Ministry of Environment,Forest and Climate Change
Government of India
Uttar Pradesh
State Forest Department
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Uttar Pradesh FP/UP/Approach/42718/2019 8B/UP/06/122/2020 Proposed BPCL Retail Outlet on Meerut-Baghpat-Sonipath Road(SH-14) in Km.53(Ch.52.500) at Khasra No.586&589 Village:Malyana, District:Meerut Approach Access BHARAT PETROLEUM CORPORATION LIMITED TERRITORY MEERUT 0.055911 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2019
Stage-I Approval on : 13 Jan 2021
Compliance Report Submitted by User Agency on : 23 Feb 2021
08 Mar 2021
2 Uttar Pradesh FP/UP/Approach/142965/2021 8B/UP/06/260/2021/FC Diversion of PF land for construction of Approach Road to Pro. NRO of IOCL on NH-34, CH.175.523RHS, KH. 128/7/2, vill-BIlar, Teh-Sikandra Rao,Hathras,( UP) Approach Access INDIAN OIL CORPORATION LTD (MARKETING DIVISION) 0.120246 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2021
Stage-I Approval on : 28 Dec 2021
Compliance Report Submitted by User Agency on : 28 Jul 2022
31 Aug 2022
3 Uttar Pradesh FP/UP/ROAD/19772/2016 P-142/14-2-2016-800(138)/2016 Proposed Reserve Forest Land for Strengthening & Widening of Kokilavan Road (Total KM 1.993km) in Mathura City Road PRO DIVISION P W D MATHURA 0.9537 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2016
Stage-I Approval on : 14 Oct 2016
Compliance Report Submitted by User Agency on : 17 Sep 2020
12 Oct 2020
4 Uttar Pradesh FP/UP/Approach/48107/2020 8B/UP/06/123/2020 Proposed IOCL Retail Outlet on Banda-Baberu-Rajapur Road(SH-92),in Km.2.00(Ch.1.470-1.500) at Gata No.708, Village:Palhari,District:Banda Approach Access IOCL MARKETING DIVISION ALLAHABAD 0.065348 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 12 Oct 2020
Compliance Report Submitted by User Agency on : 23 Nov 2020
11 Dec 2020
5 Uttar Pradesh FP/UP/ROAD/47893/2020 8B/UP/06/128/2020 “Widening and strengthening work of Vrindavan Chhatikara Radhakund Road (ODR) in District Mathura (U.P)” (Chainage 6.000 to 20.100 KM & Chainage 21.000 to 21.400 KM) (LENGTH-14.500K.M.)' Road PRO DIVISION P W D MATHURA 3.1746 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 24 Nov 2020
Compliance Report Submitted by User Agency on : 05 Jan 2021
27 Jan 2021
6 Uttar Pradesh FP/UP/Others/41410/2019 8B/UP/06/93/2019/FC Protected Forest Land Proposed to be diverted for Exit/Entry of proposed new IOCL Retail Outlet on Lucknow-Faizabad Road(NH-28) New NH-27, In Km.70(Ch.69.562), In Khasra No.1692&1693,Village:Asrafpur Gangrela,District:Ayodhya(Faizabad) Others IOCL GORAKHPUR DIVISIONAL OFFICE 0.151236 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2019
Stage-I Approval on : 25 Oct 2019
Compliance Report Submitted by User Agency on : 11 May 2020
06 Jul 2020
7 Uttar Pradesh FP/UP/RAIL/44309/2020 8B/UP/07/93/2021/FC Protected forest land to be diverted for Doubling of Existing Railway Track from (Km No.- 1.000 to 125.000) Bhatni – Aunrihar Railway line in Forest Division -Deoria (From Km. 1.000 to 28.226), Forest Division - Ballia (Km. 28.226 to 52.952 in Ballia district), Forest Division - Mau (Km. 52. 952 to 81.874 in Mau district) and Forest Division - Ghaz Railway RAIL VIKAS NIGAM LIMITED 162.8776 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2020
Stage-I Approval on : 02 Dec 2021
Compliance Report Submitted by User Agency on : 28 Mar 2022
04 May 2022
8 Uttar Pradesh FP/UP/Others/31584/2018 8B/UP/09/40/2019/FC LAYING OF GAS PIPE LINE IN 7300 MTR. LENGTH FROM MAHAVIR DHABA TO BHAGWAN FILLING STATION ON LHS OF AGRA-KANPUR ROAD (NH-2) FROM KM. 206.757 TO 213.960 BY GREEN GAS LIMITED, AGRA.(U.P.) Others GREEN GAS LIMITED AGRA 0.584 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2018
Stage-I Approval on : 21 Aug 2019
Compliance Report Submitted by User Agency on : 10 Jun 2020
01 Oct 2020
9 Uttar Pradesh FP/UP/Others/31597/2018 P-37/14-2-2019-800(53)/2019 Protected Forest Land proposed to be diverted for exit/entry Approach of Reliance Industries Limited, on (SH-14) Garh-Meerut-Bagpat-Sonipat Road in KM.53(Ch.52.540),Khasra No.103 &104 Village: Maliyana,District:Meerut Others MS RELIANCE INDUSTRIES LIMITED 0.079198 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2018
Stage-I Approval on : 04 Jun 2019
Compliance Report Submitted by User Agency on : 05 Nov 2019
03 Dec 2019
10 Uttar Pradesh FP/UP/Approach/43673/2019 8B/UP/06/54/2020/FC PROTECTED FOREST LAND TO BE DIVERTED FOR ENTRY/EXIT OF BPCL RETAIL OUTTET ON DATMAU - UNCHAHAR ROAD (SH-38), Near KM. NO. 181 (CH. NO. 180+935.90 LHS), AT KHASRA NO - 378, VILLAGE:- ALIPUR CHAKRAI, DISTRICT:RAIBARELI Approach Access BPCL TERRITORY LUCKNOW 0.08103 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2019
Stage-I Approval on : 10 Jul 2020
Compliance Report Submitted by User Agency on : 07 Aug 2020
27 Aug 2020
11 Uttar Pradesh FP/UP/Approach/48634/2020 8B/UP/06/83/2021 Protected Forest Land Proposed Exit/Entry Approach to BPCL Retail Outlet on Sikandrabad-Bulandshahr(Abadi Bhag) Road(ODR) In Km.5(Ch.4.800),At Gata No.1233,Village:Sikandrabad Dehat.Tehsil:Sikandrabad District:Bulandshahr Approach Access BHARAT PETROLEUM CORPORATION LIMITED TERRITORY MEERUT 0.053692 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2020
Stage-I Approval on : 26 Mar 2021
Compliance Report Submitted by User Agency on : 16 Jun 2021
02 Jul 2021
12 Uttar Pradesh FP/UP/Approach/49274/2020 8B/UP/06/124/2020 Proposed HPCL Retail Outlet on Fatehpur-Lalganj Road NH-335(Old NH-232),In Km.81(Ch.80.135), At Khasra No.204,Village:Saripur Bera,Tehsil:Fatehpur,Dist:Fatehpur Approach Access Hindustan Petroleum Corporation Limited 0.1903 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2020
Stage-I Approval on : 13 Jan 2021
Compliance Report Submitted by User Agency on : 30 Jan 2021
11 Feb 2021
13 Uttar Pradesh FP/UP/Approach/49282/2020 8B/UP/06/186/2021/FC Protected Forest Land For Exit/Entry Approach to Proposed BPCL Retail Outlet on Nahatpur-Noorpur-Amroha-Joya Road(SH-77), In Km.53(CH.52.421),At Khasra No.2958/1,2 Tehsil:Amroha,District:Amroha Approach Access BHARAT PETROLEUM CORPORATION LIMITED TERRITORY MEERUT 0.037025 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2020
Stage-I Approval on : 17 Nov 2021
Compliance Report Submitted by User Agency on : 12 Feb 2022
21 Mar 2022
14 Uttar Pradesh FP/UP/TRANS/41685/2019 8B/UP/04/62/2020/FC Forest Land Proposed to be diverted for construction 765 kV S/C Agra-Greater Noida Transmission Line passing through Reserve Forest land in Firozabad & Agra Districts and Protected Forest land in Cros Transmission Line GHATAMPUR TRANSMISSION LIMITED 4.3024 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2019
Stage-I Approval on : 30 Jun 2020
Compliance Report Submitted by User Agency on : 05 Jul 2022
16 Aug 2022
15 Uttar Pradesh FP/UP/Approach/147884/2021 8B/UP/06/255/2021/FC Proposed BPCL retail outlet on Etah-Kaimganj-Farrukhabad Road (SH-121) (City Part) in Km No. 100(730) (RHS) at Khasra No.-659, 660Ka & 666Kha, Village:-Kharbandi Bhikhampur, Tehsil:-Farrukhabad, District:Farrukhabad Approach Access BHARAT PETROLEUM CORPORATION LIMITED 0.059033 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 07 Dec 2021
Compliance Report Submitted by User Agency on : 24 Dec 2021
20 Jan 2022
16 Uttar Pradesh FP/UP/Approach/50244/2020 8B/UP/06/135/2020 PROPOSAL FOR THE DIVERSION OF ROAD SIDE PROTECTED FOREST LAND (0.179032)HAC.) ON AGRA-BHARATPUR ROAD NH-11(NEW NH-21), KM 42 (CH 41.293), KHASRA NO. 651, VILL - CHAUMA SHAHPUR , TEHSEEL KIRAOLI,DIST- AGRA ,FOR THE CONSTRUCTION OF APPROACH ROAD TO PROPOSED RELIANCE BP MOBILITY FUEL STATION RO /PETROL PUMP Approach Access RELIANCE BP MOBILITY LIMITED 0.1790312 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2020
Stage-I Approval on : 19 Oct 2020
Compliance Report Submitted by User Agency on : 29 Oct 2020
03 Nov 2020
17 Uttar Pradesh FP/UP/Others/42191/2019 8B/UP/06/32/2021 Protected Forest Land to be diverted for entryIexit to BPGL Retail Outlet on Bani - Mohanlalganj Road (MDR- 89C), ln KM Stone No. 4.00 , At Khasra No.268, Village: Dhawapur, Tehsil: Sarojini Nagar, Dist:Lucknow Others BPCL TERRITORY LUCKNOW 0.044014 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2019
Stage-I Approval on : 19 Jul 2021
Compliance Report Submitted by User Agency on : 08 Sep 2021
11 Oct 2021
18 Uttar Pradesh FP/UP/Others/42005/2019 8B/UP/06/130/2020 Proposed Protected Forest Land to be diverted for Entry/Exit of BPCL Retail Outlet on Basti - Dumariyagani Road (SH-26),in KM. Stone No. 397, at Khasra No - 77, 78ka, 79, 80 & 81, Village:- Malpurva, Dist:Basti Others BHARAT PETROLEUM CORPORATION LIMITED 0.075028 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2019
Stage-I Approval on : 21 Oct 2020
Compliance Report Submitted by User Agency on : 01 Jan 2021
15 Jan 2021
19 Uttar Pradesh FP/UP/Others/42318/2019 8B/UP/06/24/2020/FC Proposed IOCL Retail Outlet by Divisional Office IOCL Allahabad on Pratapgarh-Faizabad Road NH-330(Old NH-960 in Km.59(Ch.58.793) at Khasra No.2,Village: Karista,District:Pratapgarh Others IOCL MARKETING DIVISION ALLAHABAD 0.821468 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2019
Stage-I Approval on : 10 Jun 2020
Compliance Report Submitted by User Agency on : 18 Aug 2020
09 Sep 2020
20 Uttar Pradesh FP/UP/Others/21657/2016 8B/UP/06/22/2020/FC Ex-Post Facto Proposal Diversion of 0.097035 Ha. Forest Land for approach road to ""International City"" developed by Competent Builders & Developers at Vill Nariyawal on Bareilly - Shahjahanpur Road Km Stone No 244-245 NH-24 District Bareilly Others COMPETENT BUILDERS AND DEVELOPERS 0.097035 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2016
Stage-I Approval on : 09 Mar 2020
Compliance Report Submitted by User Agency on : 08 Jul 2020
07 Sep 2020
21 Uttar Pradesh FP/UP/Pipeline/52656/2020 8B/UP/08/234/2021/FC Protected Forest Land Proposed to be diverted for Laying of Gas Pipeline along Lucknow-Sultanpur Road NH-56(New NH-731) from Ch.64.00 to 77.420 in District:Amethi Pipeline TORRENT GAS PRIVATE LIMITED 0.6689 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2020
Stage-I Approval on : 24 Nov 2021
Compliance Report Submitted by User Agency on : 12 Jan 2022
17 Mar 2022
22 Uttar Pradesh FP/UP/Approach/52607/2020 8B/UP/06/42/2021/FC Proposed BPCL Retail Outlet on Bahraich-Sitapur Road(SH-30B) In Km.78(Ch 77.022 to 77.057) at Khasra No.1447,Village:Govardhanpur,Tehsil:Biswan,District:Sitapur Approach Access BHARAT PETROLEUM CORPORATION LIMITED 0.210572 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2020
Stage-I Approval on : 12 Mar 2021
Compliance Report Submitted by User Agency on : 07 Jun 2021
06 Jul 2021
23 Uttar Pradesh FP/UP/Approach/42689/2019 8B/UP/06/25/2020/FC PROPOSAL FOR THE DIVERSION OF ROAD SIDE PROTECTED FOREST LAND (0.03678 HAC.) ON MATHURA -SADABAD MAARG MDR 102, KM 11 (CH. 10.735), KHASRA NO. 177, VILLAGE - MUBARAKPUR BANGER, TEHSEEL MAHAVAN, DIST- MATHURA FOR THE CONSTRUCTION OF APPROACH ROAD TO PROPOSED BPCL NRO. Approach Access BHARAT PETROLEUM CORPORATION LIMITED 0.03678 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2019
Stage-I Approval on : 18 Mar 2020
Compliance Report Submitted by User Agency on : 03 Jun 2020
22 Jul 2020
24 Uttar Pradesh FP/UP/RAIL/43121/2019 8B/UP/07/162/2020/FC Protected Forest Proposed for Proposed Railway Track Doubling from Km.847.170 to 868.00 in Jaunpur District, From km.868.00 to 924.00 and From Km.924.00 to 934.450 in Amethi District Under Janghai-Pratapgarh-Amethi Railway Track Doubling Project Railway CONSTRUCTION-V NORTHEN RAILWAY LUCKNOW 47.3031 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2019
Stage-I Approval on : 05 Apr 2021
Compliance Report Submitted by User Agency on : 15 Jul 2021
13 Sep 2021
25 Uttar Pradesh FP/UP/ROAD/37343/2018 8B/UP/06/78/2019/FC Four laning of Panipat ( Start from junction with Existing Km of NH-44 at Panipat) -to Shamli (End at its junction with Existing 39+300 of SH- 12) of NH-709AD in the State of Uttar Pradesh Road NHAI BAGHPAT 19.80775 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 30 Jan 2020
Compliance Report Submitted by User Agency on : 22 Jan 2021
18 Feb 2021
26 Uttar Pradesh FP/UP/ROAD/37286/2018 8B/UP/06/88/2019/FC Four laning of Bijnor ( Part of NH-119) -Kotwali ( End of NH-74) of NH- 709AD in the State of Uttar Pradesh Package-IV (km 111.680 to km 133.300) Road NHAI BAGHPAT 21.286 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 30 Jan 2020
Compliance Report Submitted by User Agency on : 20 Jul 2020
09 Sep 2020
27 Uttar Pradesh FP/UP/ROAD/37341/2018 8B/UP/06/84/2019/FC Four laning of Muzaffarnagar ( Start from existing Km 5+140 of SH 12A)) -to Miranpur (End on existing Km of 60+000 of NH-34) of NH-709AD in the State of Uttar Pradesh Pkg-3-III (km 82.840 to km 110.001) Road NHAI BAGHPAT 31.5323 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 30 Jan 2020
Compliance Report Submitted by User Agency on : 12 Jan 2021
11 Feb 2021
28 Uttar Pradesh FP/UP/RAIL/10849/2015 8B/UP/07/92/2016/FC Eastern Dedicated Freight corridor Project Railway DEDICATED FREIGHT CORRIDOR CORPORATION INDIA LIMITED 0.7957 Pending at Nodal Officer after receiving Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Mar 2015
Stage-I Approval on : 21 Mar 2017
Compliance Report Submitted by User Agency on : 04 Jan 2020
29 Uttar Pradesh FP/UP/ROAD/144211/2021 8B/UP/06/243/2021/FC Proposed protected forest land to be diverted for construction of Flyover/Viaduct at Entry/Exit of the Loop of Expressway on Prayagraj-Ayodhya Road NH-330 crossing Km. No. 121+870 of Purvanchal Expressway operated by UPEIDA in Forest Division & District:Sultanpur Road UTTAR PRADESH EXPRESSWAYS INDUSTRIAL DEVELOPMENT AUTHORITY (UPEIDA) 4.8 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jun 2021
Stage-I Approval on : 07 Jan 2022
Compliance Report Submitted by User Agency on : 24 Mar 2022
13 Apr 2022
30 Uttar Pradesh FP/UP/Approach/46930/2020 8B/UP/06/159/2020 Proposal for diversion of protected forest land to construct the approach road to proposed Retail AT KM. CHAINAGE 38.790, RHS, Vill- Naugawana, Tehsil- Sadabad, Distt- Hathras Approach Access BHARAT PETROLEUM CORPORATION LIMITED MATHURA 0.0590172 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jun 2020
Stage-I Approval on : 04 Dec 2020
Compliance Report Submitted by User Agency on : 14 Jun 2021
13 Aug 2021
31 Uttar Pradesh FP/UP/Approach/46630/2020 8B/UP/06/116/2020 Proposed BPCL Retail Outlet on Shivrajpur-Bindki-Lalauli Road(MDR-15) in Km.28(Ch.27.925) at Khara No.48&49 Village:Katra Naraicha,Tehsil:Bindki,Dist:Fatehpur Approach Access BHARAT PETROLEUM CORPORATION LIMITED TERRITORY KANPUR 0.20264 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jun 2020
Stage-I Approval on : 07 Oct 2020
Compliance Report Submitted by User Agency on : 21 Oct 2020
09 Nov 2020
32 Uttar Pradesh FP/UP/WATER/145479/2021 8B/UP/08/266/2021/FC Proposed Laying of Water Distribution Line Along Banda-Baberu Road, Banda-Chilla Road, Banda-Atarra Road, Banda-Naraini Road, Banda-Oran Road, Palara-Pailani Road, Banda-Tindwari Road, Piparhi Mode to Amlore Mode, Under Amlikaur Village ,in Banda District Drinking Water STATE WATER & SANITATION MISSION LUCKNOW (UP) 10.555675 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jul 2021
Stage-I Approval on : 02 May 2022
Compliance Report Submitted by User Agency on : 28 Jun 2022
13 Jul 2022
33 Uttar Pradesh FP/UP/Others/44262/2020 8B/UP/06/178/2020 Construction of Entry &Exit for New Iocl Retail Outlet and protected land is required to be diverted (FCA Act 1980 for Non forestry purpose) Along Rampur –Kemri (District O.D.R. N0-20) Road km.4 Chainage 3.808 (LHS) Site Situated at Village Bhamravva Gata No.31 Tehsil Sadar District Rampur (U.P.). Others INDIAN OIL CORPORATION LIMITED BAREILLY 0.052 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jan 2020
Stage-I Approval on : 20 Jan 2021
Compliance Report Submitted by User Agency on : 05 Mar 2021
12 Jul 2021
34 Uttar Pradesh FP/UP/Approach/118062/2020 8B/UP/06/53/2021 0.2024 Ha. (P.F. land) Forest land proposed to be diverted for approach to BPCL Retail Outlet on Muzaffarnagar-Saharanpur road (Km. chainage 13.200, LHS) within 3 Km. of Rohana Khurd Toll Barrier, Kha Approach Access BPCL KUM 0.2024 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Dec 2020
Stage-I Approval on : 10 Jul 2021
Compliance Report Submitted by User Agency on : 11 Aug 2021
02 Sep 2021
35 Uttar Pradesh FP/UP/RAIL/43640/2019 8B/UP/07/181/2020/FC Proposed Protected forest land to bediverted for Doubling of Railway Track from (Km No.- 823.530 to 906.780) Zafrabad to Akbarpur Railway line ( Km. 823.250 to 874.355 ) in Jaunpur district), ( Km. 874.355 to 884.545 ) in Sultanpur district) and ( Km. 884.545 to 906.780 ) in Ambedkar Nagar distric Railway CONSTRUCTION II NORTHERN RAILWAY LUCKNOW 57.2948 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Dec 2019
Stage-I Approval on : 05 Apr 2021
Compliance Report Submitted by User Agency on : 01 Jul 2021
30 Jul 2021
36 Uttar Pradesh FP/UP/Pipeline/141900/2021 8B/UP/09/45/2022/FC Proposed Forest Land to be diverted for Laying of Gas Pipe Line along Bareilly to Moradabad Road, NH-24 (Ch. 22.7 to 60.5 and PWD Road 0.0 km to 5.95 Km) for approx 43.75 KM in Distt- Rampur UP Pipeline Hindustan Petroleum Corporation Limited 2.4062 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 30 Apr 2021
Stage-I Approval on : 21 Apr 2022
Compliance Report Submitted by User Agency on : 02 Sep 2022
37 Uttar Pradesh FP/UP/Others/33389/2018 P-106/14-2-2018-800(97)/2018 Protected Forest Land Proposed to be diverted for Exit/Entry Approach to IOCL Retail Outlet on Allahabad-Gorakhpur Road SH-7(Allahabad-Murga Badshapur Road) in KM.45 Gata No.2638 Village:Mathiya-Bhikhpur, District:Jaunpur Others INDIAN OIL CORPORATION LTD VARANASI 0.075518 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Apr 2018
Stage-I Approval on : 13 Jul 2018
Compliance Report Submitted by User Agency on : 03 Mar 2022
28 Apr 2022
38 Uttar Pradesh FP/UP/Approach/148905/2021 8B/UP/06/80/2022/FC Proposed IOCL Retail Outlet on Sultanpur-Ayodhya Road NH-330 (Old NH-96) In Km No. 138 (CH. No.-137.585, LHS) At Khasra No. – 241, Village: - Khanpur Masaudha, Tehsil: - Sohawal, District: - Ayodhya Approach Access IOCL GORAKHPUR DIVISIONAL OFFICE 0.069778 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 29 Oct 2021
Stage-I Approval on : 03 Sep 2022
Compliance Report Submitted by User Agency on : 28 Sep 2022
39 Uttar Pradesh FP/UP/Others/51244/2020 8B/UP/06/70/2021/FC Proposed IOCL Retail Outlet on Bani-Mohanlalganj-Gosaiganj(MRD-89C)Road in Km.10(Ch 9.829 to 9.861) at Gata No-1480, Kisan Sewa Kendra at Village-Jaitikhera on Mohanlalganj-Junabganj Road, Tehsil-Sarojninagar, District-Lucknow Others INDIAN OIL CORPORATION LIMITED, LUCKNOW DIVISIONAL OFFICE 0.060558 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Oct 2020
Stage-I Approval on : 19 Mar 2021
Compliance Report Submitted by User Agency on : 03 Jun 2021
21 Jun 2021
40 Uttar Pradesh FP/UP/ROAD/30342/2017 8B/UP/06/276/2021/FC Development of service road along the underpass between chainage 276+420 to 277+320 of Bareilly-Sitapur Section, NH-24 in District-Bareilly (U.P.) by N.H.A.I. PIU-Bareilly Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU BAREILLY 1.08 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Nov 2017
Stage-I Approval on : 07 Feb 2022
Compliance Report Submitted by User Agency on : 21 Mar 2022
30 Apr 2022
41 Uttar Pradesh FP/UP/Approach/45603/2020 8B/UP/06/155/2020 Protected Forest Land Proposed For Exit/Entry Approach to BPCL Retail Outlet on Phrenda-Jarwal Road(Gonda-Barabanki) SH-1A, in Km.288, at Gat No.8SA, Village:Pachmari,District:Gonda Approach Access BPCL TERRITORY LUCKNOW 0.053153 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 May 2020
Stage-I Approval on : 14 Dec 2020
Compliance Report Submitted by User Agency on : 25 Feb 2021
10 Mar 2021
42 Uttar Pradesh FP/UP/Others/33894/2018 8B/UP/06/72/2019/FC Protected Forest Land Proposed to be diverted for Exit/Entry Appraoch to IOCL Retail out Let on Ghazipur-Ballia Road NH-31(Old-NH-19) in KM.419(Ch.418.755) Khasra No.85,Village:Ahmad Patti,District:Ghazipur Others INDIAN OIL CORPORATION LTD VARANASI 0.166743 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 May 2018
Stage-I Approval on : 09 Sep 2019
Compliance Report Submitted by User Agency on : 04 Nov 2019
29 Nov 2019
43 Uttar Pradesh FP/UP/Others/39621/2019 8B/UP/06/16/2020 Protected Forest Land Proposed to be diverted for Exit/Entry to IOCL Retail Outle(Kisan Seva Kendra)t on Sindhauli-Mahmudabad Road(MDR-32C),In KM.19(Ch.18.850-18.870) at Village:Behma,Gata No.91,District:Sitapur Others Indian Oil Corporation Limited 0.036868 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Mar 2019
Stage-I Approval on : 04 Aug 2020
Compliance Report Submitted by User Agency on : 17 Jan 2022
04 Feb 2022
44 Uttar Pradesh FP/UP/ROAD/32853/2018 8B/UP/06/54/2018/FC Rehabilitation and Up-gradation of Faizabad-Allahabad Road (Section of NH 96) from km. 148.600 to 149.400 (Teliyarganj Chungi to MNNIT Gate, total length 800 meter) in district Allahabad, Uttar Pradesh. Road OFFICE OF THE EXECUTIVE ENGINEER 0.708 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Mar 2018
Stage-I Approval on : 21 Jun 2018
Compliance Report Submitted by User Agency on : 03 Feb 2021
12 Sep 2018
45 Uttar Pradesh FP/UP/Approach/144149/2021 8B/UP/06/264/2021/FC Diversion of PF for construction of Access road to Retail Outlet of M/S HPCL Ltd, at Vill- Sikandra Rao Dehat, Khasra No.- 1908, 1909,1910 1911 sa in Ch.186.015 LHS of NH-530 B Approach Access Hindustan Petroleum Corporation Limited 0.139071 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jun 2021
Stage-I Approval on : 14 Jan 2022
Compliance Report Submitted by User Agency on : 28 Jul 2022
30 Aug 2022
46 Uttar Pradesh FP/UP/Approach/46773/2020 8B/UP/06/56/2021/FC Establishment of IOCL Retail Outlet on Jalalabad-Dhaighat Road(Jariyanpur-Samsabad Road) ODR In Km.15.0(Ch.14.499 to 14.534) at Gata No.2453,2953 and 2954, Village:Prithvipur Dhai.District:Shahjahanpur Approach Access INDIAN OIL COPERATION LIMITED 0.059033 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jun 2020
Stage-I Approval on : 09 Mar 2021
Compliance Report Submitted by User Agency on : 09 Jun 2021
28 Jun 2021
47 Uttar Pradesh FP/UP/Others/46912/2020 8B/UP/06/103/2020/FC protected forest land proposed for IOCL retail outlate on Etawah-Mainpuri Road (SH-83)in Khasra no 386mi in village Lachwai, Tehsil Saifai, District Etawah Others INDIAN OIL 0.1997 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jun 2020
Stage-I Approval on : 10 Sep 2020
Compliance Report Submitted by User Agency on : 05 Nov 2020
01 Dec 2020
48 Uttar Pradesh FP/UP/RAIL/26757/2017 8B/UP/07/73/2018/FC METRO RAIL PROJECT LUCKNOW Railway LUCKNOW METRO RAIL CORPORATION LIMITED 0.05595 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 29 Jun 2017
Stage-I Approval on : 04 Oct 2018
Compliance Report Submitted by User Agency on : 20 Sep 2022
49 Uttar Pradesh FP/UP/Pipeline/145423/2021 8B/UP/08/267/2021/FC construction of Etawah sewerage scheme ( treated eflluent pipeline & rising Main pipe line) under namami Gange Programme at Mauza Padraya and Umrain, Chainage km 0.000 to km 01.768, Tehsil& Distt- Etawah Pipeline YAMUNA POLLUTION CONTROL UNIT I UP JAL NIGAM AGRA 0.0349 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jul 2021
Stage-I Approval on : 20 Jan 2022
Compliance Report Submitted by User Agency on : 12 Feb 2022
01 Apr 2022
50 Uttar Pradesh FP/UP/Others/41380/2019 P-126/81-2-2019-800(149)/2019 Protected Forest Land Proposed to be Diverted for Exit/Entry of Proposed New My Own Eco Energy Retail Outlet(Bio-Diesel) on Chilla-Banda Road(SH-13) in Km.313-314(Ch.313.730),Khasra No.1304,Village:Mawai Buzurg,Dist:Banda Others MY WON ECO ENERGY PRIVATE LIMITED 0.099518 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jul 2019
Stage-I Approval on : 27 Dec 2019
Compliance Report Submitted by User Agency on : 23 Jun 2020
09 Sep 2020