List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Tripura FP/TR/ROAD/143916/2021 3-TR A 065/2021-SHI Up-gradation of selected road stretches/Corridors to two lane with Paved Shoulder NH up-gradation of selected road stretches/Corridors to two lane with Paved Shoulder NH Configuration under BHARMALA project and National Highways Connectivity to backward areas/Religious/Tourist places of the country – Teliamura - Sabroom Section KM 0.00 to KM 108.6 Road NHIDCL PMU UDAIPUR 128.7364 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Jul 2021
Stage-I Approval on : 17 Nov 2022
Compliance Report Submitted by User Agency on : 30 May 2024
24 Jun 2024
2 Tripura FP/TR/TRANS/47082/2020 3-TR C 012/2021-SHI Diversion of 5.09487 Ha of Forest land for construction of 33kV Overhead line from Teliamura to Taidu under NERPSIP Transmission Line TRIPURA STATE ELECTRICITY CORPORATION LIMITED 5.09487 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Jul 2020
Stage-I Approval on : 05 May 2021
Compliance Report Submitted by User Agency on : 15 Apr 2024
14 May 2024
3 Tripura FP/TR/Pipeline/157421/2022 3 TR C 008/2023-SHI Proposal for Diversion of 37.8273 Foret Land for Laying Pipeline from Panisagar – Aizawl and Agartala – Tulamura Natural Gas Pipeline Project Under North Tripura, Sepahijala and Gomti Division. Pipeline INDRADHANUSH GAS GRID LIMITED 37.8273 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Jun 2022
Stage-I Approval on : 14 Jun 2023
Compliance Report Submitted by User Agency on : 20 Mar 2024
04 Apr 2024
4 Tripura FP/TR/TRANS/157144/2022 3-TR B 007/2023-SHI Proposal for Diversion of 3.663968 Ha of Forest land in connection with diversion and reconstruction of 132kV Single Circuit Agartala Grid to Dhalabil TL line due to widening of NH108B Transmission Line TRIPURA STATE ELECTRICITY CORPORATION LIMITED 3.66396 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Jun 2022
Stage-I Approval on : 28 Mar 2023
Compliance Report Submitted by User Agency on : 23 Feb 2024
28 Mar 2024
5 Tripura FP/TR/MIN/25897/2017 3-TR B 084/2020-SHI Drilling of location BMDE Mining ONGC 0.551 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 May 2017
Stage-I Approval on : 14 Mar 2023
Compliance Report Submitted by User Agency on : 13 Oct 2023
01 Nov 2023
6 Tripura FP/TR/Pipeline/157588/2022 3-TR B 052/2022-SHI Proposal for Diversion of Additional 2.0378 Ha Forest Land for laying Panisagar - Agartala Natural Gas Pipeline Project. Pipeline INDRADHANUSH GAS GRID LIMITED 2.0378 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jun 2022
Stage-I Approval on : 12 Jan 2023
Compliance Report Submitted by User Agency on : 13 Sep 2023
21 Sep 2023
7 Tripura FP/TR/MIN/143105/2021 3-TR B 009/2022-SHI Exploration through Drilling & Approach Road for Location RO#15A Mining ONGC 0.76229 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Jun 2021
Stage-I Approval on : 08 Feb 2023
Compliance Report Submitted by User Agency on : 21 Aug 2023
01 Sep 2023
8 Tripura FP/TR/MIN/145542/2021 3-TR C 029/2022-SHI Proposal for diversion of 5.24 Ha of forest land for construction of oil & gas well drilling including approach road at location TULA of Mouja Kalashi in favour of Oil India Limited under South Tripura District. Mining OIL INDIA LIMITED 5.24 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Aug 2021
Stage-I Approval on : 30 Dec 2022
Compliance Report Submitted by User Agency on : 01 Aug 2023
03 Aug 2023
9 Tripura FP/TR/MIN/145546/2021 3-TR C 028/2022-SHI Proposal for diversion of 5.47 Ha of forest land for construction of oil & gas well drilling including approach road at Location TULD of Mouja Silachari in favour of Oil India Limited under Gomati District. Mining OIL INDIA LIMITED 5.47 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Aug 2021
Stage-I Approval on : 30 Dec 2022
Compliance Report Submitted by User Agency on : 24 Jul 2023
31 Jul 2023
10 Tripura FP/TR/MIN/145135/2021 3-TR B 030/2022-SHI Proposal for diversion of 4.82 Ha of forest land for construction of oil & gas well drilling including approach road at Location TULB of Mouja Silachari in favour of Oil India Limited under Gomati District. Mining OIL INDIA LIMITED 4.82 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Aug 2021
Stage-I Approval on : 30 Dec 2022
Compliance Report Submitted by User Agency on : 24 Jul 2023
31 Jul 2023
11 Tripura FP/TR/MIN/145220/2021 3-TR C 027/2022-SHI Proposal for diversion of 9.40 Ha of forest land for construction of oil & gas well drilling including approach road at Location TULC of Mouja Silachari in favour of Oil India Limited under Gomati District. Mining OIL INDIA LIMITED 9.4 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Aug 2021
Stage-I Approval on : 10 Feb 2023
Compliance Report Submitted by User Agency on : 24 Jul 2023
31 Jul 2023
12 Tripura FP/TR/MIN/144493/2021 3-TR B 031/2022-SHI Exploration through Drilling, Waste-pit and Approach Road of Exploratory Location BRMAK Mining ONGC 1.98 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Jul 2021
Stage-I Approval on : 10 Feb 2023
Compliance Report Submitted by User Agency on : 11 Jul 2023
18 Jul 2023
13 Tripura FP/TR/TRANS/149768/2021 3-TR B 050/2022-SHI Proposal for Diversion of a Section of 132kv Rabindranagar- Belonia Line due to Garjee Railway Station under District Forest officer- Gomati Transmission Line TRIPURA STATE ELECTRICITY CORPORATION LIMITED 0.9 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Dec 2021
Stage-I Approval on : 07 Mar 2023
Compliance Report Submitted by User Agency on : 19 May 2023
26 May 2023
14 Tripura FP/TR/MIN/144616/2021 3-TR B 007/2022-SHI Exploration through Drilling and Waste Pit for Location BMDK Mining ONGC 1.36 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Jul 2021
Stage-I Approval on : 15 Nov 2022
Compliance Report Submitted by User Agency on : 03 Apr 2023
12 Apr 2023
15 Tripura FP/TR/Others/155506/2022 3-TR B 036/2022-SHI Proposal for diversion of forest land measuring 0.3858 Ha for construction of permanent sectionalizing valve (SV-1) Station for day-to-day monitoring and control for Panisagar - Agartala Natural Gas Pipeline operation Others INDRADHANUSH GAS GRID LIMITED 0.3858 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 May 2022
Stage-I Approval on : 12 Jan 2023
Compliance Report Submitted by User Agency on : 15 Feb 2023
07 Mar 2023
16 Tripura FP/TR/Others/155510/2022 3-TR B 037/2022-SHI Proposal for diversion of forest land measuring 0.2228 Ha for construction of permanent sectionalizing valve (SV-3) Station for day-to-day monitoring and control for Panisagar - Agartala Natural Gas Pipeline operation Others INDRADHANUSH GAS GRID LIMITED 0.2228 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 May 2022
Stage-I Approval on : 30 Sep 2022
Compliance Report Submitted by User Agency on : 02 Feb 2023
07 Mar 2023
17 Tripura FP/TR/Others/155511/2022 3-TR B 039/2022-SHI Proposal for diversion of forest land measuring 0.2390 Ha for construction of permanent sectionalizing valve (SV-4) Station for day-to-day monitoring and control for Panisagar - Agartala Natural Gas Pipeline operation Others INDRADHANUSH GAS GRID LIMITED 0.239 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 May 2022
Stage-I Approval on : 07 Oct 2022
Compliance Report Submitted by User Agency on : 02 Feb 2023
07 Mar 2023
18 Tripura FP/TR/ROAD/39905/2019 3-TR C 114/2019-SHI Improvement/ Widening of road from Machmara to Kanchanpur Road SRI RITAN KHISA 12.466122 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Apr 2019
Stage-I Approval on : 25 Feb 2020
Compliance Report Submitted by User Agency on : 22 Dec 2021
31 Jan 2023
19 Tripura FP/TR/Pipeline/128047/2021 3-TR C 063/2021-SHI Panisagar - Agartala Natural Gas Pipeline Project Pipeline INDRADHANUSH GAS GRID LIMITED 64.0179 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Mar 2021
Stage-I Approval on : 11 May 2022
Compliance Report Submitted by User Agency on : 20 Aug 2022
19 Jan 2023
20 Tripura FP/TR/ROAD/140077/2021 3-TR C 042/2021-SHI Proposal for diversion of 14.32 ha of forest land for improvement/ widening of road from Jatanbari to Mandirghat via Tirthamukh Road EXECUTIVE ENGINEER PWD AMARPUR DIVISION 14.32 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Apr 2021
Stage-I Approval on : 20 Jun 2022
Compliance Report Submitted by User Agency on : 28 Nov 2022
05 Dec 2022
21 Tripura FP/TR/REHAB/157310/2022 3-TR C 044/2022-SHI Proposal for diversion of 30 ha of forest land for resettlement of BRU Migrants and approach road of mouja Kala lawgang in favour of SDM Santirbazar Rehabilitation GOVERNMENT 30 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jun 2022
Stage-I Approval on : 06 Oct 2022
Compliance Report Submitted by User Agency on : 08 Nov 2022
14 Nov 2022
22 Tripura FP/TR/REHAB/153041/2022 3-TR C 019/2022-SHI Settlement and Rehabilitation of Bru migrant families along with approach road in Paschim Kalajhari RF Mouja under Karbook Sub division of Gomati District in Tripura Rehabilitation SDM KARBOOK 20.10889 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Mar 2022
Stage-I Approval on : 30 Aug 2022
Compliance Report Submitted by User Agency on : 22 Sep 2022
07 Oct 2022
23 Tripura FP/TR/MIN/53948/2020 3-TR B 054/2021-SHI Drilling of Exploratory Location ROBM Mining ONGC 3.054 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Nov 2020
Stage-I Approval on : 17 Mar 2022
Compliance Report Submitted by User Agency on : 29 Aug 2022
21 Sep 2022
24 Tripura FP/TR/MIN/21542/2016 3-TR B 116/2019-SHI Drilling of location BMDH Mining ONGC 1.74 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 May 2017
Stage-I Approval on : 17 Mar 2022
Compliance Report Submitted by User Agency on : 02 Aug 2022
10 Aug 2022
25 Tripura FP/TR/MIN/53577/2020 3-TR B 044/2021-SHI Exploration through Drilling, DSA, Waste-pit and Approach Road of Exploratory Location TMAB Mining ONGC 2.63 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Nov 2020
Stage-I Approval on : 23 Dec 2021
Compliance Report Submitted by User Agency on : 08 Jul 2022
25 Jul 2022
26 Tripura FP/TR/REHAB/50745/2020 3-TR C 093/2020-SHI Proposal for diversion of 25.00 ha of forest land for resettlement of Bru Migrants at Mouja- Gachirampara under Tehsil- Anandabazar, Subdivision- Kanchanpur, Dist.- North Tripura in favour of SDM, Kan Rehabilitation SUB-DIVISIONAL MAGISTRATE, KANCHANPUR 25 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Oct 2020
Stage-I Approval on : 25 Jan 2021
Compliance Report Submitted by User Agency on : 02 Jul 2022
11 Jul 2022
27 Tripura FP/TR/MIN/53358/2020 3-TR B 047/2021-SHI Drilling of Exploratory Location SDAH Mining ONGC 2.978 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Nov 2020
Stage-I Approval on : 23 Dec 2021
Compliance Report Submitted by User Agency on : 16 Jun 2022
05 Jul 2022
28 Tripura FP/TR/MIN/65526/2020 3-TR B 048/2021-SHI Exploration through Drilling, Waste Pit and Approach road for Location GODD Mining ONGC 1.56 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Nov 2020
Stage-I Approval on : 23 Dec 2021
Compliance Report Submitted by User Agency on : 02 Jun 2022
05 Jul 2022
29 Tripura FP/TR/TRANS/48165/2020 3-TR C 019/2021-SHI Diversion of 10.4483 Ha of Forest Land for construction of 33kV Pole line from Hezamara Substation to Dhalabil Substation under NERPSIP Tripura. Transmission Line TRIPURA STATE ELECTRICITY CORPORATION LIMITED 10.4483 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 30 Apr 2021
Compliance Report Submitted by User Agency on : 02 Feb 2022
04 Jul 2022
30 Tripura FP/TR/TRANS/48164/2020 3-TR C 013/2021-SHI Diversion of 18.1999 Ha of Forest Land for construction of 33kV Pole line from Jolaibari Substation to Silachari Substation under NERPSIP Tripura. Transmission Line TRIPURA STATE ELECTRICITY CORPORATION LIMITED 18.1999 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 17 Jun 2021
Compliance Report Submitted by User Agency on : 21 May 2022
24 Jun 2022
31 Tripura FP/TR/ROAD/40893/2019 3-TR C 066/2020-SHI Improvement of Gandacherra to Raishyabari road (L-32.00 km)/ Sh:- Widening, Strengthening, Retaining wall, Toe wall etc. Portion from 0.00 km to 28.50 km under RIDF Scheme of NABARD (RIDF-XXI). Road EXECUTIVE ENGINEER, PWD (R&B), AMBASSA DIVISION 23.9443 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2019
Stage-I Approval on : 15 Feb 2021
Compliance Report Submitted by User Agency on : 27 May 2022
10 Jun 2022
32 Tripura FP/TR/Pipeline/126024/2021 3 TR B 059/2021-SHI Laying of Proposed 18" Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Silchari to Panisagar Pipeline INDRADHANUSH GAS GRID LIMITED 1.8161 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Mar 2021
Stage-I Approval on : 13 Jan 2022
Compliance Report Submitted by User Agency on : 01 Jun 2022
08 Jun 2022
33 Tripura FP/TR/MIN/53710/2020 3-TR B 027/2021-SHI Exploration through Drilling, Waste Pit and DSA for Exploratory Location BMSU Mining ONGC 2.652 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Nov 2020
Stage-I Approval on : 06 Oct 2021
Compliance Report Submitted by User Agency on : 28 Mar 2022
11 Apr 2022
34 Tripura FP/TR/REHAB/142936/2021 3-TR B 045/2021-SHI Proposal for diversion of 5.00 ha. of forest land at Mouja MCRF under Sub-Divisional Magistrate, Longtharai Valley of Dhalai District Rehabilitation REVENUE DEPARTMENT 5 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2021
Stage-I Approval on : 29 Nov 2021
Compliance Report Submitted by User Agency on : 25 Feb 2022
29 Mar 2022
35 Tripura FP/TR/REHAB/145449/2021 3-TR C 058/2021-SHI Proposal for diversion of 10:00 ha. of forest land at Mouja MCRF under Sub-Divisional Magistrate, Longtharai Valley of Dhalai District Rehabilitation REVENUE DEPARTMENT 10 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jul 2021
Stage-I Approval on : 25 Nov 2021
Compliance Report Submitted by User Agency on : 29 Dec 2021
11 Mar 2022
36 Tripura FP/TR/REHAB/145330/2021 3-TR C 050/2021-SHI Proposal for diversion of additional 6.85 Ha. of forest land of Mouja-Damcherra for resettlement of Bru Migrants at location Kaskaupara in favour of SDM, Panisagar under North Tripura Rehabilitation SDM PANISAGAR 6.85 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Jul 2021
Stage-I Approval on : 25 Nov 2021
Compliance Report Submitted by User Agency on : 21 Dec 2021
23 Feb 2022
37 Tripura FP/TR/ROAD/39633/2019 3-TR C 023/2020-SHI Improvement of road from Gandacherra -Raishyabari road at ch:- 18.30 km to Narkelkunja (Length-8.0 km) for easy access for the tourist from Dhalai, North & Unakoti Districts Road EXECUTIVE ENGINEER, PWD (R&B), AMBASSA DIVISION 7.6163 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Apr 2019
Stage-I Approval on : 24 Aug 2020
Compliance Report Submitted by User Agency on : 22 Dec 2021
31 Jan 2022
38 Tripura FP/TR/TRANS/48163/2020 3-TR B 011/2021-SHI Diversion of 2.70 Ha of Forest Land for construction of 33kV Pole line from Jatanbari Substation to Dhalak Substation under NERPSIP Tripura. Transmission Line TRIPURA STATE ELECTRICITY CORPORATION LIMITED 2.705 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 17 Jun 2021
Compliance Report Submitted by User Agency on : 23 Dec 2021
31 Jan 2022
39 Tripura FP/TR/REHAB/142361/2021 3-TR C 046/2021-SHI Proposal for diversion of 10.05 ha of Forest land of Revenue Mouja Kulai RF Extenstion in favour of SDM, Ambassa under Dhalai District. Rehabilitation SUB-DIVISIONAL MAGISTRATE, AMBASSA SUB-DIVISION 10.05 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jun 2021
Stage-I Approval on : 30 Nov 2021
Compliance Report Submitted by User Agency on : 29 Dec 2021
25 Jan 2022
40 Tripura FP/TR/REHAB/143485/2021 3-TR C 049/2021-SHI Proposal for diversion of additional 15.00 Ha of forest land of Mouja-Damcherra for resettlement of Bru Migrant at location Wainbukcherra-Ranipara in favour of SDM, Panisagar under North Tripura District. Rehabilitation SDM PANISAGAR 15 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jul 2021
Stage-I Approval on : 25 Nov 2021
Compliance Report Submitted by User Agency on : 21 Dec 2021
13 Jan 2022
41 Tripura FP/TR/ROAD/141993/2021 3-TR B 043/2021-SHI Improvement & Widening to 2-lane with paved shoulder of Kailashahar to Fultali section of NH-208 (Package-I, Km 21.100 to Km 29.200) under Unakoti District Road PMU AGARTALA 0.201891 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 May 2021
Stage-I Approval on : 03 Sep 2021
Compliance Report Submitted by User Agency on : 03 Dec 2021
07 Dec 2021
42 Tripura FP/TR/ROAD/125152/2021 3-TR C 023/2021-SHI Improvement/ widening of two laning with paved shoulder of Kailasahar-Kurti Bridge Section of NH-208A (Km 0.00 to Km 36.460) under North Tripura District in the state of Tripura Road PMU AGARTALA 6.619991 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Mar 2021
Stage-I Approval on : 15 Jul 2021
Compliance Report Submitted by User Agency on : 03 Dec 2021
30 Nov 2021
43 Tripura FP/TR/MIN/38526/2019 3-TR B 098/2020-SHI BREB Mining ONGC 1.74 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 May 2019
Stage-I Approval on : 17 Jun 2021
Compliance Report Submitted by User Agency on : 27 Oct 2021
08 Nov 2021
44 Tripura FP/TR/MIN/21544/2016 3-TR B 095/2020-SHI Drilling of Development location GODA Mining ONGC 3.52 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 May 2017
Stage-I Approval on : 17 Jun 2021
Compliance Report Submitted by User Agency on : 02 Nov 2021
08 Nov 2021
45 Tripura FP/TR/MIN/21543/2016 3-TR B 075/2020-SHI Drilling and Waste Pit of location GODB Mining ONGC 1.74 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 May 2017
Stage-I Approval on : 17 Jun 2021
Compliance Report Submitted by User Agency on : 04 Oct 2021
21 Oct 2021
46 Tripura FP/TR/MIN/38943/2019 3-TR B 072/2020-SHI DRILLING OF EXPLORATORY LOCATION ROBL Mining ONGC 1.783 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Feb 2019
Stage-I Approval on : 17 Jun 2021
Compliance Report Submitted by User Agency on : 29 Sep 2021
21 Oct 2021
47 Tripura FP/TR/MIN/13521/2015 3-TR B 070/2018-SHI Drilling of location TIDD Mining ONGC 1.11 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Jun 2015
Stage-I Approval on : 06 Apr 2021
Compliance Report Submitted by User Agency on : 09 Sep 2021
04 Oct 2021
48 Tripura FP/TR/MIN/13528/2015 3-TR C 011/2018-SHI Drilling of location TIAG Mining ONGC 1.42 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Jun 2015
Stage-I Approval on : 12 Jan 2021
Compliance Report Submitted by User Agency on : 26 Aug 2021
13 Sep 2021
49 Tripura FP/TR/REHAB/49877/2020 3-TR C 064/2020-SHI Settlement & Rehabilitation of Bru migrant families in West Kalajhari RF Mouja of Amarpur Sub-Division of Gomati District in Tripura Rehabilitation SUB-DIVISIONAL MAGISTRATE, AMARPUR SUB-DIVISION, GUMTI DISTRICT 15 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Sep 2020
Stage-I Approval on : 22 Jan 2021
Compliance Report Submitted by User Agency on : 20 Aug 2021
06 Sep 2021
50 Tripura FP/TR/REHAB/50713/2020 3-TR C 094/2020-SHI Proposal for diversion of 25.00 ha of forest land for resettlement of Bru Migrants at Bhandarima of Mouja CCRF in favour of SDM, Kanchanpur under North Tripura District Rehabilitation SUB-DIVISIONAL MAGISTRATE, KANCHANPUR 25 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Oct 2020
Stage-I Approval on : 25 Jan 2021
Compliance Report Submitted by User Agency on : 18 Aug 2021
06 Sep 2021
12