Ministry of Environment,Forest and Climate Change
Government of India
Online Submission & Monitoring
of Forests and Wildlife Clearance Proposals
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Andhra Pradesh FP/AP/TRANS/22375/2016 GO.Rt.No.87, Dt:17.04.2017 Proposal for Erection of 33kv Transmission line from wind farm common point VCB yard at pattanagaram to 132/33kv substation of AP Transco grid at Banaganapaali, Kurnool District, A P. Transmission Line APSPDCL DHONE 0.85 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Nov 2016
Stage-I Approval on : 17 Apr 2017
Compliance Report Submitted by User Agency on : 28 Jun 2017
2 Dadar & Nagar Haveli FP/DN/Others/21886/2016 FP/DN/Others/21886/2016 Diversion of 0.8819 Hectare Protected Forest land for laying pipeline parallel & across to Roads / Canal side strip plantation declared as Protected Forest in Dadra & Surrounding Area of Dadra and Nagar Haveli Others GUJARAT GAS LIMITED 0.8819 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 Oct 2016
Stage-I Approval on : 16 Jan 2018
Compliance Report Submitted by User Agency on : 14 Mar 2018
3 Dadar & Nagar Haveli FP/DN/Others/26693/2017 7-5/3-FD/583/20 Gujarat Gas Limited :Diversion of 0.3387 Hectare Protected Forest land for laying natural gas pipeline parallel & across to Roads side strip plantation declared as Protected Forest in Dadra and Nagar Haveli (U/T) Others GUJARAT GAS LIMITED 0.3387 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 16 Jun 2017
Stage-I Approval on : 15 Feb 2018
Compliance Report Submitted by User Agency on : 18 Apr 2018
4 Haryana FP/HR/Others/10892/2015 5211 Diversion of 0.0129 ha of forest land for Retail Outlet at village- Behal, Khewat No.264/251, Khatoni No 666 Khasra no. 49//2O (10-10), 49//21 (5-12) on Bhiwani Road, SH12 Tehsil - Loharu District Bhiwani Haryana (Haryana). Others BHARAT PETROLEUM CORPORATION LIMITED 0.0129 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 Mar 2015
Stage-I Approval on : 29 Feb 2016
Compliance Report Submitted by User Agency on : 28 Mar 2016
5 Jharkhand FP/JH/ROAD/26793/2017 Van bhumi-22/2017 Construction,rehabilitation and two lannig with paved shoulder of Govindpur-Tundi-Giridih Road in the State of Jharkhnd Road RCD DHANBAD 16.8063 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Jul 2017
Stage-I Approval on : 29 Jan 2018
Compliance Report Submitted by User Agency on : 23 Mar 2018
6 Jharkhand FP/JH/ROAD/22880/2016 Vanbhumi-10/2017 Construction, Rehabilitation and two laning with paved shoulder of Pachamba-Jamua-Sarwan-Chatro Road in the state of Jharkhand Road RCD GIRIDIH 3.52 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 05 Dec 2016
Stage-I Approval on : 11 Aug 2017
Compliance Report Submitted by User Agency on : 08 Mar 2018
7 Orissa FP/OR/MIN/8308/2014 8-113/2000-FC VOL-II Kurmitar Mine of OMC Ltd., a State Government undertaking, is a mining project for exploitation of iron ore over an area of 651.00 ha confined within Latitudes: 21° 44’ 08.85300” - 21° 45’ 31.34376” North and Longitudes: 85° 08’ 56.8356”- 85° 11’ 03.4780” East in the Survey of India Toposheets beari Mining ODISHA MINING CORPORATION LTD 517.888 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 02 Dec 2014
Stage-I Approval on : 25 Feb 2016
Compliance Report Submitted by User Agency on : 05 Apr 2018
8 Rajasthan FP/RJ/Others/11491/2015 8B/RAJ/09/42/2015 Construction of Diversion channel of Forest Nallah is an important and integral part of Baran city flood protection scheme. This diversion channel will divert the excess flood discharge from forest nallah to nalka nallah. Thus minimizing effect of floods in Baran city. Others WATER RESOURCE DIVISION IST BARAN 0.4273 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 09 Apr 2015
Stage-I Approval on : 10 Nov 2015
Compliance Report Submitted by User Agency on : 03 Mar 2016
01 Jan 2016
9 Rajasthan FP/RJ/ROAD/23867/2017 8B/RAJ/06/14/2016/FC Up gradation and strengthening of existing 2 lane road to 2 lane with paved shoulder from Nagaur to Bikaner section of NH 89 Km 161/0 to 267/325 Including Three new Bybass Nagaur, Sri balaji and Nokha Road PUBLIC WORKS DEPARTMENT RAJASTHAN JAIPUR 8.18 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 11 Feb 2017
Stage-I Approval on : 12 Sep 2017
Compliance Report Submitted by User Agency on : 19 Apr 2018
10 Rajasthan FP/RJ/TRANS/21983/2016 8B/RAJ/04/17/2017/FC CONSTRUCTION OF 400 KV DOUBLE CIRCUIT NEEMRANA (Rajasthan) –DHONANDA (Haryana) TRANSMISSION LINE UNDER ALWAR FOREST DIVISION IN RAJASTHAN STATE which is under transmission system " “Creation of new 400 kV GIS Substations in Gurgaon and Palwal area as a part of Inter State Transmission System and aw Transmission Line GURGAON PALWAL TRANSMISSION LIMITED 0.766 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 20 Oct 2016
Stage-I Approval on : 26 Sep 2017
Compliance Report Submitted by User Agency on : 22 Mar 2018
11 Rajasthan FP/RJ/ROAD/24809/2017 8B/RAJ/06/24/2017/FC The project is of widening of existing National Highway – 12 from 2 lane to 4 lane from Darah to teendhar. The project road alignment traverses in Kota and Jhalawar Districts and connects Rajasthan and MP States. There are few sections where alignment needs geometric improvements to maintain riding Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU KOTA 7.336 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Mar 2017
Stage-I Approval on : 13 Nov 2017
Compliance Report Submitted by User Agency on : 17 Apr 2018
12 Uttar Pradesh FP/UP/ROAD/12507/2015 8B/UP/06/43/2015 The UPEIDA, Govt. of UP to develop 6 lanes expandable to 8 lanes Agra-Lucknow Expressway on EPC mode. Expressway is passing through 10 districts whereas diversion of forest land is involved in 09 divisions. Which are Agra, Firozabad, Mainpuri, Etawah, Auraiya, Kannauj, Kanpur, Unnao, Lucnow Road UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) 123.8253 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 26 Jun 2015
Stage-I Approval on : 12 Feb 2016
Compliance Report Submitted by User Agency on : 03 May 2016
13 Uttarakhand FP/UK/ROAD/8881/2014 8B/UCP/06/94/2015/FC construction of silikhund kunain motor road km 5 to Sainj motor road under PMGSY of length 6.125 km . this road will benefit to the population of 260 og sainj village. Road EXECUTIVE ENGINEER 5.3478 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Dec 2014
Stage-I Approval on : 11 Sep 2017
Compliance Report Submitted by User Agency on : 26 Mar 2018
14 Uttarakhand FP/UK/ROAD/13794/2015 1(588)/2015 Construction of Motor Road. Road PUBLIC WORK DEPARTMENT 0.957 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Jul 2015
Stage-I Approval on : 07 Nov 2015
Compliance Report Submitted by User Agency on : 21 Sep 2017
15 Uttarakhand FP/UK/ROAD/10349/2015 1(570)/2015 under the state sector, construction of new motor road lenghth 2 km from siropnai to gajer village Road PUBLIC WORKS DEPARTMENT GOPESHWAR UTTARAKHAND 1.47 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 22 Feb 2015
Stage-I Approval on : 07 Nov 2015
Compliance Report Submitted by User Agency on : 13 Feb 2018
16 Uttarakhand FP/UK/ROAD/11790/2015 1(506)/2015 under state sector, construction of new motor road from jaykandi to sirtoli of km length 4.25 Road PUBLIC WORKS DEPARTMENT GOPESHWAR UTTARAKHAND 2.3 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Apr 2015
Stage-I Approval on : 07 Nov 2015
Compliance Report Submitted by User Agency on : 31 Aug 2017
17 Uttarakhand FP/UK/Others/24016/2017 01(55)/2017 Government Polytechnic Baram (Pithoragarh) is a Diploma institute established by State Government of Uttarakhand by letter no. 481/XLI-1/2014-50/14, Dated 26 may 2014.Institute is established with an objective to pursue excellence in diploma education and provide skilled and qualified mass. Others GOVTPOLYTECHNIC BARAM 0.999 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Feb 2017
Stage-I Approval on : 15 Nov 2017
Compliance Report Submitted by User Agency on : 14 Feb 2018
18 Uttarakhand FP/UK/WATER/22455/2016 02(09)/2017 Barsudi water supply scheme estimated cost Rs 32.28 lacs has been proposed to provide potable drinking water to habitants of Barsudi of Srikot G.P. situated in Pauri block of District Pauri under District plan 2013-14. Drinking Water UTTARAKHAND PAYJAL SANSADHAN VIKAS AVAM NIRMAN NIGAM 0.116 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 21 Nov 2016
Stage-I Approval on : 28 Nov 2017
Compliance Report Submitted by User Agency on : 20 Mar 2018
19 Uttarakhand FP/UK/ROAD/28851/2017 1(117)/2017 Construction of Parihar to Samog Motor Road Under PMGSY Scheme Phase XIV of Length 3.150 km. It will serve the population of 352 of village Samog. Road EXECUTIVE ENGINEER 0.8225 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 Aug 2017
Stage-I Approval on : 26 Dec 2017
Compliance Report Submitted by User Agency on : 26 Mar 2018
20 Uttarakhand FP/UK/ROAD/15684/2015 1(06)2016 Improvement and construction of roads and road links brings multiple socio-economic benefits to the rural areas and results in forming a strong backbone for the agro-based economy. Road EECDPWDUKM 0.97 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Sep 2015
Stage-I Approval on : 14 Mar 2016
Compliance Report Submitted by User Agency on : 08 Nov 2017
21 Uttarakhand FP/UK/ROAD/9306/2015 1(586)/2015 Proposed Sirai link road Under Atal Adarsh Gram Yojna that will be bifurcated from 4th Km of Dadamandi-Dwarikhal motor road. Road ENGINEER IN CHIEF, PUBLIC WORK DEPARTMENT, DEHRADUN 0.9225 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Jan 2015
Stage-I Approval on : 21 Mar 2016
Compliance Report Submitted by User Agency on : 28 Jun 2017
22 Uttarakhand FP/UK/ROAD/12704/2015 1(613)/2015 under the declaration of honourable chief minister uttarakhand, in state sector, construction of new motor road name kimdhar shayn kishanpur of length 1.350 KM Road PUBLIC WORKS DEPARTMENT GOPESHWAR UTTARAKHAND 0.946 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 May 2015
Stage-I Approval on : 21 Mar 2016
Compliance Report Submitted by User Agency on : 02 Sep 2017
23 Uttarakhand FP/UK/ROAD/15889/2015 1(23)/2016 this road joining Villages chamini gair,chamini dhar& kunshyari almora distt in uttrakhnd Road PUBLIC WORK DEPARTMENT 0.72 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 08 Oct 2015
Stage-I Approval on : 08 Apr 2016
Compliance Report Submitted by User Agency on : 31 Jul 2017
24 Uttarakhand FP/UK/ROAD/6957/2014 1(164)/2015 Construction of Kharsi link km 5 to Indroli Kandhar motor road under PMGSY in Dehradun district Road EXECUTIVE ENGINEER 4.275 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 09 Sep 2014
Stage-I Approval on : 30 May 2015
Compliance Report Submitted by User Agency on : 29 Aug 2017
25 Uttarakhand FP/UK/ROAD/19179/2016 1(169)/2016 under state sector, construction of new motor road name rano kwinthi simkholi of length 3 K.M. (K.M 8 TO K.M 11) to village kwinthi. Road OFFICE OF THE EXECUTIVE ENGINEER CONSTRUCTION DIVISION PUBLIC WORKS DEPARTMENT POKHARI 1.77 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 01 May 2016
Stage-I Approval on : 13 Jun 2016
Compliance Report Submitted by User Agency on : 13 Feb 2018
26 Uttarakhand FP/UK/ROAD/15498/2015 01(186)/2016 Construction of Daulaghat to Gurna Motor Road in Someswer constituency,Distt Almora.Construction of Daulaghat to Gurna Motor Road is proposed as a extension of Koshi-Daulaghat motor road the sention lenth of proposed motor road is 4.00 km. The benifited village of this Road are. Gurana and Takoli Road EXECUTIVE ENGINEER 0.877 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Feb 2016
Stage-I Approval on : 22 Jul 2016
Compliance Report Submitted by User Agency on : 30 Aug 2017
27 Uttarakhand FP/UK/ROAD/18712/2016 1(277)/2016 Construction of Tikochi Bridge to Jhakuli Duchanu Kandasidhar Motor Road required to provide motorable road so tha villagers get facilitate and transport thier cash crops to market easily. Road PWD 4.9725 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 12 Apr 2016
Stage-I Approval on : 04 Aug 2016
Compliance Report Submitted by User Agency on : 28 Dec 2017
28 Uttarakhand FP/UK/ROAD/16276/2015 1(266)/2016 Improvement and construction of roads and road links brings multiple socio-economic benefits to the rural areas and results in forming a strong backbone for the agro-based economy. It will serve better connectivity in nearby villages. Road EECDPWDUKM 0.698 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 29 Oct 2015
Stage-I Approval on : 12 Aug 2016
Compliance Report Submitted by User Agency on : 08 May 2017
29 Uttarakhand FP/UK/ROAD/17937/2016 8B/UCP/06/141/2016 Ganiadoli Pali Naduli motor road Km 3 to Dholadhar motor road is sanction vide Uttarakhand Govt order no 4287/III(2)/15-06(CM.Ghosna)/2008 T.C. dated 18-05-2015. The length of the proposed road is 4.00 Km. The sanction cost of the project is Rs 140 Lacs. This road will provide road connectivity to M Road EXECUTIVE ENGINEER 0.405 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 10 Feb 2016
Stage-I Approval on : 23 Sep 2016
Compliance Report Submitted by User Agency on : 15 Jul 2017
30 Uttarakhand FP/UK/ROAD/17582/2016 1(244)/2016 For constuction of Motor Road Total Area of Forest Land proposed for diversion 0.794 Ha.and Non-Forest Land required for this Project is 1.382 Ha. Road PUBLIC WORK DEPARTMENT 0.794 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Jan 2016
Stage-I Approval on : 24 Oct 2016
Compliance Report Submitted by User Agency on : 18 Aug 2017
31 Uttarakhand FP/UK/Others/9605/2015 01(141)/2016 Construction of 30 M. Span Bridle Bridge on Bhonara-Pantoli Bridle Road at District Nainital Others PUBLIC WORKS DEPARTMENT 0.07 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 27 Jan 2015
Stage-I Approval on : 13 Dec 2016
Compliance Report Submitted by User Agency on : 15 Jun 2017
32 Uttarakhand FP/UK/ROAD/19725/2016 8B/UCP/06/173/2016 A new road of 2.50 Km length to connect village Baina from Dabour Ghatti via Saunkhal vide Uttarakhand Govt order No 1835/111(2)/ 15-03(CM Ghosna.)/2015 dated 19-03-2015. The cost of the road for phase I is Rs 23.03 Lac. This road will provide road connectivity to village Baina. Total Population of Road EXECUTIVE ENGINEER 2.16 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 06 Jun 2016
Stage-I Approval on : 29 Dec 2016
Compliance Report Submitted by User Agency on : 25 Nov 2017
33 Uttarakhand FP/UK/ROAD/17814/2016 1(185)/2016 The Proposed road is for providing the connectivity to the village Unana, Burkot and Roomdhar total population of these villages are 1551, total length is 4.00 km Road PWD 0.245 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 04 Feb 2016
Stage-I Approval on : 31 Mar 2017
Compliance Report Submitted by User Agency on : 14 Nov 2017
34 Uttarakhand FP/UK/ROAD/13810/2015 1(91)/2017 After Construction of this Motor Road It will join Dhura Village with population of 78. For development of this rural area this road will be Very Important. Road PUBLIC WORK DEPARTMENT 0.906 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 23 Sep 2015
Stage-I Approval on : 06 Jul 2017
Compliance Report Submitted by User Agency on : 28 Nov 2017
35 Uttarakhand FP/UK/ROAD/22233/2016 1 (26)/2017 This motor road is connecting village kunjethi,khetinadala, jaggibagwan,bedulaban and serving population of total 1273,these villages are not connected through any motor road yet.Villagers will benefited through many ways from this road,this roads is the only means of connectivity for these villages Road PMGSY 0.99 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 08 Nov 2016
Stage-I Approval on : 06 Jul 2017
Compliance Report Submitted by User Agency on : 02 Nov 2017
36 Uttarakhand FP/UK/ROAD/18621/2016 1(161)/2016 Under state sector construction of 'Virajkunj to Nauli-Hadkoti ' motor road of length 0.225 km in district chamoli. Road TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR 0.187 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 21 Mar 2016
Stage-I Approval on : 06 Jul 2017
Compliance Report Submitted by User Agency on : 27 Nov 2017
37 Uttarakhand FP/UK/ROAD/19669/2016 1(41)/2017 Diversion of Forest Land for Project of 2-lane with Paved shoulder including protection work from Km 329.540 to km 330.240 in villages Ufalda and Fatehpur Reti on NH-58 in Uttarakhand State. Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS 0.6615 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 May 2016
Stage-I Approval on : 11 Jul 2017
Compliance Report Submitted by User Agency on : 23 Dec 2017
38 Uttarakhand FP/UK/Others/21571/2016 1(28)/2017 The main objective of acquiring the required forest land is to establish Government Polytechnic Pokhari Chamoli for providing opportunities to impart technical education to the youth of far flung areas of Pokhari tehsil of District Chamoli. Others GOVERNMENT POLYTECHNIC POKHARI 0.964 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 07 Oct 2016
Stage-I Approval on : 20 Jul 2011
Compliance Report Submitted by User Agency on : 13 Mar 2018
39 Uttarakhand FP/UK/IRRIG/21089/2016 8B/UCP/02/247/2016/FC CONSTRUCTION OF WEIR IN AEERI GADHERA BLOCK HAWALBAGH OF ALMORA DISTRICT ,TOTAL LAND REQUIRED FOR THIS PROJECT 0.09 HECT.THIS PROJECT IS LOCATED AT RESERVE FOREST LAND. Irrigation Irrigation Department 0.09 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 23 Aug 2016
Stage-I Approval on : 27 Jul 2017
Compliance Report Submitted by User Agency on : 17 Apr 2018
40 Uttarakhand FP/UK/ROAD/13260/2015 8B/UCP/06/185/2015/FC MOTOR ROAD FOR CONNECTING VILLAGES UTTHIND AND PELLING IN RUDRAPRAYAG DISTRICT.ROAD STARTS AT VILLAGE UTHIND AND GOES UPTO PELING.IT PASSES THROUGH PRIVATE LAND AND FOREST LAND.TOTAL 1300 PEOPLE WILL BE BENEFITED FROM THIS ROAD IN FARMING AND AGRICULTURE WORKS. Road PMGSY 0.63 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 16 Jun 2015
Stage-I Approval on : 02 Aug 2017
Compliance Report Submitted by User Agency on : 25 Oct 2017
41 Uttarakhand FP/UK/ROAD/9773/2015 1(29/2015 The road is for providing connectivity to the village Vijaypur with a population of 263 numbers under PMGSY scheme. The proposed road is located in Block-Tharali of District Chamoli in Uttrakhand. The proposed length of the road is 10.00 km. Road RES PMGSY KARANPERAYAG 3.71 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Jan 2015
Stage-I Approval on : 20 Mar 2015
Compliance Report Submitted by User Agency on : 19 Aug 2017
42 Uttarakhand FP/UK/ROAD/10267/2015 1(56)/15 The road is required for providing connectivity to Village - Main situated in Block-Tharali of District Chamoli with a population of 355 numbers. The total length of the road is 4.50 km. Road RES PMGSY KARANPERAYAG 2.692 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 Feb 2015
Stage-I Approval on : 30 Mar 2015
Compliance Report Submitted by User Agency on : 19 Aug 2017
43 Uttarakhand FP/UK/ROAD/8970/2014 1(59)/15 Road Construction Road PMGSY 0.991 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 31 Dec 2014
Stage-I Approval on : 01 Apr 2015
Compliance Report Submitted by User Agency on : 08 Sep 2017
44 Uttarakhand FP/UK/ROAD/9684/2015 1(113)/15 The road is for providing connectivity to 12 villages with a total population of 3249 situated in Tehsil Tharali of District Chamoli. The total length of the road is 31.25km, however forest land is required for 11.72km only as clearance for the remaining length has already been obtained. Road RES PMGSY KARANPERAYAG 4.756 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Jan 2015
Stage-I Approval on : 21 Apr 2015
Compliance Report Submitted by User Agency on : 08 Aug 2017
45 Uttarakhand FP/UK/ROAD/8078/2014 1(123)/15 A total of 1.505 hectare of land needs to be diverted for construction of Giwar to Peb Motor Road under PMGSY in Phase-XII. The road is necessary for providing connectivity to the village -Peb with a population of 350. The total length of the road is 4.74 km Road RES PMGSY KARANPERAYAG 1.505 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 14 Dec 2014
Stage-I Approval on : 02 May 2015
Compliance Report Submitted by User Agency on : 09 Feb 2018
46 Uttarakhand FP/UK/ROAD/7325/2014 1(227)/2015 Construction of kathang solang to Jhitad motor road under PMGSY scheme. Its length is 3.675 km Road EXECUTIVE ENGINEER 0.9716 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 24 Sep 2014
Stage-I Approval on : 01 Jul 2015
Compliance Report Submitted by User Agency on : 17 Oct 2016
47 Uttarakhand FP/UK/ROAD/10529/2015 1(301)/2015 Connecting of 250+ habitation to Motor Road Under PMGSY. Road PUBLIC WORKS DEPARTMENT 0.9 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 28 Feb 2015
Stage-I Approval on : 09 Jul 2015
Compliance Report Submitted by User Agency on : 09 Jun 2017
48 Uttarakhand FP/UK/ROAD/11635/2015 1(333)/2015 This Road is proposed to connect the unconnected habitation such as Talla Tajpur-236, Malla tajpur-283 and Sungari-486 Yet not connected. Road PMGSY 3.87 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 13 Apr 2015
Stage-I Approval on : 29 Jul 2015
Compliance Report Submitted by User Agency on : 02 Jun 2017
49 Uttarakhand FP/UK/Others/13386/2015 1(391)/2015 70 mtr span suspension bridle bridge over Nandakini river at Jokhana lagga Bura Bridle road was washed out last disaster, due to this the villagers facing difficulty to reach their destination. Others PUBLIC WORK DEPARTMENT 0.212 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 20 Jun 2015
Stage-I Approval on : 06 Aug 2015
Compliance Report Submitted by User Agency on : 01 Jan 2018
50 Uttarakhand FP/UK/ROAD/8637/2014 1(428)/2015 This road will connect Simkhet, ReethaBaman & Maigari state Road EXICUTIVE ENGINEER 3.839 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 18 Dec 2014
Stage-I Approval on : 13 Aug 2015
Compliance Report Submitted by User Agency on : 01 Sep 2017
12