43 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Apr 2018
Stage-I Approval on : 10 Oct 2018
Compliance Report Submitted by User Agency on : 01 Jul 2019
12