Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Punjab FP/PB/ROAD/30001/2017 9-PBB384-2018-CHA Moonlight Tools Pvt. Ltd. Road MOONLIGHT TOOLS PVT. LTD. 0.03291 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2017
Stage-I Approval on : 12 Sep 2018
Compliance Report Submitted by User Agency on : 21 Dec 2018
05 Jan 2019
2 Punjab FP/PB/ROAD/29992/2017 9-PBB353-2021-CHA Approach road to M/s N.R. Plywood Pvt Ltd Road N R PLYWOOD PVT LTD 0.0013 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2017
Stage-I Approval on : 02 Aug 2021
Compliance Report Submitted by User Agency on : 08 Mar 2022
08 Apr 2022
3 Punjab FP/PB/TRANS/16328/2015 fca/1980/344/2016 Replacement of 66 KV line from 220 KV G/S/S Bajakhana to 66 KV G/S/S Bargari SC ON DC Tower line Transmission Line ADDL S E TL DIV PSPCL PATIALA 0.105336 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2015
Stage-I Approval on : 05 Apr 2017
Compliance Report Submitted by User Agency on : 02 Feb 2018
29 Jan 2018
4 Punjab FP/PB/RAIL/7749/2014 9-PBC325-2015-CHA DOUBLING OF RAILWAY TRACK FROM DHAPPAR TO CHANDIGARH Railway NORTHERN RAILWAY 14.4203 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2014
Stage-I Approval on : 15 Apr 2015
Compliance Report Submitted by User Agency on : 11 Dec 2017
15 Oct 2015
5 Punjab FP/PB/ROAD/142922/2021 9-PBC479-2021-CHA 4-LANING OF LAMA PIND CHOWK TO JANDU SINGHA ROAD Road EXECUTIVE ENGINEER, PROVINCIAL DIVISION, PWD B&R JALANDHAR CANTT 5.194 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2021
Stage-I Approval on : 17 Dec 2021
Compliance Report Submitted by User Agency on : 11 Apr 2022
29 Apr 2022
6 Punjab FP/PB/Approach/45534/2020 FOREST-FCA0FC1F/16/2020-FCA Retail outlet of M/s Indian Oil Corporation Ltd at village Chak Kande Shah on Ferozepur-Fazilka road SH 20 km stone 29 & 31 Left Side Distt Ferozepur under Forest Division Ferozepur Approach Access INDIAN OIL CORPORATION LTD BATHINDA 0.08124 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2020
Stage-I Approval on : 28 Oct 2020
Compliance Report Submitted by User Agency on : 12 Oct 2020
12 Oct 2020
7 Punjab FP/PB/OFC/40469/2019 FOREST-FCA0FC1F/1/2021-FCA BBNL BLOCK BAGHA PURANA DISTRICT MOGA Optical Fibre Cable BBNL 0.3776 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2019
Stage-I Approval on : 13 Nov 2019
Compliance Report Submitted by User Agency on : 31 Mar 2021
24 Mar 2021
8 Punjab FP/PB/OFC/40483/2019 FOREST-FCA0FC1F/3/2020-FCA BBNL BLOCK GHALL KHURD DISTRICT FEROZEPUR Optical Fibre Cable BBNL 0.2718 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2019
Stage-I Approval on : 22 Jun 2020
Compliance Report Submitted by User Agency on : 06 Jul 2020
02 Aug 2022
9 Punjab FP/PB/Others/33950/2018 FCA/1980/181/2018 Diversion of 0.9729 Hac forest land for laying optical fiber cable from Faridkot-Bathinda Distt. Boundary NH-54 KM 265/700 To Kanahiya Chowk, Bathinda KM 287/215 Total length 21.515 Km Others VINDHYA TELELINKS LIMITED 0.9729 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2018
Stage-I Approval on : 01 Sep 2018
Compliance Report Submitted by User Agency on : 02 Mar 2022
30 Aug 2018
10 Punjab FP/PB/TRANS/33946/2018 FCA/1980/174/2018 Permission for construction of 66 Kv Tr.line in favour Canal Solar Energy Pvt,Ltd from solar Power Plant Vill: Dandrala Kharoud to 66 Kv S/stn Vill: Allowal (Line cross on Patiala-Bhadson road KM 15-16 B/S) Tehsil: Nabha Distt: Patiala Transmission Line CANAL SOLAR ENERGY PVT LTD 0.0238 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2018
Stage-I Approval on : 25 Jul 2019
Compliance Report Submitted by User Agency on : 01 Oct 2019
15 Nov 2019
11 Punjab FP/PB/Approach/39624/2019 FCA/1980/137/2019 Marriage Palace of N.K. & G.H. Associates Approach Access N.K & G.H. ASSOCIATES 0.013542 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Mar 2019
Stage-I Approval on : 29 Oct 2019
Compliance Report Submitted by User Agency on : 04 Jun 2020
09 Sep 2020
12 Punjab FP/PB/SCH/18411/2016 9-PBB342-2017-CHA Industrial Training Institute at village Niari School INDUSTRIYAL TRIANING INSTITUTE 0.3603 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Mar 2016
Stage-I Approval on : 18 Oct 2017
Compliance Report Submitted by User Agency on : 27 Nov 2018
27 Dec 2018
13 Punjab FP/PB/Approach/145517/2021 FOREST-FCA0FC1M/25/2021-FCA Construction of approach road for proposed Retail outlet at Village Killi, CHKM 83.697(RHS), SH-20, on Ferozepur - Fazilka Road, Tehsil & Distt. Fazilka (Punjab) Approach Access Indian Oil Corporation Limited 0.0857 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2021
Stage-I Approval on : 02 Nov 2021
Compliance Report Submitted by User Agency on : 01 Dec 2021
13 Dec 2021
14 Punjab FP/PB/ROAD/27549/2017 9-PBB315-2019-CHA DPS World school By VS Education Foundation Road DPS SCHOOL BY VS FOUNDATION 0.01188 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2017
Stage-I Approval on : 24 Apr 2019
Compliance Report Submitted by User Agency on : 15 Feb 2022
04 Mar 2022
15 Punjab FP/PB/HYD/27628/2017 9-PBB312-2018-CHA CONSTRUCTION OF A MINI HYDRO PROECT Hydel SALASAR HYDRO URJA PRIVATE LIMITED 0.4352 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2017
Stage-I Approval on : 15 May 2018
Compliance Report Submitted by User Agency on : 20 Sep 2018
03 Oct 2018
16 Punjab FP/PB/ROAD/20764/2016 9-PBC361-2017-CHA Proposed widening of 2-Lane with Paved Shoulder NH-754 Section Bathinda-Muktsar Road RD 0.00 KM to 16.49 KM under Forest Division & District Bathinda Road EXECUTIVE ENGINEER CENTRAL WORKS DIVISION PB PWD B AND R BRANCH BATHINDA 6.596 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2016
Stage-I Approval on : 24 May 2017
Compliance Report Submitted by User Agency on : 30 Jan 2018
22 Feb 2018
17 Punjab FP/PB/Approach/121209/2021 FOREST-FCA0FC1M/7/2021-FCA Proposed Retail outlet village CHIBRANWALI on Muktsar Abohar Road km 13-14 L/s Approach Access INDIAN OIL CORP LTD BATHINDA 0.007 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2021
Stage-I Approval on : 27 May 2021
Compliance Report Submitted by User Agency on : 19 Jul 2021
29 Sep 2021
18 Punjab FP/PB/ROAD/38574/2019 9-PBC350-2019-CHA Diversion of 12.074660 hec. (instead of 12.592160 hec.) of forest area in favour of Central Works Division No. 2 PWD (B&R) Bathinda for Rehabilitation and Up-gradation to 2 lane with paved shoulders of Salabatpura to Phul section of NH-254 from Design KM 56.240 to 68.800 & KM. 69.820 to 70.500 in the state of Punjab under Forest Division, Bathinda Road PWD 12.59216 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2019
Stage-I Approval on : 18 Nov 2019
Compliance Report Submitted by User Agency on : 29 Jan 2020
25 Feb 2020
19 Punjab FP/PB/Others/8744/2014 9-PBB337-2015-CHA Good Morning Bread Bakers Others BALDEV PAWAN 0.003538 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2014
Stage-I Approval on : 22 Jun 2015
Compliance Report Submitted by User Agency on : 11 Dec 2017
07 Aug 2015
20 Punjab FP/PB/Pipeline/49278/2020 FOREST-FCA0FC2P/24/2021-FCA Proposed for laying 4” Dia Steel & 125 mm Dia. MDPE Gas Pipeline Along/Across NH-44 (Srinagar-Kanyakumari Highway) from Sirhind Chowk to HP Petrol Pump Connectivity in Fatehgarh Sahib city under Fateh Pipeline IRM ENERGY PRIVATE LIMITED 0.5991 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2020
Stage-I Approval on : 12 Aug 2021
Compliance Report Submitted by User Agency on : 20 Dec 2021
23 Dec 2021
21 Punjab FP/PB/Approach/49168/2020 FOREST-FCA0FC6L/70/2020-FCA Diversion of 0.0284 ha. of forest land for approach access road to MS/HSD & CNG Retail Outlet Hindustan Petroleum Corporation Limited on Raikot-Barnala Road Km. 0-2 (LHS) Tehsil Jagraon Distt. Ludhian Approach Access HINDUSTAN PETROLEUM CORPORATION LTD CHANDIGARH 0.0284 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2020
Stage-I Approval on : 20 Sep 2021
Compliance Report Submitted by User Agency on : 05 Jan 2022
06 Jan 2022
22 Punjab FP/PB/Approach/49156/2020 FOREST-FCA0FC6L/71/2020-FCA Diversion of 0.005069 ha. of Forest land for approach road to MS/HSD Retail Outlet Hindustan Petroleum Corporation Limited at Village Kotli, Tehsil Payal & Distt. Ludhiana State Punjab Category: SC (C Approach Access HINDUSTAN PETROLEUM CORP LTD CHANDIGARH RO 0.005069 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2020
Stage-I Approval on : 26 Feb 2021
Compliance Report Submitted by User Agency on : 30 Mar 2021
27 May 2021
23 Punjab FP/PB/RAIL/49268/2020 9-PBC431-2021-CHA Diversion of 28.092 ha. of forest land for use for doubling of Railway Line by Northern Railway Between Ludhiana and Mullanpur and Ludhiana yard station Km1/575 to 21/325 L.H.S. and km 0/700 to 21/80 Railway DEPUTY CHIEF ENGINEER CONSTRUCTION NORTHERN RAILWAY JALANDHAR CITY 28.092 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2020
Stage-I Approval on : 12 Oct 2021
Compliance Report Submitted by User Agency on : 04 Jan 2022
10 Feb 2022
24 Punjab FP/PB/Approach/35489/2018 FCA/1980/80/2019 Diversion of 0.0350 Ha. forest land for approach road to connect proposed Mehta CNG Station at SH-66 between Km 19-20 in village Mehta, Tehsil Baba Bakal in Amritsar District. Approach Access GUJARAT STATE PETRONET LIMITED 0.035 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2018
Stage-I Approval on : 07 Oct 2019
Compliance Report Submitted by User Agency on : 03 Dec 2019
10 Dec 2019
25 Punjab FP/PB/IND/15056/2015 9-PBB447-2015-CHA J.K INTERNATIONAL Industry J K INTERNATIONAL 0.0036 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2015
Stage-I Approval on : 23 Mar 2016
Compliance Report Submitted by User Agency on : 28 Apr 2016
10 May 2016
26 Punjab FP/PB/Approach/147825/2021 .FOREST-FCA0FC1M/37/2021-FCA Construction of approach road for proposed Retail outlet at village Mallan-1,on Dhulkot- Mallan Road, Tehsil Gidderbaha, Distt. Sri Muktsar Sahib (Punjab). Approach Access BHARAT PETROLEUM CORP LTD 0.0018 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 15 Mar 2022
Compliance Report Submitted by User Agency on : 05 May 2022
09 May 2022
27 Punjab FP/PB/Approach/147892/2021 9-PBB480-2021-CHA N.M GARDEN AT VILLAGE GHUMAN KALAN Approach Access N M GARDEN 0.0024 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 15 Dec 2021
Compliance Report Submitted by User Agency on : 19 Apr 2022
11 May 2022
28 Punjab FP/PB/Approach/50261/2020 FOREST-FCA0FC5A/47/2020-FCA Construction of approach road for proposed Kissan Sewa Kendra at Village Manawala, on Ajnala to Chogawan road, Tehsil Ajnala, Distt. Amritsar (Punjab). Approach Access Indian Oil Corporation Limited 0.0121 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2020
Stage-I Approval on : 17 Mar 2021
Compliance Report Submitted by User Agency on : 22 Jun 2021
10 Dec 2021
29 Punjab FP/PB/Approach/42310/2019 9-PBB325-2021-CHA BPCL Retail Outlet at Talwandi Sabo Approach Access BHARAT PETROLEUM CORP LTD BATHINDA 0.0683 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2019
Stage-I Approval on : 24 Mar 2021
Compliance Report Submitted by User Agency on : 22 Jul 2021
13 Aug 2021
30 Punjab FP/PB/Approach/36267/2018 FCA/1980/44/2019 M/S Remira Motors Pvt.Ltd. (Car Showroom) Approach Access M/S REMIRA MOTORS PVT. LTD. 0.0118 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2018
Stage-I Approval on : 26 Jun 2019
Compliance Report Submitted by User Agency on : 26 Aug 2020
26 Aug 2020
31 Punjab FP/PB/Approach/42690/2019 9-PBB330-2021-CHA Showroom of Sarbjit Singh at Vill: Alipur Araian, Near Focal Point, Northern Byepass Km 3-4 R/S Patiala Approach Access SH SARBJIT SINGH 0.0079 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2019
Stage-I Approval on : 31 Mar 2021
Compliance Report Submitted by User Agency on : 01 Feb 2022
29 Apr 2022
32 Punjab FP/PB/Approach/42703/2019 FCA/1980/295/2019 Diversion of 0.0153 ha. of forest land for approach access road to Retail Outlet(Kissan Sewa Kendra) of Indian OIl Corporation Limited at Khasra No. 35//3/2/1/2 village Shamshpur on Chawa-Samrala roa Approach Access INDIAN OIL CORPORATION LIMITD 0.0153 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2019
Stage-I Approval on : 26 Feb 2020
Compliance Report Submitted by User Agency on : 26 Jun 2020
27 Jun 2020
33 Punjab FP/PB/Approach/42698/2019 9-PBB310-2020-CHA IOCL Retail Outlet at Village Ikolaha, Ludhiana Approach Access IOCL CHANDIGARH DO 0.0941 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2019
Stage-I Approval on : 22 May 2020
Compliance Report Submitted by User Agency on : 04 Jan 2022
31 Jan 2022
34 Punjab FP/PB/OFC/36829/2018 FOREST-FCA0FC5J/35/2020-FCA Laying of optical fiber cable from village Naugajja to Kishangarh and Kishangarh to Adampur via village Alawalpur Total Length=15400 Meter Optical Fibre Cable RELIANCE JIO INFO COMM LTD 0.6975 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2018
Stage-I Approval on : 22 Jun 2021
Compliance Report Submitted by User Agency on : 23 Dec 2021
06 Jan 2022
35 Punjab FP/PB/TRANS/36647/2018 9-PBB337-2020-CHA 220KV Line from Sandhaur to Kup Kalan Railway TSS Transmission Line PSTCL TLSC 0.06475 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2018
Stage-I Approval on : 11 May 2020
Compliance Report Submitted by User Agency on : 09 Jul 2020
13 Aug 2020
36 Punjab FP/PB/Others/16303/2015 FCA/1980/336/2015 HPCL Filling Station Others Hindustan Petroleum Corporation Limited 0.010023 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2015
Stage-I Approval on : 18 Dec 2015
Compliance Report Submitted by User Agency on : 10 Feb 2016
27 Jan 2016
37 Punjab FP/PB/Others/7781/2014 9-PBB306-2015-CHA For Access of Retail Outlet Others BHARAT PETROLEUM CORPORATION LIMITED 0.0957 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2014
Stage-I Approval on : 09 Sep 2015
Compliance Report Submitted by User Agency on : 07 Jan 2016
21 Jan 2016
38 Punjab FP/PB/Approach/55657/2020 FOREST-FCA0FC5G/17/2021-FCA Petrol pump Approach Access INDIAN OIL CORPORATION LTD AMRITSAR 0.0118 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2020
Stage-I Approval on : 24 Sep 2021
Compliance Report Submitted by User Agency on : 11 Nov 2021
15 Nov 2021
39 Punjab FP/PB/ROAD/22782/2016 9-PBB327-2017-CHA Road Widening & Strengthening Road EXECUTIVE ENGINEER CONSTRUCTION DIVISION PWD BR SHRI MUKTSAR SAHIB 2.2 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2016
Stage-I Approval on : 10 Nov 2017
Compliance Report Submitted by User Agency on : 07 Jan 2019
28 Jan 2019
40 Punjab FP/PB/Approach/142887/2021 FOREST-FCA0FC1F/24/2021-FCA retail outlet of Bharat Petroleum Corporation Ltd at village Rukna Bodla on Jiwan Arian-Chak Panje ke road km 0-2 L/s Distt Ferozepur Approach Access BPCL BATHINDA 0.0037 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2021
Stage-I Approval on : 17 Sep 2021
Compliance Report Submitted by User Agency on : 30 Sep 2021
08 Oct 2021
41 Punjab FP/PB/Approach/33923/2018 9-PBB304-2017-CHA CONSTRUCTION OF NRSS INDUSTRIES Approach Access NRSS INDUSTRIES 0.0053 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2018
Stage-I Approval on : 26 Dec 2019
Compliance Report Submitted by User Agency on : 08 Mar 2021
02 Apr 2021
42 Punjab FP/PB/TRANS/19758/2016 FCA/1980/246/2016 220 KV Makhu-Algon Kothi Transmission Line PSTCL TLSC 0.6615 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2016
Stage-I Approval on : 27 Sep 2016
Compliance Report Submitted by User Agency on : 30 May 2017
30 May 2017
43 Punjab FP/PB/ROAD/118129/2020 FOREST-FCA0FC6L/74/2021-FCA widening service road for Panipat -Ludhiana– Jalandhar road (NH-44) from Km 311.865 to 312.315 in Punjab state, Lundhiana under forest Division & District – Lundiana , Road NHAI PIU I AMBALA HARYANA 0.675 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Mar 2021
Stage-I Approval on : 16 May 2022
Compliance Report Submitted by User Agency on : 20 Sep 2022
23 Sep 2022
44 Punjab FP/PB/Approach/39627/2019 FCA/1980/95/2019 M/S Big Resorts (Marriage Palace) Approach Access BEST & BIG RESORTS 0.009252 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Mar 2019
Stage-I Approval on : 25 Jun 2019
Compliance Report Submitted by User Agency on : 07 Oct 2019
13 Nov 2019
45 Punjab FP/PB/Approach/32873/2018 9-PBB420-2018-CHA Construction of the Access road to the Retail Outlet of Essar Oil Ltd at Village Mavi Kalan Distt. Patiala Approach Access ESSAR OIL LIMITED MOHALI 0.092145 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Mar 2018
Stage-I Approval on : 20 Nov 2018
Compliance Report Submitted by User Agency on : 17 Dec 2018
27 Dec 2018
46 Punjab FP/PB/Others/11389/2015 9-PBB406-2015-CHA Petrol Pump Others SANDEEP SHARMA 0.0144 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Mar 2015
Stage-I Approval on : 15 Sep 2015
Compliance Report Submitted by User Agency on : 12 Dec 2017
11 Dec 2015
47 Punjab FP/PB/Approach/144268/2021 .FOREST-FCA0FC1F/36/2021-FCA Forest land for access to proposed retail outlet of M/s HPCL at village Jhok Harihar CH. KM. 5.737 (LHS), NH-354, on Ferozepur-Sadiq Road Distt. & Forest Division. Approach Access H.P.C.L BATHINDA 0.0775 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jun 2021
Stage-I Approval on : 25 May 2022
Compliance Report Submitted by User Agency on : 18 Jul 2022
29 Jul 2022
48 Punjab FP/PB/TRANS/13577/2015 9-PBB357-2017-CHA 66KV Line from 132KV S/S Banga Raod Phagwara to 33/66 KV GT Road Phagwara Transmission Line PSPCL TL DIVISION JALANDHAR 2.68 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jun 2015
Stage-I Approval on : 29 Nov 2017
Compliance Report Submitted by User Agency on : 05 Jun 2018
12 Jun 2018
49 Punjab FP/PB/Others/20744/2016 9-PBB472-2016-CHA Solar Power Plant at Ghaggar Sangrur Others SAM SOLAR PVT LTD 0.055266 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jul 2016
Stage-I Approval on : 12 May 2017
Compliance Report Submitted by User Agency on : 12 Jul 2017
26 Jul 2017
50 Punjab FP/PB/Others/20743/2016 9-PBB473-2016-CHA Solar Power Plant at Sidhwan Ludhiana Others SAM SOLAR PVT LTD 0.000726 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jul 2016
Stage-I Approval on : 12 May 2017
Compliance Report Submitted by User Agency on : 16 Jun 2017
13 Jul 2017