Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Uttar Pradesh
|
FP/UP/Pipeline/115789/2020
|
P-85/81-2-2021-800(98)/2021
|
Forest Land Proposed to be diverted for laying of 4'', 6'', 8'', 10'' dia steel gas pipeline along Bareilly Mod to Pakka Pul from Ch. 0.00 to 4.00, Bareilly Mod- Pipraula Ahmadpur SH-29 from Ch. 469.0
|
Pipeline
|
Hindustan Petroleum Corporation Limited
|
0.66
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Dec 2020
|
Stage-I Approval on
|
:
|
04 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2025
|
|
|
|
10 Apr 2025
|
2
|
Uttar Pradesh
|
FP/UP/Approach/157266/2022
|
157262
|
PROPOSAL FOR THE DIVERSION OF ROAD SIDE PROTECTED FOREST LAND ON SADABAD-JALESAR ROAD (SH-122) LHS, KM STONE NO-49, CH. 48.633, AT KHASRA NO.- 1096(MI), VILLAGE-SAHPAU, TEHSIL- SADABAD, DISTRICT- HATHRAS, FOR THE CONSTRUCTION OF APPROACH TO PROPOSED HPCL NRO
|
Approach Access
|
HPCL AGRA RO
|
0.0781246
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jun 2022
|
Stage-I Approval on
|
:
|
19 Feb 2025
|
Compliance Report Submitted by User Agency on
|
:
|
21 Mar 2025
|
|
|
|
25 Mar 2025
|
3
|
Uttar Pradesh
|
FP/UP/Pipeline/152159/2022
|
P-358/81-2-2022-800(393)/2022
|
Proposed Protected Forest Land to be diverted for laying of 4" Dia Natural Gas pipeline along the Moradabad to Chandausi Road NH-509 LHS (Old NH-93) (Ch : 192.320 to 197.450 km) for approx 5.13 KM and Budaun to Chandausi Road SH-43 LHS (Ch :42.000 to 44.170 km) for approx 2.17 KM in Sambhal District (U.P)
|
Pipeline
|
TORRENT GAS PRIVATE LTD
|
0.438
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Feb 2022
|
Stage-I Approval on
|
:
|
12 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
02 May 2023
|
|
|
|
28 Feb 2024
|
4
|
Uttar Pradesh
|
FP/UP/ROAD/148569/2021
|
P-162/81-2-2023-800(159)/2023
|
Construction of 4 laning of Ghazipur –Ballia- UP/Bihar New Greenfield section from Km. 0.000 to 117.120 of NH-31 and construction of new Buxar Spur connectivity from km 0.000 to km 17.270 in the Ballia district of Uttar Pradeshstate
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU AZAMGARH
|
0.49
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2021
|
Stage-I Approval on
|
:
|
20 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Dec 2023
|
|
|
|
28 Feb 2024
|
5
|
Uttar Pradesh
|
FP/UP/Pipeline/143184/2021
|
P-363/81-2-2022-800(361)/2022
|
Laying Of Gas Pipe Line Along Ghanta Ghar Road, Lucknow road, Sandi road (Ch. 0.0-2.5km,and 2.0 Km) for approx. 4.5 km in Distt. Hardoi
|
Pipeline
|
HINDUSTAN PETROLEUM COORPERATION LIMITED
|
0.2475
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jun 2021
|
Stage-I Approval on
|
:
|
12 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
23 Aug 2023
|
|
|
|
14 Sep 2023
|
6
|
Uttar Pradesh
|
FP/UP/Others/143253/2021
|
BS 101/81-2-2022-800(277)/2022
|
Reliance 4G Project for Laying of OFC along with road on NH-731(Old NH-56) (Lucknow-Sultanpur Road) from Km. 64.00 to Km. 112.80 & NH-96(330) (Ayodhya-Sultanpur-Prayagraj Road) from Km.69.00 to Km 79.80. Total Km. 59.60 & 0.6281 Ha. in Social Forestry Division Amethi, District - Amethi -UP.
|
Others
|
Reliance Jeo Infocomm Ltd
|
0.6281
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2021
|
Stage-I Approval on
|
:
|
26 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
12 May 2023
|
|
|
|
29 Aug 2023
|
7
|
Uttar Pradesh
|
FP/UP/Pipeline/153250/2022
|
995/81-2-2023-800(387)/2022
|
Diversion of 0.0316 Ha of Protected Forest Land in Bareilly District for LMC GAIL SV 11 Chaubari to HPCL CGS Station of total length of 0.785 Km
|
Pipeline
|
GAIL INDIA LIMITED
|
0.0316
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Mar 2022
|
Stage-I Approval on
|
:
|
13 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
13 Jun 2023
|
|
|
|
29 Aug 2023
|
8
|
Uttar Pradesh
|
FP/UP/Pipeline/153911/2022
|
P-297/81-2-2022-800(319)/2022
|
Green Gas Limited project for Laying of 10" Carbon Steel Gas Pipeline along NH - 731 (Left Side) from Km. 112.000 to Km. 115.588, from Km 122.413 to Km 129.293 & from Km 147.725 to Km 148.825 of Total Km. 11.568 & 0.34704 Ha. of Protected Forest in Social Forestry Division Amethi, District - Amethi, UP.
|
Pipeline
|
GREEN GAS LIMITED
|
0.34704
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Mar 2022
|
Stage-I Approval on
|
:
|
26 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
12 May 2023
|
|
|
|
29 Aug 2023
|
9
|
Uttar Pradesh
|
FP/UP/Pipeline/152073/2022
|
P-305/81-2-2022-800(307)/2022
|
Laying of Gas Pipeline along Etawah-Chakeri Road (NH-19), from Bamhora Humyounpur (Auraiya District Boundary) to Near Reliance Pump Etawah in Between CH. No. 348+000 to CH. No. 323+55 (RHS) in District Etawah.
|
Pipeline
|
TORRENT GAS PRIVATE LIMITED
|
1.46265
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2022
|
Stage-I Approval on
|
:
|
12 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jun 2023
|
|
|
|
29 Aug 2023
|
10
|
Uttar Pradesh
|
FP/UP/Pipeline/53780/2020
|
P-77/81-2-2021-800(73)/2021
|
Indraprastha Gas Limited project for Laying of 12" NB Carbon Steel Gas Pipeline, 125 mm MDPE & 50 mm Duct in same trench along NH - 24 (New NH - 9) (Delhi - Lucknow Road) from Km. 34.00 to Km. 49.800. Total Km. 15.80 & 0.7900 Ha. in Forest Division Hapur, District Hapur-UP.
|
Pipeline
|
INDRAPRASTHA. GAS LTD.
|
0.79
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Nov 2020
|
Stage-I Approval on
|
:
|
08 Apr 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Feb 2023
|
|
|
|
23 May 2023
|
11
|
Uttar Pradesh
|
FP/UP/Pipeline/52661/2020
|
P-238/81-2-2021-800(194)/2021
|
Protected Forest Land Proposed to be diverted for Laying of Gas Pipeline along Etawah-Chakeri Road(Rind River-Kisan Nagar) NH-19 from Ch.450.96 to 453.07 in District:Kanpur Nagar
|
Pipeline
|
TORRENT GAS PRIVATE LIMITED
|
0.1015
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Nov 2020
|
Stage-I Approval on
|
:
|
31 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2022
|
|
|
|
18 May 2023
|
12
|
Uttar Pradesh
|
FP/UP/Others/26800/2017
|
P-148/14-2-2017-800(153)/2017
|
Reliance 4G project for Laying of Optical Fibre Cable (OFC) along with Km. 0.00 to Km. 22.00 (Fatehpur to Joniha Marg), Km. 0.00 to Km. 36.00 Jonhia to Amoli (Sathigawan Road) & Km. 0.00 to Km. 16.00 Bindki to Fatehpur Marg (ODR), Km. 6.00 to Km. 15.00 Chaugdra to Bindki Marg (MDR-15) & Ganga Bridge to Fatehpur road on SH-13 Km 195.00 to 207.00 To
|
Others
|
Reliance Jeo Infocomm Ltd
|
0.9842
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jun 2017
|
Stage-I Approval on
|
:
|
12 Feb 2018
|
Compliance Report Submitted by User Agency on
|
:
|
23 Aug 2022
|
|
|
|
28 Apr 2023
|
13
|
Uttar Pradesh
|
FP/UP/Others/143114/2021
|
P-179/81-2-2022-800(185)/2022
|
Reliance 4G Project for Laying of OFC along with road on NH-731(Old NH-56) (Lucknow-Sultanpur Road, Left Side) from Km 35.00 to Km 64.00, MDR (Barabanki-Zaidpur-Siddhaur-Deviganj-Bhitariya Road, Left Side) from Km 33.788 to Km 43.788. Total Km 39.00 & 0.4110 Ha. in Social Forestry Division Barabanki-UP.
|
Others
|
Reliance Jeo Infocomm Ltd
|
0.411
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Aug 2021
|
Stage-I Approval on
|
:
|
28 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
15 Mar 2023
|
|
|
|
28 Apr 2023
|
14
|
Uttar Pradesh
|
FP/UP/Pipeline/152636/2022
|
P-370/81-2-2022-800(378)/2022
|
Proposed Forest Land to be diverted for Laying of Gas Pipe Line along Lal Fatak (SH-33) Road (Ch 0.370 to 2.620) for approx 2.25 Kms District- Bareilly, UP
|
Pipeline
|
Hindustan Petroleum Corporation Limited
|
0.12375
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Feb 2022
|
Stage-I Approval on
|
:
|
27 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 Mar 2023
|
|
|
|
21 Apr 2023
|
15
|
Uttar Pradesh
|
FP/UP/Pipeline/141464/2021
|
2709/81-2-2022-800(274)/2022
|
Proposed Forest Land to be diverted for Laying of HPCL Gas Pipe Line NH-09 Moradabad-Rampur Road, Distt- Moradabad, under City Gas distribution project
|
Pipeline
|
Hindustan Petroleum Corporation Limited
|
0.57145
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Apr 2021
|
Stage-I Approval on
|
:
|
03 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jan 2023
|
|
|
|
15 Feb 2023
|
16
|
Uttar Pradesh
|
FP/UP/Pipeline/118863/2021
|
P-97/81-2-2021-800(95)/2021
|
Permission for laying of Gas Pipeline along the Shikohabad-Bhogaon Road SH-84 CH. 49.00 to 61.80 in Distt Mainpuri
|
Pipeline
|
HINDUSTAN PETROLEUM COORPERATION LIMITED
|
0.704
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jan 2021
|
Stage-I Approval on
|
:
|
05 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
16 Dec 2022
|
|
|
|
15 Feb 2023
|
17
|
Uttar Pradesh
|
FP/UP/Pipeline/149929/2021
|
BS 96/81-2-2022-800(247)/2022
|
City Gas Distribution Project in Shahjahanpur District of Uttar Pradesh State
|
Pipeline
|
Hindustan Petroleum Corporation Limited
|
4.0945
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2022
|
Stage-I Approval on
|
:
|
14 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jan 2023
|
|
|
|
15 Feb 2023
|
18
|
Uttar Pradesh
|
FP/UP/Others/146071/2021
|
P-309/81-2-2022-800(323)/2022
|
Laying oI 12 dia natural gas pipe line at various roads, Muzaffarnagar Border to Nagli Tirth Road, NH- S8 km. chainage 90.290 to 85.800, total length 4.490 km. total length hectare 0.2245 ha in socia
|
Others
|
INDRAPRASTHA GAS LIMITED
|
0.2245
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Aug 2021
|
Stage-I Approval on
|
:
|
26 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jan 2023
|
|
|
|
10 Feb 2023
|
19
|
Uttar Pradesh
|
FP/UP/TRANS/146255/2021
|
P-168/81-2-2022-800(176)/2022
|
Construction of 765 KV D/C Sikar-II -Aligarh Transmission line(Package-TW03) Under Transmission Scheme for evacuation of power from Solar Energy Zones in Rajasthan (8.1GW)under phase=II part-D, through tariff based competitive bidding (TBCB) Route in District Mathura & Aligarh (Utter Pradesh)
|
Transmission Line
|
SIKAR -II ALIGARH TRANSMISSION LIMITED (A 100% WHOLLY OWNED SUBSIDIARY OF POWERGRID CORPORATION OF INDIA LIMITED)
|
0.5293
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Aug 2021
|
Stage-I Approval on
|
:
|
24 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
10 Dec 2022
|
|
|
|
31 Jan 2023
|
20
|
Uttar Pradesh
|
FP/UP/Pipeline/154062/2022
|
P-227/81-2-2022-800(225)/2022
|
Laying of 8" CS and 125mm MDPE gas pipe line at , Bhopa Road Transport Nagar to Jat Mujheda PWD Ch. Km. 79.400 to Km. 85.900 (Length 6.500 Km) and Jansath Flyover to Pawar Dharam kanta Sikheda NH 709 AD Ch. Km. 97.450 to Km. 104.450 (Length 7.000 KM) total length Km. 13.500 and total 0.6750 hac in Muzaffranagar,U.P.
|
Pipeline
|
INDRAPRASTHA GAS LIMITED
|
0.675
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Apr 2022
|
Stage-I Approval on
|
:
|
13 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 Dec 2022
|
|
|
|
31 Jan 2023
|
21
|
Uttar Pradesh
|
FP/UP/Pipeline/149748/2021
|
P-158/81-2-2022-800(152)/2022
|
Laying of Carbon Steel Gas Pipe Line (300mm) along with road on Chaudagra-Ghatampur-Bhognipur Marg (SH-46) from Km. 64 to Km. 57 (On R.H.S.) Km. 7.0 & Jahanabad-Amauli Marg (MDR-35) from Km. 0 to Km. 10 (On L.H.S.) Km. 10, Total Km. 17 & 0.850 Ha. In Forest Division/ Social Forestry Division Fatehpur, District-Fatehpur (UP).
|
Pipeline
|
INDRAPRASTHA GAS LIMITED NEW DELHI
|
0.85
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Apr 2022
|
Stage-I Approval on
|
:
|
13 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
15 Nov 2022
|
|
|
|
06 Dec 2022
|
22
|
Uttar Pradesh
|
FP/UP/Pipeline/148454/2021
|
P-91/81-2-2022-800(95)/2022
|
Indraprastha Gas Ltd project for Laying of 8" NB Carbon Steel Gas Pipeline, 125 mm MDPE & 50 mm Duct in same trench along Old NH-24(Hapur City Area(Left Side)) from Km.49.800 to Km.54.00 & NH-235(Meerut-Hapur Road(Left Side)) from Km.28.500 to Km.31.300. Total Km 7.00 & 0.3500 Ha. in Forest Division Hapur, District Hapur-UP.
|
Pipeline
|
INDRAPRASTHA. GAS LTD.
|
0.35
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Oct 2021
|
Stage-I Approval on
|
:
|
01 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2022
|
|
|
|
11 Nov 2022
|
23
|
Uttar Pradesh
|
FP/UP/Others/30152/2017
|
P-47/81-2-2021-800(42)/2021
|
Reliance 4G Project for Laying of Optical Fibre Cable (OFC) along with road on left side of SH-75 (Bewa - Itawa - Domariyaganj Road) from Km. 0.00 to Km. 42.00 & NH - 233 (Basti - Bansi Road) from Km. 65.60 to Km. 46.00, Total Km. 61.60 & 0.6492 Ha. in Social Forestry Division Siddharthnagar – UP, District: Siddharthnagar - UP.
|
Others
|
Reliance Jeo Infocomm Ltd
|
0.6492
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Mar 2018
|
Stage-I Approval on
|
:
|
22 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
07 Sep 2022
|
|
|
|
04 Nov 2022
|
24
|
Uttar Pradesh
|
FP/UP/Pipeline/49544/2020
|
BS 167/81-2-2021-800(81)/2021
|
Laying gas pipeline along & acoross on Moradabad - Kanth road (Ch: 6.870 - 30.570 Km)
|
Pipeline
|
TORRENT GAS PVT LTD
|
1.4118
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Sep 2020
|
Stage-I Approval on
|
:
|
31 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 Aug 2022
|
|
|
|
22 Sep 2022
|
25
|
Uttar Pradesh
|
FP/UP/Pipeline/120198/2021
|
P-335/81-2-2021-800(36)/2022
|
Proposed Protected Forest Land to be diverted for Laying of Gas Pipeline along Badeban Chauraha-Company Bagh Chauraha and Basti Roadways-Plastic Complex in District Basti
|
Pipeline
|
TORRENT GAS PRIVATE LIMITED
|
0.35805
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jan 2021
|
Stage-I Approval on
|
:
|
28 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jun 2022
|
|
|
|
29 Aug 2022
|
26
|
Uttar Pradesh
|
FP/UP/Pipeline/122517/2021
|
P-162/81-2-2021-800(141)/2021
|
Laying of Proposed 6" Dia. Steel pipeline along the Moradabad to Chandausi NH-509 (Ch : 34.100 to 41.150 km)Left Side and (Ch :45.600 to 45.750 km) Right Side in Sambhal District (U.P)
|
Pipeline
|
TORRENT GAS PRIVATE LTD
|
0.4323
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Feb 2021
|
Stage-I Approval on
|
:
|
24 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Nov 2021
|
|
|
|
29 Aug 2022
|
27
|
Uttar Pradesh
|
FP/UP/Pipeline/123162/2021
|
P-14/81-2-2022-800(31)/2022
|
for Laying of Gas Pipeline along Lucknow-Sultanpur Road, NH-56 (New NH-731), (from Ch. No. 54.86 to Ch. No. 64.00, RHS) and along Haidergarh-Ramsanehi Ghat (SH-13) Road (from Ch. No. 0.00 to Ch. No. 11.23, LHS) in District: - Barabanki
|
Pipeline
|
TORRENT GAS PRIVATE LIMITED
|
1.0078
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Feb 2021
|
Stage-I Approval on
|
:
|
24 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 May 2022
|
|
|
|
29 Aug 2022
|
28
|
Uttar Pradesh
|
FP/UP/Pipeline/122734/2021
|
P-151/81-2-2021-800(142)/2021
|
Laying of Proposed 6" Dia. Steel pipeline (Ch:136.48 to 141.22 km) and 125 mm MDPE Gas pipeline (Ch:141.22 to 141.78 km) from along the CL Gupta to Stoneman Craft National Highway 09 Right Side in A
|
Pipeline
|
TORRENT GAS PRIVATE LTD
|
0.3182
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2021
|
Stage-I Approval on
|
:
|
24 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
09 Jun 2022
|
|
|
|
29 Aug 2022
|
29
|
Uttar Pradesh
|
FP/UP/Pipeline/60933/2020
|
1258/81-2-2021-800(44)/2021
|
Indraprastha Gas Limited project for Laying of 12" (300 mm) Carbon Steel Gas Pipeline along NH - 19 (Kanpur - Prayagraj Road) from Km. 507.500 to Km. 519.00. Total Km. 11.50 & 0.3450 Ha. in Social Forestry Division Fatehpur, District - Fatehpur UP.
|
Pipeline
|
INDRAPRASTHA. GAS LTD.
|
0.345
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Nov 2020
|
Stage-I Approval on
|
:
|
11 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 May 2022
|
|
|
|
18 Jul 2022
|
30
|
Uttar Pradesh
|
FP/UP/Pipeline/148458/2021
|
P-301/81-2-2021-800(20)/2022
|
Project for Laying of Carbon Steel Gas Pipe Line (300mm) along with road on Chaudagra-Ghatampur-Bhognipur Marg (SH-46) from Km. 82 to Km. 64 (On R.H.S.) Km. 18.0, Total Km. 18 & 0.900 Ha. In Forest Di
|
Pipeline
|
INDRAPRASTHA GAS LIMITED NEW DELHI
|
0.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Oct 2021
|
Stage-I Approval on
|
:
|
28 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 May 2022
|
|
|
|
22 Jun 2022
|
31
|
Uttar Pradesh
|
FP/UP/Others/146059/2021
|
P-324/81-2-2021-800(21)/2022
|
Laying of 12" dia natural gas pipe line at various roads, Khatoli by Pass to Muzafifarnagar Border, PWD km. chainage 0.00 to 9.200 km. NH- 58 km. chainage 92.290 to 90.290, total length 11.200 km. and
|
Others
|
INDRAPRASTHA GAS LIMITED
|
0.56
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Aug 2021
|
Stage-I Approval on
|
:
|
28 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 May 2022
|
|
|
|
22 Jun 2022
|
32
|
Uttar Pradesh
|
FP/UP/Others/146070/2021
|
P-325/81-2-2021-800(22)/2022
|
Laying of 8" & 4 dia natural gas pipe line at various roads,Thana Bhawan to Aziz Petrol Pump, NH- 709B old km. chainage 118.345 to 119.645, NH-709AD old km. chainage 38.000 to 43.000 and Vijay Takij to Carriers Wheels NH-709AD old chainage km. 37.200 to 31.700 hectare O.6050 in social forestry division Shamli
|
Others
|
INDRAPRASTHA GAS LIMITED
|
0.605
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Aug 2021
|
Stage-I Approval on
|
:
|
28 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
17 May 2022
|
|
|
|
17 Jun 2022
|
33
|
Uttar Pradesh
|
FP/UP/Others/21754/2016
|
P-52/81-2-2019-800(57)/2019
|
Forest Land to be diverted for Exit/Entry Apprpach of Bharat Petroleum Corporation Limited(BPCL) Retail Outlet on Bisalpur-Bilsanda Road (MDR-62P), at from CH. 3.807 to 3.842,(LHS)
|
Others
|
BHARAT PETROLEUM CORPORATION LIMITED
|
0.061624
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Oct 2016
|
Stage-I Approval on
|
:
|
09 Sep 2019
|
Compliance Report Submitted by User Agency on
|
:
|
30 Apr 2022
|
|
|
|
16 Jun 2022
|
34
|
Uttar Pradesh
|
FP/UP/TRANS/33687/2018
|
P-143/14-2-2018-800(127)/2018
|
Protected Forest Land Proposed to Diverted FOR Laying 132 KV Underground Power distribution Cable in between 132KV S/S Teliarganj and 132KV S/S Minto Park in Allahabad City
|
Transmission Line
|
ELECTRICITY TRANSMISSION DIVISION II UPPTCL ALLAHABAD
|
0.298
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2018
|
Stage-I Approval on
|
:
|
03 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
13 Jul 2021
|
|
|
|
10 Jun 2022
|
35
|
Uttar Pradesh
|
FP/UP/ROAD/35290/2018
|
P-29/81-2-2020-800(85)/2019
|
WIDENING & STRENGTHENING OF NAUGARH TO BANDH ROAD FROM KM 0.00 TO 12.000 UNDER ROAD CONNECTIVITY PROJECT ON LEFT WING EXTREMISM AREA (RCPLWEA) IN TAH.-NAUGARH, DISTT.-CHANDAULI BY TEMPORARY-DIVISION (P.P.), P.W.D., CHANDAULI (U.P.)
|
Road
|
EE PMGSY PWD CHANDAULI
|
9.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Aug 2018
|
Stage-I Approval on
|
:
|
11 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
30 Apr 2021
|
|
|
|
26 May 2022
|
36
|
Uttar Pradesh
|
FP/UP/ROAD/35276/2018
|
P-30/81-2-2020-800(85)/2019
|
WIDENING & STRENGTHENING OF NAUGARH TO CHAKARGHATTA ROAD FROM KM 0.00 TO 7.500 UNDER ROAD CONNECTIVITY PROJECT ON LEFT WING EXTREMISM AREA (RCPLWEA) IN TAH.-NAUGARH, DISTT.-CHANDAULI BY TEMPORARY-DIVISION (P.P.), P.W.D., CHANDAULI (U.P.)
|
Road
|
EE PMGSY PWD CHANDAULI
|
6.75
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Aug 2018
|
Stage-I Approval on
|
:
|
11 Jun 2020
|
Compliance Report Submitted by User Agency on
|
:
|
30 Apr 2021
|
|
|
|
26 May 2022
|
37
|
Uttar Pradesh
|
FP/UP/OFC/34588/2018
|
2298/81-2-2020-800(48)/2020
|
M/s Vindhya Telelinks Pvt. Ltd., Mohali project for Laying of Optical Fiber (OFC) along with road on Khaga-Vijaipur-Naraini-Santo-Aeorai-Rampur from KM. 0.0 To 27.50 Km & Khaga-Naubasta-Husainganj-Fatehpur From Km 0.0 To Km 59.00 .Total KM 86.50 KM & 0.8961 Ha. In Forest Division, District: Fatehpur , UP
|
Optical Fibre Cable
|
VINDHYA TELELINKS LIMITED
|
0.8961
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jul 2018
|
Stage-I Approval on
|
:
|
23 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
16 Mar 2021
|
|
|
|
12 May 2022
|
38
|
Uttar Pradesh
|
FP/UP/Pipeline/120844/2021
|
2404/81-2-2021-800(138)/2021
|
Diversion of Forest land(Area-2.3544 Ha.)for Laying of U/G Gas P/L along Rd, 1) Moradabad–Chandausi (NH-509) Rd L/S Ch: 20.0-34.1 km, 2) Moradabad-Sambhal SH-148 L/S Ch: 6.18-16.140 Km, 3) Meerut- barelly Rd Ch: 160. 05-164.10Km R/S, 4) Moradabad- Thakurdwara-Kashipur Rd (NH-734) Ch:0.0-2.2Km L/S, 5) Meerut- barelly Rd (NH-09) L/S Ch: 166.0-174.9
|
Pipeline
|
TORRENT GAS PRIVATE LTD
|
2.3544
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2021
|
Stage-I Approval on
|
:
|
08 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Feb 2022
|
|
|
|
04 May 2022
|
39
|
Uttar Pradesh
|
FP/UP/Pipeline/118228/2021
|
P-80/81-2-2021-800(79)/2021
|
Laying of Proposed 6" Dia. Steel Gas pipeline from Near Marque lmpex to Kundarki (Ch : 6.150 to 16.500 km) Moradabad-Chandausi National Highway.509 in Moradabad District (U.P)
|
Pipeline
|
TORRENT GAS MORADABAD LTD
|
0.6214
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jan 2021
|
Stage-I Approval on
|
:
|
09 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Nov 2021
|
|
|
|
04 May 2022
|
40
|
Uttar Pradesh
|
FP/UP/Pipeline/53597/2020
|
P-35/81-2-2021-800(25)/2021
|
Laying of Proposed 6" Dia. Steel pipeline along the Moradabad to Farrukhabad State Highway No. 43 (Ch : 4.420 to 5.820 km) in Moradabad District (U.P)
|
Pipeline
|
TORRENT GAS MORADABAD LTD
|
0.0841
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Nov 2020
|
Stage-I Approval on
|
:
|
13 Apr 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Nov 2021
|
|
|
|
02 May 2022
|
41
|
Uttar Pradesh
|
FP/UP/WATER/45140/2020
|
2672/81-2-2020-800(121)/2020
|
Protected Forest Land Proposed to be diverted for laying of Drinking Water Pipeline under Gurusarai-Garautha Water Supply Reorganizatin Scheme along Erach-Gurusarai(Mauranpur)Road in Km.16.00 to 27.00 Tehsil:Garautha,Dist:Jhansi
|
Drinking Water
|
CONSTRUCTION DIVISION UP JAL NIGAM JHANSI
|
0.654
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Mar 2020
|
Stage-I Approval on
|
:
|
16 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
04 Aug 2021
|
|
|
|
29 Apr 2022
|
42
|
Uttar Pradesh
|
FP/UP/Others/33389/2018
|
P-106/14-2-2018-800(97)/2018
|
Protected Forest Land Proposed to be diverted for Exit/Entry Approach to IOCL Retail Outlet on Allahabad-Gorakhpur Road SH-7(Allahabad-Murga Badshapur Road) in KM.45 Gata No.2638 Village:Mathiya-Bhikhpur, District:Jaunpur
|
Others
|
INDIAN OIL CORPORATION LTD VARANASI
|
0.075518
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2018
|
Stage-I Approval on
|
:
|
13 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
03 Mar 2022
|
|
|
|
28 Apr 2022
|
43
|
Uttar Pradesh
|
FP/UP/ROAD/35326/2018
|
P-62/81-2-2020-800(65)/2020
|
WIDENING & STRENGTHENING OF RAMPUR-BARKONIYA TO LAUA VIA MAUKALA ROAD FROM KM 0.00 TO 20.200 UNDER ROAD CONNECTIVITY PROJECT ON LEFT WING EXTREMISM AREA (RCPLWEA) IN TAH.-ROBERTSGANJ, DISTT. SONEBHADRA BY PMGSY-DIVISION, P.W.D., SONBHADRA.
|
Road
|
PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA
|
8.01
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Aug 2018
|
Stage-I Approval on
|
:
|
28 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2021
|
|
|
|
01 Apr 2022
|
44
|
Uttar Pradesh
|
FP/UP/ROAD/34160/2018
|
P-60/81-2-2020-800(65)/2020
|
WIDENING & STRENGTHENING OF RPK ROAD KM 45.00 TO CHARGADA, MANCHI, DEVHAR, DAREV, MADAPA ROAD FROM KM 0.00 TO 22.000 UNDER ROAD CONNECTIVITY PROJECT ON LEFT WING EXTREMISM AREA (RCPLWEA) IN TAH.- ROBERTSGANJ, DISTT. SONBHADRA BY PMGSY-DIVISION, P.W.D., SONEBHADRA.
|
Road
|
PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA
|
15.255
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jun 2018
|
Stage-I Approval on
|
:
|
28 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2021
|
|
|
|
01 Apr 2022
|
45
|
Uttar Pradesh
|
FP/UP/Others/121963/2021
|
P-113/81-2-2021-800(97)/2021
|
laying of 12"dia natuaral gas pipe line at various roads, Shiva Chowk to Thana Bhawan Tiraha Shamli Nh- 709B km chainagae 98.845 To 118.345) total length 19.500 km. total land 0.975ha. in Shamli fores
|
Others
|
INDRAPRASTHA GAS LIMITED DELHI
|
0.975
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2021
|
Stage-I Approval on
|
:
|
14 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
10 Nov 2021
|
|
|
|
31 Dec 2021
|
46
|
Uttar Pradesh
|
FP/UP/ROAD/29617/2017
|
P-35/14-2-2018-800(33)/2018
|
Forest Land Proposed to be diverted for Construction of two-Lane with paved shoulders Bahraich Bypass from KM.92.547 to 99.0 of NH-28C in the state of Uttar Pradesh
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.7225
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Oct 2017
|
Stage-I Approval on
|
:
|
21 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
24 Sep 2021
|
|
|
|
29 Dec 2021
|
47
|
Uttar Pradesh
|
FP/UP/Others/121957/2021
|
P-108/81-2-2021-800(91)/2021
|
Laying of 12"&8" dia natural gas pipe line at avarious roads, Khatoli by Pass to Rana Chowk, NH-58 km. chainage 102.050 to 113.440, Suzroo Chowk, to Rana Chowk, PWD raoad km 3.000to 0.000), Charthawal
|
Others
|
INDRAPRASTHA GAS LIMITED DELHI
|
0.8445
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2021
|
Stage-I Approval on
|
:
|
16 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
11 Oct 2021
|
|
|
|
29 Dec 2021
|
48
|
Uttar Pradesh
|
FP/UP/Pipeline/116044/2020
|
P-52/81-2-2021-800(55)/2021
|
Laying of (300mm) Carbon Steel Gas Pipeline along NH-19 (Kanpur-Prayagraj Section) on L.H.S. from Km. 519.00 to Km. 552.00 (Length 33.0 Km) in Distt.-Fatehpur by Indraprastha Gas Ltd, New Delhi.
|
Pipeline
|
INDRAPRASTHA GAS LIMITED, NEW DELHI
|
0.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Dec 2020
|
Stage-I Approval on
|
:
|
30 Mar 2021
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jul 2021
|
|
|
|
24 Aug 2021
|
49
|
Uttar Pradesh
|
FP/UP/Others/33502/2018
|
2297/81-2-2020-800(49)/2020
|
VTL Project for Laying of Optical Fibre Cable (OFC) along with road on Kora Jahanabad-Amuli Modh-Jonhia Chauraha-Shahbajpur, Jonhia Chauraha-Bandhwa Tiraha-Laluli, Bandhwa Tiraha-Bahua , Total KM 72.50 & 0.7511 Ha. In Forest Division, District: FATEHPUR , UP
|
Others
|
VINDHYA TELELINKS LIMITED
|
0.7511
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 May 2018
|
Stage-I Approval on
|
:
|
23 Dec 2020
|
Compliance Report Submitted by User Agency on
|
:
|
16 Mar 2021
|
|
|
|
08 Apr 2021
|
50
|
Uttar Pradesh
|
FP/UP/ROAD/22408/2016
|
P-62/14-2-2017-800(62)/2017
|
NH-232 (Raebareilly - Banda Section)
|
Road
|
NHAI PIU RAEBAREILLY
|
0.7954
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Nov 2016
|
Stage-I Approval on
|
:
|
23 Jun 2017
|
Compliance Report Submitted by User Agency on
|
:
|
23 Dec 2020
|
|
|
|
24 Feb 2021
|
|