Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Andhra Pradesh FP/AP/TRANS/22375/2016 GO.Rt.No.87, Dt:17.04.2017 Proposal for Erection of 33kv Transmission line from wind farm common point VCB yard at pattanagaram to 132/33kv substation of AP Transco grid at Banaganapaali, Kurnool District, A P. Transmission Line APSPDCL DHONE 0.85 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Nov 2016
Stage-I Approval on : 17 Apr 2017
Compliance Report Submitted by User Agency on : 28 Jun 2017
2 Haryana FP/HR/Others/13376/2015 5108 NOC for diversion of forest land of 0.0069 hectare area for our Retail Outlet at Bharog to Dahri Road, Village Bharog, Distt. Ambala (Haryana) Others IOCL PANIPAT DIVISIONAL OFFICE 0.0069 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Jun 2015
Stage-I Approval on : 19 Nov 2015
Compliance Report Submitted by User Agency on : 23 Feb 2016
3 Haryana FP/HR/Others/10771/2015 4981 NOC FOR ESTABLISHMENT OF NEW RETAIL OUTLET (KSK) OF INDIAN OIL CORPORATION LTD. ON MURABA NO. 105, KILA NO. 18 ON DABWALI-CHOUTALA ROAD(MDR-105), VILLAGE-ABUB SEHAR,TEHSIL-DABWALI,DISTT-SIRSA. Others INDIAN OIL CORPORATION LTD 0.0115 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 09 Mar 2015
Stage-I Approval on : 18 Sep 2015
Compliance Report Submitted by User Agency on : 23 Oct 2015
4 Haryana FP/HR/Others/10892/2015 5211 Diversion of 0.0129 ha of forest land for Retail Outlet at village- Behal, Khewat No.264/251, Khatoni No 666 Khasra no. 49//2O (10-10), 49//21 (5-12) on Bhiwani Road, SH12 Tehsil - Loharu District Bhiwani Haryana (Haryana). Others BHARAT PETROLEUM CORPORATION LIMITED 0.0129 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 Mar 2015
Stage-I Approval on : 29 Feb 2016
Compliance Report Submitted by User Agency on : 28 Mar 2016
5 Haryana FP/HR/Others/13906/2015 5119 NOC for diversion of forest land of 0.0191 hectare area for our Retail Outlet on Shehjadpur to old Saharanpur road, Village Bhogpur, Distt. Yamunanagar (Haryana) Others IOCL PANIPAT DIVISIONAL OFFICE 0.0191 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Jul 2015
Stage-I Approval on : 14 Mar 2016
Compliance Report Submitted by User Agency on : 21 Mar 2016
6 Haryana FP/HR/Others/14155/2015 5146 NOC for diversion of forest land of 0.0112 hectare area for our Retail Outlet between KM 2-8, on SH-7, near KM stone no. 6, Karnal – Ladwa Road, at Village Darar, District Karnal (Haryana) Others IOCL PANIPAT DIVISIONAL OFFICE 0.0112 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 Jul 2015
Stage-I Approval on : 08 Jan 2016
Compliance Report Submitted by User Agency on : 14 Jan 2016
7 Haryana FP/HR/ROAD/16294/2015 5203 Diversion of forest land for widening of NH-1 from 162 to 163 & KM 181 to 182 in Kurukshetra district as part of Six Laning NH-1. Road National Highways Authority of India 0.319 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Nov 2015
Stage-I Approval on : 11 Feb 2016
Compliance Report Submitted by User Agency on : 29 Apr 2016
8 Haryana FP/HR/Others/16315/2015 5240 DIVERSION OF FOREST LAND FOR ACCESS TO THE PROPOSED PETROL PUMP OF BHARAT PETROLEUM CORPORATION LTD. MDR 118 KM STONE 20.515 ON PUNDRI RAJOUND ROAD VILLAGE PAI DISTT KAITHAL (HARYANA)BEARING KHASRA NO 134//5/1. Others BHARAT PETROLEUM CORPORATION LIMITED 0.0159 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 31 Oct 2015
Stage-I Approval on : 22 Mar 2016
Compliance Report Submitted by User Agency on : 04 Apr 2016
9 Rajasthan FP/RJ/Others/11491/2015 8B/RAJ/09/42/2015 Construction of Diversion channel of Forest Nallah is an important and integral part of Baran city flood protection scheme. This diversion channel will divert the excess flood discharge from forest nallah to nalka nallah. Thus minimizing effect of floods in Baran city. Others WATER RESOURCE DIVISION IST BARAN 0.4273 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 09 Apr 2015
Stage-I Approval on : 10 Nov 2015
Compliance Report Submitted by User Agency on : 03 Mar 2016
01 Jan 2016
10 Rajasthan FP/RJ/ROAD/17056/2015 F.1(13)Forest/2017 “Construction of Approach Road for Proposed INDIAN OIL CORPORATION LIMITED Retail Outlet on Barmer - Sanchore Road (NH-15) between KM. Stone 284 -286 (Ch.285/985.00-286/030.00), Khasra No. 3586/832 & 3589/832 (old Khasra No. 832) at village-B.Dhani, Tehsil – Sanchore & District-Jalore (Rajasthan)”. Road Indian Oil Corporation Limited 0.058382 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Dec 2015
Stage-I Approval on : 23 Feb 2017
Compliance Report Submitted by User Agency on : 09 May 2017
11 Rajasthan FP/RJ/ROAD/22610/2016 F.1(22)Forest/2017 Construction of Approach Road for Proposed Indian Oil Corporation Ltd. Retail Outlet (Kisan Sewa Kendra) on Raghunathpura – Rajiyasar Road between Chainage 20/942.23 – 20/972.23 at Village – 3BMM, Tehsil - Suratgarh, District- Sri Ganganagar (Rajasthan). Road Indian Oil Corporation Limited 0.0335 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 27 Nov 2016
Stage-I Approval on : 01 May 2017
Compliance Report Submitted by User Agency on : 16 Jun 2017
12 Uttar Pradesh FP/UP/ROAD/12507/2015 8B/UP/06/43/2015 The UPEIDA, Govt. of UP to develop 6 lanes expandable to 8 lanes Agra-Lucknow Expressway on EPC mode. Expressway is passing through 10 districts whereas diversion of forest land is involved in 09 divisions. Which are Agra, Firozabad, Mainpuri, Etawah, Auraiya, Kannauj, Kanpur, Unnao, Lucnow Road UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) 123.8253 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Jun 2015
Stage-I Approval on : 12 Feb 2016
Compliance Report Submitted by User Agency on : 03 May 2016
13 Uttarakhand FP/UK/ROAD/12733/2015 1(555)/2015 This project provide the shortest rout to village kathyur. Road PWD 4.86 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 May 2015
Stage-I Approval on : 07 Nov 2015
Compliance Report Submitted by User Agency on : 24 Mar 2017
14 Uttarakhand FP/UK/ROAD/12421/2015 1(489)/2015 under the state sector, in Atal Aadrarsh Gram Yojna, construction of new motor road from chattwapipal to jhirkoti of length 2 KM Road PUBLIC WORKS DEPARTMENT GOPESHWAR UTTARAKHAND 0.59 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 05 May 2015
Stage-I Approval on : 30 Oct 2015
Compliance Report Submitted by User Agency on : 28 Apr 2016
15 Uttarakhand FP/UK/ROAD/11010/2015 1(604)/2015 This Project is Comes under Pradhan mantari Gram Sadak Yogna Norms. There is no other alternates except Forest Land to Connect this (Balli) Village. Road EXECUTIVE ENGINEER 0.2925 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Mar 2015
Stage-I Approval on : 07 Nov 2015
Compliance Report Submitted by User Agency on : 26 Apr 2016
16 Uttarakhand FP/UK/ROAD/11083/2015 1(185)/2015 Construction of Almora Sainar Chan Motor Road (Length 3.875 KM) Road EXECUTIVE ENGINEER 0.965 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 Mar 2015
Stage-I Approval on : 06 Nov 2015
Compliance Report Submitted by User Agency on : 06 Apr 2017
17 Uttarakhand FP/UK/ROAD/7782/2014 1(461)/2015 A 300mtr span double lane RCC bridge is proposed to be constructed across the rawasan river on Laldhang-Mithiberi road. Road EXECUTIVE ENGINEER, PD PWD HARIDWAR 0.75 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 15 Nov 2014
Stage-I Approval on : 07 Sep 2015
Compliance Report Submitted by User Agency on : 08 Mar 2017
18 Uttarakhand FP/UK/ROAD/8581/2014 1(305)/2015 Construction of Manau Kotli Sailakhan Chauna Motor Road (Length 3.00 KM) Road EXECUTIVE ENGINEER 0.801 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 17 Dec 2014
Stage-I Approval on : 19 Jan 2016
Compliance Report Submitted by User Agency on : 06 Apr 2017
19 Uttarakhand FP/UK/ROAD/9323/2015 1(18)/2016 This bridge will be constructed for village khadrasi over Mandal river which will link to Km 174 of SH 9 under state sector. Road ENGINEER IN CHIEF, PUBLIC WORK DEPARTMENT, DEHRADUN 0.504 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Jan 2015
Stage-I Approval on : 31 Mar 2016
Compliance Report Submitted by User Agency on : 22 Feb 2017
20 Uttarakhand FP/UK/ROAD/9496/2015 1(221)/2015 Barakot to Kothera Motor Road Road PMGSY LOHAGHAT 2.24 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 21 Jan 2015
Stage-I Approval on : 01 Jul 2015
Compliance Report Submitted by User Agency on : 14 Dec 2016
21 Uttarakhand FP/UK/ROAD/9524/2015 1(206)/2015 khetikhan to bungabirora motor road Road PMGSY LOHAGHAT 3.169 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Jan 2015
Stage-I Approval on : 09 Jul 2015
Compliance Report Submitted by User Agency on : 14 Dec 2016
22 Uttarakhand FP/UK/ROAD/9539/2015 1(205)/2015 Raigalband to Bigrakot motor road Road PMGSY LOHAGHAT 3.39 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 23 Jan 2015
Stage-I Approval on : 15 Jun 2015
Compliance Report Submitted by User Agency on : 14 Dec 2016
23 Uttarakhand FP/UK/ROAD/10022/2015 1(547)/2015 The proposed road is for providing the connectivity to the village Manjuli with a population of 412. The road is located in Block Kirtinagar, District- Tehri (Uttarakhand). The total length of the road for fresh cutting is 5.825 Km. Road PMGSY PWD KIRTINAGAR 3.908 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Feb 2015
Stage-I Approval on : 30 Oct 2015
Compliance Report Submitted by User Agency on : 19 May 2017
24 Uttarakhand FP/UK/ROAD/10529/2015 1(301)/2015 Connecting of 250+ habitation to Motor Road Under PMGSY. Road PUBLIC WORKS DEPARTMENT 0.9 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Feb 2015
Stage-I Approval on : 09 Jul 2015
Compliance Report Submitted by User Agency on : 09 Jun 2017
25 Uttarakhand FP/UK/ROAD/10755/2015 1(152)/2016 Construction of motor road from Bungidhar-Mehalchori-Bachuwaban motor road to Hargad Road PWD GAIRSAIN 0.228 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 08 Mar 2015
Stage-I Approval on : 10 Jun 2016
Compliance Report Submitted by User Agency on : 15 Sep 2016
26 Uttarakhand FP/UK/ROAD/18567/2016 1(291)/2016 Road construction for the caring farmers crop-products from their village to mandi for gaining good prices of their crops & become a Economically strong as well Road UTTARAKHAND KIRSHI UTPADAN MARKETING BOARD HALDWANI 0.98 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 09 Apr 2016
Stage-I Approval on : 29 Nov 2016
Compliance Report Submitted by User Agency on : 22 Feb 2017
27 Uttarakhand FP/UK/ROAD/21566/2016 1(387)/2016 An approach road from gujjarbasti existing road to basaochandpur village is to be constructed under Chief Minister's declaration Road EXECUTIVE ENGINEER, PD PWD HARIDWAR 0.675 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Sep 2016
Stage-I Approval on : 28 Dec 2016
Compliance Report Submitted by User Agency on : 29 Jun 2017
28 Uttarakhand FP/UK/ROAD/21733/2016 1(01)/2017 Construction of 21 Mtr Span Bridge at Km 173 on NH-94 Road NATIONAL HIGHWAY AUTHORTY OF INDIA PIU DEHRADUN 0.036 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 Oct 2016
Stage-I Approval on : 25 Jan 2017
Compliance Report Submitted by User Agency on : 19 Jun 2017
29 Uttarakhand FP/UK/ROAD/16840/2015 1(300)/2016 Improvement and construction of roads and road links brings multiple socio-economic benefits to the rural areas and results in forming a strong backbone for the agro-based economy. It will serve better connectivity in nearby villages. Road EECDPWDUKM 0.445 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 09 Dec 2015
Stage-I Approval on : 16 Sep 2016
Compliance Report Submitted by User Agency on : 04 May 2017
30 Uttarakhand FP/UK/ROAD/16876/2015 1(117)/2016 Construction Of Kheti Randoli Benital Motor Road Under State Sector. Proposed road providing connectivity to Kheti Randoli and incidentally other surrounding villages also get the benefit of this road having approximate population is 235. Road PWD CD GAIRSAIN 0.595 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 05 Dec 2015
Stage-I Approval on : 21 Apr 2016
Compliance Report Submitted by User Agency on : 15 Sep 2016
31 Uttarakhand FP/UK/ROAD/14233/2015 1(598)/2015 Proposed road is 1.75 Km.Beneficiary villag Sirsa provide connectivity to market place. Road PUBLIC WORK DEPARTMENT 0.9212 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Jul 2015
Stage-I Approval on : 07 Nov 2015
Compliance Report Submitted by User Agency on : 03 Feb 2017
32 Uttarakhand FP/UK/ROAD/14845/2015 1(571)/2015 This road connect the saknayana talla clustur of saknayana village. this is the only one solution of the village. And all the alignment goes for the village is also goes from the forest land hence the forest land is required for the scheme. Road PWD 3.95 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 21 Aug 2015
Stage-I Approval on : 07 Nov 2015
Compliance Report Submitted by User Agency on : 24 Mar 2017
33 Uttarakhand FP/UK/ROAD/16105/2015 1(92)/2016 The new road of 03 km length (Actual length 2.75KM) is sanction to connect Sher inter college in Shomeshwar constituency under C.M.Ghosna no 261/2015. Road EXECUTIVE ENGINEER 0.405 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Feb 2016
Stage-I Approval on : 26 May 2016
Compliance Report Submitted by User Agency on : 22 Apr 2017
34 Uttarakhand FP/UK/ROAD/16276/2015 1(266)/2016 Improvement and construction of roads and road links brings multiple socio-economic benefits to the rural areas and results in forming a strong backbone for the agro-based economy. It will serve better connectivity in nearby villages. Road EECDPWDUKM 0.698 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 29 Oct 2015
Stage-I Approval on : 12 Aug 2016
Compliance Report Submitted by User Agency on : 08 May 2017
35 Uttarakhand FP/UK/ROAD/16278/2015 1(270)/2016 Improvement and construction of roads and road links brings multiple socio-economic benefits to the rural areas and results in forming a strong backbone for the agro-based economy. It will serve better connectivity in nearby villages. Road EECDPWDUKM 0.448 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 29 Oct 2015
Stage-I Approval on : 12 Aug 2016
Compliance Report Submitted by User Agency on : 08 May 2017
36 Uttarakhand FP/UK/ROAD/16280/2015 1(269)/2016 Improvement and construction of roads and road links brings multiple socio-economic benefits to the rural areas and results in forming a strong backbone for the agro-based economy. It will serve better connectivity in nearby villages. Road EECDPWDUKM 0.133 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 29 Oct 2015
Stage-I Approval on : 12 Aug 2016
Compliance Report Submitted by User Agency on : 08 May 2017
37 Uttarakhand FP/UK/ROAD/13812/2015 1(587)/2015 Construction of Devalidhar to Surang Motor Road Legislative Assembly Dhari at Nainital District Road PUBLIC WORKS DEPARTMENT 1.435 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 10 Jul 2015
Stage-I Approval on : 06 Nov 2015
Compliance Report Submitted by User Agency on : 05 Nov 2016