Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Madhya Pradesh FP/MP/ROAD/8287/2014 6-MPC008/2015-BHO Betul-Sarni-Parasiya SH-43 Road MPRDC 22.845 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Nov 2014
Stage-I Approval on : 28 Apr 2015
Compliance Report Submitted by User Agency on : 06 Jul 2021
2 Madhya Pradesh FP/MP/IRRIG/15320/2015 8-30/2017-FC Chunar Tank Irrigation WRD MP 95.387 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Sep 2015
Stage-I Approval on : 12 Sep 2017
Compliance Report Submitted by User Agency on : 13 Nov 2017
3 Madhya Pradesh FP/MP/MIN/10885/2015 8-47/2017-FC Jamunia Under Ground Mine Mining WCL Pench Area 54.639 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Mar 2015
Stage-I Approval on : 03 Jan 2018
Compliance Report Submitted by User Agency on : 24 Dec 2020
4 Madhya Pradesh FP/MP/MIN/16527/2015 8-45/2017-FC Dhankasa UG Mine Mining WCL Pench Area 385.841 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 09 Sep 2016
Stage-I Approval on : 02 Jan 2018
Compliance Report Submitted by User Agency on : 24 Dec 2020
5 Madhya Pradesh FP/MP/Others/26068/2017 6-MPC03/2018-BHO National Lake, Conservation Project Others EXECUTIVE ENGINEER PUBLIC HEALTH ENGINEERING DIVISION 1.83 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 08 May 2017
Stage-I Approval on : 02 Apr 2018
Compliance Report Submitted by User Agency on : 20 Jun 2018
6 Madhya Pradesh FP/MP/MIN/23800/2017 8-59/2017-FC SHOBHAPUR UG MINE Mining WESTERN COALFIELDS LIMITED 80.902 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Jan 2017
Stage-I Approval on : 03 May 2018
Compliance Report Submitted by User Agency on : 29 Jul 2021
7 Madhya Pradesh FP/MP/IRRIG/7121/2014 8-37/2017-FC Majhgaon Dam Irrigation WATER RESOURCE DIVISION PANNA 426.763 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 Dec 2014
Stage-I Approval on : 03 May 2018
Compliance Report Submitted by User Agency on : 20 Jul 2020
8 Madhya Pradesh FP/MP/MIN/24598/2017 8-52/2017-fc Expansion of Tawa-II UG Mine Mining WESTERN COALFIELDS LIMITED 201.079 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Apr 2017
Stage-I Approval on : 14 May 2018
Compliance Report Submitted by User Agency on : 18 May 2021
9 Madhya Pradesh FP/MP/Others/32757/2018 8-22/2018-FC CHIDIYATOL ZOO & RESCUE CENTER KHARBAI Others MP ECO TOURISM DEVELOPMENT BOARD BHOPAL 150 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 Mar 2018
Stage-I Approval on : 20 Jul 2018
Compliance Report Submitted by User Agency on : 15 Nov 2019
10 Madhya Pradesh FP/MP/IRRIG/30441/2017 8-39/2018-FC Parna Minor Irrigation Project Irrigation WRD DAMOH 55.3 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 01 Dec 2017
Stage-I Approval on : 29 Aug 2018
Compliance Report Submitted by User Agency on : 21 May 2022
11 Madhya Pradesh FP/MP/RAIL/36675/2018 6-MPC09/2019 doubling of existing rail line Karaila - Shaktinagar section under Dhanbad division of ECR from km 0 to 7.85 Railway INDIAN RAILWAY EAST CENTRAL RAILWAY CONSTRUCTION ORGNISATION 12.979 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 29 Oct 2018
Stage-I Approval on : 12 Apr 2019
Compliance Report Submitted by User Agency on : 25 May 2019
12 Madhya Pradesh FP/MP/VELEC/37708/2018 6-MPC029/2019-BHO Construction of 33 KV electric line for 33/11 KV from Chiriya to Titraniya Village Electricity EXECUTIVEENGINEER MPEB 24 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 16 Dec 2018
Stage-I Approval on : 02 Jul 2019
Compliance Report Submitted by User Agency on : 16 Oct 2020
13 Madhya Pradesh FP/MP/MIN/20225/2016 8-69/2018-FC Bina Kakari Amalgamation OCP mine Mining NORTHERN COALFIELDS LTD 390.264 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Jul 2016
Stage-I Approval on : 13 Jan 2020
Compliance Report Submitted by User Agency on : 02 Feb 2021
14 Madhya Pradesh FP/MP/Others/27128/2017 8-16/2019-FC Establishment of Special Economic Zone, Chhindwara Others CHHINDWARA PLUS DEVELOPERS LIMITED 80.737 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 Jul 2017
Stage-I Approval on : 11 Feb 2020
Compliance Report Submitted by User Agency on : 11 Mar 2022
15 Madhya Pradesh FP/MP/IRRIG/32224/2018 8-20/2019-FC Tendua Nalla Tank Scheme Irrigation EXECUTIVE ENGINEER WATER RESOURCES DIVISION NOWGONG 45.278 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Mar 2018
Stage-I Approval on : 11 Mar 2020
Compliance Report Submitted by User Agency on : 17 Jun 2022
16 Madhya Pradesh FP/MP/RAIL/35283/2018 6-MPA004/2021-BHO Khajuraho-Panna New B.G. Railway Line (73 Km). A part of Lalitpur-Singarauli, Mahoba, Khajuraho Rail Line Project (541 Km). Railway WEST CENTRAL RAILWAY 315.937 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 27 Feb 2019
Stage-I Approval on : 25 Feb 2021
Compliance Report Submitted by User Agency on : 08 Dec 2021
17 Madhya Pradesh FP/MP/TRANS/49075/2020 6-MPC012/2021-BHO POWERGRID BHIND GUNA TRASNMISSION LIMITED Transmission Line POWERGRID BHIND GUNA TRANSMISSION LIMITED 25.746 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Aug 2020
Stage-I Approval on : 25 Feb 2021
Compliance Report Submitted by User Agency on : 16 Jun 2021
18 Madhya Pradesh FP/MP/ROAD/51001/2020 6-MPB037/2021-BHO Proposal for Diversion of Forest Land for Jharkheda Berasiya Dholkhedi Road (Old Proposal Number FP/MP/ROAD/36563/2018) Road MORTH (NH-MP) 4.412 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 Oct 2020
Stage-I Approval on : 24 Mar 2021
Compliance Report Submitted by User Agency on : 14 May 2022
19 Madhya Pradesh FP/MP/WATER/39770/2019 6-MPB024/2021-BHO Karanpura-1 Multi Village Rural Water Supply Scheme Drinking Water MADHYA PRADESH JAL NIGAM MARYADIT SHAHDOL 0.992 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Apr 2019
Stage-I Approval on : 26 Mar 2021
Compliance Report Submitted by User Agency on : 11 Jun 2021
20 Madhya Pradesh FP/MP/ROAD/36342/2018 6-MPC027/2021-BHO Up-gradation / Four laning of stretch form km 8.300 to km 20.740 (total length 12.440 km) on Obedullaganj-Betul Section of NH- 69 in the state of Madhya Pradesh. Road National Highways Authority of India 14.116 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 Oct 2018
Stage-I Approval on : 10 May 2021
Compliance Report Submitted by User Agency on : 20 May 2022
21 Madhya Pradesh FP/MP/TRANS/41840/2019 6-MPC051/2020-BHO MPPTCL 132 kv Mandla - Bichhiya Transmission Line Transmission Line MPPTCL JABALPUR 14.193 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 09 Sep 2019
Stage-I Approval on : 27 May 2021
Compliance Report Submitted by User Agency on : 20 Dec 2021
22 Madhya Pradesh FP/MP/MIN/20919/2016 6-MPC001/2018-BHO TAWA-III UG MINE Mining WESTERN COALFIELDS LIMITED 25.866 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 Oct 2016
Stage-I Approval on : 27 May 2021
Compliance Report Submitted by User Agency on : 20 Nov 2021
23 Madhya Pradesh FP/MP/ROAD/37808/2018 6-MPB044/2021-BHO Jiyawan to Parma Dist. Singrauli MPRRDA Road GMMPRRDAPIUWAIDHAN 3.968 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Dec 2018
Stage-I Approval on : 07 Jun 2021
Compliance Report Submitted by User Agency on : 16 Nov 2021
24 Madhya Pradesh FP/MP/ROAD/51020/2020 6-MPB049/2021-BHO Mayapur Khuteli Lauar road to Bichhari Under Package No MP41209 Road GM MPRRDA PIU SIDHI 1.68 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Oct 2020
Stage-I Approval on : 08 Jun 2021
Compliance Report Submitted by User Agency on : 12 Nov 2021
25 Madhya Pradesh FP/MP/ROAD/49834/2020 6-MPC040/2021-BHO Forest Clearance Proposal for Nasrullaganj Rehti Budhni Road (Old Proposal Number FP/MP/ROAD/36454/2018) Road MORTH (NH-MP) 11.595 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Sep 2020
Stage-I Approval on : 28 Jun 2021
Compliance Report Submitted by User Agency on : 14 May 2022
26 Madhya Pradesh FP/MP/ROAD/37810/2018 6-MPB048/2021-BHO Gidher to Bodi Dist. Singrauli MPRRDA Road GMMPRRDAPIUWAIDHAN 2.14 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Dec 2018
Stage-I Approval on : 22 Jul 2021
Compliance Report Submitted by User Agency on : 24 Nov 2021
27 Madhya Pradesh FP/MP/IRRIG/33882/2018 8-04/2020-FC Banda Irrigation Project Irrigation WRD SAGAR DIVISION 505.5 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Sep 2018
Stage-I Approval on : 28 Jul 2021
Compliance Report Submitted by User Agency on : 02 Dec 2021
28 Madhya Pradesh FP/MP/IRRIG/30971/2017 6-MPC050/2021-BHO Jamdarra Minor Irrigation Project Irrigation WATER RESOURCES DIVISION NO ONE SAGAR 24.29 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 29 Dec 2017
Stage-I Approval on : 30 Jul 2021
Compliance Report Submitted by User Agency on : 01 Jun 2022
29 Madhya Pradesh FP/MP/IRRIG/31249/2018 6-MPC002/2019-BHO Dargawan Minor Tank Irrigation EESASVIDISHA 35.3 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Mar 2018
Stage-I Approval on : 03 Aug 2021
Compliance Report Submitted by User Agency on : 28 Apr 2022
30 Madhya Pradesh FP/MP/IRRIG/14872/2015 6-MPB012/2020-BHO Khora Tank Scheme Irrigation MINISTRY OF WATER RESOURCES MADHYA PRADESH DIVISION PAWAI 1.6 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Oct 2015
Stage-I Approval on : 09 Aug 2021
Compliance Report Submitted by User Agency on : 02 Feb 2022
31 Madhya Pradesh FP/MP/IRRIG/32232/2018 6-MPC013/2019-BHO Gour Tank Project Irrigation ENGINEER IN CHIEF WATER RESOURCES DEPTT MP 20.22 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 23 Feb 2018
Stage-I Approval on : 30 Aug 2021
Compliance Report Submitted by User Agency on : 21 Apr 2022
32 Madhya Pradesh FP/MP/ROAD/30989/2017 8-67/2002-FC Vol. Road from Jayant to Morwa Siding Road NORTHERN COALFIELDS LIMITED 7.448 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Nov 2018
Stage-I Approval on : 06 Sep 2021
Compliance Report Submitted by User Agency on : 01 Nov 2021
33 Madhya Pradesh FP/MP/Others/49510/2020 6-MPC023/2021-BHO Approach Road and Integrated Power Line etc for Gandhigram UG and Tawa-III UG mine Others WESTERN COALFIELDS LIMITED 3.283 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 09 Sep 2020
Stage-I Approval on : 20 Sep 2021
Compliance Report Submitted by User Agency on : 13 Jun 2022
34 Madhya Pradesh FP/MP/Others/143779/2021 6-MPB088/2021-BHO Construction of Community Park in Village Malthone Under CM Infra Yojana Others DIRECTORATE OF URBAN ADMINISTRATION AND DEVELOPMENT BHOPAL 0.999 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Jun 2021
Stage-I Approval on : 23 Sep 2021
Compliance Report Submitted by User Agency on : 30 Nov 2021
35 Madhya Pradesh FP/MP/TRANS/143221/2021 6-MPC057/2021-BHO Kodwar 33 KV Transmission line to Pump House 1 and Pump House 2 Transmission Line EE ND DIVISION NO TWENTY FIVE NARMADA NAGAR 5.7 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 10 Jun 2021
Stage-I Approval on : 09 Nov 2021
Compliance Report Submitted by User Agency on : 11 Jan 2022
36 Madhya Pradesh FP/MP/IRRIG/123170/2021 6-MPB092/2021-BHO Pagara Tank Project Irrigation WRD MP 4.53 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 16 Feb 2021
Stage-I Approval on : 17 Nov 2021
Compliance Report Submitted by User Agency on : 28 Jun 2022
37 Madhya Pradesh FP/MP/WATER/38873/2019 6-MPC060/2021-BHO Satna Bansagar Multi Village Rural Water Supply Scheme Drinking Water MADHYA PRADESH JAL NIGAM MARYADIT BHOPAL 19.847 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 Mar 2019
Stage-I Approval on : 24 Nov 2021
Compliance Report Submitted by User Agency on : 08 Mar 2022
38 Madhya Pradesh FP/MP/ROAD/142381/2021 6-MPB096/2021-BHO Chandrapura to Bhadana kanjarda road Road GENERAL MANAGER MPRRDA NEEMUCH 1.875 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 08 Jun 2021
Stage-I Approval on : 21 Dec 2021
Compliance Report Submitted by User Agency on : 02 Mar 2022
39 Madhya Pradesh FP/MP/ROAD/147888/2021 6-MPC070/2021-BHO Upgradation of Major District Road Sendhwa Varla Road (MP-MDR- 48-22) Road PUBLIC WORK DEPARTMENT BHOPAL 5.518 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 04 Jan 2022
Compliance Report Submitted by User Agency on : 03 Feb 2022
40 Madhya Pradesh FP/MP/IRRIG/139995/2021 6-MPA016/2021-BHO ISP KALISINDH PHASE-II MICRO LIFT IRRIGATION PROJECT SCHEME (PIPELINE) Irrigation EE ND DIVISION NO TWENTY MANDLESHWAR 147.09 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Apr 2021
Stage-I Approval on : 07 Feb 2022
Compliance Report Submitted by User Agency on : 14 Jul 2022
41 Madhya Pradesh FP/MP/WATER/39222/2019 6-MPC067/2021-BHO Satna Bansagar Multi Village Rural Water Supply Scheme Drinking Water MADHYA PRADESH JAL NIGAM MARYADIT BHOPAL 22.696 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 Mar 2019
Stage-I Approval on : 07 Feb 2022
Compliance Report Submitted by User Agency on : 07 Mar 2022
42 Madhya Pradesh FP/MP/IRRIG/123932/2021 6-MPC063/2021-BHO Banda Tank Project Irrigation WRD MP 25 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 23 Feb 2021
Stage-I Approval on : 11 May 2022
Compliance Report Submitted by User Agency on : 23 Jun 2022
43 Madhya Pradesh FP/MP/ROAD/138582/2021 6-MPC065/2021-BHO Bhabhra - Kathiwada - Kheda Road Road MPRDC DHAR DIVISION 18.33 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Apr 2021
Stage-I Approval on : 28 May 2022
Compliance Report Submitted by User Agency on : 13 Jun 2022
44 Madhya Pradesh FP/MP/IRRIG/34676/2018 8-31/2021-FC SARKULA MEDIUM LIFT IRRIGATION PROJECT Irrigation EXECUTIVE ENGINEER WATER RESOURCES DIVISION SHIVPURI 126.42 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 Aug 2018
Stage-I Approval on : 02 Jun 2022
Compliance Report Submitted by User Agency on : 26 Aug 2022