Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Uttarakhand
|
FP/UK/ROAD/8930/2014
|
1(74)/15
|
Naghar Kumalta to Gangaseri Motar Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.819
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2014
|
Stage-I Approval on
|
:
|
30 Mar 2015
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jun 2025
|
|
|
|
|
2
|
Uttarakhand
|
FP/UK/ROAD/8887/2014
|
1(65)/15
|
Bhandari-Rajwar-Wokta-Dhurali Motar Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
3.87
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2014
|
Stage-I Approval on
|
:
|
30 Mar 2015
|
Compliance Report Submitted by User Agency on
|
:
|
03 May 2025
|
|
|
|
|
3
|
Uttarakhand
|
FP/UK/ROAD/10696/2015
|
1(67)/15
|
CONSTRUCTION OF CHANDAK BANS MOTOR ROAD (POKHARI) TO RATWALI MOTOR ROAD
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.955
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Mar 2015
|
Stage-I Approval on
|
:
|
30 Mar 2015
|
Compliance Report Submitted by User Agency on
|
:
|
03 May 2025
|
|
|
|
|
4
|
Uttarakhand
|
FP/UK/ROAD/8880/2014
|
1(94)/15
|
Chinyalisaur to Kot-Bagi motor Road from Km. 7.00 to Km. 10.00 till kot village
|
Road
|
PMGSY ID UTTARKASHI
|
0.262
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Dec 2014
|
Stage-I Approval on
|
:
|
17 Apr 2015
|
Compliance Report Submitted by User Agency on
|
:
|
23 Aug 2023
|
|
|
|
|
5
|
Uttarakhand
|
FP/UK/ROAD/8571/2014
|
1(96)/15
|
construction of chinyalisaur jogath motor road to Bagodi motor Road
|
Road
|
PMGSY ID UTTARKASHI
|
1.319
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Dec 2014
|
Stage-I Approval on
|
:
|
21 Apr 2015
|
Compliance Report Submitted by User Agency on
|
:
|
26 Apr 2022
|
|
|
|
|
6
|
Uttarakhand
|
FP/UK/ROAD/9574/2015
|
1(114)/15
|
Nakuri Singot Motor Road To Paab Motor Road
|
Road
|
PMGSY ID UTTARKASHI
|
1.092
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2015
|
Stage-I Approval on
|
:
|
02 May 2015
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2023
|
|
|
|
|
7
|
Uttarakhand
|
FP/UK/ROAD/10384/2015
|
1(210)/15
|
chelchina to primary school chupra motor road
|
Road
|
EXECUTIVE ENGINEER
|
2.365
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2015
|
Stage-I Approval on
|
:
|
30 May 2015
|
Compliance Report Submitted by User Agency on
|
:
|
29 Nov 2024
|
|
|
|
|
8
|
Uttarakhand
|
FP/UK/ROAD/10668/2015
|
1(160)/15
|
Bhagartola-Chamua-Kapkoli Motor Road
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
2.43
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2015
|
Stage-I Approval on
|
:
|
30 May 2015
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2025
|
|
|
|
|
9
|
Uttarakhand
|
FP/UK/ROAD/9512/2015
|
8B/UCP/06/22/2015
|
Toli Maichun Motor Road
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
0.215
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2015
|
Stage-I Approval on
|
:
|
09 Jun 2015
|
Compliance Report Submitted by User Agency on
|
:
|
05 Mar 2025
|
|
|
|
|
10
|
Uttarakhand
|
FP/UK/ROAD/9447/2015
|
1(290)/2015
|
Submergence Road Km 18 to Maisasa MR
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.4025
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jan 2015
|
Stage-I Approval on
|
:
|
25 Jul 2015
|
Compliance Report Submitted by User Agency on
|
:
|
29 Nov 2024
|
|
|
|
|
11
|
Uttarakhand
|
FP/UK/ROAD/10814/2015
|
1(291)/2015
|
Lakshyar-Ludhra-Kyari-Kachata
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.4175
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2015
|
Stage-I Approval on
|
:
|
29 Jul 2015
|
Compliance Report Submitted by User Agency on
|
:
|
29 Nov 2024
|
|
|
|
|
12
|
Uttarakhand
|
FP/UK/ROAD/10372/2015
|
1(349)/2015
|
Jaili-Margaon-Taila Motor Road under State Sector
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.7425
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2015
|
Stage-I Approval on
|
:
|
27 Jul 2015
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jan 2025
|
|
|
|
|
13
|
Uttarakhand
|
FP/UK/ROAD/10063/2015
|
1(451)/2015
|
Aunshu to Baskuna Motor Road(4.00km)
|
Road
|
PWDKAPKOT
|
1.4
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Feb 2015
|
Stage-I Approval on
|
:
|
07 Sep 2015
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jan 2025
|
|
|
|
|
14
|
Uttarakhand
|
FP/UK/ROAD/10393/2015
|
8B/UCP/06/124/2015-FC
|
Bartoli-Banthok Motor Road(Part I)
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
2.705
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Feb 2015
|
Stage-I Approval on
|
:
|
08 Oct 2015
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2025
|
|
|
|
|
15
|
Uttarakhand
|
FP/UK/Others/10419/2015
|
1(118)/15
|
Bridge construction in Naken Gadhera
|
Others
|
PUBLIC WORK DEPARTMENT
|
0.009
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Feb 2015
|
Stage-I Approval on
|
:
|
02 May 2015
|
Compliance Report Submitted by User Agency on
|
:
|
27 Dec 2024
|
|
|
|
|
16
|
Uttarakhand
|
FP/UK/ROAD/10294/2015
|
1(490)/2015
|
Manaldura to Nanankoti Motor Road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
2.7
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2015
|
Stage-I Approval on
|
:
|
03 Nov 2015
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2024
|
|
|
|
|
17
|
Uttarakhand
|
FP/UK/ROAD/10070/2015
|
1(496)/2015
|
Pothing to Sobhakund Motor Road(5.00)
|
Road
|
PWDKAPKOT
|
3.15
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Feb 2015
|
Stage-I Approval on
|
:
|
30 Oct 2015
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jan 2025
|
|
|
|
|
18
|
Uttarakhand
|
FP/UK/ROAD/13166/2015
|
1(449)/2015
|
Construction of Motor Road up to Amdhar from Kwisu Sumari Motor Road via Dharigaon under Srinagar Constituency in District Pauri.
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.664
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jun 2015
|
Stage-I Approval on
|
:
|
03 Nov 2015
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2024
|
|
|
|
|
19
|
Uttarakhand
|
FP/UK/ROAD/8718/2014
|
1(531)/2015
|
Chopra-Dungri-Chapar Motor Road (State Sector)
|
Road
|
PUBLIC WORK DEPARTMENT
|
1.4625
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Dec 2014
|
Stage-I Approval on
|
:
|
02 Nov 2015
|
Compliance Report Submitted by User Agency on
|
:
|
11 Feb 2025
|
|
|
|
|
20
|
Uttarakhand
|
FP/UK/ROAD/14187/2015
|
1(635)/2015
|
Baijnath-Bageshwar motor road Km 17 to Manura-Nargwari Link motor road in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.5103
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jul 2015
|
Stage-I Approval on
|
:
|
21 Mar 2016
|
Compliance Report Submitted by User Agency on
|
:
|
14 May 2025
|
|
|
|
|
21
|
Uttarakhand
|
FP/UK/ROAD/16204/2015
|
1(187)/2016
|
Construction of Lata-Lata mandir motor road from 0.00 to 4.00 (Length 1.50 km0
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.738
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Oct 2015
|
Stage-I Approval on
|
:
|
28 Jun 2016
|
Compliance Report Submitted by User Agency on
|
:
|
20 Aug 2024
|
|
|
|
|
22
|
Uttarakhand
|
FP/UK/Others/13110/2015
|
1(118)/2016
|
THANA GHANSALI
|
Others
|
S.P OFFICE TEHRI
|
0.2
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jun 2015
|
Stage-I Approval on
|
:
|
20 Jul 2016
|
Compliance Report Submitted by User Agency on
|
:
|
13 Mar 2024
|
|
|
|
|
23
|
Uttarakhand
|
FP/UK/ROAD/17945/2016
|
1(222)/2016
|
Kameridevi Bantola Syakot Motor road Km 2 to Rangthari-Mjgaun-Chaunal motor Road(2.00 Km)
|
Road
|
PWDKAPKOT
|
1.05
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Feb 2016
|
Stage-I Approval on
|
:
|
21 Jul 2016
|
Compliance Report Submitted by User Agency on
|
:
|
29 Oct 2024
|
|
|
|
|
24
|
Uttarakhand
|
FP/UK/ROAD/15327/2015
|
1(213)/2016
|
Lamchula-Ganigawn motor road in District-Bageshwar (CM Ghosna-694/2015)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.802
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Sep 2015
|
Stage-I Approval on
|
:
|
12 Aug 2016
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2024
|
|
|
|
|
25
|
Uttarakhand
|
FP/UK/ROAD/10511/2015
|
1(231)/2016
|
Construction of Khadlekh-Bhanar-Dana-Tikta Motor Road (4.00km)
|
Road
|
PWDKAPKOT
|
1.75
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Feb 2015
|
Stage-I Approval on
|
:
|
12 Aug 2016
|
Compliance Report Submitted by User Agency on
|
:
|
27 Feb 2025
|
|
|
|
|
26
|
Uttarakhand
|
FP/UK/ROAD/10468/2015
|
1(230)/2016
|
Construction of Kameri Devi to Jhakra motor road (Length 3.00km)
|
Road
|
PWDKAPKOT
|
1.47
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Feb 2015
|
Stage-I Approval on
|
:
|
12 Aug 2016
|
Compliance Report Submitted by User Agency on
|
:
|
14 Feb 2025
|
|
|
|
|
27
|
Uttarakhand
|
FP/UK/ROAD/19168/2016
|
1(275)/2016
|
Construction of Garkhet Lakmara motor road(Length 5.00Km)
|
Road
|
PWDKAPKOT
|
3.375
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2016
|
Stage-I Approval on
|
:
|
12 Aug 2016
|
Compliance Report Submitted by User Agency on
|
:
|
19 Feb 2025
|
|
|
|
|
28
|
Uttarakhand
|
FP/UK/ROAD/20227/2016
|
1(312)/2016
|
Construction of Bageshwar kapkot motor road km 16 to Verui Okhaldhar motor road (Length 6.00)
|
Road
|
PWDKAPKOT
|
2.68
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jun 2016
|
Stage-I Approval on
|
:
|
16 Sep 2016
|
Compliance Report Submitted by User Agency on
|
:
|
27 Feb 2025
|
|
|
|
|
29
|
Uttarakhand
|
FP/UK/ROAD/11292/2015
|
8B/UCP/06/222/2015
|
Construction of Farsali Palli To Kharkanatoli
|
Road
|
PMGSY
|
8.931
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Mar 2015
|
Stage-I Approval on
|
:
|
14 Mar 2017
|
Compliance Report Submitted by User Agency on
|
:
|
07 Mar 2025
|
|
|
|
|
30
|
Uttarakhand
|
FP/UK/ROAD/13621/2015
|
8B/UCP/06/148/2016/FC
|
construction of Adichaura to Sinni Motor Road Under PMGSY.
|
Road
|
PMGSY
|
10.35
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jun 2015
|
Stage-I Approval on
|
:
|
26 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jun 2025
|
|
|
|
|
31
|
Uttarakhand
|
FP/UK/ROAD/21752/2016
|
8B/UCP/06/60/2017/FC
|
Const of Ghugti Kelani to Masmoli motor road
|
Road
|
EXECUTIVE ENGINEER
|
1.044
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Dec 2016
|
Stage-I Approval on
|
:
|
06 Oct 2017
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2024
|
|
|
|
|
32
|
Uttarakhand
|
FP/UK/ROAD/20224/2016
|
8B/UCP/06/03/2017/FC
|
Margaon-Jaspur-Chamiyari to Ulan motor road.
|
Road
|
EXECUTIVE ENGINEER
|
4.879
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2016
|
Stage-I Approval on
|
:
|
12 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
04 Dec 2024
|
|
|
|
|
33
|
Uttarakhand
|
FP/UK/ROAD/8895/2014
|
8B/UCP/06/267/2015/FC
|
Construction of Mavadhar to Chamk Motor road under Distt Sector
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.91
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Dec 2014
|
Stage-I Approval on
|
:
|
26 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2025
|
|
|
|
|
34
|
Uttarakhand
|
FP/UK/ROAD/29012/2017
|
8B/UCP/06/126/2018/FC
|
Construction of Raiagarh Chaurmanya Motor Road to Bhul ki Adhyali Motor Road Under PMGSY Didihat.
|
Road
|
P.M.G.S.Y Didihat
|
4.661
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Oct 2017
|
Stage-I Approval on
|
:
|
24 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jan 2025
|
|
|
|
|
35
|
Uttarakhand
|
FP/UK/ROAD/20937/2016
|
1(225)
|
Construction of Road in village Rainapur Girdhari Lal Farm to Turanmajra in District Dehradun.
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.6
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jul 2018
|
Stage-I Approval on
|
:
|
02 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2024
|
|
|
|
|
36
|
Uttarakhand
|
FP/UK/ROAD/27734/2017
|
8B/UCP/06/54/2019/FC
|
Construction of Tharali to Paingarh Motor Road under PMGSY.
|
Road
|
RES PMGSY KARANPERAYAG
|
4.812
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2019
|
Stage-I Approval on
|
:
|
02 Jul 2019
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jun 2025
|
|
|
|
|
37
|
Uttarakhand
|
FP/UK/ROAD/18867/2016
|
1(224)/2018
|
Construction of Kurur to Kundbagar Motor Road. (Length 1.00 Km)
|
Road
|
PUBLIC WORKS DEPARTMENT
|
0.81
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Apr 2016
|
Stage-I Approval on
|
:
|
31 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
24 Oct 2024
|
|
|
|
|
38
|
Uttarakhand
|
FP/UK/ROAD/38307/2019
|
8B/UCP/06/106/2019/FC
|
Construction of Gulabrai Toona Motor Road Km.2.00 to Chingwar Motor Road
|
Road
|
PMGSY
|
4.412
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Feb 2019
|
Stage-I Approval on
|
:
|
18 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jun 2025
|
|
|
|
|
39
|
Uttarakhand
|
FP/UK/ROAD/42150/2019
|
1(95)/2020
|
New Construction of Bungachina Dhaunkhola to Raseapata motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.81
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Sep 2019
|
Stage-I Approval on
|
:
|
07 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
09 Apr 2025
|
|
|
|
|
40
|
Uttarakhand
|
FP/UK/ROAD/42729/2019
|
1(92)/2020
|
New Construction of Gram-Panchayat Satgarh to Dharmshala Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.742
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Nov 2019
|
Stage-I Approval on
|
:
|
07 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
07 Mar 2025
|
|
|
|
|
41
|
Uttarakhand
|
FP/UK/ROAD/41895/2019
|
1(116)/2020
|
Construction of Chopta to Dadugad Motor Road.
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.404
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Sep 2019
|
Stage-I Approval on
|
:
|
02 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2024
|
|
|
|
|
42
|
Uttarakhand
|
FP/UK/ROAD/42515/2019
|
1(154)/2020
|
Karnaprayag Nauti Paithani M/R to Koli Bhatoli M/R
|
Road
|
TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR
|
0.6
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Oct 2019
|
Stage-I Approval on
|
:
|
07 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
01 Apr 2025
|
|
|
|
|
43
|
Uttarakhand
|
FP/UK/ROAD/18882/2016
|
1(153)/2020
|
Timiltona Aarusari Virot Bhemitola Talayi Motor Road.
|
Road
|
EXECUTIVE ENGINEER
|
0.945
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 May 2016
|
Stage-I Approval on
|
:
|
22 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jan 2024
|
|
|
|
|
44
|
Uttarakhand
|
FP/UK/ROAD/39655/2019
|
8B/UCP/06/86/2020/FC
|
Construction of approach road from Nawali from Km. 11 of Laxmikhan-Nathuwakhan-Pura-Qurab motor road to Losgayani in Ramgarh Block of District Nainital
|
Road
|
EE CD NAINITAL
|
0.936
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Apr 2019
|
Stage-I Approval on
|
:
|
27 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
05 Apr 2025
|
|
|
|
|
45
|
Uttarakhand
|
FP/UK/ROAD/41148/2019
|
8B/UCP/06/05/2021/FC
|
New Construction of Chamu to Bhandari Gaon Rajwar Motor Road
|
Road
|
PUBLIC WORK DEPARTMENT
|
3.555
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jul 2019
|
Stage-I Approval on
|
:
|
29 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
22 Apr 2025
|
|
|
|
|
46
|
Uttarakhand
|
FP/UK/ROAD/9429/2015
|
1(16)/2021
|
Construction Of Rathi to Bora Village Motor Road
|
Road
|
CONSTRUCTION DIVISION PWD ASKOTE
|
0.275
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jan 2015
|
Stage-I Approval on
|
:
|
23 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
11 Dec 2024
|
|
|
|
|
47
|
Uttarakhand
|
FP/UK/ROAD/120059/2021
|
1(59)/21
|
C/o Nirai to Auliya gaon, Lachhampur and Supakote Motor Road
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
0.018
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jan 2021
|
Stage-I Approval on
|
:
|
10 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
05 Dec 2024
|
|
|
|
|
48
|
Uttarakhand
|
FP/UK/ROAD/55006/2020
|
1(76)/21
|
New construction of Jajardeval To Mulagarh Motor Raod
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.9
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Nov 2020
|
Stage-I Approval on
|
:
|
02 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
08 Apr 2025
|
|
|
|
|
49
|
Uttarakhand
|
FP/UK/ROAD/43416/2019
|
1(90)/2021
|
Construction of Tilwara Bhardar Syari to Syari Gaon Motor road
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.1575
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Dec 2019
|
Stage-I Approval on
|
:
|
10 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jan 2025
|
|
|
|
|
50
|
Uttarakhand
|
FP/UK/ROAD/38955/2019
|
8B/UCP/06/92/2020/FC
|
Bhatgara to Fadiyali Nayal Pabhya Moter Road
|
Road
|
EE TY DIV PWD BERINAG
|
3.6
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Feb 2019
|
Stage-I Approval on
|
:
|
22 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
25 Apr 2025
|
|
|
|
|
|