Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Tripura
|
FP/TR/ROAD/143916/2021
|
3-TR A 065/2021-SHI
|
Up-gradation of selected road stretches/Corridors to two lane with Paved Shoulder NH up-gradation of selected road stretches/Corridors to two lane with Paved Shoulder NH Configuration under BHARMALA project and National Highways Connectivity to backward areas/Religious/Tourist places of the country – Teliamura - Sabroom Section KM 0.00 to KM 108.6
|
Road
|
NHIDCL PMU UDAIPUR
|
128.7364
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jul 2021
|
Stage-I Approval on
|
:
|
17 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
30 May 2024
|
|
|
|
24 Jun 2024
|
2
|
Tripura
|
FP/TR/TRANS/47082/2020
|
3-TR C 012/2021-SHI
|
Diversion of 5.09487 Ha of Forest land for construction of 33kV Overhead line from Teliamura to Taidu under NERPSIP
|
Transmission Line
|
TRIPURA STATE ELECTRICITY CORPORATION LIMITED
|
5.09487
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jul 2020
|
Stage-I Approval on
|
:
|
05 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
15 Apr 2024
|
|
|
|
14 May 2024
|
3
|
Tripura
|
FP/TR/Pipeline/157421/2022
|
3 TR C 008/2023-SHI
|
Proposal for Diversion of 37.8273 Foret Land for Laying Pipeline from Panisagar – Aizawl and Agartala – Tulamura Natural Gas Pipeline Project Under North Tripura, Sepahijala and Gomti Division.
|
Pipeline
|
INDRADHANUSH GAS GRID LIMITED
|
37.8273
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jun 2022
|
Stage-I Approval on
|
:
|
14 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Mar 2024
|
|
|
|
04 Apr 2024
|
4
|
Tripura
|
FP/TR/TRANS/157144/2022
|
3-TR B 007/2023-SHI
|
Proposal for Diversion of 3.663968 Ha of Forest land in connection with diversion and reconstruction of 132kV Single Circuit Agartala Grid to Dhalabil TL line due to widening of NH108B
|
Transmission Line
|
TRIPURA STATE ELECTRICITY CORPORATION LIMITED
|
3.66396
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2022
|
Stage-I Approval on
|
:
|
28 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
23 Feb 2024
|
|
|
|
28 Mar 2024
|
5
|
Tripura
|
FP/TR/MIN/25897/2017
|
3-TR B 084/2020-SHI
|
Drilling of location BMDE
|
Mining
|
ONGC
|
0.551
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 May 2017
|
Stage-I Approval on
|
:
|
14 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
13 Oct 2023
|
|
|
|
01 Nov 2023
|
6
|
Tripura
|
FP/TR/Pipeline/157588/2022
|
3-TR B 052/2022-SHI
|
Proposal for Diversion of Additional 2.0378 Ha Forest Land for laying Panisagar - Agartala Natural Gas Pipeline Project.
|
Pipeline
|
INDRADHANUSH GAS GRID LIMITED
|
2.0378
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jun 2022
|
Stage-I Approval on
|
:
|
12 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
13 Sep 2023
|
|
|
|
21 Sep 2023
|
7
|
Tripura
|
FP/TR/MIN/143105/2021
|
3-TR B 009/2022-SHI
|
Exploration through Drilling & Approach Road for Location RO#15A
|
Mining
|
ONGC
|
0.76229
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jun 2021
|
Stage-I Approval on
|
:
|
08 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2023
|
|
|
|
01 Sep 2023
|
8
|
Tripura
|
FP/TR/MIN/145542/2021
|
3-TR C 029/2022-SHI
|
Proposal for diversion of 5.24 Ha of forest land for construction of oil & gas well drilling including approach road at location TULA of Mouja Kalashi in favour of Oil India Limited under South Tripura District.
|
Mining
|
OIL INDIA LIMITED
|
5.24
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Aug 2021
|
Stage-I Approval on
|
:
|
30 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Aug 2023
|
|
|
|
03 Aug 2023
|
9
|
Tripura
|
FP/TR/MIN/145546/2021
|
3-TR C 028/2022-SHI
|
Proposal for diversion of 5.47 Ha of forest land for construction of oil & gas well drilling including approach road at Location TULD of Mouja Silachari in favour of Oil India Limited under Gomati District.
|
Mining
|
OIL INDIA LIMITED
|
5.47
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Aug 2021
|
Stage-I Approval on
|
:
|
30 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2023
|
|
|
|
31 Jul 2023
|
10
|
Tripura
|
FP/TR/MIN/145135/2021
|
3-TR B 030/2022-SHI
|
Proposal for diversion of 4.82 Ha of forest land for construction of oil & gas well drilling including approach road at Location TULB of Mouja Silachari in favour of Oil India Limited under Gomati District.
|
Mining
|
OIL INDIA LIMITED
|
4.82
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Aug 2021
|
Stage-I Approval on
|
:
|
30 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2023
|
|
|
|
31 Jul 2023
|
11
|
Tripura
|
FP/TR/MIN/145220/2021
|
3-TR C 027/2022-SHI
|
Proposal for diversion of 9.40 Ha of forest land for construction of oil & gas well drilling including approach road at Location TULC of Mouja Silachari in favour of Oil India Limited under Gomati District.
|
Mining
|
OIL INDIA LIMITED
|
9.4
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Aug 2021
|
Stage-I Approval on
|
:
|
10 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2023
|
|
|
|
31 Jul 2023
|
12
|
Tripura
|
FP/TR/MIN/144493/2021
|
3-TR B 031/2022-SHI
|
Exploration through Drilling, Waste-pit and Approach Road of Exploratory Location BRMAK
|
Mining
|
ONGC
|
1.98
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jul 2021
|
Stage-I Approval on
|
:
|
10 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2023
|
|
|
|
18 Jul 2023
|
13
|
Tripura
|
FP/TR/TRANS/149768/2021
|
3-TR B 050/2022-SHI
|
Proposal for Diversion of a Section of 132kv Rabindranagar- Belonia Line due to Garjee Railway Station under District Forest officer- Gomati
|
Transmission Line
|
TRIPURA STATE ELECTRICITY CORPORATION LIMITED
|
0.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Dec 2021
|
Stage-I Approval on
|
:
|
07 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
19 May 2023
|
|
|
|
26 May 2023
|
14
|
Tripura
|
FP/TR/MIN/144616/2021
|
3-TR B 007/2022-SHI
|
Exploration through Drilling and Waste Pit for Location BMDK
|
Mining
|
ONGC
|
1.36
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jul 2021
|
Stage-I Approval on
|
:
|
15 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
03 Apr 2023
|
|
|
|
12 Apr 2023
|
15
|
Tripura
|
FP/TR/Others/155506/2022
|
3-TR B 036/2022-SHI
|
Proposal for diversion of forest land measuring 0.3858 Ha for construction of permanent sectionalizing valve (SV-1) Station for day-to-day monitoring and control for Panisagar - Agartala Natural Gas Pipeline operation
|
Others
|
INDRADHANUSH GAS GRID LIMITED
|
0.3858
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 May 2022
|
Stage-I Approval on
|
:
|
12 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
15 Feb 2023
|
|
|
|
07 Mar 2023
|
16
|
Tripura
|
FP/TR/Others/155510/2022
|
3-TR B 037/2022-SHI
|
Proposal for diversion of forest land measuring 0.2228 Ha for construction of permanent sectionalizing valve (SV-3) Station for day-to-day monitoring and control for Panisagar - Agartala Natural Gas Pipeline operation
|
Others
|
INDRADHANUSH GAS GRID LIMITED
|
0.2228
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 May 2022
|
Stage-I Approval on
|
:
|
30 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
02 Feb 2023
|
|
|
|
07 Mar 2023
|
17
|
Tripura
|
FP/TR/Others/155511/2022
|
3-TR B 039/2022-SHI
|
Proposal for diversion of forest land measuring 0.2390 Ha for construction of permanent sectionalizing valve (SV-4) Station for day-to-day monitoring and control for Panisagar - Agartala Natural Gas Pipeline operation
|
Others
|
INDRADHANUSH GAS GRID LIMITED
|
0.239
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 May 2022
|
Stage-I Approval on
|
:
|
07 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
02 Feb 2023
|
|
|
|
07 Mar 2023
|
18
|
Tripura
|
FP/TR/ROAD/39905/2019
|
3-TR C 114/2019-SHI
|
Improvement/ Widening of road from Machmara to Kanchanpur
|
Road
|
SRI RITAN KHISA
|
12.466122
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Apr 2019
|
Stage-I Approval on
|
:
|
25 Feb 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Dec 2021
|
|
|
|
31 Jan 2023
|
19
|
Tripura
|
FP/TR/Pipeline/128047/2021
|
3-TR C 063/2021-SHI
|
Panisagar - Agartala Natural Gas Pipeline Project
|
Pipeline
|
INDRADHANUSH GAS GRID LIMITED
|
64.0179
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2021
|
Stage-I Approval on
|
:
|
11 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 Aug 2022
|
|
|
|
19 Jan 2023
|
20
|
Tripura
|
FP/TR/ROAD/140077/2021
|
3-TR C 042/2021-SHI
|
Proposal for diversion of 14.32 ha of forest land for improvement/ widening of road from Jatanbari to Mandirghat via Tirthamukh
|
Road
|
EXECUTIVE ENGINEER PWD AMARPUR DIVISION
|
14.32
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Apr 2021
|
Stage-I Approval on
|
:
|
20 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
28 Nov 2022
|
|
|
|
05 Dec 2022
|
21
|
Tripura
|
FP/TR/REHAB/157310/2022
|
3-TR C 044/2022-SHI
|
Proposal for diversion of 30 ha of forest land for resettlement of BRU Migrants and approach road of mouja Kala lawgang in favour of SDM Santirbazar
|
Rehabilitation
|
GOVERNMENT
|
30
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jun 2022
|
Stage-I Approval on
|
:
|
06 Oct 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Nov 2022
|
|
|
|
14 Nov 2022
|
22
|
Tripura
|
FP/TR/REHAB/153041/2022
|
3-TR C 019/2022-SHI
|
Settlement and Rehabilitation of Bru migrant families along with approach road in Paschim Kalajhari RF Mouja under Karbook Sub division of Gomati District in Tripura
|
Rehabilitation
|
SDM KARBOOK
|
20.10889
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Mar 2022
|
Stage-I Approval on
|
:
|
30 Aug 2022
|
Compliance Report Submitted by User Agency on
|
:
|
22 Sep 2022
|
|
|
|
07 Oct 2022
|
23
|
Tripura
|
FP/TR/MIN/53948/2020
|
3-TR B 054/2021-SHI
|
Drilling of Exploratory Location ROBM
|
Mining
|
ONGC
|
3.054
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Nov 2020
|
Stage-I Approval on
|
:
|
17 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2022
|
|
|
|
21 Sep 2022
|
24
|
Tripura
|
FP/TR/MIN/21542/2016
|
3-TR B 116/2019-SHI
|
Drilling of location BMDH
|
Mining
|
ONGC
|
1.74
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 May 2017
|
Stage-I Approval on
|
:
|
17 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
02 Aug 2022
|
|
|
|
10 Aug 2022
|
25
|
Tripura
|
FP/TR/MIN/53577/2020
|
3-TR B 044/2021-SHI
|
Exploration through Drilling, DSA, Waste-pit and Approach Road of Exploratory Location TMAB
|
Mining
|
ONGC
|
2.63
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Nov 2020
|
Stage-I Approval on
|
:
|
23 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2022
|
|
|
|
25 Jul 2022
|
26
|
Tripura
|
FP/TR/REHAB/50745/2020
|
3-TR C 093/2020-SHI
|
Proposal for diversion of 25.00 ha of forest land for resettlement of Bru Migrants at Mouja- Gachirampara under Tehsil- Anandabazar, Subdivision- Kanchanpur, Dist.- North Tripura in favour of SDM, Kan
|
Rehabilitation
|
SUB-DIVISIONAL MAGISTRATE, KANCHANPUR
|
25
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Oct 2020
|
Stage-I Approval on
|
:
|
25 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2022
|
|
|
|
11 Jul 2022
|
27
|
Tripura
|
FP/TR/MIN/53358/2020
|
3-TR B 047/2021-SHI
|
Drilling of Exploratory Location SDAH
|
Mining
|
ONGC
|
2.978
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Nov 2020
|
Stage-I Approval on
|
:
|
23 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jun 2022
|
|
|
|
05 Jul 2022
|
28
|
Tripura
|
FP/TR/MIN/65526/2020
|
3-TR B 048/2021-SHI
|
Exploration through Drilling, Waste Pit and Approach road for Location GODD
|
Mining
|
ONGC
|
1.56
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Nov 2020
|
Stage-I Approval on
|
:
|
23 Dec 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jun 2022
|
|
|
|
05 Jul 2022
|
29
|
Tripura
|
FP/TR/TRANS/48165/2020
|
3-TR C 019/2021-SHI
|
Diversion of 10.4483 Ha of Forest Land for construction of 33kV Pole line from Hezamara Substation to Dhalabil Substation under NERPSIP Tripura.
|
Transmission Line
|
TRIPURA STATE ELECTRICITY CORPORATION LIMITED
|
10.4483
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jul 2020
|
Stage-I Approval on
|
:
|
30 Apr 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 Feb 2022
|
|
|
|
04 Jul 2022
|
30
|
Tripura
|
FP/TR/TRANS/48164/2020
|
3-TR C 013/2021-SHI
|
Diversion of 18.1999 Ha of Forest Land for construction of 33kV Pole line from Jolaibari Substation to Silachari Substation under NERPSIP Tripura.
|
Transmission Line
|
TRIPURA STATE ELECTRICITY CORPORATION LIMITED
|
18.1999
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jul 2020
|
Stage-I Approval on
|
:
|
17 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 May 2022
|
|
|
|
24 Jun 2022
|
31
|
Tripura
|
FP/TR/ROAD/40893/2019
|
3-TR C 066/2020-SHI
|
Improvement of Gandacherra to Raishyabari road (L-32.00 km)/ Sh:- Widening, Strengthening, Retaining wall, Toe wall etc. Portion from 0.00 km to 28.50 km under RIDF Scheme of NABARD (RIDF-XXI).
|
Road
|
EXECUTIVE ENGINEER, PWD (R&B), AMBASSA DIVISION
|
23.9443
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2019
|
Stage-I Approval on
|
:
|
15 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2022
|
|
|
|
10 Jun 2022
|
32
|
Tripura
|
FP/TR/Pipeline/126024/2021
|
3 TR B 059/2021-SHI
|
Laying of Proposed 18" Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Silchari to Panisagar
|
Pipeline
|
INDRADHANUSH GAS GRID LIMITED
|
1.8161
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Mar 2021
|
Stage-I Approval on
|
:
|
13 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jun 2022
|
|
|
|
08 Jun 2022
|
33
|
Tripura
|
FP/TR/MIN/53710/2020
|
3-TR B 027/2021-SHI
|
Exploration through Drilling, Waste Pit and DSA for Exploratory Location BMSU
|
Mining
|
ONGC
|
2.652
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Nov 2020
|
Stage-I Approval on
|
:
|
06 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Mar 2022
|
|
|
|
11 Apr 2022
|
34
|
Tripura
|
FP/TR/REHAB/142936/2021
|
3-TR B 045/2021-SHI
|
Proposal for diversion of 5.00 ha. of forest land at Mouja MCRF under Sub-Divisional Magistrate, Longtharai Valley of Dhalai District
|
Rehabilitation
|
REVENUE DEPARTMENT
|
5
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 May 2021
|
Stage-I Approval on
|
:
|
29 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
25 Feb 2022
|
|
|
|
29 Mar 2022
|
35
|
Tripura
|
FP/TR/REHAB/145449/2021
|
3-TR C 058/2021-SHI
|
Proposal for diversion of 10:00 ha. of forest land at Mouja MCRF under Sub-Divisional Magistrate, Longtharai Valley of Dhalai District
|
Rehabilitation
|
REVENUE DEPARTMENT
|
10
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2021
|
Stage-I Approval on
|
:
|
25 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
29 Dec 2021
|
|
|
|
11 Mar 2022
|
36
|
Tripura
|
FP/TR/REHAB/145330/2021
|
3-TR C 050/2021-SHI
|
Proposal for diversion of additional 6.85 Ha. of forest land of Mouja-Damcherra for resettlement of Bru Migrants at location Kaskaupara in favour of SDM, Panisagar under North Tripura
|
Rehabilitation
|
SDM PANISAGAR
|
6.85
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jul 2021
|
Stage-I Approval on
|
:
|
25 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2021
|
|
|
|
23 Feb 2022
|
37
|
Tripura
|
FP/TR/ROAD/39633/2019
|
3-TR C 023/2020-SHI
|
Improvement of road from Gandacherra -Raishyabari road at ch:- 18.30 km to Narkelkunja (Length-8.0 km) for easy access for the tourist from Dhalai, North & Unakoti Districts
|
Road
|
EXECUTIVE ENGINEER, PWD (R&B), AMBASSA DIVISION
|
7.6163
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Apr 2019
|
Stage-I Approval on
|
:
|
24 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
22 Dec 2021
|
|
|
|
31 Jan 2022
|
38
|
Tripura
|
FP/TR/TRANS/48163/2020
|
3-TR B 011/2021-SHI
|
Diversion of 2.70 Ha of Forest Land for construction of 33kV Pole line from Jatanbari Substation to Dhalak Substation under NERPSIP Tripura.
|
Transmission Line
|
TRIPURA STATE ELECTRICITY CORPORATION LIMITED
|
2.705
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jul 2020
|
Stage-I Approval on
|
:
|
17 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
23 Dec 2021
|
|
|
|
31 Jan 2022
|
39
|
Tripura
|
FP/TR/REHAB/142361/2021
|
3-TR C 046/2021-SHI
|
Proposal for diversion of 10.05 ha of Forest land of Revenue Mouja Kulai RF Extenstion in favour of SDM, Ambassa under Dhalai District.
|
Rehabilitation
|
SUB-DIVISIONAL MAGISTRATE, AMBASSA SUB-DIVISION
|
10.05
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jun 2021
|
Stage-I Approval on
|
:
|
30 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
29 Dec 2021
|
|
|
|
25 Jan 2022
|
40
|
Tripura
|
FP/TR/REHAB/143485/2021
|
3-TR C 049/2021-SHI
|
Proposal for diversion of additional 15.00 Ha of forest land of Mouja-Damcherra for resettlement of Bru Migrant at location Wainbukcherra-Ranipara in favour of SDM, Panisagar under North Tripura District.
|
Rehabilitation
|
SDM PANISAGAR
|
15
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jul 2021
|
Stage-I Approval on
|
:
|
25 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2021
|
|
|
|
13 Jan 2022
|
41
|
Tripura
|
FP/TR/ROAD/141993/2021
|
3-TR B 043/2021-SHI
|
Improvement & Widening to 2-lane with paved shoulder of Kailashahar to Fultali section of NH-208 (Package-I, Km 21.100 to Km 29.200) under Unakoti District
|
Road
|
PMU AGARTALA
|
0.201891
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 May 2021
|
Stage-I Approval on
|
:
|
03 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Dec 2021
|
|
|
|
07 Dec 2021
|
42
|
Tripura
|
FP/TR/ROAD/125152/2021
|
3-TR C 023/2021-SHI
|
Improvement/ widening of two laning with paved shoulder of Kailasahar-Kurti Bridge Section of NH-208A (Km 0.00 to Km 36.460) under North Tripura District in the state of Tripura
|
Road
|
PMU AGARTALA
|
6.619991
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Mar 2021
|
Stage-I Approval on
|
:
|
15 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
03 Dec 2021
|
|
|
|
30 Nov 2021
|
43
|
Tripura
|
FP/TR/MIN/38526/2019
|
3-TR B 098/2020-SHI
|
BREB
|
Mining
|
ONGC
|
1.74
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 May 2019
|
Stage-I Approval on
|
:
|
17 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
27 Oct 2021
|
|
|
|
08 Nov 2021
|
44
|
Tripura
|
FP/TR/MIN/21544/2016
|
3-TR B 095/2020-SHI
|
Drilling of Development location GODA
|
Mining
|
ONGC
|
3.52
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 May 2017
|
Stage-I Approval on
|
:
|
17 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
02 Nov 2021
|
|
|
|
08 Nov 2021
|
45
|
Tripura
|
FP/TR/MIN/21543/2016
|
3-TR B 075/2020-SHI
|
Drilling and Waste Pit of location GODB
|
Mining
|
ONGC
|
1.74
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 May 2017
|
Stage-I Approval on
|
:
|
17 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
04 Oct 2021
|
|
|
|
21 Oct 2021
|
46
|
Tripura
|
FP/TR/MIN/38943/2019
|
3-TR B 072/2020-SHI
|
DRILLING OF EXPLORATORY LOCATION ROBL
|
Mining
|
ONGC
|
1.783
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2019
|
Stage-I Approval on
|
:
|
17 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
29 Sep 2021
|
|
|
|
21 Oct 2021
|
47
|
Tripura
|
FP/TR/MIN/13521/2015
|
3-TR B 070/2018-SHI
|
Drilling of location TIDD
|
Mining
|
ONGC
|
1.11
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jun 2015
|
Stage-I Approval on
|
:
|
06 Apr 2021
|
Compliance Report Submitted by User Agency on
|
:
|
09 Sep 2021
|
|
|
|
04 Oct 2021
|
48
|
Tripura
|
FP/TR/MIN/13528/2015
|
3-TR C 011/2018-SHI
|
Drilling of location TIAG
|
Mining
|
ONGC
|
1.42
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jun 2015
|
Stage-I Approval on
|
:
|
12 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
26 Aug 2021
|
|
|
|
13 Sep 2021
|
49
|
Tripura
|
FP/TR/REHAB/49877/2020
|
3-TR C 064/2020-SHI
|
Settlement & Rehabilitation of Bru migrant families in West Kalajhari RF Mouja of Amarpur Sub-Division of Gomati District in Tripura
|
Rehabilitation
|
SUB-DIVISIONAL MAGISTRATE, AMARPUR SUB-DIVISION, GUMTI DISTRICT
|
15
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Sep 2020
|
Stage-I Approval on
|
:
|
22 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
20 Aug 2021
|
|
|
|
06 Sep 2021
|
50
|
Tripura
|
FP/TR/REHAB/50713/2020
|
3-TR C 094/2020-SHI
|
Proposal for diversion of 25.00 ha of forest land for resettlement of Bru Migrants at Bhandarima of Mouja CCRF in favour of SDM, Kanchanpur under North Tripura District
|
Rehabilitation
|
SUB-DIVISIONAL MAGISTRATE, KANCHANPUR
|
25
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Oct 2020
|
Stage-I Approval on
|
:
|
25 Jan 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Aug 2021
|
|
|
|
06 Sep 2021
|
|