Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Dadar & Nagar Haveli FP/DN/Others/16736/2015 7-5/3-FD/562 Diversion of 0.6969 Hectare Protected Forest land for laying pipeline parallel & across to Roads and Canals side of their strip plantation declared as Protected Forest in Dadra and Nagar Haveli (U/T) Others GUJARAT GAS LIMITED 0.6969 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Nov 2015
Stage-I Approval on : 16 Sep 2016
Compliance Report Submitted by User Agency on : 25 May 2017
2 Gujarat FP/GJ/Others/16371/2015 C/FCA/T-3/97-100/2016-17 Diversion of 2.5751 Hectare of Protected Forest land i.e. road side strip plantation declared as protected forest for laying natural gas pipeline to supply natural gas to various en-route villages in District Navsari Others GUJARAT GAS LIMITED 2.5751 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 Nov 2015
Stage-I Approval on : 23 May 2016
Compliance Report Submitted by User Agency on : 02 Mar 2017
3 Gujarat FP/GJ/Others/13789/2015 A/FCA/T-8/615-18/16 Diversion of 0.785 Hect of Protected Forest land i.e road side strip plantation declared as protected forest for laying of 15 Cm dia Steel natural gas pipeline to supply natural gas to various en-route villages / industries in Sayla Taluka in Surendranagar District, Gujarat State Others GUJARAT GAS LIMITED 0.785 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Jul 2015
Stage-I Approval on : 27 May 2016
Compliance Report Submitted by User Agency on : 02 Mar 2017
4 Haryana FP/HR/IRRIG/7978/2014 5078 Const. of Rattakhera Kharif Chanel RD. 65000 to 116000 crossing Forest Land of Panniwala Mota to Ghukanwali, Goriwala to Ghukanwali & Ghukanwali to Odhan Road in Sirsa Distt. Irrigation IRRIGATION DEPTT 0.062 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 20 Feb 2015
Stage-I Approval on : 04 Nov 2015
Compliance Report Submitted by User Agency on : 28 Jan 2016
5 Haryana FP/HR/Others/8074/2014 4879 NOC FOR ESTABLISHMENT OF NEW RETAIL OUTLET OF INDIAN OIL CORPORATION LTD AT BHIWANI ON TOSHAM BY PASS ON KHASRA NO.51//19/1 , 22/1/2. Others INDIAN OIL CORPORATION LTD 0.00228 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Nov 2014
Stage-I Approval on : 21 Jul 2016
Compliance Report Submitted by User Agency on : 04 Nov 2016
6 Haryana FP/HR/Others/13140/2015 5070 HPCL RETAIL OUTLET VILLAGE-GOTHRA TAPPA KHORI, REWARI Others Hindustan Petroleum Corporation Limited 0.0825 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 08 Jun 2015
Stage-I Approval on : 14 Jan 2016
Compliance Report Submitted by User Agency on : 08 Feb 2016
7 Haryana FP/HR/RAIL/14350/2015 5104 Construction of RUB at L.c No 63 & 64 Railway BALBIR SINGH 0.11 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 05 Aug 2015
Stage-I Approval on : 30 Sep 2015
Compliance Report Submitted by User Agency on : 17 Nov 2015
8 Haryana FP/HR/Others/14586/2015 5234 Retail outlet on Ateli Kanina road at village Kariya Others INDIAN OIL CORPORATION LIMITED 0.0119 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Aug 2015
Stage-I Approval on : 23 Mar 2016
Compliance Report Submitted by User Agency on : 03 May 2016
9 Haryana FP/HR/Others/15912/2015 5200 HPCL RETAIL OUTLET VILLAGE KHAMBI, PALWAL Others HINDUSTAN PETROLEUM CORPORATION LIMITED 0.0099 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 08 Oct 2015
Stage-I Approval on : 02 Feb 2016
Compliance Report Submitted by User Agency on : 17 Feb 2016
10 Haryana FP/HR/Others/15982/2015 5399 Diversion of 0.0033 Hac. forest land for access to the Proposed Petrol Pump of Indian Oil Corporation Ltd. Along at Khe/Kha No.-760 / 1, Khasra 632, Village- Gohana, Tehsil-Nagina, District- Mewat, on Gohana to Sikrawa Road State - Haryana Others Indian Oil Corporation Limited (IOCL) 0.0033 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Oct 2015
Stage-I Approval on : 16 Aug 2016
Compliance Report Submitted by User Agency on : 26 Aug 2016
11 Haryana FP/HR/ROAD/16184/2015 5245 Improvement of Old G.T. Road (city portion) Karnal Road PUBLIC WORKS DEPARTMENT 0.18 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 21 Oct 2015
Stage-I Approval on : 21 Mar 2016
Compliance Report Submitted by User Agency on : 30 Mar 2016
12 Haryana FP/HR/Others/17795/2016 5269 Diversion of 0.0118 Ha. forest land for approach road for our Proposed Retail Outlet at Village Jeevan Nagar (Sant Nagar) on Jeevan Nagar - Kariwala road, CH-2.978(RHS), Tehsil Rania, Distt.Sirsa, State Haryana Others BHARAT PETROLEUM CORP LTD 0.0118 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 Feb 2016
Stage-I Approval on : 21 Apr 2016
Compliance Report Submitted by User Agency on : 06 Jun 2016
13 Haryana FP/HR/Others/19033/2016 5389 LAYING OFC BY RELIANCE JIO INFOCOM LTD, MOHALI FROM VILL HATT TO SAFIDON ON SAFIDON SARAFABAD ROAD (0.00 to 9.20 km) upto PANIPAT- BHIWANI ROAD (33.050 to 33.350 km) in TEHSIL SAFIDON, DISTRICT JIND, HARYANA. 0.43 hq FOREST LAND REQUIRED Others RELIANCE JIO INFOCOMM LIMITED 0.43 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 20 Apr 2016
Stage-I Approval on : 25 Jul 2016
Compliance Report Submitted by User Agency on : 05 Oct 2016
14 Haryana FP/HR/ROAD/19071/2016 5443 Const. of 2 lne ROB at LC No. 30 at KM 37/8-9 on road from Ateli to Kheri road Road PWD B AND R NARNAUL 0.68 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 23 Apr 2016
Stage-I Approval on : 19 Sep 2016
Compliance Report Submitted by User Agency on : 27 Jan 2017
15 Haryana FP/HR/ROAD/21816/2016 9-HRB036-2017-CHA Diversion of 3.077 Hectare of Forest Land for Improvement f Saharanpur Kurukshetra Road (SH-06), for providing periodical repair and construction of four lanning in Ladwa Town, Mathana Village and Pipli Twon (ID-7951) in District Kurukshetra (Haryana) (CM Code 12593). Road PWD PROVINCIAL DIV NO II 3.077 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Oct 2016
Stage-I Approval on : 30 Mar 2017
Compliance Report Submitted by User Agency on : 03 May 2017
16 Haryana FP/HR/Others/21918/2016 9-HRB012-2017-CHA Diversion of forest land 0.009896 Hac. for access to the Proposed Petrol Pump of Essar Oil Ltd. Along at Khewat No. 112, Khata No. 17, Mustkil No. 13, Kila No. 13, Village-Chhajju Nagar, Tehsil & District - Palwal (Haryana) Others Essar Oil Limited 0.009896 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 16 Oct 2016
Stage-I Approval on : 07 Jul 2017
Compliance Report Submitted by User Agency on : 17 Jul 2017
17 Haryana FP/HR/Others/22354/2016 9-HRB025-2017-CHA Diversion of forest land 0.0152 Hac. for access to the Proposed Petrol Pump of Essar Oil Ltd. Along at KM Stone No 31 (LHS) Chainage 31.704 at Khasra No 71//24 min, 25/1/2 min, Village Khera Khemawati, on Panipat - Assandh Road, Tehsil Safidon, District Jind, Haryana Others Essar Oil Limited 0.0152 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Nov 2016
Stage-I Approval on : 14 Jul 2017
Compliance Report Submitted by User Agency on : 21 Jul 2017
18 Haryana FP/HR/Others/23785/2017 5721 diversion of forest land for entry and exit for bpcl nro at satnali to dhana road villag bass, district mahendergarh, haryana Others BHARAT PETROLEUM CORPORATION LIMITED 0.027 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Jan 2017
Stage-I Approval on : 07 Apr 2017
Compliance Report Submitted by User Agency on : 17 Jul 2017
19 Haryana FP/HR/Others/24343/2017 9-HRB089-2017-CHA NOC for access to the establishment of Gas Godown and Office on Khasra No. 52//1/2/3,2 Min on Pugthala-Ganaur road at 15.5 Km (LHS) in Village-Pugthala Tehsil-Ganaur, District Sonepat Others BHARAT PETROLEUM CORP LTD 0.007734 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Feb 2017
Stage-I Approval on : 13 Jul 2017
Compliance Report Submitted by User Agency on : 20 Jul 2017
20 Haryana FP/HR/Others/24572/2017 5070 NOC FOR ESTABLISHMENT OF NEW RETAIL OUTLET (KSK) OF INDIAN OIL CORPORATION LTD. ON KHASRA NO. 106//13/2, 18 ON RANIA- JOHARNALI ROAD, VILLAGE- KALENIA, TEHSIL- SIRSA, DISTRICT- SIRSA Others INDIAN OIL CORPORATION LTD 0.0256 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 23 Feb 2017
Stage-I Approval on : 15 Jun 2017
Compliance Report Submitted by User Agency on : 11 Jul 2017
21 Haryana FP/HR/Others/24993/2017 5078 NOC FOR ESTABLISHMENT OF NEW RETAIL OUTLET (KSK) OF INDIAN OIL CORPORATION LTD. ON KHASRA NO. 75//20/1/1, 75//21/1/2 ON ROORKI- BHALOT ROAD, VILLAGE- ROORKI, TEHSIL- ROHTAK, DISTRICT- ROHTAK Others INDIAN OIL CORPORATION LTD 0.0101 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Mar 2017
Stage-I Approval on : 22 Jun 2017
Compliance Report Submitted by User Agency on : 11 Jul 2017
22 Haryana FP/HR/Others/25591/2017 5089 PROPOSED BPCL RETAIL OUTLET ON GURGAON -ALWAR ROAD, (NH-248A), AT CHAINAGE-71.638 (RHS) AT VILLAGE-MOHAMMADBAS, TEHSIL FEROZPUR JHIRKA, DISTT- MEWAT, (HARYANA) Others BHARAT PETROLEUM CORPORATION LIMITED 0.0798 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 08 Apr 2017
Stage-I Approval on : 29 Jun 2017
Compliance Report Submitted by User Agency on : 24 Jul 2017
23 Haryana FP/HR/Others/25688/2017 5087 NOC FOR ESTABLISHMENT OF NEW RETAIL OUTLET OF INDIAN OIL CORPORATION LTD. ON KHASRA NO. 52//23/1 ON BETWEEN KM STONE 2 AND 5 ON SH-19 (SIWANI TO ISHARWAL ROAD), VILLAGE- BAKHTAWARPURA, TEHSIL- SIWANI, DISTRICT- BHIWANI, HARYANA. Others INDIAN OIL CORPORATION LTD 0.0239 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Apr 2017
Stage-I Approval on : 29 Jun 2017
Compliance Report Submitted by User Agency on : 24 Jul 2017
24 Haryana FP/HR/Others/20700/2016 5482 NOC for diversion of forest land of 0.0058 hectare area for our Retail Outlet at Village Begah, Block Gananur, Distt. Sonipat (Haryana) Others IOCL PANIPAT DIVISIONAL OFFICE 0.0058 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 29 Jul 2016
Stage-I Approval on : 07 Oct 2016
Compliance Report Submitted by User Agency on : 13 Dec 2016
25 Haryana FP/HR/Others/20842/2016 5517 PROPOSED HPCL RETAIL OUTLET ON LINK ROAD AT VILLAGE CHITADUNGRA, TEHSIL REWARI, DISTT. REWARI (HARYANA) Others Hindustan Petroleum Corporation Limited 0.011 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 Aug 2016
Stage-I Approval on : 08 Nov 2016
Compliance Report Submitted by User Agency on : 22 Nov 2016
26 Haryana FP/HR/ROAD/21222/2016 9-HRB174-2016-CHA Diversion of extra forest strip of 0.35 hectares for construction of junctions & canal structures falling in Kaithal bypass under Kaithal Forest Divsion from existing ch. 72+305 to existing km. 88+500 Road NHAI PIU AMBALA 0.35 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 01 Sep 2016
Stage-I Approval on : 12 May 2017
Compliance Report Submitted by User Agency on : 14 Jul 2017
27 Himachal Pradesh FP/HP/TRANS/15505/2015 Ft. 48-3234/2015 (FCA) HPSEBL has the proposal for up gradation of existing 33/11 KV, 2X3.15 MVA Substation at Fatehpur, Distt- Kangra into 132/33 KV, 2X16 MVA capacity. The Electricity power to this Substation will be fed through proposed 132 KV double circuit EHV transmission line (From Village- Palauhra, Tehsil- Jawal Transmission Line HP STATE ELECTRICITY BOARD LTD 0.2484 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Nov 2015
Stage-I Approval on : 30 Dec 2016
Compliance Report Submitted by User Agency on : 10 Apr 2017
28 Himachal Pradesh FP/HP/ROAD/10378/2015 8B/HPB/06/21/2016 Chasni to Mandog road is being constructed to provide motor link to village Mandog. This road will cater to the needs of population of about 700 and will give a boost to the local economy. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 0.8504 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 27 Feb 2015
Stage-I Approval on : 11 Nov 2016
Compliance Report Submitted by User Agency on : 16 Jun 2017
29 Karnataka FP/KA/ROAD/9563/2015 4-KRB 1067/2015-BAN Diversion of 0.2808 ha. of forest land in Fsy.No.297A1A1A1A of Shatageri village, Ankola Taluk for approach road to Stone Quarry in favour of M/s. National Higway Authority of India, PIU, Mangalore. Road NATIONAL HIGHWAYS AUTHORITY OF INDIA MANGALURU 0.2808 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Jan 2015
Stage-I Approval on : 15 Dec 2015
Compliance Report Submitted by User Agency on : 28 Jun 2016
04 Jul 2016
30 Punjab FP/PB/Others/14225/2015 FCA/1980/20/2016 DIVERSION OF 0.02064 HA OF FOREST LAND FOR APPROACH ROAD TO RETAIL OUTLET AT AJNALA CITY(WML)ON AMRITSAR-DERA BABA NANAK ROAD KM 25-26 R/S,TEHSIL AJNALA DIVISION & DISTRICT AMRITSAR Others RETAIL OUTLET 0.02064 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Jul 2015
Stage-I Approval on : 09 Mar 2016
Compliance Report Submitted by User Agency on : 22 Apr 2016
18 Apr 2016
31 Punjab FP/PB/IND/18839/2016 9-PBB378-2016-CHA BICYCLE COMPONENT MANUFACTURING UNIT Industry ............. 0.004774 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Apr 2016
Stage-I Approval on : 12 Aug 2016
Compliance Report Submitted by User Agency on : 06 Oct 2016
32 Punjab FP/PB/ROAD/18329/2016 9-PBB358-2017-CHA Govt. of India has taken up to replace all the existing crossing with ROB's.in Faridkot city.Traffic is a major issue at this location Road PUBLIC WORKS DEPARTMENT 1.0992 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Mar 2016
Stage-I Approval on : 31 May 2017
Compliance Report Submitted by User Agency on : 27 Jun 2017
33 Punjab FP/PB/ROAD/19087/2016 9-PBB362-2017-CHA Govt. of India has taken up to replace all the existing crossing with ROB's so in kotkapura city in punjab S 26 railway crossing on NH 15 carry high traffic hindrance Road PUBLIC WORKS DEPARTMENT 3.784 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Apr 2016
Stage-I Approval on : 23 May 2017
Compliance Report Submitted by User Agency on : 27 Jun 2017
34 Punjab FP/PB/ROAD/19836/2016 9-PBB414-2016-CHA Diversion of 0.7032 Hec of forest area in favour of Central works Division No:2 PWD(B & R) BTI for Development to four lanes with paved side shoulders of Tapa to Bathinda section on NH-64 (New NH -07) from Existing Km 168.00 to 209.500 in the state of Punjab EPC mode under NHDP-IV Under forest Divi Road PWD 0.7032 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Jun 2016
Stage-I Approval on : 07 Dec 2016
Compliance Report Submitted by User Agency on : 04 Jul 2017
35 Punjab FP/PB/Others/20194/2016 9-PBB485-2016-CHA Diversion of 0.0095 Ha. of the Forest Land for the approach road to the Proposed Retail outlet of Essar Oil Ltd, Situated at Villahe Mataur in KM 37.500 LHS, on SH 22, (New NH - 503 Ext.), on ropar to Nangal Road, Tehsil Anandpur Sahib, Distt Roopnagar. Others ESSAR OIL LIMITED MOHALI 0.0095 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 Jun 2016
Stage-I Approval on : 31 May 2017
Compliance Report Submitted by User Agency on : 28 Jun 2017
36 Punjab FP/PB/TRANS/17061/2015 FCA/1980/31/2016 Replacement of 66 KV line from 220KV G/S/S Mallkatora to 66 KV G/S/S Gillzewala SC/ DC Tower line in favour of PSPCL is a part of Transmission Networks System which is being developed for the industrial,economical and overall development of the region by constructing the prestigious line. The line Transmission Line ADDL S E TL DIV PSPCL PATIALA 0.0234 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Dec 2015
Stage-I Approval on : 03 Mar 2016
Compliance Report Submitted by User Agency on : 21 Dec 2016
37 Punjab FP/PB/TRANS/17226/2015 FCA/1980/109/2016 Replacement of 66 KV Line 220 KV G/S/S Mallkatora to 66 KV G/S/S Chak Sherewala D/C on D/C Tower in favour of PSPCL is a part of Transmission Networks System which is being developed for the industrial, economical and overall development of the region by constructing the prestigious line. The line Transmission Line ADDITIONAL SE TL PSPCL 0.2214 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Dec 2015
Stage-I Approval on : 27 Sep 2016
Compliance Report Submitted by User Agency on : 20 Apr 2017
38 Punjab FP/PB/ROAD/21758/2016 9-PBB334-2017-CHA Forest land proposed for upgradation proposed four lane road (NH-15) section Bathinda-Gidderbaha-Malout Road RD KM 292.00 to 293.100 B/s Road EXECUTIVE ENGINEER CENTRAL WORKS DIVISION PB PWD B AND R BRANCH BATHINDA 1.54 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 05 Oct 2016
Stage-I Approval on : 12 May 2017
Compliance Report Submitted by User Agency on : 27 Jun 2017
39 Punjab FP/PB/ROAD/25896/2017 9-PBB381-2017-CHA Improvement of 7 numbers of junctions on Abohar bypass (New NH-07) in the State of Punjab Road EXECUTIVE ENGINEER CENTRAL WORKS DIVISION PWD BR ABOHAR 2.69 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 May 2017
Stage-I Approval on : 05 Jun 2017
Compliance Report Submitted by User Agency on : 26 Jun 2017
40 Uttarakhand FP/UK/ROAD/18619/2016 8B/UCP/06/97/2016-FC Under state sector,Hona'ble chief minister uttarakhand declaration construction of 80.0 meter span bridge and 0.250 km road in simli,karanprayag(chamoli). Road TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR 0.134 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 21 Mar 2016
Stage-I Approval on : 15 Jun 2016
Compliance Report Submitted by User Agency on : 21 Sep 2016
41 Uttarakhand FP/UK/ROAD/7325/2014 1(227)/2015 Construction of kathang solang to Jhitad motor road under PMGSY scheme. Its length is 3.675 km Road EXECUTIVE ENGINEER 0.9716 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Sep 2014
Stage-I Approval on : 01 Jul 2015
Compliance Report Submitted by User Agency on : 17 Oct 2016
42 Uttarakhand FP/UK/IRRIG/8919/2014 1(466)/2015 Due to location of the area it's not possible to provide water for irrigation of agricultural land. So it is necessary to lift water from the river. Irrigation IRRIGATION TUBE WELL 0.102 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 23 Jan 2015
Stage-I Approval on : 24 Sep 2015
Compliance Report Submitted by User Agency on : 07 Jan 2016
43 Uttarakhand FP/UK/ROAD/9568/2015 1(516)/2015 Extension of Ghat Natra Salan M/R with 5 No. Bridge Road PUBLIC WORKS DEPARTMENT 4.86 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 23 Jan 2015
Stage-I Approval on : 30 Oct 2015
Compliance Report Submitted by User Agency on : 10 Mar 2017
44 Uttarakhand FP/UK/ROAD/10500/2015 1(427)/2015 70 meter paidal marg needs to connect villagers of pangot to main road. Road GRAM VIKAS ADHIKARI GRAM SABHA PANGOT NAINITAL 0.0222 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Mar 2015
Stage-I Approval on : 14 Aug 2015
Compliance Report Submitted by User Agency on : 19 Jun 2017
45 Uttarakhand FP/UK/ROAD/12712/2015 1(94)/2016 Construction of Samsanghat-Puchri-Bhagwabangar-Kalusiddh Mandir village Puchri in Foji Colony Motor Road Ramnagar (1.20 Km. Reserve Foreset 0.84 Hect.) Road PWD RAMNAGAR 0.84 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 May 2015
Stage-I Approval on : 16 Mar 2017
Compliance Report Submitted by User Agency on : 22 May 2017