Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Orissa FP/OR/ROAD/35088/2018 5-ORC373/2019-BHU Construction of 200 Feet (60 Mts) Master plan road from Rail Vihar- Hatiasuni- Ekamrakanan Park over a stretch of 1.790 Km by Executive Engineer (R&B) Division (No-III), Bhubaneswar and under Tahsil : Bhubaneswar of Khordha District. Odisha Road EXECUTIVE ENGINEER, BBSR (R&B) DIVISION NO.III. BHUBANESWAR 10.183 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Aug 2018
Stage-I Approval on : 29 Mar 2019
Compliance Report Submitted by User Agency on : 16 Apr 2022
23 Sep 2022
2 Orissa FP/OR/TRANS/20956/2016 5-ORC314/2017-BHU 400kV D/C OPGC-Jharsuguda(Sundargarh) Transmission Line Transmission Line ODISHA GENERATION PHASE II TRANSMISSION LIMITED 30.134 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Aug 2016
Stage-I Approval on : 24 May 2017
Compliance Report Submitted by User Agency on : 26 May 2022
19 Sep 2022
3 Orissa FP/OR/RAIL/34204/2018 5-ORC411/2020-BHU Propasal for diversion of 24.188ha of forest land for construction of Budhapank-Salegaon 3rd & 4th Railway line Project, (0-85km) Railway DCE CON I EAST COAST RAILWAY 24.188 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Jun 2018
Stage-I Approval on : 08 Oct 2020
Compliance Report Submitted by User Agency on : 30 Aug 2022
09 Sep 2022
4 Orissa FP/OR/TRANS/17794/2016 5-ORC306/2017-BHU 400 KV D/C tarnsmission line from LILO point to PGCIL Sundargarh Pooling Station by M/s Vedanta Ltd. Transmission Line VEDANTA LIMITED 6 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jan 2016
Stage-I Approval on : 28 Feb 2017
Compliance Report Submitted by User Agency on : 03 Aug 2022
11 Aug 2022
5 Orissa FP/OR/RAIL/35352/2018 5-ORC471/2021-BHU Construction of 3rd Railway line between Vizianagaram to Titlagarh under East Coast Railway by Rail Vikas Nigam Limited. Railway CHIEF PROJECT MANGERRAIL VIKAS NIGAM LIMITED 5.858 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Aug 2018
Stage-I Approval on : 07 Sep 2021
Compliance Report Submitted by User Agency on : 03 Aug 2022
10 Aug 2022
6 Orissa FP/OR/IRRIG/15278/2015 5-ORC308/2017-BHU Ranjore Irrigation Project Irrigation PADAMPUR INVESTIGATION DIVISION,PADAMPUR 7.054 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Sep 2015
Stage-I Approval on : 01 Dec 2017
Compliance Report Submitted by User Agency on : 27 Jun 2022
26 Jul 2022
7 Orissa FP/OR/TRANS/21714/2016 5-ORA334/2018-BHU 765 KV D/C JHARSUGUDA (SUNDARGARH) – RAIPUR POOL TRANSMISSION LINE Transmission Line ODISHA GENERATION PHASE II TRANSMISSION LIMITED 94.656 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Oct 2016
Stage-I Approval on : 06 Mar 2018
Compliance Report Submitted by User Agency on : 06 Jun 2022
22 Jun 2022
8 Orissa FP/OR/TRANS/45428/2020 5-ORC450/2021-BHU 33 kv power transmission line from Jaroli sub station to PMPL Plant site at Basantapur Transmission Line ESSEL MINING & INDUSTRIES LIMITED 22.368 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 May 2020
Stage-I Approval on : 08 Jun 2021
Compliance Report Submitted by User Agency on : 23 Dec 2021
08 Mar 2022
9 Orissa FP/OR/TRANS/15421/2015 5-ORB368/2018-BHU Proposal for diversion of 3.665 Ha. forests lands under Keonjhar forest division for non-forest purpose for construction of 33 kV DC Transmission line from MRSS, Joda to Khondbond Transmission Line TATA STEEL LIMITED KHONDBOND IRON AND MN MINES 3.665 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Oct 2015
Stage-I Approval on : 28 Jan 2019
Compliance Report Submitted by User Agency on : 30 Dec 2021
13 Jan 2022
10 Orissa FP/OR/Others/12382/2015 5-ORB351/2018-BHU Forest Diversion Proposal for Conveyor Corridor from Khondbond Iron Ore Mine to Railway Siding of Joda East Iron Ore Mine by M/s Tata Steel Ltd. Others TATA STEEL LIMITED KHONDBOND IRON AND MN MINES 4.68 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 May 2015
Stage-I Approval on : 17 Sep 2018
Compliance Report Submitted by User Agency on : 27 Dec 2021
13 Jan 2022
11 Orissa FP/OR/DISP/43480/2019 5-ORC439/2020-BHU Centers of Excellence ,AIIMS Bhubaneswar Dispensary/Hospital DIRECTOR AIIMS BHUBANESWAR 10.58 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Dec 2019
Stage-I Approval on : 07 Jan 2021
Compliance Report Submitted by User Agency on : 21 Dec 2021
30 Dec 2021
12 Orissa FP/OR/HYD/39171/2019 5-ORB436/2020-BHU Upper Indravati Pump Storage Hydro Project Hydel ODISHA HYDRO POWER CORPORATION LIMITED 0.99 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Feb 2019
Stage-I Approval on : 21 Dec 2020
Compliance Report Submitted by User Agency on : 08 Nov 2021
29 Dec 2021
13 Orissa FP/OR/ROAD/17857/2016 5-ORA310/2017-BHU 4-laning of Teleibani Sambalpur Section of NH-6 (Km.493.300 to Km.518.800 and Km.545.176 to Km.567.400) Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU SAMBALPUR 54.214 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Feb 2016
Stage-I Approval on : 24 May 2017
Compliance Report Submitted by User Agency on : 08 Oct 2021
29 Dec 2021
14 Orissa FP/OR/RAIL/33802/2018 5-ORB408/2020-BHU Propasal for diversion of 4.232ha of forest land for construction of Nirgundi- Bhadrak 3rd line Railway Project, Phase-I(0-14km) Railway EAST COAST RAILWAY JJKR 4.232 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Jun 2018
Stage-I Approval on : 20 Feb 2020
Compliance Report Submitted by User Agency on : 29 Sep 2021
09 Oct 2021
15 Orissa FP/OR/RAIL/39739/2019 5-ORC423/2020-BHU Proposal for diversion of 18.131ha of forest land for construction of 3rd & 4th Railway line from Jarapada-Budhapank Railway DEPUTY CHIEF ENGINEER CON-1 18.131 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Apr 2019
Stage-I Approval on : 31 Jul 2020
Compliance Report Submitted by User Agency on : 10 Aug 2021
02 Sep 2021
16 Orissa FP/OR/TRANS/38936/2019 5-ORB432/2020-BHU CONSTRUCTION OF DIVERSION PORTION OF 400 KV DOUBLE CIRCUIT TALCHER-MERAMUNDALI TRANSMISSION LINE. Transmission Line POWERGRID KANHIA 1.3841 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Feb 2019
Stage-I Approval on : 05 Nov 2020
Compliance Report Submitted by User Agency on : 03 May 2021
02 Jul 2021
17 Orissa FP/OR/QRY/32655/2018 5-ORB369/2018-BHU Khindo Stone Quarry Quarrying TAHSILDAR KANIHA 1.214 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Mar 2018
Stage-I Approval on : 29 May 2020
Compliance Report Submitted by User Agency on : 03 May 2021
08 Jun 2021
18 Orissa FP/OR/TRANS/38942/2019 5-ORB402/2019-BHU CONSTRUCTION OF DIVERSION PORTION OF HVDC EARTH ELECTRODE TRANSMISSION LINE Transmission Line POWERGRID KANHIA 0.943 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Feb 2019
Stage-I Approval on : 16 Jan 2020
Compliance Report Submitted by User Agency on : 16 Mar 2021
17 May 2021
19 Orissa FP/OR/TRANS/30962/2017 5-ORC418/2020-BHU 132 KV Transmission Line from 132/33 KV to Kamanda Steel Plant at- Village Kamanda, Sundargarh to grid Barbil Keonjhar. Transmission Line RUNGTA MINES LTD 35.507 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Dec 2017
Stage-I Approval on : 25 Jun 2020
Compliance Report Submitted by User Agency on : 19 Feb 2021
31 Mar 2021
20 Orissa FP/OR/HYD/9265/2015 5-ORB409/2020-BHU 25 MW SHAHEED LAKHAN NAYAK SHEP Hydel MEENAKSHI ODISHA POWER PRIVATE LIMITED 4.902 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Jun 2016
Stage-I Approval on : 06 Jul 2020
Compliance Report Submitted by User Agency on : 18 Dec 2020
16 Feb 2021
21 Orissa FP/OR/ROAD/25629/2017 5-ORC344/2018-BHU Balasore-Baripada-Jharpokharia Section of NH-5 Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BALASORE 13.856 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jul 2017
Stage-I Approval on : 27 Apr 2018
Compliance Report Submitted by User Agency on : 12 Jan 2021
16 Feb 2021
22 Orissa FP/OR/TRANS/40463/2019 5-ORB403/2019-BHU “Diversion of 400KV D/C Talcher – Meramundli Transmission Line” of PGCIL at Village Kamalang in Dhenkanal district, Odisha. Transmission Line POWERGRID KANHIA 0.378 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2019
Stage-I Approval on : 16 Jan 2020
Compliance Report Submitted by User Agency on : 22 Jan 2021
09 Feb 2021
23 Orissa FP/OR/ROAD/46616/2020 5-ORB433/2020-BHU Construction of link road on forest land for Page Industry Ltd. to provide connectivity to the project area. Road IDCO 0.307 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Jun 2020
Stage-I Approval on : 21 Oct 2020
Compliance Report Submitted by User Agency on : 23 Dec 2020
22 Jan 2021
24 Orissa FP/OR/RAIL/30199/2017 5-ORC348/2018-BHU Establishment of Industries i.e.Establishment of Railway line & Siding under Danagadi Tahasil in Jajpur District of M/s Emami Cement Ltd. Railway IDCO 8.114 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Nov 2017
Stage-I Approval on : 18 Jun 2018
Compliance Report Submitted by User Agency on : 18 Dec 2020
07 Jan 2021
25 Orissa FP/OR/THE/29588/2017 5-ORC383/2019-BHU 3x800 MW Super Critical Thermal Power Plant at Kamakhyanagar Tahasil in Dhenkanal District Thermal ODISHA THERMAL POWER CORPORATION LTD (OTPCL) 38.098 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Oct 2017
Stage-I Approval on : 07 Jun 2019
Compliance Report Submitted by User Agency on : 11 Nov 2020
04 Jan 2021
26 Orissa FP/OR/IND/38849/2019 5-ORB4100/2020-BHU Proposal for diversion of 3.93 Ha of forest land for expansion of project within Kamanda steel Plant of Rungta Mines Ltd. Industry MS RUNGTA MINES LIMITED 3.93 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Feb 2019
Stage-I Approval on : 05 Mar 2020
Compliance Report Submitted by User Agency on : 19 Nov 2020
11 Dec 2020
27 Orissa FP/OR/ROAD/17550/2016 5-ORA313/2017-BHU REHABILITATION AND UPGRADATION OF NH-6 PACKAGE-1 BAHARGORA TO SINGARA (KM 199.200 TO KM 310.806) SECTION OF NH-6 IN THE STATE OF ORISSA Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BALASORE 85.104 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Jan 2016
Stage-I Approval on : 12 Sep 2017
Compliance Report Submitted by User Agency on : 06 Nov 2020
08 Dec 2020
28 Orissa FP/OR/Others/37517/2018 5-ORC395/2019-BHU Jagdishpur-Haldia-Bokaro-Dhamra Pipeline (JHBDPL), Odisha Project of GAIL Permanent land acquisition Others GAIL INDIA LIMITED 0.9712 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Dec 2018
Stage-I Approval on : 04 Oct 2019
Compliance Report Submitted by User Agency on : 25 Jun 2020
08 Dec 2020
29 Orissa FP/OR/ROAD/24576/2017 5-ORA357/2018-BHU Rehabilitation and upgradation to two/four laning of Talchar-Dubari-Chandikhole section of NH-200 in Odisha Road National Highways Authority of India 176.231 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Feb 2017
Stage-I Approval on : 05 Dec 2018
Compliance Report Submitted by User Agency on : 10 Nov 2020
03 Dec 2020
30 Orissa FP/OR/ROAD/9955/2015 5-ORA319/2017-BHU Rehabilitation and Upgradation of existing 2-lane road to 4-lane of NH Stretches Angul-Sambalpur (Jn. of NH-6 at Sambalpur) Section of NH-42 from km.112.000 to Km.265.000 (Length = 153 km ) under NHDP – IV-B [Group B (Package No. OR/DPR/NHDP/IV/06)] Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU SAMBALPUR 110.179 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Feb 2015
Stage-I Approval on : 07 Aug 2017
Compliance Report Submitted by User Agency on : 16 Nov 2020
03 Dec 2020
31 Orissa FP/OR/ROAD/9123/2015 5-ORA293/2016-BHU Cuttack-Angul Section of NH 42(New 55) Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU SAMBALPUR 66.783 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Feb 2015
Stage-I Approval on : 23 Feb 2017
Compliance Report Submitted by User Agency on : 10 Nov 2020
03 Dec 2020
32 Orissa FP/OR/Others/32129/2018 5-ORB397/2019-BHU Setting up a new Oil Depot of BPCL Others BHARAT PETROLEUM CORP LTD SADASHIBPUR 2.091 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Feb 2018
Stage-I Approval on : 25 Nov 2019
Compliance Report Submitted by User Agency on : 20 Oct 2020
12 Nov 2020
33 Orissa FP/OR/ROAD/15279/2015 5-ORA340/2018-BHU Rehabilitation and Upgrading of the Existing Road to 2/4- lane with paved shoulders configuration from Birmitrapur to Barkote Section of NH-23 (Ch 211.200 to Ch.337.197 Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU SAMBALPUR 135.216 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Sep 2015
Stage-I Approval on : 04 May 2018
Compliance Report Submitted by User Agency on : 15 Sep 2020
27 Oct 2020
34 Orissa FP/OR/ROAD/31840/2018 5-ORC350/2018-BHU Construction of 200 feet master plan road from Rail Vihar to Ekamrakanan over a stretch of 1.930 KM under Executive Engineer (R&B) Division (No-III), bhubaneswar and under Tahasil: Bhubaneswar of Khurdha District. Road EXECUTIVE ENGINEER, BBSR (R&B) DIVISION NO.III. BHUBANESWAR 10.501 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Feb 2018
Stage-I Approval on : 18 Jul 2018
Compliance Report Submitted by User Agency on : 02 Mar 2020
15 Sep 2020
35 Orissa FP/OR/Pipeline/36091/2018 5-ORB387/2019-BHU Joda to Paradeep Iron Ore Slurry Pipelines System [Alignment under Non-RoW]of M/s JSW Utkal Steel Ltd. Pipeline JSW UTKAL STEEL LIMITED 0.654 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Sep 2018
Stage-I Approval on : 12 Jul 2019
Compliance Report Submitted by User Agency on : 09 Jul 2020
27 Jul 2020
36 Orissa FP/OR/ROAD/18943/2016 5-ORA346/2018-BHU 4- laning of Singara - Brinjabahal Section of NH-6 (Km. 310.806 to km 414.982) Road National Highways Authority of India 111.407 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Apr 2016
Stage-I Approval on : 12 Jul 2018
Compliance Report Submitted by User Agency on : 12 Jun 2020
25 Jun 2020
37 Orissa FP/OR/RAIL/23845/2017 5-ORA386/2019-BHU Proposal for diversion of 244.623 ha of forest land for Talcher-Bimlagarh New B.G. Rail link Project, Phase-II(Chainage 25.00km to 153.90km) Railway EAST COAST RAILWAY 244.623 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Feb 2017
Stage-I Approval on : 01 Jul 2019
Compliance Report Submitted by User Agency on : 27 May 2020
04 Jun 2020
38 Orissa FP/OR/Others/14546/2015 5-ORC322/2017-BHU Infrastructure Project for Kurmitar & Rantha ML Others ODISHA MINING CORPORATION LTD 11.912 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2015
Stage-I Approval on : 29 Nov 2018
Compliance Report Submitted by User Agency on : 19 May 2020
29 May 2020
39 Orissa FP/OR/ROAD/35474/2018 5-ORB389/2019-BHU Proposed approach road from NH 520 to Kamanda Steel Plan of Rungta Mines Ltd. Road MS RUNGTA MINES LIMITED 0.28 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Aug 2018
Stage-I Approval on : 30 Jul 2019
Compliance Report Submitted by User Agency on : 20 Mar 2020
23 Mar 2020
40 Orissa FP/OR/RAIL/18705/2016 5-ORA352/2018-BHU Khurda Road Bolangir New B.G. Raillink Project Phase-II i.e. from km 36-112 Railway EAST COAST RAILWAY 59.717 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Apr 2016
Stage-I Approval on : 18 Jul 2018
Compliance Report Submitted by User Agency on : 07 Jul 2020
21 Jan 2020
41 Orissa FP/OR/RAIL/20653/2016 5-ORA155/2012-BHU Proposal for diversion of 13.630 ha of Sabik Kissam Revenue forest in Sundargarh and Jharsuguda Forest Division for MGR project of OPGC Railway ODISHA POWER GENERATION CORPORATION LTD 13.63 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Aug 2016
Stage-I Approval on : 23 May 2017
Compliance Report Submitted by User Agency on : 09 Dec 2019
10 Jan 2020
42 Orissa FP/OR/TRANS/14204/2015 5-ORA285/2016-BHU 765 KV DOUBLE CIRCUIT TRANSMISSION LINE FROM ANGUL POOLING STATION TO JHARSUGUDA POOLING STATION Transmission Line POWERGRID CORPORATION OF INDIA LIMITED 461.1496 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Aug 2015
Stage-I Approval on : 19 Dec 2016
Compliance Report Submitted by User Agency on : 23 Oct 2019
08 Nov 2019
43 Orissa FP/OR/ROAD/18864/2016 5-ORA329/2017-BHU 4-laning of Brinjabahal - Teleibani Section of NH-6 (Km. 414.982 to Km.493.300) Road National Highways Authority of India 64.094 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Apr 2016
Stage-I Approval on : 15 Jan 2018
Compliance Report Submitted by User Agency on : 22 Aug 2019
30 Oct 2019
44 Orissa FP/OR/TRANS/22467/2016 5-ORC320/2017-BHU LILO of Both Circuits of Rourkela-Raigarh 400KV D/C transmission line (2nd line) at Jharsuguda (Sundargarh) Sub-Station Transmission Line POWER GRID CORPORATION OF INDIA LTD 24.424 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Nov 2016
Stage-I Approval on : 04 Aug 2017
Compliance Report Submitted by User Agency on : 20 Jul 2019
26 Jul 2019
45 Orissa FP/OR/Others/17057/2015 5-ORB315/2017-BHU Establishment of Lighthouse as advised by Central Advisory Committee for Lighthouses (CACL) Others DIRECTORATE OF LIGHT HOUSES AND LIGHTSHIPS KOLKATA 0.332 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Dec 2015
Stage-I Approval on : 12 Oct 2017
Compliance Report Submitted by User Agency on : 12 Jun 2019
24 Jul 2019
46 Orissa FP/OR/THE/18224/2016 5-ORC355/2018-BHU Mine Void Filling Project of Talcher Super Thermal Power Station, Kaniha, NTPC Ltd. Thermal NTPC Limited 38.726 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Mar 2016
Stage-I Approval on : 12 Jul 2018
Compliance Report Submitted by User Agency on : 27 Jun 2019
16 Jul 2019
47 Orissa FP/OR/Others/15371/2015 5-ORB311/2017-BHU Shri Jagannath Steel and Power Ltd. - Water Pipe line Project Others SHREE JAGANNATH STEEL POWER LTD 0.197 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Sep 2015
Stage-I Approval on : 30 Mar 2017
Compliance Report Submitted by User Agency on : 17 Dec 2018
20 Dec 2018
48 Orissa FP/OR/IND/10338/2015 5-ORB295/2016-BHU Tata Steel Special Economic Zone at Gopalpur in Ganjam District, Odisha. Industry Tata Steel Limited, Jamshedpur 3.792 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Aug 2015
Stage-I Approval on : 19 Dec 2016
Compliance Report Submitted by User Agency on : 26 Oct 2018
24 Oct 2018
49 Orissa FP/OR/TRANS/9972/2015 5-ORC267/2015-BHU 765 KV DOUBLE CIRCUIT TRANSMISSIONLINEFROM SUNDARGARH POOLING STATION TODARLIPALI TPS(NTPC) Transmission Line POWER GRID CORPORATION OF INDIA LTD 18.91 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Feb 2015
Stage-I Approval on : 22 Dec 2015
Compliance Report Submitted by User Agency on : 21 Jun 2018
25 Jun 2018
50 Orissa FP/OR/TRANS/12273/2015 5-ORA270/2015-BHU 765 KV DOUBLE CIRCUIT TRANSMISSION LINE FROM JHARSUGUDA POOLING STATION TO DHARAMJAYGARH POOLING STATION Transmission Line POWER GRID CORPORATION OF INDIA LTD 60.058 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 May 2015
Stage-I Approval on : 23 Mar 2016
Compliance Report Submitted by User Agency on : 23 May 2018
30 May 2018