Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Madhya Pradesh FP/MP/OFC/42712/2019 FP/MP/OFC/42712/2019 Jio digital Fibre Pvt. Ltd. 4G OFC Project Nainpur-Lamta route DFO West Mandla Optical Fibre Cable JIO DIGITAL FIBRE PRIVATE LTD 0.296 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2019
Stage-I Approval on : 31 Jan 2020
Compliance Report Submitted by User Agency on : 31 Jan 2020
05 Feb 2020
2 Madhya Pradesh FP/MP/IRRIG/35219/2018 F-4/2018/10-11/ Hirwar Micro Lift Irrigation Project Irrigation Minor Irrigation Division 1.423 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2018
Stage-I Approval on : 22 Jan 2019
Compliance Report Submitted by User Agency on : 04 Feb 2019
18 Feb 2019
3 Madhya Pradesh FP/MP/IRRIG/29973/2017 6-MPC019/2018-BHO ALIRAJPUR LIFT IRRIGATION SCHEME Irrigation Narmada Valley Development Authority 14.958 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2017
Stage-I Approval on : 07 May 2018
Compliance Report Submitted by User Agency on : 31 May 2018
20 Aug 2018
4 Madhya Pradesh FP/MP/Others/29682/2017 FP/MP/Others/29682/2017 OFC Laying work at Barsali village in Betul amla Section Others IDEA CELLULAR LIMITED 0.021 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2017
Stage-I Approval on : 15 May 2019
Compliance Report Submitted by User Agency on : 06 Jun 2019
24 Jun 2020
5 Madhya Pradesh FP/MP/ROAD/155629/2022 6-MPR018/2023-BHO Bodalkha to Dhiri murum Under RCPLWEA Scheme Road MPRRDA PIU-1 BALAGHAT 16.65 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 May 2022
Stage-I Approval on : 30 Aug 2024
Compliance Report Submitted by User Agency on : 28 May 2025
6 Madhya Pradesh FP/MP/ROAD/156090/2022 6-MPR022/2023-BHO Chalisbodi Kulpa (M) Palagondi Mate Via Bhamni Road Road ABDUL KHAN 5.988 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 May 2022
Stage-I Approval on : 13 Feb 2024
Compliance Report Submitted by User Agency on : 26 Mar 2024
7 Madhya Pradesh FP/MP/ROAD/156089/2022 6-MPR028/2023-BHO Khursod Gaunajhola to Khara Road ABDUL KHAN 14.045 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 31 May 2022
Stage-I Approval on : 07 May 2025
Compliance Report Submitted by User Agency on : 23 May 2025
8 Madhya Pradesh FP/MP/ROAD/142860/2021 F-5/2021/10-11 Bijoliya mata mandir raste to katna gram road Road GM, MPRRDA, MANDSOUR 0.72 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2021
Stage-I Approval on : 16 Sep 2021
Compliance Report Submitted by User Agency on : 15 Feb 2022
15 Mar 2022
9 Madhya Pradesh FP/MP/WATER/45654/2020 F-5/2020/10-11 Payli Multi Village Rural Water Supply Scheme(for pipeline) (Part of 42241/2019) Drinking Water MADHYA PARDESH JAL NIGAM MARYADIT JABALPUR 4.9063 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2020
Stage-I Approval on : 12 Jun 2020
Compliance Report Submitted by User Agency on : 16 Jul 2020
29 Jul 2020
10 Madhya Pradesh FP/MP/OFC/40471/2019 F-5/2019/10-11 Jio Digital Fibre Pvt. Ltd. OFC 4G Project Pichore-Khaniyadana Route Optical Fibre Cable JIO DIGITAL FIBRE PRIVATE LTD 0.5 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2019
Stage-I Approval on : 28 Jul 2020
Compliance Report Submitted by User Agency on : 10 Aug 2020
07 Sep 2020
11 Madhya Pradesh FP/MP/Others/33956/2018 mp/other/5 4G PROJECT (OFC LAYING) Abhana-Dhansara Others RELIANCE JIO INFOCOM LTD. 0.534 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2018
Stage-I Approval on : 03 Oct 2018
Compliance Report Submitted by User Agency on : 19 Nov 2018
24 Nov 2018
12 Madhya Pradesh FP/MP/ROAD/19782/2016 F-5/2016/10-11 Pipariya to saristal Road MPRRDAPIU ANUPPUR 2.1 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2016
Stage-I Approval on : 19 Jul 2017
Compliance Report Submitted by User Agency on : 08 Jan 2018
29 Jan 2018
13 Madhya Pradesh FP/MP/RAIL/140205/2021 6-MPC066/2021-BHO Railway Guage Conversion work form MG to BG between Akola-Khandwa Railway SOUTH CENTRAL RAILWAY. 21.49 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Mar 2021
Stage-I Approval on : 09 May 2022
Compliance Report Submitted by User Agency on : 07 Jul 2022
03 Oct 2022
14 Madhya Pradesh FP/MP/OFC/145519/2021 F-5 Jio Digital Fiber Pvt.Ltd 4G OFC Project Bhimkhedi-Bamhani route Optical Fibre Cable JIO DIGITAL FIBRE PRIVATE LTD 0.4 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2021
Stage-I Approval on : 11 Nov 2021
Compliance Report Submitted by User Agency on : 12 Nov 2021
24 Nov 2021
15 Madhya Pradesh FP/MP/Others/35070/2018 F-5/2018/10-11 Reliance 4G project Berasia-Baruakhar-Sironj route (Vidisha) Others RELIANCE JIO INFOCOM LTD. 0.799 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2018
Stage-I Approval on : 16 Feb 2019
Compliance Report Submitted by User Agency on : 18 Feb 2019
13 Mar 2019
16 Madhya Pradesh FP/MP/WATER/33505/2018 F-5/2019/10-11 Laying of water pipe line in the right of way Drinking Water EXECUTIVE ENGINEER PUBLIC HEALTH ENGINEERING DIVISION 3.71 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2018
Stage-I Approval on : 10 May 2019
Compliance Report Submitted by User Agency on : 27 Jun 2019
13 Jun 2019
17 Madhya Pradesh FP/MP/RAIL/35062/2018 6-MPC011/2019-BHO doubling between ramna-singrauli section Railway INDIAN RAILWAY EAST CENTRAL RAILWAY CONSTRUCTION ORGNISATION 20.791 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2018
Stage-I Approval on : 06 Mar 2019
Compliance Report Submitted by User Agency on : 08 Apr 2019
05 Feb 2021
18 Madhya Pradesh FP/MP/ROAD/27618/2017 6-MPB022/2019-BHO Rampur to Chandaniya Koyalwadi Rd Under PMGSY Road MPRRDA PIU THREE CHHINDWARA 3.798 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2017
Stage-I Approval on : 14 Feb 2020
Compliance Report Submitted by User Agency on : 26 May 2020
10 Jul 2020
19 Madhya Pradesh FP/MP/TRANS/151776/2022 6-MPR029/2022-BHO Ajaygarh Panna 132 kV DSSS Line Transmission Line MP POWER TRANSMISSION PACKAGE II LIMITED 39.6495 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2022
Stage-I Approval on : 03 Jul 2023
Compliance Report Submitted by User Agency on : 19 Oct 2023
24 Jan 2024
20 Madhya Pradesh FP/MP/WATER/151774/2022 F-5/2022/10-11/ Waidhan-2 Multi Village Rural Water Supply Scheme Drinking Water MADHYA PRADESH JAL NIGAM MARYADIT 4.0401 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2022
Stage-I Approval on : 01 Feb 2023
Compliance Report Submitted by User Agency on : 16 May 2023
17 May 2023
21 Madhya Pradesh FP/MP/ROAD/43629/2019 F-5/2020/10-11 Taradehi Pondi Chandana Road Road EE PWD DAMOH 0.94696 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2019
Stage-I Approval on : 03 Sep 2020
Compliance Report Submitted by User Agency on : 04 Nov 2020
04 Nov 2020
22 Madhya Pradesh FP/MP/ROAD/37960/2018 6-MPB017/2019-BHO Nalti to Fundriyapani Road Road PMGSY 3.6 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2018
Stage-I Approval on : 13 Sep 2019
Compliance Report Submitted by User Agency on : 20 Feb 2020
26 May 2020
23 Madhya Pradesh FP/MP/OFC/37980/2018 FP/MP/OFC/37980/2018 Reliance Jio Infocomm Ltd. OFC 4G Project Udaipura-Gairatganj & Ghatpiplia - Naktra route Optical Fibre Cable RELIANCE JIO INFOCOM LTD. 0.8138 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2018
Stage-I Approval on : 20 Jul 2019
Compliance Report Submitted by User Agency on : 22 Jul 2019
25 Jul 2019
24 Madhya Pradesh FP/MP/ROAD/37959/2018 6-MPB018/2019-BHO Kully to Gatabara Road Road PMGSY 4.86 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2018
Stage-I Approval on : 14 Oct 2019
Compliance Report Submitted by User Agency on : 20 Feb 2020
26 May 2020
25 Madhya Pradesh FP/MP/ROAD/17333/2015 6-MPC008/2016-BHO Katni-Umaria-Shahdol Road NH-78 Package-II widening and Construction of KM 68+00 to 141+200 including Chandia Bypass where Forest Land Acquisition is 23.287 Ha. & Forest Revenue Land is 7.136 Ha. Total 30.423 Ha. land is required. Road MP ROAD DEVELOPMENT CORPORATION LTD 30.423 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2015
Stage-I Approval on : 23 Dec 2016
Compliance Report Submitted by User Agency on : 31 Aug 2018
10 May 2021
26 Madhya Pradesh FP/MP/WATER/41775/2019 FP/MP/WATER/41775/2019 KUNDALIYA MULTI VILLAGE RURAL WATER SUPPLY SCHEME RAJGARH Drinking Water M P JAL NIGAM 0.54 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2019
Stage-I Approval on : 28 Feb 2020
Compliance Report Submitted by User Agency on : 01 Aug 2020
21 Oct 2020
27 Madhya Pradesh FP/MP/OFC/35125/2018 FP/MP/OFC/35125/2018 NOFN (DIGITAL INDIA) PROJECT Optical Fibre Cable BSNL BETUL MP 2.27 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2018
Stage-I Approval on : 02 May 2019
Compliance Report Submitted by User Agency on : 22 Aug 2019
03 Sep 2019
28 Madhya Pradesh FP/MP/OFC/35533/2018 f-5 Reliance Jio Infocomm Ltd. OFC 4G Project Banda- Behrol route Optical Fibre Cable RELIANCE JIO INFOCOM LTD. 0.175 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Aug 2018
Stage-I Approval on : 02 Apr 2019
Compliance Report Submitted by User Agency on : 15 Apr 2019
17 Jan 2019
29 Madhya Pradesh FP/MP/ROAD/147888/2021 6-MPC070/2021-BHO Upgradation of Major District Road Sendhwa Varla Road (MP-MDR- 48-22) Road PUBLIC WORK DEPARTMENT BHOPAL 5.518 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 04 Jan 2022
Compliance Report Submitted by User Agency on : 03 Feb 2022
31 Mar 2023
30 Madhya Pradesh FP/MP/IRRIG/15320/2015 8-30/2017-FC Chunar Tank Irrigation WRD MP 95.387 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 30 Sep 2015
Stage-I Approval on : 12 Sep 2017
Compliance Report Submitted by User Agency on : 13 Nov 2017
31 Madhya Pradesh FP/MP/OFC/42699/2019 FP/MP/OFC/42699/2019 Telesonic Network Ltd. OFC Project Waidhan-MP/UP Border(Dudhi) route Optical Fibre Cable TELESONIC NETWORK LIMITED. 0.32 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2019
Stage-I Approval on : 23 Jan 2020
Compliance Report Submitted by User Agency on : 24 Jan 2020
29 Jan 2020
32 Madhya Pradesh FP/MP/ROAD/16304/2015 6-MPC014/2017-BHO National Highway 86 widening Road EXECUTIVE ENGINEER 9.7975 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2015
Stage-I Approval on : 10 Jul 2017
Compliance Report Submitted by User Agency on : 26 Jun 2020
28 Nov 2017
33 Madhya Pradesh FP/MP/ROAD/149613/2021 6-MPB055/2023-BHO Diversion of 2.06 ha of forest land for construction of Begamganj sultanganj road under FCA 1980 Road MPRDC BHOPAL DIVISION 2.06 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2022
Stage-I Approval on : 18 Apr 2024
Compliance Report Submitted by User Agency on : 03 Sep 2024
22 Jan 2025
34 Madhya Pradesh FP/MP/ROAD/149386/2021 6-MPR036/2023-BHO Diversion of 6.93 ha of forest land under FCA 1980 for Construction of Garhi Ahmedpur Road Road MPRDC BHOPAL DIVISION 6.93 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2022
Stage-I Approval on : 18 Jun 2024
Compliance Report Submitted by User Agency on : 03 Sep 2024
12 Jan 2025
35 Madhya Pradesh FP/MP/Canal/149734/2021 6-MPR014/2022-BHO Construction of Maa Ratangarh Under ground pipe line with electric line Micro Irrigation Project Canal Madhya Pradesh Water Resources Department 17.63 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2021
Stage-I Approval on : 30 Jan 2023
Compliance Report Submitted by User Agency on : 03 Mar 2023
13 May 2024
36 Madhya Pradesh FP/MP/OFC/37377/2018 F-5/2018/10-11 Reliance Jio Infocomm Ltd OFC 4G project Govindgarh-Sagounikhurd route (Satna) Optical Fibre Cable RELIANCE JIO INFOCOM LTD. 0.33 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 03 Mar 2019
Compliance Report Submitted by User Agency on : 26 Mar 2019
02 Apr 2019
37 Madhya Pradesh FP/MP/OFC/37378/2018 FP/MP/OFC/37378/2018 Reliance Jio Infocomm Ltd OFC 4G project Govindgarh-Sagounikhurd route (Rewa) Optical Fibre Cable RELIANCE JIO INFOCOM LTD. 0.0145 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 01 May 2019
Compliance Report Submitted by User Agency on : 01 May 2019
16 May 2019
38 Madhya Pradesh FP/MP/OFC/37186/2018 f5 BBNL OFC Cable Giduraha to Marha Banjar in Jabalpur district Optical Fibre Cable DE RURAL NOFN INCHARGE BSNL JABALPUR 0.12 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2018
Stage-I Approval on : 25 Dec 2020
Compliance Report Submitted by User Agency on : 29 Dec 2020
30 Dec 2020
39 Madhya Pradesh FP/MP/Others/30546/2017 F-5/2018/10-11 4G PROJECT (OFC LAYING)Jhirpaniyan-Nisarpur Others RELIANCE JIO INFOCOM LTD. 0.46 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2017
Stage-I Approval on : 30 Oct 2018
Compliance Report Submitted by User Agency on : 10 Nov 2018
22 Nov 2018
40 Madhya Pradesh FP/MP/TRANS/22331/2016 6-MPC031/2017-BHO 765 KV DC HEXA KHANDWA - DHULE TRANSMISSION LINE Transmission Line KHARGONE TRANSMISSION LIMITED 39.437 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2016
Stage-I Approval on : 07 Nov 2017
Compliance Report Submitted by User Agency on : 25 Feb 2018
05 Jun 2020
41 Madhya Pradesh FP/MP/Others/156029/2022 6-MPC022/2022-BHO Extension of Acharya Shankar International Institute of Adwaita Vedanta Others GOVT. OF M.P. CULTURE DEPARTMENT 17.28 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 30 May 2022
Stage-I Approval on : 12 Sep 2023
Compliance Report Submitted by User Agency on : 22 Oct 2024
42 Madhya Pradesh FP/MP/Others/156029/2022 6-MPC022/2022-BHO Extension of Acharya Shankar International Institute of Adwaita Vedanta Others GOVT. OF M.P. CULTURE DEPARTMENT 17.28 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 30 May 2022
Stage-I Approval on : 12 Sep 2023
Compliance Report Submitted by User Agency on : 22 Oct 2024
43 Madhya Pradesh FP/MP/OFC/156036/2022 F-5/2022/10-11/ Jio Digital Fiber Pvt Ltd OFC Project Gandhi Sagar Hydel Border Ratangarh Route DFO Mandsaur Optical Fibre Cable JIO DIGITAL FIBRE PRIVATE LTD 0.2 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2022
Stage-I Approval on : 22 Sep 2022
Compliance Report Submitted by User Agency on : 30 Sep 2022
30 Sep 2022
44 Madhya Pradesh FP/MP/WATER/156031/2022 F-5/2022/10-11/ Waidhan-2 Multi Village Rural Water Supply Scheme Drinking Water MADHYA PRADESH JAL NIGAM MARYADIT 3.1019 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2022
Stage-I Approval on : 21 Dec 2022
Compliance Report Submitted by User Agency on : 18 Jan 2023
07 Feb 2023
45 Madhya Pradesh FP/MP/OFC/45643/2020 F-5/2020/10-11 Jio Digital Fiber Pvt.Ltd. OFC 4G Project Gandhisagar Heydel - Rampura route DFO-Neemuch Optical Fibre Cable JIO DIGITAL FIBRE PRIVATE LTD 0.65 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2020
Stage-I Approval on : 28 Aug 2020
Compliance Report Submitted by User Agency on : 22 Sep 2020
30 Sep 2020
46 Madhya Pradesh FP/MP/WATER/39733/2019 FP/MP/WATER/39733/2019 Mohanpura Multi Village Rural Water Supply Scheme Rajgarh Drinking Water M P JAL NIGAM 0.63 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2019
Stage-I Approval on : 08 Mar 2020
Compliance Report Submitted by User Agency on : 20 May 2020
09 Jul 2020
47 Madhya Pradesh FP/MP/RAIL/21484/2016 6-MPB020/2019-BHO Doubling between Deoragram-Majhaoli block section of Railway. Railway DY CHIEF ENGINEER WEST CENTRAL RAILWAY JABALPUR 1.575 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2018
Stage-I Approval on : 28 Jun 2019
Compliance Report Submitted by User Agency on : 11 Oct 2019
01 Nov 2019
48 Madhya Pradesh FP/MP/OFC/36830/2018 FP/MP/OFC/36830/2018 OFC Line Essagarh to Kadwaya Optical Fibre Cable BSNL ASHOKNAGAR 0.053 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Mar 2019
Stage-I Approval on : 02 Oct 2019
Compliance Report Submitted by User Agency on : 18 Nov 2019
09 Dec 2019
49 Madhya Pradesh FP/MP/OFC/36860/2018 FP/MP/OFC/36860/2018 OFC Line Futera to Mamon Optical Fibre Cable BSNL ASHOKNAGAR 0.1995 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Mar 2019
Stage-I Approval on : 02 Oct 2019
Compliance Report Submitted by User Agency on : 18 Nov 2019
09 Dec 2019
50 Madhya Pradesh FP/MP/WATER/144241/2021 F-5 Niwadi-prithvipur 2 Multi village water supply scheme (Distribution Network) Drinking Water MADHYA PRADESH JAL NIGAM MARYADIT 2.0224 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jun 2021
Stage-I Approval on : 07 Jan 2022
Compliance Report Submitted by User Agency on : 25 Jan 2022
31 Jan 2022
12345678910...