Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Madhya Pradesh
|
FP/MP/IRRIG/32304/2018
|
6-MPC054/2021-BHO
|
Rosiya Talab Yojana
|
Irrigation
|
ENGINEER,WATER RESOURCES ENGINEER,DISTRICT=KHARGONE
|
39.715
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jun 2018
|
Stage-I Approval on
|
:
|
29 Sep 2024
|
Compliance Report Submitted by User Agency on
|
:
|
09 Mar 2025
|
|
|
|
30 May 2025
|
2
|
Madhya Pradesh
|
FP/MP/IRRIG/37077/2018
|
6-MPB029/2022-BHO
|
Ghoghri Irrigation Project (Affected in Pipeline)
|
Irrigation
|
EXECUTIVE ENGINEER WATER RESOURCES DIVISION NO II BETUL
|
1.987
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Feb 2022
|
Stage-I Approval on
|
:
|
26 Jun 2023
|
Compliance Report Submitted by User Agency on
|
:
|
14 Jul 2023
|
|
|
|
30 May 2025
|
3
|
Madhya Pradesh
|
FP/MP/RAIL/42206/2019
|
6-MPR040/2023-BHO
|
BUDNI - INDORE NEW B.G. RAIL LINE PROJECT
|
Railway
|
RAIL VIKAS NIGAM LTD
|
70.775
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Nov 2019
|
Stage-I Approval on
|
:
|
17 Feb 2025
|
Compliance Report Submitted by User Agency on
|
:
|
19 Mar 2025
|
|
|
|
14 May 2025
|
4
|
Madhya Pradesh
|
FP/MP/IRRIG/153417/2022
|
6-MPR021/2022-BHO
|
Badnawar Micro Lift Irrigation Scheme
|
Irrigation
|
Narmada Valley Development Authority
|
35
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Mar 2022
|
Stage-I Approval on
|
:
|
07 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
13 Apr 2023
|
|
|
|
08 May 2025
|
5
|
Madhya Pradesh
|
FP/MP/WATER/39226/2019
|
6-MPR027/2022-BHO
|
Satna Bansagar Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT BHOPAL
|
6.084
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Mar 2019
|
Stage-I Approval on
|
:
|
15 Apr 2024
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jun 2024
|
|
|
|
07 May 2025
|
6
|
Madhya Pradesh
|
FP/MP/ROAD/41616/2019
|
6-MPB033/2022-BHO
|
Hinauti- Majhigawan road
|
Road
|
M S ULTRATECH CEMENTS LTD
|
0.77
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Aug 2019
|
Stage-I Approval on
|
:
|
09 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Mar 2025
|
|
|
|
07 May 2025
|
7
|
Madhya Pradesh
|
FP/MP/TRANS/152571/2022
|
6-MPR032/2022-BHO
|
PAYLI Multi Village Rural Water Supply Scheme
|
Transmission Line
|
MADHYA PARDESH JAL NIGAM MARYADIT JABALPUR
|
13.18
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Mar 2022
|
Stage-I Approval on
|
:
|
26 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
03 Aug 2024
|
|
|
|
22 Apr 2025
|
8
|
Madhya Pradesh
|
FP/MP/ROAD/36650/2018
|
6-MPB070/2020-BHO
|
Making Road for Vipassana Center
|
Road
|
VIPASSANA TRUST JABALPUR
|
0.105
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Oct 2018
|
Stage-I Approval on
|
:
|
10 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
13 Feb 2025
|
|
|
|
19 Apr 2025
|
9
|
Madhya Pradesh
|
FP/MP/IRRIG/41363/2019
|
6-MPR008/2023-BHO
|
LOWER ORR MAJOR IRRIGATION PROJECT
|
Irrigation
|
PROJECT DIRECTOR ORPMU BAMOR KALAN
|
23.652
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Aug 2019
|
Stage-I Approval on
|
:
|
25 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
09 Jun 2023
|
|
|
|
02 Apr 2025
|
10
|
Madhya Pradesh
|
FP/MP/ROAD/148018/2021
|
6-MPR030/2022-BHO
|
Forest land diversion proposal of “Four Lanning of Sagar Link Road section from design Ch. 134+736 To 163+100 under Bharatmala Pariyojana, Lot-4, Pkg-3 in the state of Madhya Pradesh”.
|
Road
|
NHAI
|
7.718
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Oct 2021
|
Stage-I Approval on
|
:
|
21 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
14 Oct 2023
|
|
|
|
01 Apr 2025
|
11
|
Madhya Pradesh
|
FP/MP/ROAD/148018/2021
|
6-MPR030/2022-BHO
|
Forest land diversion proposal of “Four Lanning of Sagar Link Road section from design Ch. 134+736 To 163+100 under Bharatmala Pariyojana, Lot-4, Pkg-3 in the state of Madhya Pradesh”.
|
Road
|
NHAI
|
7.718
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Oct 2021
|
Stage-I Approval on
|
:
|
21 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
14 Oct 2023
|
|
|
|
01 Apr 2025
|
12
|
Madhya Pradesh
|
FP/MP/WATER/151540/2022
|
6-MPB057/2023-BHO
|
Gond Deosar Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
3.1109
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jan 2022
|
Stage-I Approval on
|
:
|
22 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jan 2024
|
|
|
|
01 Apr 2025
|
13
|
Madhya Pradesh
|
FP/MP/IRRIG/31586/2018
|
6-MPB040/2018-BHO
|
Netna Minor Irrigation Project
|
Irrigation
|
WATER RESOURCES DIVISION NO ONE SAGAR
|
2.5
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Feb 2018
|
Stage-I Approval on
|
:
|
10 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Nov 2024
|
|
|
|
10 Mar 2025
|
14
|
Madhya Pradesh
|
FP/MP/RAIL/33238/2018
|
6-MPR016/2023-BHO
|
Sidhi-Singrauli New Rail Line Project a Part of Lalitpur -Singrauli Rail line project.
|
Railway
|
DY CHIEF ENGINEER WEST CENTRAL RAILWAY JABALPUR
|
176.402
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 May 2018
|
Stage-I Approval on
|
:
|
27 Aug 2024
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jan 2025
|
|
|
|
18 Feb 2025
|
15
|
Madhya Pradesh
|
FP/MP/ROAD/155297/2022
|
6-MPR041/2023-BHO
|
Improvement and Upgradation of existing 2-lane to 4-lane with paved shoulders, with/without Service Roads including Realignments and Shahgarh & Hirapur Bypasses from Mohari to Satia Ghat section of NH-934 & NH-34 (old NH-86) from Design Km 50+300 (Existing Km 49.789) to Design Km 89+878 (Existing Km 90.302) in the state of Madhya Pradesh
|
Road
|
NHAI
|
109.496
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 May 2022
|
Stage-I Approval on
|
:
|
15 Apr 2024
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jul 2024
|
|
|
|
18 Feb 2025
|
16
|
Madhya Pradesh
|
FP/MP/WATER/121759/2021
|
6-MPB022/2022-BHO
|
Payli Multi village rural water supply project
|
Drinking Water
|
MADHYA PARDESH JAL NIGAM MARYADIT JABALPUR
|
3.1317
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Feb 2021
|
Stage-I Approval on
|
:
|
21 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jan 2024
|
|
|
|
17 Feb 2025
|
17
|
Madhya Pradesh
|
FP/MP/ROAD/124417/2021
|
6-MPR003/2022-BHO
|
Proposal for diversion of Forest Land for Goras to Shyampur Road (old proposal no. FP/MP/ROAD/30794/2017)
|
Road
|
MORTH (NH-MP)
|
52.164
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Mar 2021
|
Stage-I Approval on
|
:
|
29 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2024
|
|
|
|
17 Feb 2025
|
18
|
Madhya Pradesh
|
FP/MP/ROAD/34206/2018
|
6-MPR019/2022-BHO
|
Keoti Jankhai Road to Paniyari Ghat
|
Road
|
OFFICE OF THE EXECUTIVE ENGINEER P.W.D. DIVISION NO.1 REWA
|
6.132
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jul 2018
|
Stage-I Approval on
|
:
|
31 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 Sep 2023
|
|
|
|
14 Feb 2025
|
19
|
Madhya Pradesh
|
FP/MP/ROAD/125037/2021
|
6-MPR016/2022-BHO
|
Tamia - Junnardev Road
|
Road
|
MPRDC CHHINDWARA DIVISION
|
8.85
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Mar 2021
|
Stage-I Approval on
|
:
|
05 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
14 Aug 2023
|
|
|
|
14 Feb 2025
|
20
|
Madhya Pradesh
|
FP/MP/WATER/153484/2022
|
6-MPB051/2023-BHO
|
Waidhan-1 Multi Village Rural Water Supply Scheme.
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
3.445
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2022
|
Stage-I Approval on
|
:
|
15 Aug 2024
|
Compliance Report Submitted by User Agency on
|
:
|
10 Oct 2024
|
|
|
|
14 Feb 2025
|
21
|
Madhya Pradesh
|
FP/MP/WATER/146889/2021
|
6-MPB063/2023-BHO
|
RAJGHAT MULTI VILLAGE SCHEME
|
Drinking Water
|
MP JAL NIGAM MARYADIT
|
4.11
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Sep 2021
|
Stage-I Approval on
|
:
|
22 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Mar 2024
|
|
|
|
14 Feb 2025
|
22
|
Madhya Pradesh
|
FP/MP/WATER/146483/2021
|
6-MPB064/2023-BHO
|
RAJGHAT MULTI VILLAGE SCHEME
|
Drinking Water
|
MP JAL NIGAM MARYADIT
|
2.669
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Sep 2021
|
Stage-I Approval on
|
:
|
20 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2024
|
|
|
|
14 Feb 2025
|
23
|
Madhya Pradesh
|
FP/MP/ROAD/138582/2021
|
6-MPC065/2021-BHO
|
Bhabhra - Kathiwada - Kheda Road
|
Road
|
MPRDC DHAR DIVISION
|
18.33
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Apr 2021
|
Stage-I Approval on
|
:
|
28 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
13 Jun 2022
|
|
|
|
14 Feb 2025
|
24
|
Madhya Pradesh
|
FP/MP/WATER/151344/2022
|
6-MPB052/2023-BHO
|
Waidhan-1 Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
2.8607
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jan 2022
|
Stage-I Approval on
|
:
|
02 May 2024
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jul 2024
|
|
|
|
13 Feb 2025
|
25
|
Madhya Pradesh
|
FP/MP/ROAD/153796/2022
|
6-MPR039/2023-BHO
|
Additional Land Required for 4 Laning of Harda to Betul Section of National Highway (NH-47)from Temagav Km 30+000 to Chicholi Km 81+000(Length- 51 km) under BHARATMALA Pariyojna Economic Corridor (Phase-I) in three districts of Harda, Hoshangabad and Betul in the state of Madhya Pradesh on EPC Mode
|
Road
|
PRASHANT PATHAK
|
11.399
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Mar 2022
|
Stage-I Approval on
|
:
|
05 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jun 2024
|
|
|
|
28 Jan 2025
|
26
|
Madhya Pradesh
|
FP/MP/WATER/145554/2021
|
6-MPB062/2023-BHO
|
Rajghat Multi Village Scheme
|
Drinking Water
|
MP JAL NIGAM MARYADIT
|
3.885
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Aug 2021
|
Stage-I Approval on
|
:
|
18 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
13 Aug 2024
|
|
|
|
24 Jan 2025
|
27
|
Madhya Pradesh
|
FP/MP/WATER/145554/2021
|
6-MPB062/2023-BHO
|
Rajghat Multi Village Scheme
|
Drinking Water
|
MP JAL NIGAM MARYADIT
|
3.885
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Aug 2021
|
Stage-I Approval on
|
:
|
18 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
13 Aug 2024
|
|
|
|
24 Jan 2025
|
28
|
Madhya Pradesh
|
FP/MP/ROAD/149613/2021
|
6-MPB055/2023-BHO
|
Diversion of 2.06 ha of forest land for construction of Begamganj sultanganj road under FCA 1980
|
Road
|
MPRDC BHOPAL DIVISION
|
2.06
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2022
|
Stage-I Approval on
|
:
|
18 Apr 2024
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2024
|
|
|
|
22 Jan 2025
|
29
|
Madhya Pradesh
|
FP/MP/ROAD/149386/2021
|
6-MPR036/2023-BHO
|
Diversion of 6.93 ha of forest land under FCA 1980 for Construction of Garhi Ahmedpur Road
|
Road
|
MPRDC BHOPAL DIVISION
|
6.93
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Nov 2022
|
Stage-I Approval on
|
:
|
18 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
03 Sep 2024
|
|
|
|
12 Jan 2025
|
30
|
Madhya Pradesh
|
FP/MP/WATER/151775/2022
|
6-MPB048/2023-BHO
|
Gond Deosar Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
4.8959
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2022
|
Stage-I Approval on
|
:
|
23 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
10 Jan 2025
|
31
|
Madhya Pradesh
|
FP/MP/IRRIG/32308/2018
|
6-MPC063/2018-BHO
|
Beka Tank
|
Irrigation
|
Madhya Pradesh Water Resources Department
|
36.726
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Jul 2018
|
Stage-I Approval on
|
:
|
27 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
15 May 2023
|
|
|
|
06 Jan 2025
|
32
|
Madhya Pradesh
|
FP/MP/WATER/151013/2022
|
6-MPB058/2023-BHO
|
Waidhan-1 Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
4.7558
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jan 2022
|
Stage-I Approval on
|
:
|
23 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Feb 2024
|
|
|
|
20 Dec 2024
|
33
|
Madhya Pradesh
|
FP/MP/WATER/151384/2022
|
6-MPB050/2023-BHO
|
Gond Deosar Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
3.0766
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jan 2022
|
Stage-I Approval on
|
:
|
14 Aug 2024
|
Compliance Report Submitted by User Agency on
|
:
|
10 Oct 2024
|
|
|
|
20 Dec 2024
|
34
|
Madhya Pradesh
|
FP/MP/WATER/151345/2022
|
6-MPB060/2023-BHO
|
Gond Devsar Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
4.9481
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jan 2022
|
Stage-I Approval on
|
:
|
22 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jan 2024
|
|
|
|
09 Dec 2024
|
35
|
Madhya Pradesh
|
FP/MP/WATER/151318/2022
|
6-MPB059/2023-BHO
|
Gond Devsar Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
4.9809
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jan 2022
|
Stage-I Approval on
|
:
|
22 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jan 2024
|
|
|
|
09 Dec 2024
|
36
|
Madhya Pradesh
|
FP/MP/WATER/151861/2022
|
6-MPB049/2023-BHO
|
Gond Deosar Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
4.8787
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Feb 2022
|
Stage-I Approval on
|
:
|
23 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
04 Dec 2024
|
37
|
Madhya Pradesh
|
FP/MP/WATER/151867/2022
|
6-MPB053/2023-BHO
|
Gond Devsar Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
2.7473
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Feb 2022
|
Stage-I Approval on
|
:
|
23 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
04 Dec 2024
|
38
|
Madhya Pradesh
|
FP/MP/WATER/154522/2022
|
6-MPB054/2023-BHO
|
Waidhan-2 Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
4.4909
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Apr 2022
|
Stage-I Approval on
|
:
|
07 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
02 Apr 2024
|
|
|
|
04 Dec 2024
|
39
|
Madhya Pradesh
|
FP/MP/WATER/151715/2022
|
6-MPB043/2023-BHO
|
Gond Devsar Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
4.9866
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jan 2022
|
Stage-I Approval on
|
:
|
23 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
02 Dec 2024
|
40
|
Madhya Pradesh
|
FP/MP/WATER/151412/2022
|
6-MPB047/2023-BHO
|
Gond Devsar Multi Village Rural Water Supply Scheme
|
Drinking Water
|
MADHYA PRADESH JAL NIGAM MARYADIT
|
4.9602
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jan 2022
|
Stage-I Approval on
|
:
|
23 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
30 Nov 2024
|
41
|
Madhya Pradesh
|
FP/MP/ROAD/146981/2021
|
6-MPR042/2023-BHO
|
4 laning of Ashapur-Khandwa-Deshgaon Section of NH-347B from Ashapur Design Ch 114+000 to Deshgaon (Khandwa) Design Ch 177+680 (length-63.680 km) on Betul Khandwa Corridor under BHARATMALA Pariyojana in the State of Madhya Pradesh
|
Road
|
National Highways Authority of India
|
16.153
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Sep 2021
|
Stage-I Approval on
|
:
|
15 Apr 2024
|
Compliance Report Submitted by User Agency on
|
:
|
01 Oct 2024
|
|
|
|
21 Nov 2024
|
42
|
Madhya Pradesh
|
FP/MP/ROAD/143349/2021
|
6-MPB032/2022-BHO
|
Construction of road from village temni to village sayar
|
Road
|
MPRRDA PIU-1 BALAGHAT
|
1.62
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jun 2021
|
Stage-I Approval on
|
:
|
03 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jul 2023
|
|
|
|
17 Nov 2024
|
43
|
Madhya Pradesh
|
FP/MP/IRRIG/44847/2020
|
6-MPR028/2022-BHO
|
Bambori Tank Project
|
Irrigation
|
Madhya Pradesh Water Resources Department
|
26.28
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Feb 2020
|
Stage-I Approval on
|
:
|
01 Mar 2024
|
Compliance Report Submitted by User Agency on
|
:
|
09 Oct 2024
|
|
|
|
05 Nov 2024
|
44
|
Madhya Pradesh
|
FP/MP/ROAD/156162/2022
|
6-MPB033/2023-BHO
|
Construction of road from Temni to Tattidhar via Keradehi Road under RCPLWEA SCHEME
|
Road
|
MPRRDA PIU-1 BALAGHAT
|
1.275
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Jun 2022
|
Stage-I Approval on
|
:
|
07 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
05 Nov 2024
|
45
|
Madhya Pradesh
|
FP/MP/ROAD/155818/2022
|
6-MPB034/2023-BHO
|
Nallejhari to Satona Road under RCPLWEA Scheme
|
Road
|
MPRRDA PIU-1 BALAGHAT
|
2.1
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 May 2022
|
Stage-I Approval on
|
:
|
11 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
15 Oct 2024
|
46
|
Madhya Pradesh
|
FP/MP/ROAD/156107/2022
|
6-MPB035/2023-BHO
|
Newerwahi to Wardha Road construction under RCPLWEA scheme
|
Road
|
MPRRDA PIU-1 BALAGHAT
|
1.97
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jun 2022
|
Stage-I Approval on
|
:
|
07 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
15 Oct 2024
|
47
|
Madhya Pradesh
|
FP/MP/ROAD/155407/2022
|
6-MPR030/2023-BHO
|
Bhaiswahi to Jaldidand Under RCPLWEA Scheme
|
Road
|
MPRRDA PIU ONE BALAGHAT
|
9.954
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 May 2022
|
Stage-I Approval on
|
:
|
13 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jun 2024
|
|
|
|
15 Oct 2024
|
48
|
Madhya Pradesh
|
FP/MP/WATER/146486/2021
|
6-MPB065/2023-BHO
|
RAJGHAT MULTI VILLAGE SCHEME
|
Drinking Water
|
MP JAL NIGAM MARYADIT
|
3.173
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Sep 2021
|
Stage-I Approval on
|
:
|
08 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
11 Mar 2024
|
|
|
|
11 Oct 2024
|
49
|
Madhya Pradesh
|
FP/MP/ROAD/49834/2020
|
6-MPC040/2021-BHO
|
Forest Clearance Proposal for Nasrullaganj Rehti Budhni Road (Old Proposal Number FP/MP/ROAD/36454/2018)
|
Road
|
MORTH (NH-MP)
|
11.595
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2020
|
Stage-I Approval on
|
:
|
28 Jun 2021
|
Compliance Report Submitted by User Agency on
|
:
|
14 May 2022
|
|
|
|
10 Oct 2024
|
50
|
Madhya Pradesh
|
FP/MP/TRANS/152053/2022
|
6-MPR001/2023-BHO
|
Associated Transmission Lines with 220/132/33kV Substation Begumgang involving 1. Sagar - Begumganj 220 kV DCDS Line, 2. Begumganj - Rahatgarh 132kV DCSS Line, 3. Begumganj - Silwani 132 kV DCSS Line, 4. Begumganj Gyaraspur 132 kV DCSS line
|
Transmission Line
|
MP POWER TRANSMISSION PACKAGE II LIMITED
|
55.0227
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2022
|
Stage-I Approval on
|
:
|
23 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2023
|
|
|
|
23 Sep 2024
|
|