1
|
Madhya Pradesh
|
FP/MP/ROAD/8287/2014
|
6-MPC008/2015-BHO
|
Betul-Sarni-Parasiya SH-43
|
Road
|
MPRDC
|
22.845
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Nov 2014
|
Stage-I Approval on
|
:
|
28 Apr 2015
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jul 2021
|
|
|
|
|
2
|
Madhya Pradesh
|
FP/MP/IRRIG/15320/2015
|
8-30/2017-FC
|
Chunar Tank
|
Irrigation
|
WRD MP
|
95.387
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Sep 2015
|
Stage-I Approval on
|
:
|
12 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2017
|
|
|
|
|
3
|
Madhya Pradesh
|
FP/MP/Others/26068/2017
|
6-MPC03/2018-BHO
|
National Lake, Conservation Project
|
Others
|
EXECUTIVE ENGINEER PUBLIC HEALTH ENGINEERING DIVISION
|
1.83
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 May 2017
|
Stage-I Approval on
|
:
|
02 Apr 2018
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2018
|
|
|
|
|
4
|
Madhya Pradesh
|
FP/MP/MIN/23800/2017
|
8-59/2017-FC
|
SHOBHAPUR UG MINE
|
Mining
|
WESTERN COALFIELDS LIMITED
|
80.902
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jan 2017
|
Stage-I Approval on
|
:
|
03 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jul 2021
|
|
|
|
|
5
|
Madhya Pradesh
|
FP/MP/Others/32757/2018
|
8-22/2018-FC
|
CHIDIYATOL ZOO & RESCUE CENTER KHARBAI
|
Others
|
MP ECO TOURISM DEVELOPMENT BOARD BHOPAL
|
150
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Mar 2018
|
Stage-I Approval on
|
:
|
20 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
15 Nov 2019
|
|
|
|
|
6
|
Madhya Pradesh
|
FP/MP/MIN/20921/2016
|
8-06/2018-FC
|
TAWA UG MINE
|
Mining
|
WESTERN COALFIELDS LIMITED
|
107.816
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Sep 2016
|
Stage-I Approval on
|
:
|
02 Nov 2018
|
Compliance Report Submitted by User Agency on
|
:
|
16 Aug 2023
|
|
|
|
|
7
|
Madhya Pradesh
|
FP/MP/VELEC/37708/2018
|
6-MPC029/2019-BHO
|
Construction of 33 KV electric line for 33/11 KV from Chiriya to Titraniya
|
Village Electricity
|
EXECUTIVEENGINEER MPEB
|
24
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Dec 2018
|
Stage-I Approval on
|
:
|
02 Jul 2019
|
Compliance Report Submitted by User Agency on
|
:
|
16 Oct 2020
|
|
|
|
|
8
|
Madhya Pradesh
|
FP/MP/Others/27128/2017
|
8-16/2019-FC
|
Establishment of Special Economic Zone, Chhindwara
|
Others
|
CHHINDWARA PLUS DEVELOPERS LIMITED
|
80.737
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jul 2017
|
Stage-I Approval on
|
:
|
11 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
11 Mar 2022
|
|
|
|
|
9
|
Madhya Pradesh
|
FP/MP/IRRIG/32224/2018
|
8-20/2019-FC
|
Tendua Nalla Tank Scheme
|
Irrigation
|
EXECUTIVE ENGINEER WATER RESOURCES DIVISION NOWGONG
|
45.278
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Mar 2018
|
Stage-I Approval on
|
:
|
11 Mar 2020
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jun 2022
|
|
|
|
|
10
|
Madhya Pradesh
|
FP/MP/WATER/39770/2019
|
6-MPB024/2021-BHO
|
Karanpura-1 Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT SHAHDOL
|
0.992
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Apr 2019
|
Stage-I Approval on
|
:
|
26 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jun 2021
|
|
|
|
|
11
|
Madhya Pradesh
|
FP/MP/TRANS/41840/2019
|
6-MPC051/2020-BHO
|
MPPTCL 132 kv Mandla - Bichhiya Transmission Line
|
Transmission Line
|
MPPTCL JABALPUR
|
14.193
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Sep 2019
|
Stage-I Approval on
|
:
|
27 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
20 Dec 2021
|
|
|
|
|
12
|
Madhya Pradesh
|
FP/MP/MIN/20919/2016
|
6-MPC001/2018-BHO
|
TAWA-III UG MINE
|
Mining
|
WESTERN COALFIELDS LIMITED
|
25.866
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Oct 2016
|
Stage-I Approval on
|
:
|
27 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
20 Nov 2021
|
|
|
|
|
13
|
Madhya Pradesh
|
FP/MP/ROAD/51020/2020
|
6-MPB049/2021-BHO
|
Mayapur Khuteli Lauar road to Bichhari Under Package No MP41209
|
Road
|
GM MPRRDA PIU SIDHI
|
1.68
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Oct 2020
|
Stage-I Approval on
|
:
|
08 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
12 Nov 2021
|
|
|
|
|
14
|
Madhya Pradesh
|
FP/MP/ROAD/35242/2018
|
6-MPB021/2019-BHO
|
Amanganj - Katni Road NH - 43 Ext. (CH: 77+00 to CH: 163+85)
|
Road
|
NHMP
|
0.98
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Aug 2018
|
Stage-I Approval on
|
:
|
21 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
07 Dec 2022
|
|
|
|
|
15
|
Madhya Pradesh
|
FP/MP/IRRIG/32232/2018
|
6-MPC013/2019-BHO
|
Gour Tank Project
|
Irrigation
|
ENGINEER IN CHIEF WATER RESOURCES DEPTT MP
|
20.22
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Feb 2018
|
Stage-I Approval on
|
:
|
30 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 Apr 2022
|
|
|
|
|
16
|
Madhya Pradesh
|
FP/MP/Others/143779/2021
|
6-MPB088/2021-BHO
|
Construction of Community Park in Village Malthone Under CM Infra Yojana
|
Others
|
DIRECTORATE OF URBAN ADMINISTRATION AND DEVELOPMENT BHOPAL
|
0.999
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jun 2021
|
Stage-I Approval on
|
:
|
23 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 Nov 2021
|
|
|
|
|
17
|
Madhya Pradesh
|
FP/MP/TRANS/143221/2021
|
6-MPC057/2021-BHO
|
Kodwar 33 KV Transmission line to Pump House 1 and Pump House 2
|
Transmission Line
|
EE ND DIVISION NO TWENTY FIVE NARMADA NAGAR
|
5.7
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jun 2021
|
Stage-I Approval on
|
:
|
09 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jan 2022
|
|
|
|
|
18
|
Madhya Pradesh
|
FP/MP/IRRIG/139995/2021
|
6-MPA016/2021-BHO
|
ISP KALISINDH PHASE-II MICRO LIFT IRRIGATION PROJECT SCHEME (PIPELINE)
|
Irrigation
|
EE ND DIVISION NO TWENTY MANDLESHWAR
|
147.09
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Apr 2021
|
Stage-I Approval on
|
:
|
07 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
14 Jul 2022
|
|
|
|
|
19
|
Madhya Pradesh
|
FP/MP/IRRIG/35107/2018
|
6-MPB099/2021-BHO
|
Mahan ( Gulab Sagar) canal extension Project phase 2
|
Irrigation
|
EEMAHANCANAL
|
2.8516
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Sep 2018
|
Stage-I Approval on
|
:
|
20 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2022
|
|
|
|
|
20
|
Madhya Pradesh
|
FP/MP/IRRIG/38634/2019
|
6-MPB005/2022-BHO
|
Bahuti Canal Scheme
|
Irrigation
|
Madhya Pradesh Water Resources Department
|
1.4002
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Mar 2019
|
Stage-I Approval on
|
:
|
05 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
09 Sep 2022
|
|
|
|
|
21
|
Madhya Pradesh
|
FP/MP/TRANS/145914/2021
|
6-MPB014-2022-BHO
|
LILO OF 132 kv Mahalgaon-Gwalior-II line at 132 kv GIS PHOOLBAGH
|
Transmission Line
|
MPPTCL
|
3.861
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Aug 2021
|
Stage-I Approval on
|
:
|
11 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
10 Apr 2023
|
|
|
|
|
22
|
Madhya Pradesh
|
FP/MP/ROAD/139945/2021
|
6-MPB030/2022-BHO
|
Tanda-Balwari Road
|
Road
|
MPRDC DHAR DIVISION
|
0.988
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Mar 2022
|
Stage-I Approval on
|
:
|
13 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 May 2023
|
|
|
|
|
23
|
Madhya Pradesh
|
FP/MP/ROAD/152685/2022
|
6-MPB015/2022-BHO
|
Suktanawad-Jhirpanjariya road
|
Road
|
PWD DIVISION BURHANPUR
|
2.38
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Feb 2022
|
Stage-I Approval on
|
:
|
01 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2023
|
|
|
|
|
24
|
Madhya Pradesh
|
FP/MP/TRANS/143391/2021
|
6-MPB024/2022-BHO
|
POWER SUPPLY TO 1000 BEDDED HOSPITAL, GWALIOR
|
Transmission Line
|
PWD PIU GWALIOR MP
|
3
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Sep 2021
|
Stage-I Approval on
|
:
|
03 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 May 2023
|
|
|
|
|
25
|
Madhya Pradesh
|
FP/MP/ROAD/49265/2020
|
6-MPR013/2022-BHO
|
Proposal for diversion of Forest Land, under DFO Sagar for Improvements and Widening of Sagar - Rehli Road SH-21 (KM 0/000 to KM 39/165) Section Sagar to Rehli under MPRDC, Division - Sagar with Fina
|
Road
|
MP ROAD DEVELOPMENT CORPORATION LTD
|
6.08
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Oct 2020
|
Stage-I Approval on
|
:
|
22 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
13 Jun 2023
|
|
|
|
|
26
|
Madhya Pradesh
|
FP/MP/ROAD/143616/2021
|
6-MPR026/2022-BHO
|
Padmi- Ramnagar – Ghunghri – Salvah Road
|
Road
|
MPRDC JABALPUR DIVISION
|
5.7
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Jun 2021
|
Stage-I Approval on
|
:
|
26 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
14 Feb 2024
|
|
|
|
|
27
|
Madhya Pradesh
|
FP/MP/ROAD/149667/2021
|
6-MPR034/2022-BHO
|
Gajrabahra coalyard to suliyari road
|
Road
|
GMMPRRDAPIUWAIDHAN
|
5.672
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2021
|
Stage-I Approval on
|
:
|
21 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
06 Feb 2024
|
|
|
|
|
28
|
Madhya Pradesh
|
FP/MP/ROAD/157126/2022
|
6-MPB042/2023-BHO
|
Madwa to Raipura Road
|
Road
|
MPRRDA PIU-I PANNA
|
1.9
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jun 2022
|
Stage-I Approval on
|
:
|
22 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
28 Dec 2023
|
|
|
|
|
29
|
Madhya Pradesh
|
FP/MP/ROAD/51129/2020
|
6-MPR008/2022-BHO
|
Proposal for diversion of forest land for Jabalpur-Kundam-Shahpura-Dindori Road under FCA 1980(old proposal No.FP/MP/ROAD/34442/2018)
|
Road
|
MORTH (NH-MP)
|
12.956
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2021
|
Stage-I Approval on
|
:
|
30 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jan 2024
|
|
|
|
|
30
|
Madhya Pradesh
|
FP/MP/ROAD/139257/2021
|
6-MPR007/2023-BHO
|
Aron via Vidoriya- Raghagarh Road
|
Road
|
MPRDC GWALIOR DIVISION
|
22.8
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Mar 2021
|
Stage-I Approval on
|
:
|
06 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
17 Oct 2023
|
|
|
|
|
31
|
Madhya Pradesh
|
FP/MP/ROAD/151553/2022
|
6-MPB002/2023-BHO
|
Diversion of 3.72 ha. of Forest land under FCA 1980 for Construction of Siddikaganj Hatpipaliya Road
|
Road
|
MPRDC BHOPAL DIVISION
|
3.72
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jun 2022
|
Stage-I Approval on
|
:
|
05 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jan 2024
|
|
|
|
|
32
|
Madhya Pradesh
|
FP/MP/ROAD/155435/2022
|
6-MPB032/2023-BHO
|
Halbitola bhalwa kalagota kesha mate under RCPLWEA Scheme
|
Road
|
MPRRDA PIU-1 BALAGHAT
|
2.25
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 May 2022
|
Stage-I Approval on
|
:
|
11 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
|
33
|
Madhya Pradesh
|
FP/MP/ROAD/155399/2022
|
6-MPB031/2023-BHO
|
Construction of road from KM28 of T01 to Banjaritola under RCPLWEA scheme
|
Road
|
MPRRDA PIU-1 BALAGHAT
|
1.523
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 May 2022
|
Stage-I Approval on
|
:
|
22 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
|
34
|
Madhya Pradesh
|
FP/MP/ROAD/41589/2019
|
6-MPC064/2021-BHO
|
Widening of Lateri Mundela Nazirabad road
|
Road
|
PUBLIC WORKS DEPARTMENT (B/R)
|
7.11
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Aug 2019
|
Stage-I Approval on
|
:
|
06 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jan 2024
|
|
|
|
|
35
|
Madhya Pradesh
|
FP/MP/ROAD/156438/2022
|
6-MPR038/2023-BHO
|
4 Laning of Indore-Muktainagar Section of NH-753L from Boregaon Buzurg, Khandwa District in MP Design Ch. 139+000 to Muktainagar, Jalgaon District in MH Design Ch. 216+278 (length 77.278 km) under Bharatmala Pariyojana in the state of Madhya Pradesh
|
Road
|
National Highways Authority of India
|
87.5709
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jun 2022
|
Stage-I Approval on
|
:
|
29 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2024
|
|
|
|
|
36
|
Madhya Pradesh
|
FP/MP/ROAD/141922/2021
|
6-MPR018/2022-BHO
|
Alirajpur-Mathawad ROad
|
Road
|
MPRDC DHAR DIVISION
|
5.874
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Nov 2021
|
Stage-I Approval on
|
:
|
13 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
15 Mar 2024
|
|
|
|
|
37
|
Madhya Pradesh
|
FP/MP/ROAD/156133/2022
|
6-MPR020/2023-BHO
|
Godri Harranala Via Dugali road under RCPLWEA Scheme
|
Road
|
MPRRDA PIU ONE BALAGHAT
|
7.56
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jun 2022
|
Stage-I Approval on
|
:
|
13 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
26 Mar 2024
|
|
|
|
|
38
|
Madhya Pradesh
|
FP/MP/ROAD/155479/2022
|
6-MPR025/2023-BHO
|
Benegaon sitapar nandora Borban road construction under RCPLWEA scheme
|
Road
|
MPRRDA PIU-1 BALAGHAT
|
7.29
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2022
|
Stage-I Approval on
|
:
|
14 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
26 Mar 2024
|
|
|
|
|
39
|
Madhya Pradesh
|
FP/MP/ROAD/43379/2019
|
6-MPB027/2022-BHO
|
Construction of road from Loharra to Jhiriya Mandir.
|
Road
|
PUBLIC WORKS DEPARTMENT (B/R)
|
2.28
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Dec 2019
|
Stage-I Approval on
|
:
|
19 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
28 Mar 2024
|
|
|
|
|
40
|
Madhya Pradesh
|
FP/MP/ROAD/149883/2021
|
6-MPR043/2023-BHO
|
Four laning of Indore-Harda Section of NH-59 A (New NH-47)
|
Road
|
NHAI PIU HARDA
|
40.053
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2021
|
Stage-I Approval on
|
:
|
18 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
07 Mar 2025
|
|
|
|
|
41
|
Madhya Pradesh
|
FP/MP/ROAD/152561/2022
|
6-MPB031/2022-BHO
|
Indore to Edlabad NH347BG & 753L
|
Road
|
National Highways Authority of India
|
3.2
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Feb 2022
|
Stage-I Approval on
|
:
|
08 Jul 2024
|
Compliance Report Submitted by User Agency on
|
:
|
03 Mar 2025
|
|
|
|
|
42
|
Madhya Pradesh
|
FP/MP/MIN/29264/2017
|
8-196/1984-FC (vol.)
|
BANGWAR UG MINE
|
Mining
|
SOUTH EASTERN COALFIELDS LIMITED
|
36.734
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jun 2018
|
Stage-I Approval on
|
:
|
19 Feb 2025
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jun 2025
|
|
|
|
|