Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Karnataka
|
FP/KA/WATER/44306/2020
|
FEE 36 FLL 2021
|
Construction of Main Balancing Tank and Laying of water pipeline in Kurkunda village Sy. No. 202, Manvi Tauka, Raichur District under Combined Water Supply Scheme to Mallat and other 10 villages in Manvi taluka in favour of the Executive Engineer, Rural Drining Water Supply and Sanitation Department, Raichur
|
Drinking Water
|
RURAL WATER SUPPLY AND SANITATION DEPARTMENT
|
0.0978
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2020
|
Stage-I Approval on
|
:
|
24 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
09 Aug 2021
|
|
|
|
28 Oct 2022
|
2
|
Karnataka
|
FP/KA/IRRIG/43456/2019
|
F.No.4-KRB1273/2021-BAN
|
Laying of Pipeline (0-3km) under Chachadi LIS
|
Irrigation
|
KARNATAKA NEERAVARI NIGAM LIMITED
|
3.92
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Dec 2019
|
Stage-I Approval on
|
:
|
04 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Sep 2023
|
|
|
|
21 Dec 2023
|
3
|
Karnataka
|
FP/KA/ROAD/36272/2018
|
No.4-KRB1232/2020-BAN
|
WIDENING TO TWO/FOUR LANE WITH PAVED SHOULDERS FROM KM 34.00 TO 70.90 OF GULBARGA-WADI-YADGIR SECTION OF NH-150 IN YADGIR DISTRICT
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION KALABURAGI
|
4.6038
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Sep 2018
|
Stage-I Approval on
|
:
|
12 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jul 2023
|
|
|
|
03 Nov 2023
|
4
|
Karnataka
|
FP/KA/QRY/7549/2014
|
4-KRB 551/2008-BAN
|
Padma Crusher/enterprises.
|
Quarrying
|
PADMA CRUSHERS
|
1.78
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Oct 2014
|
Stage-I Approval on
|
:
|
31 Dec 2015
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2016
|
|
|
|
09 Nov 2016
|
5
|
Karnataka
|
FP/KA/ROAD/40347/2019
|
F.No.KRC1321/2021-BAN
|
Two Laning with Paved Shoulder of Chintamani to AP Border (length 39.8 kms), on Hybrid Annuity (DBFOMT) basis under Project KSHIP-III in Chikkaballapura & Kolar District of Karnataka State .
|
Road
|
KSHIP-TUMKUR
|
16.8014
|
Pending at DFO for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 May 2019
|
Stage-I Approval on
|
:
|
28 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2022
|
|
|
|
|
6
|
Karnataka
|
FP/KA/Pipeline/44313/2020
|
F.No.4-KRB1277/2021-BAN/
|
Bharmasagara LIS, Construction of rising main pipe line (CH : 36.225 to CH - 37.550 Km) parellel to NH-48 in Anagodu village, Davanagere Taluk & District
|
Pipeline
|
EXECUTIVE ENGINEER KNNL DAVANAGERE
|
0.789
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2020
|
Stage-I Approval on
|
:
|
27 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
19 Mar 2025
|
|
|
|
04 May 2025
|
7
|
Karnataka
|
FP/KA/ROAD/9563/2015
|
4-KRB 1067/2015-BAN
|
Approach Road to (Stone Quarry in Malki land)
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA MANGALURU
|
0.2808
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2015
|
Stage-I Approval on
|
:
|
15 Dec 2015
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jun 2016
|
|
|
|
04 Jul 2016
|
8
|
Karnataka
|
FP/KA/Others/32508/2018
|
No.4-KRB/1193-2019-BAN
|
Coronet Canning Company
|
Others
|
CORONET CANNING COMPANY
|
0.4858
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2018
|
Stage-I Approval on
|
:
|
22 May 2019
|
Compliance Report Submitted by User Agency on
|
:
|
09 Oct 2019
|
|
|
|
14 May 2020
|
9
|
Karnataka
|
FP/KA/TRANS/35444/2018
|
F. No.4-KRB1270/2020-BAN
|
construction of 66 KV DC line from proposed 220KV Hosadurga to link existing Halurameshwara 66KV SC line near Honnenahalli limits for a distance of 8.553Kms in the new corridor in Hosadurga Talluk, Chitradurga District.
|
Transmission Line
|
MAJOR WORKS DIVISION KPTCL CHITRADURGA
|
4.645
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Sep 2018
|
Stage-I Approval on
|
:
|
22 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
01 Feb 2022
|
|
|
|
16 Mar 2023
|
10
|
Karnataka
|
FP/KA/ROAD/21015/2016
|
|
Rehabilitation and upgradation of Chitradurga-Davanagere (from Km.189 to Km.260) Section of NH 48 (old NH 04) in the State of Karnataka.
|
Road
|
NHAI PIU CHITRADURGA
|
3.155
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Sep 2016
|
Stage-I Approval on
|
:
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Dec 2021
|
|
|
|
08 Feb 2023
|
11
|
Karnataka
|
FP/KA/HYD/7231/2014
|
4-KRB 1050/2015-BAN
|
Aniyur Mini Hydel Scheme (24 MW),Neriya Village ,Belthangady Taluk, D. K. Dist.
|
Hydel
|
SLV POWER PRIVATE LIMITED
|
1.5383
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Sep 2014
|
Stage-I Approval on
|
:
|
30 Sep 2015
|
Compliance Report Submitted by User Agency on
|
:
|
29 Mar 2016
|
|
|
|
14 Jan 2016
|
12
|
Karnataka
|
FP/KA/Others/19136/2016
|
4-KRB1151/2018-BAN
|
Diversion of 1.645 ha. of forestland for Main Pipe Conveyor Belt Corridor in S.M. Block, D.M. Block Forest and Sy. No. 224 Bannihatti Village (CA Land) , Sandur South Range, in Lakshmipura, Taranagar and Bannihatti Villages, Sandur Taluk, Ballari District, Karnataka
|
Others
|
JSW Steel Limited
|
1.645
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2016
|
Stage-I Approval on
|
:
|
28 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
06 Dec 2018
|
|
|
|
25 Jun 2019
|
13
|
Karnataka
|
FP/KA/MIN/35480/2018
|
8-95/1994-FC Vol.
|
Downhill pipe conveyor belt
|
Mining
|
M/S VEERBHADRAPPA SANGAPPA & COMPANY
|
14.8457
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Aug 2018
|
Stage-I Approval on
|
:
|
15 Oct 2019
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jun 2025
|
|
|
|
|
14
|
Karnataka
|
FP/KA/TRANS/28661/2017
|
4-KRB1139/2018-BAN
|
For Laying of Under Ground 66kv Transmission Cable at Tumkur Division in Favour M/s Adani Green Energy(UP)Ltd
|
Transmission Line
|
ADANI GREEN ENERGY (UP) LTD
|
0.8955
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Aug 2017
|
Stage-I Approval on
|
:
|
01 Feb 2018
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2022
|
|
|
|
17 Nov 2022
|
15
|
Karnataka
|
FP/KA/WATER/15630/2015
|
FEE 87 FLL 2016
|
PROVIDING MULTI VILLAGE WATER SUPPLY TO KAROPADY & OTHER 79 HABITATIONS IN BANTWAL TALUK
|
Drinking Water
|
RURAL DRINKING WATER SUPPLY AND SANITATION DEPARTMENT
|
0.03
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Sep 2015
|
Stage-I Approval on
|
:
|
04 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jan 2024
|
|
|
|
|
16
|
Karnataka
|
FP/KA/ROAD/22056/2016
|
FEE 16 FLL 2018
|
Improvements to road - Arashinakeri to Vanaballari
|
Road
|
KARNATAKA RURAL ROAD DEVELOPMENT AGENCY
|
0.96
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Oct 2016
|
Stage-I Approval on
|
:
|
08 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
11 Sep 2019
|
|
|
|
27 Feb 2020
|
17
|
Karnataka
|
FP/KA/ROAD/40747/2019
|
F.No.KRB1305/2021-BAN
|
2 Laning of Gadag to Honnali Section of SH-57 and SH-26 in the State of Karnataka
|
Road
|
KSHIP
|
5.1564
|
Pending at DFO for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2019
|
Stage-I Approval on
|
:
|
04 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 Nov 2022
|
|
|
|
|
18
|
Karnataka
|
FP/KA/IRRIG/32685/2018
|
No.4-KRB1263/2020-BAN
|
Diversion of 0.17845 Ha of Forest land of Sri Venkateshwar Lift Irriagation Scheme in favour of Executive Engineer KNNL R& R Division, Athani
|
Irrigation
|
EE KNNL R AND R DIV ATHANI
|
0.17845
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Apr 2018
|
Stage-I Approval on
|
:
|
20 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jul 2022
|
|
|
|
04 Mar 2024
|
19
|
Karnataka
|
FP/KA/SubStation/36164/2018
|
F.No.4-KRB1271/2021-BAN/
|
Establishing 1x10MVA 110/11kV Sub Station at Kansur, Siddapur Taluk, Uttar Kannada District
|
Sub Station
|
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
|
1.33
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Sep 2018
|
Stage-I Approval on
|
:
|
22 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
29 Sep 2022
|
|
|
|
17 Oct 2023
|
20
|
Karnataka
|
FP/KA/WATER/28708/2017
|
No.4-KRB1167/2018-BAN
|
Comprehensive Water Supply Scheme to Bhalki Town and 23 enroute villages
|
Drinking Water
|
OFFICE OF THE EXECUTIVE ENGINEER
|
0.986
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2017
|
Stage-I Approval on
|
:
|
01 May 2019
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2021
|
|
|
|
23 Mar 2021
|
21
|
Karnataka
|
FP/KA/RAIL/40302/2019
|
F.No.4-KRB1281/2021-BAN/
|
For laying of New BG Line from Chikkamagaluru to Belur at Chikmagalur & Hassan District in favour of the DYCE (West), South Western Railway, Bengaluru.
|
Railway
|
DEPUTY CHIEF ENGINEER CON WEST I
|
1.0938
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jun 2019
|
Stage-I Approval on
|
:
|
26 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
01 Aug 2022
|
|
|
|
05 Jul 2023
|
22
|
Karnataka
|
FP/KA/Others/124291/2021
|
F.No.4-KRB1326/2021-BAN/
|
Diversion of 0.90 Hectare of Forest Land for Construction of RTO Office Building and Driving Track in Honnavar Village, Honnavar Taluk, Uttar Kannada District.
|
Others
|
COMMISSIONER FOR TRANSPORT
|
0.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2021
|
Stage-I Approval on
|
:
|
05 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Feb 2023
|
|
|
|
23 May 2023
|
23
|
Karnataka
|
FP/KA/ROAD/24619/2017
|
FEE 64 FLL 2017
|
For Widening of Road from Kalinja to Kalmane, Veerakamba Village & Reserved Forest of Bantwal taluk. Mangalore Forest Division, D.K. District.
|
Road
|
ASSISTANT EXECUTIVE ENGINEER PRED SUB DIVISION BANTWALA
|
0.126
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2017
|
Stage-I Approval on
|
:
|
30 Jun 2017
|
Compliance Report Submitted by User Agency on
|
:
|
06 Sep 2019
|
|
|
|
17 Oct 2020
|
24
|
Karnataka
|
FP/KA/TRANS/41479/2019
|
F.No.4-KRB1268/2020-BAN
|
Heightening of existing Ehv electrical power transmission lines of 66Kv class in the forest land bearing sy no 38, U.M.kaval, Kengeri-3 hobli, Bangalore south taluk
|
Transmission Line
|
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
|
0.9518
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Aug 2019
|
Stage-I Approval on
|
:
|
19 Nov 2020
|
Compliance Report Submitted by User Agency on
|
:
|
15 Feb 2025
|
|
|
|
|
25
|
Karnataka
|
FP/KA/Others/141683/2021
|
F. No. 4-KRB1339/2022-BAN
|
Diversion of 4.5769 ha of forest land Sy No 12 of Siriyuru village, shivamogga district for establishment of Instrument Landing System (ILS) for extension of runway in favour of Executive Engineer, Public works Department, special Division, shivamogga
|
Others
|
PUBLIC WORKS DEPARTMENT SD SHIVAMOGGA
|
4.5769
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Apr 2021
|
Stage-I Approval on
|
:
|
25 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
12 Oct 2023
|
|
|
|
08 Nov 2023
|
26
|
Karnataka
|
FP/KA/ROAD/141816/2021
|
FEE 110 FLL 2021e
|
Diversion of 0.913 ha Forest land of FSy No.25 of Thindlu village and FSy No.7 of Tarabahalli village of Jadigenahalli Hobli Hosakote Taluk, Bangalore Rural District, Karnataka state for Special road repairs and Improvement to road from IOCL connecting to HP gas and reaching to ITC Foods Ltd from IOCL junction to upto Sy No.19/1 Thindlu Village.
|
Road
|
EXECUTIVE ENGINEER, PUBLIC WORKS PORTS & INLAND WATER TRANSPORT DEPARTMENT (PWP & WTD) BANGALORE DIVISION
|
0.913
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Apr 2021
|
Stage-I Approval on
|
:
|
03 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
22 Feb 2023
|
|
|
|
23 Oct 2024
|
27
|
Karnataka
|
FP/KA/TRANS/42624/2019
|
F. No.4-KRB 1246/2020-BAN
|
Establishment of 1x12.5 MVA, 66/11kV Substation at Kunur in Kanakapura Taluk, Ramanagara District and Construction of 66kV SC line on DC towers from existing 66/11kV Harobele Substation to proposed 66/11kV Kunur substation for a distance of 7.297Kms in Kanakapura Taluk, Ramanagara District.
|
Transmission Line
|
MAJOR WORKS DIVISION KPTCL RAMANAGARA
|
1.121
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Oct 2019
|
Stage-I Approval on
|
:
|
30 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jan 2024
|
|
|
|
01 Aug 2024
|
28
|
Karnataka
|
FP/KA/OFC/64054/2020
|
F.No.4-KRB1369/2022-BAN
|
Jio digital optical fiber underground cable along RoW of road in Jamakandi, Huliyal and Siddhapura villages, Jamakhandi Taluk, Bagalkot District
|
Optical Fibre Cable
|
JIO DIGITAL FIBER PRIVATE LIMITED
|
0.101
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Nov 2020
|
Stage-I Approval on
|
:
|
05 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
22 Dec 2023
|
|
|
|
27 Jun 2024
|
29
|
Karnataka
|
FP/KA/WATER/8136/2014
|
4-KRB 1061/2015
|
multivillage water supply scheme to sarjapur & other 16 villages in ron taluka
|
Drinking Water
|
EXECUTIVE ENGINEER
|
0.7527
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Nov 2014
|
Stage-I Approval on
|
:
|
20 Aug 2015
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jul 2022
|
|
|
|
14 Mar 2023
|
30
|
Karnataka
|
FP/KA/MIN/44719/2020
|
F.No.4-KRB1483/2024-BAN
|
Diversion of 3.862 Ha for Road Purpose of Forest land in Connection with obtaining Forest Clearance to Ms Kirloskar Bharath Mines ML No.2245 (Swamymalai BLock)
|
Mining
|
KIRLOSKAR FERROUS INDUSTRIES LTD
|
3.862
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jun 2020
|
Stage-I Approval on
|
:
|
03 Apr 2024
|
Compliance Report Submitted by User Agency on
|
:
|
22 Apr 2024
|
|
|
|
19 Sep 2024
|
31
|
Karnataka
|
FP/KA/ROAD/28960/2017
|
4-KRC1171/2018-BAN
|
Strengthening and Widening of existing National Highway from Bellary (Km 253.600) to Hiriyur (Km 413.500) section of NH150A (Involving Forest land from Km 283.500 to Km 413.500).
|
Road
|
NHAI PIU HOSPET
|
32.28
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Nov 2017
|
Stage-I Approval on
|
:
|
21 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
14 Aug 2023
|
|
|
|
17 Oct 2023
|
32
|
Karnataka
|
FP/KA/RAIL/19574/2016
|
4-KRB 1103/ 2017-BAN
|
For laying of double railway line between Oddarahalli & Makalidurga Railway Station, Doddaballapura Taluk Bangalore Rural District & Rural Division in favour of the Deputy Chief Engineer / HQ/Construction /South Western Railway /Bangalore Cantonment.
|
Railway
|
SOUTH WESTERN RAILWAY CONSTRUCTION
|
3.5062
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 May 2016
|
Stage-I Approval on
|
:
|
01 Feb 2017
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jul 2022
|
|
|
|
24 Feb 2023
|
33
|
Karnataka
|
FP/KA/IRRIG/6617/2014
|
FEE 70 FLL 2017
|
Shiggaon Lift Irrigation Scheme - Diversion weir
|
Irrigation
|
EXECUTIVE ENGINEER
|
0.96
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Aug 2014
|
Stage-I Approval on
|
:
|
30 Aug 2017
|
Compliance Report Submitted by User Agency on
|
:
|
11 Dec 2020
|
|
|
|
02 Dec 2022
|
34
|
Karnataka
|
FP/KA/ROAD/26269/2017
|
No.4-KRB1166/2018-BAN
|
Rehabilitation and upgrading of the existing road to 2-lane with paved shoulders/ 4 lane configuration from Km 438.475 (proposed Km 435.250) Harohalli to 461.550 (proposed Km 458.420) Nice Road section of NH – 209 in the State of Karnataka - Bangalore Urban District
|
Road
|
NHAI PIU RAMANAGARA
|
1.894
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 May 2017
|
Stage-I Approval on
|
:
|
22 Jul 2019
|
Compliance Report Submitted by User Agency on
|
:
|
12 May 2022
|
|
|
|
24 Jun 2022
|
35
|
Karnataka
|
FP/KA/WATER/46598/2020
|
4-KRC1477/2023-BAN
|
Laying of water pipeline & ancillary works, in forest land, in Tergaon, Kawalwad & other 91 villages (113 Habitations) in Haliyal Taluka of Uttar Kannada district in favour of "Executive Engineer Rural Drinking Water Supply and Sanitation Division Karwar."
|
Drinking Water
|
ASST EXECUTIVE ENGINEER RURAL DRINKING WATER AND SANITATION SUB DIVISION HALIYAL
|
8.8537
|
Pending at DFO for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jun 2020
|
Stage-I Approval on
|
:
|
21 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 May 2024
|
|
|
|
|
36
|
Karnataka
|
FP/KA/WATER/27276/2017
|
No.4-KRC1234/2020-BAN
|
Vented Barrage to Gangavali River
|
Drinking Water
|
KARNATAKA URBAN WATER SUPPLY AND DRAINAGE BOARD
|
34.98
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jul 2017
|
Stage-I Approval on
|
:
|
12 Nov 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Sep 2022
|
|
|
|
09 Dec 2022
|
37
|
Karnataka
|
FP/KA/TRANS/152682/2022
|
F. No.4-KRC1468/2023-BAN
|
Construction of 137.701 Kms of 400 KV Quad D/C Koppal PS- Narendra (New) Transmission Line passing through forest land in Sy No. 50/1 Mannerala Village and Sy No. 70/1,70/2, 70/3, 71, 73 and 89 of Mavinaitagi Village, Hanamasagara Hobli, Kushtagi Taluk, Koppal District for a length of 1.644 Kms (7.562 Ha.) by Koppal-Narendra Transmission Limited
|
Transmission Line
|
KOPPAL-NARENDRA TRANSMISSION LIMITED
|
7.562
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Feb 2022
|
Stage-I Approval on
|
:
|
02 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
01 Oct 2024
|
|
|
|
|
38
|
Karnataka
|
FP/KA/TRANS/23066/2016
|
4-KRB1157/2018-BAN
|
765KV S/C Dharmapuri (Salem) Madhugiri Transmission Line
|
Transmission Line
|
POWERGRID NM TRANSMISSION LTD
|
1.75
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Dec 2016
|
Stage-I Approval on
|
:
|
29 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
01 Oct 2018
|
|
|
|
21 Jun 2019
|
39
|
Karnataka
|
FP/KA/RAIL/155505/2022
|
F.No.4-KRA1364/2022-BAN
|
Construction of New BG Railway line in Forest lands in various villages of Shivamoogga and Dsvangere district in favour of Deputy Chief Engineer Construction South Western Railway Mysuru
|
Railway
|
SOUTH WESTERN RAILWAY CONSTRUCTION
|
47.91
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 May 2022
|
Stage-I Approval on
|
:
|
27 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
13 Feb 2023
|
|
|
|
23 Mar 2023
|
40
|
Karnataka
|
FP/KA/WATER/142465/2021
|
FEE 159 FLL 2022
|
Diversion of 0.914 Hectare of Forest Land in Vadiyondahalli village for providing water supply to Mahadevapura & other Villages , Arakere, Kasaba & K Shettihalli Hobli, Srirangapatna Taluk, Mandya
|
Drinking Water
|
RURAL DRINKING WATER & SANITATION SUB DIVISION, SHRIRANGAPATANA
|
0.914
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 May 2021
|
Stage-I Approval on
|
:
|
15 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jan 2024
|
|
|
|
|
41
|
Karnataka
|
FP/KA/RAIL/34288/2018
|
F.No.KRC1227/2020-BAN
|
Tinaighat-Castlerock-Caranzol Railway doubling of South Western Railways(in the state of Karnataka)
|
Railway
|
SOUTH WESTERN RAILWAY
|
10.45
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jun 2018
|
Stage-I Approval on
|
:
|
04 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
09 Feb 2022
|
|
|
|
05 Apr 2022
|
42
|
Karnataka
|
FP/KA/ROAD/38636/2019
|
F.No.4-KRB1301/2021-BAN
|
Widening and Improvement of the existing road of NH - 161 A (old SH-15) to 4 lane from Karnataka - Maharashtra Border (Km0.000) to Bidar (Km 45+878)
|
Road
|
NATIONAL HIGHWAYS AUTHORITY OF INDIA GULBARGA
|
4.7417
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Feb 2019
|
Stage-I Approval on
|
:
|
23 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 May 2022
|
|
|
|
01 Feb 2023
|
43
|
Karnataka
|
FP/KA/ROAD/30938/2017
|
4-KRA /1178-2019-BAN
|
Four laning of Tumkur - Shimoga Section of NH-206 under NHDP Phase IV between Chainage km 12+310 and km 217+000
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU SHIMOGA
|
40.2625
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Dec 2017
|
Stage-I Approval on
|
:
|
20 Feb 2019
|
Compliance Report Submitted by User Agency on
|
:
|
15 Sep 2021
|
|
|
|
09 Dec 2021
|
44
|
Karnataka
|
FP/KA/MIN/48654/2020
|
F.No.4-KRB1348/2022-BAN/
|
To access existing approach road to M.L No 2545 Jaisinghpur Iron Ore Mines, Ramghad Block Forest, Jaisinghpur Village, Sandur Taluk, Bellary District. In favour of M/s Lakshmi Minerals, Hospet
|
Mining
|
LAKSHMI MINERALS
|
0.32
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Aug 2020
|
Stage-I Approval on
|
:
|
06 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Oct 2023
|
|
|
|
31 Jan 2025
|
45
|
Karnataka
|
FP/KA/ROAD/41432/2019
|
No.4-KRB1231/2020-BAN
|
Construction of proposed 4 lane ROB and its approachers in lieu of existing level crossing No. 48/E @ km 66.900 on NH-50 (Railway Chainage 96/6-7) near Noubad in the state of Karnataka
|
Road
|
EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION
|
0.3221
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Aug 2019
|
Stage-I Approval on
|
:
|
13 Mar 2020
|
Compliance Report Submitted by User Agency on
|
:
|
08 Dec 2021
|
|
|
|
20 Jan 2022
|
46
|
Karnataka
|
FP/KA/WATER/13361/2015
|
No.4-KRB1187/2019-BAN
|
DRINKING WATER TO SUBRAMANYA MATT
|
Drinking Water
|
SRI SRI VIDYA PRASANNA THEERTHA SWAMIJI, SRI SUBRAMANYAN MUTT, KUKKE SUBRAMANYA
|
0.082
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2015
|
Stage-I Approval on
|
:
|
23 Jul 2019
|
Compliance Report Submitted by User Agency on
|
:
|
05 Sep 2019
|
|
|
|
21 Jan 2020
|
47
|
Karnataka
|
FP/KA/ROAD/41019/2019
|
F.No.4-KRC1359/2022-BAN
|
Diversion of 5.724414 Ha of forest land for work of “Widening to Two Lane with Paved Shoulders from km 24.600 to km 70.063 (45.463kms) of Mudigere - Kadur Section of NH-173 on EPC mode in the State of Karnataka” Job No. KNT-NH-173-2017-18-873
|
Road
|
NATIONAL HIGHWAY DIVISION HASSAN
|
5.724414
|
Pending at DFO for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jul 2019
|
Stage-I Approval on
|
:
|
30 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jul 2023
|
|
|
|
|
48
|
Karnataka
|
FP/KA/WATER/24468/2017
|
FEE 09 FLL 2018
|
providing drinking water supply pipeline extension at kalmale in bantwal taluk
|
Drinking Water
|
RURAL DRINKING WATER SUPPLY AND SANITATION DEPARTMENT
|
0.01255
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Feb 2017
|
Stage-I Approval on
|
:
|
12 Feb 2018
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jan 2024
|
|
|
|
|
49
|
Karnataka
|
FP/KA/TRANS/21198/2016
|
4-KRC1144/2018-BAN
|
Construction 220/220KV MC line for shifting of existing 220KV B1, B2 & B3,B4 lines at proposed HAL land premises near Bidare Hallada kavalu village in Gubbi taluk Tumkur District
|
Transmission Line
|
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
|
9.437
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Dec 2016
|
Stage-I Approval on
|
:
|
15 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
18 Nov 2022
|
|
|
|
26 Dec 2022
|
50
|
Karnataka
|
FP/KA/TRANS/23165/2016
|
4-KRC 1143/2018-BAN
|
CONSTRUCTION OF THE PROPOSED 110KV D/C NARROW BASED TOWERS (KPTCL DESIGN). FOR THE SHIFTING OF EXISTING 110KV S/C NITTUR - DODDAGUNI LINES AT PROPOSED HAL FACTORY LAND PREMISSES, NEAR BIDAREHALLADAKAVALU VILLAGE LIMITS. IN GUBBI TALUK, TUMKUR DISTRICT
|
Transmission Line
|
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
|
5.237
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Dec 2016
|
Stage-I Approval on
|
:
|
15 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
18 Nov 2022
|
|
|
|
26 Dec 2022
|
|