Ministry of Environment,Forest and Climate Change
Government of India
Himachal Pradesh
State Forest Department
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Himachal Pradesh FP/HP/TRANS/148907/2021 FC/HPB/91/2023 66KV D/C Transmission line from Pragati Nagar to 66/22KV Sub-Station Hulli (Kotkhai) Shimla. (H.P) Transmission Line HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD 3.613 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Jan 2022
Stage-I Approval on : 10 Jan 2025
Compliance Report Submitted by User Agency on : 10 Jun 2025
26 Jun 2025
2 Himachal Pradesh FP/HP/ROAD/151416/2022 FC/HPB/06/124/2022 C/O road from Shamshar to Chalohan Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 1.668 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Jan 2022
Stage-I Approval on : 31 Oct 2023
Compliance Report Submitted by User Agency on : 03 Jun 2025
13 Jun 2025
3 Himachal Pradesh FP/HP/Others/51314/2020 FC/HPB/06/42/2021 Construction of Sewerage Treatment Plant at Naddi, in Tehsil Dharamshala, District Kangra Others IRRIGATION AND PUBLIC HEALTH GOVT OF HP 0.3 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Oct 2020
Stage-I Approval on : 06 Jul 2022
Compliance Report Submitted by User Agency on : 01 Jun 2025
11 Jun 2025
4 Himachal Pradesh FP/HP/ROAD/48987/2020 FC/HPB/73/2023 C/O CHILLON TO CHOWKIMRIGWAL ROAD KM 0/00 TO 8/00 Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 1.92 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Aug 2020
Stage-I Approval on : 22 Jun 2024
Compliance Report Submitted by User Agency on : 08 May 2025
30 May 2025
5 Himachal Pradesh FP/HP/Others/123920/2021 8B/HP/09/86/2021/FC Diversion of 0.3253 Ha. Forest Land for Augmentation of Sewerage Scheme to Mandi Town and Providing sewerage facility to adjoing villages of Mandi Town HP Others JAL SHAKTI VIBHAG GOVT. OF HIMACHAL PRADESH 0.3253 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Feb 2021
Stage-I Approval on : 29 Jul 2021
Compliance Report Submitted by User Agency on : 07 May 2025
29 May 2025
6 Himachal Pradesh FP/HP/ROAD/25347/2017 FC/HPB/64/2023 C/o Link Road from Domehar-Navi Road Km 0/0 to 5/241 Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 3.2322 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Jan 2020
Stage-I Approval on : 18 Apr 2024
Compliance Report Submitted by User Agency on : 26 Mar 2025
21 Apr 2025
7 Himachal Pradesh FP/HP/HYD/14396/2015 8B/HP/01/116/2017 MANIMAHESH ENTERPRISES Hydel M/S MANIMAHESH ENTERPRISES 0.7649 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Aug 2015
Stage-I Approval on : 01 May 2018
Compliance Report Submitted by User Agency on : 12 Mar 2025
11 Apr 2025
8 Himachal Pradesh FP/HP/Others/123004/2021 FC/HPB/09/52/2021 Diversion of 0.561098 hectare of Forest Land for the Construction of Sewerage Treatment Plant 5.00 MLD for Zone No. 1 within the Jurisdiction of Bilaspur Forest Division Others JAL SHAKTI VIBHAG GOVT. OF HIMACHAL PRADESH 0.56109 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Feb 2021
Stage-I Approval on : 07 Mar 2022
Compliance Report Submitted by User Agency on : 15 Mar 2025
08 Apr 2025
9 Himachal Pradesh FP/HP/ROAD/32474/2018 8B/HP/06/99/2019/FC BANOUN KANCHI SE GHARA ROAD KM 0/0 TO 4/00 Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 2.27 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Mar 2018
Stage-I Approval on : 21 Oct 2020
Compliance Report Submitted by User Agency on : 17 Mar 2025
08 Apr 2025
10 Himachal Pradesh FP/HP/ROAD/147914/2021 FC/HPB/50/2023 C/O Ambulance road from NH-205 to Kamna Devi of portion vinod sharma house to Kamna Devi Ward No.8 Boileauganj Shimla RD 0/0 to 0/425. Road Commissioner MCS 0.2143 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2021
Stage-I Approval on : 05 Jul 2024
Compliance Report Submitted by User Agency on : 12 Mar 2025
02 Apr 2025
11 Himachal Pradesh FP/HP/ROAD/120302/2021 FC/HPB/06/13/2022 Proposal for Diversion of forest land measuring 2.4589 ha. in Village Kathali from R/D 127/450 to 128/250 for four laning of Solan-Kaitlighat section of NH-22 (Now NH-05) from Km. 106.139 to Km 129.05 Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU SHIMLA 2.4589 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Apr 2021
Stage-I Approval on : 07 Jul 2022
Compliance Report Submitted by User Agency on : 05 Feb 2025
02 Apr 2025
12 Himachal Pradesh FP/HP/ROAD/152261/2022 FC/HPC/06/155/2022 Diversion of 7.2834 Ha. Forest land for Rehabilitation and Upgradation to Four Lane configuration & Strengthening of Sihuni to Rajol from Km 51.00 to Km 72.00 (Package IIA) (Design Length 18.450 km) of NH-20 (New NH-154) of Pathankot-Mandi Section in the state of Himachal Pradesh. Road NATIONAL HIGHWAY AUTHORITY OF INDIA, PIU-PALAMPUR 7.2834 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jul 2022
Stage-I Approval on : 05 Apr 2023
Compliance Report Submitted by User Agency on : 17 Mar 2025
01 Apr 2025
13 Himachal Pradesh FP/HP/ROAD/15861/2015 B/HP/06/27/2018/FC Construction of link road from Upper Jamli to Baron Kathana road km.0/0 to 6/700 Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 1.276 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Oct 2015
Stage-I Approval on : 21 Jun 2024
Compliance Report Submitted by User Agency on : 18 Feb 2025
23 Mar 2025
14 Himachal Pradesh FP/HP/ROAD/148886/2021 FC/HPB/06/153/2022 Two laning with paved shoulders from End of Hamirpur Bypass (Chil Bahal) to Bhangbar section via Jwalamukhi from km 138+295 to Km 175+270 (Package IV) of existing NH 88 (New NH-3 & 303) Road National Highways Authority of India 2.1338 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Oct 2021
Stage-I Approval on : 23 Feb 2023
Compliance Report Submitted by User Agency on : 21 Feb 2025
23 Mar 2025
15 Himachal Pradesh FP/HP/HYD/49792/2020 FC/HPB/01/77/2021 Lower Bhagair 1 MW SHEP Hydel SHIV SHAKTI ENTERPRISES 0.7903 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Oct 2020
Stage-I Approval on : 09 Jan 2024
Compliance Report Submitted by User Agency on : 24 Sep 2024
25 Feb 2025
16 Himachal Pradesh FP/HP/ROAD/25608/2017 8B/HP/06/80/2019/FC CONSTRUCTION OF LINK ROAD TO KUFRI-NIHON-KHEEL-DEMELA IN G.P. – KUFRI KM. 0/0 TO 8/100. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 4 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Apr 2017
Stage-I Approval on : 22 Jul 2021
Compliance Report Submitted by User Agency on : 14 Jan 2025
19 Feb 2025
17 Himachal Pradesh FP/HP/Pipeline/39422/2019 8B/HP/02/29/2020 C/O BALI CHOWKI AND MULTI VILLAGE GROUP PIPED WATER SUPPLY SCHEME FOR PART OF SERAJ BLOCK OF MANDI DISTRICT. (H.P.) Pipeline EXECUTIVE ENGINEER IPH DIVISION THUNAG 4.32 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 May 2019
Stage-I Approval on : 30 Apr 2020
Compliance Report Submitted by User Agency on : 05 Nov 2024
18 Feb 2025
18 Himachal Pradesh FP/HP/ROAD/37860/2018 8b/hp//06/47/2021/FC C/O LINK ROAD FROM DANDHAL TO JARAL KM 0/0 TO 2/00. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 1.2222 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jan 2019
Stage-I Approval on : 26 Nov 2021
Compliance Report Submitted by User Agency on : 01 Dec 2024
18 Feb 2025
19 Himachal Pradesh FP/HP/ROAD/20377/2016 8B/HP/06/41/2017/FC Construction of Link Road to Harizan Basti Kalehri. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 0.6123 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Jul 2016
Stage-I Approval on : 10 Oct 2017
Compliance Report Submitted by User Agency on : 17 Dec 2024
18 Feb 2025
20 Himachal Pradesh FP/HP/WATER/43930/2020 8B/HP/09/63/2020/FC Augmentation of various Water Supply Schemes in GP Tandi, Saroa, Tharjoon, Musrani, Bassi, Devdhar, Kharshi and Kotla in Gohar Block Tehsil Chachiot District Mandi. Drinking Water EXECUTIVE ENGINEER IPH DIVISION THUNAG 3.6 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Jan 2020
Stage-I Approval on : 13 Oct 2020
Compliance Report Submitted by User Agency on : 29 Nov 2024
18 Feb 2025
21 Himachal Pradesh FP/HP/ROAD/154466/2022 FC/HPC/79/2023 Diversion of 19.5896 Ha. Forest land for Rehabilitation and Upgradation to Two lane with paved shoulder configuration & Strengthening of Padhar to Bijni (Package-VA) from Km 180.00 to Km 202.815 (Design Length 19.050 km) of NH-20 (New NH-154) of Pathankot-Mandi Section in the state of Himachal Pradesh. Road NATIONAL HIGHWAY AUTHORITY OF INDIA, PIU-PALAMPUR 19.5896 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Jul 2022
Stage-I Approval on : 22 Dec 2023
Compliance Report Submitted by User Agency on : 27 Jan 2025
04 Feb 2025
22 Himachal Pradesh FP/HP/Others/40164/2019 8B/HP/09/36/2020/FC C/O AE office at Kelodhar in Tehsil Chachiot District Mandi. Others EXECUTIVE ENGINEER IPH DIVISION THUNAG 0.0576 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 May 2019
Stage-I Approval on : 14 Jan 2022
Compliance Report Submitted by User Agency on : 05 Nov 2024
17 Jan 2025
23 Himachal Pradesh FP/HP/MIN/129370/2021 FC/HPB/47/2023 Mining Lease of Sh. Vinod Kumar Auctioned Area for extraction of minor minerals like Sand, Stone and Bajri from river bed of son khad Mining M/S VINOD KUMAR (MINING) 0.7984 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Mar 2021
Stage-I Approval on : 17 Sep 2024
Compliance Report Submitted by User Agency on : 05 Dec 2024
19 Dec 2024
24 Himachal Pradesh FP/HP/SCH/21873/2016 8B/HP/09/30/2017 Govt. Degree College Sihunta School DIRECTORATE OF HIGHER EDUCATION 1.5298 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Oct 2016
Stage-I Approval on : 31 Jul 2024
Compliance Report Submitted by User Agency on : 24 Nov 2024
19 Dec 2024
25 Himachal Pradesh FP/HP/MIN/119019/2021 FC/HPB/56/2023 Mining Lease of Sh. Vinod Kumar Auctioned Area for extraction of minor minerals like Sand, Stone and Bajri from river bed of son khad. Mining M/S VINOD KUMAR (MINING) 1.7674 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Jan 2021
Stage-I Approval on : 17 Sep 2024
Compliance Report Submitted by User Agency on : 25 Oct 2024
27 Nov 2024
26 Himachal Pradesh FP/HP/Others/122895/2021 FC/HPC/09/53/2022 Construction of Setting up of National Disaster Response Force (NDRF) Battalion at Tehsil Balh District Mandi (HP) Others COMMANDANT 14TH BN NDRF 23.97 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Feb 2021
Stage-I Approval on : 11 Dec 2023
Compliance Report Submitted by User Agency on : 26 Oct 2024
25 Nov 2024
27 Himachal Pradesh FP/HP/Others/42960/2019 8B/HP/09/60/2020/FC C/o Building and Campus of GDC Telka, Distt. Chamba, H.P. Others DIRECTOR OF HIGHER EDUCATION 2.83 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Nov 2019
Stage-I Approval on : 30 Sep 2021
Compliance Report Submitted by User Agency on : 31 Aug 2024
18 Nov 2024
28 Himachal Pradesh FP/HP/WATER/151171/2022 FC/HPB/08/110/2022 Source Augmentation & Improvement of LWSS Kathwari & its adjoining villages in GP Bie, BariGumanoo, Sadhyana, Sehli, Sai, kashan, Sadoh and Tarnoh Tehsil Sadar Distt. Mandi (H.P). Drinking Water JAL SHAKTI VIBHAG GOVT. OF HIMACHAL PRADESH 0.5214 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Jan 2022
Stage-I Approval on : 13 Sep 2023
Compliance Report Submitted by User Agency on : 12 Sep 2024
18 Nov 2024
29 Himachal Pradesh FP/HP/ROAD/47684/2020 FC/HPB/62/2023 C/O Ambulance road Dhali Chowk to Durga Colony Road Commissioner MCS 0.1287 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Jul 2020
Stage-I Approval on : 01 Nov 2023
Compliance Report Submitted by User Agency on : 29 Aug 2024
10 Nov 2024
30 Himachal Pradesh FP/HP/HYD/34393/2018 8B/HP/01/127/2019/FC C/o Baada Deo Small Hydro Project (1.5 MW) Hydel Baada Deo Small Hydel Project Pvt. Ltd 0.9991 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Jul 2018
Stage-I Approval on : 15 Jun 2022
Compliance Report Submitted by User Agency on : 10 Sep 2024
28 Oct 2024
31 Himachal Pradesh FP/HP/ROAD/119280/2021 FC/HPB/06/49/2022 C/O Ambulance Road from Anji road to Gautam Niwas Via Govt. Primary School Ghora Chowki in ward No.9 Kachighati KM 0/0 to 0/800. Road Commissioner MCS 0.2701 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Jan 2021
Stage-I Approval on : 16 Dec 2022
Compliance Report Submitted by User Agency on : 31 Aug 2024
21 Oct 2024
32 Himachal Pradesh FP/HP/SCH/49067/2020 FC/HPB/09/14/2021 CONSTRUCTION OF KENDRIYA VIDYALAYA IN TEHSIL DHARMPUR, DISTRICT MANDI H.P School DIRECTOR OF HIGHER EDUCATION 1 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Aug 2020
Stage-I Approval on : 10 Feb 2022
Compliance Report Submitted by User Agency on : 31 Jul 2024
06 Sep 2024
33 Himachal Pradesh FP/HP/ROAD/33116/2018 8B/HP/06/39/2021/FC construction of Lakhwan Dahanu Hawanu Bhangot Rathol Andreta Meramsit Road km.0/0 To 8/010. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 2.3698 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Sep 2019
Stage-I Approval on : 25 Oct 2023
Compliance Report Submitted by User Agency on : 11 Jun 2024
03 Sep 2024
34 Himachal Pradesh FP/HP/ROAD/42899/2019 FC/HPC/06/30/2021 C/O shamshar to Panai km 0/0 to 9/390 Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 5.31 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Nov 2019
Stage-I Approval on : 15 Feb 2022
Compliance Report Submitted by User Agency on : 19 Jun 2024
20 Aug 2024
35 Himachal Pradesh FP/HP/Others/149118/2021 FC/HPB/09/148/2022 Construction of Sewerage Treatment Plant 3.10 MLD at Ashwani Khad (0.4122 Hectares) Others SHIMLA JAL PARBANDHAN NIGAM LIMITED 0.4122 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Nov 2021
Stage-I Approval on : 04 May 2023
Compliance Report Submitted by User Agency on : 19 Mar 2024
03 Jul 2024
36 Himachal Pradesh FP/HP/SubStation/46229/2020 FC/HPB/12/75/2022 Construction of 220/66kv Sub-Station Nadukhar & 220kv LILO Tower for LILO of 220kv Bhaba-Kunihar line. Sub Station HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD 1.1333 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Jun 2020
Stage-I Approval on : 11 Oct 2023
Compliance Report Submitted by User Agency on : 15 May 2024
02 Jul 2024
37 Himachal Pradesh FP/HP/ROAD/144814/2021 FC/HPB/06/179/2022 Up-gradation of Paonta Saheb-Ballupur (Dehradun) section from km 97.000 to km 149.000 of NH-72 in the State of Uttarakhand and Himachal Pradesh Road NATIONAL HIGHWAY AUTHORITY OF INDIA, VASANT VIHAR, PIU, DEHRADUN 1.8916 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Aug 2021
Stage-I Approval on : 07 Mar 2023
Compliance Report Submitted by User Agency on : 24 May 2024
24 Jun 2024
38 Himachal Pradesh FP/HP/Others/34070/2018 8B/HP/09/79/2020/FC Construction of Office Building of Home Guard 2/4 Company Kumarsain Others ADG CUM COMMANDANT GENRAL HOME GUARD CIVIL DEFENCE HIMACHAL PRADESH SHIMLA 0.0357 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Jun 2018
Stage-I Approval on : 11 Sep 2020
Compliance Report Submitted by User Agency on : 10 Jan 2024
25 Apr 2024
39 Himachal Pradesh FP/HP/ROAD/118872/2021 FC/HPB/06/63/2022 link Road From Bharari to Padhya Mata Mandir RD 0/0 to 1/210 Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 0.7574 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Jan 2021
Stage-I Approval on : 29 Nov 2023
Compliance Report Submitted by User Agency on : 26 Mar 2024
15 Apr 2024
40 Himachal Pradesh FP/HP/ROAD/44200/2020 FC/HPB/06/33/2022 C/o road from Kufar to Kanda Shilyar Gavan Sunna Bathal in G.P Halau KM 0/0 to 4/0 Road PUBLIC WORK DEPARTMENT 2.4037 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Jan 2020
Stage-I Approval on : 15 Sep 2022
Compliance Report Submitted by User Agency on : 23 Mar 2024
14 Apr 2024
41 Himachal Pradesh FP/HP/TRANS/157184/2022 FC/HPC/71/2023 Diversion of 17.84 Hectare of forest land for construction of 132 kV MCT line on 220kV MCTs with ACSR ZEBRA conductor from 220/132 kV Substation proposed at Andheri to Tower No. 20/21 of existing 132 kV Jamta-Kala Amb transmission line at Kala Amb Distt. Sirmaur (HP) Transmission Line HP POWER TRANSMISSION CORPORATION LIMITED 17.84 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Jun 2022
Stage-I Approval on : 10 Oct 2023
Compliance Report Submitted by User Agency on : 08 Dec 2023
09 Jan 2024
42 Himachal Pradesh FP/HP/ROAD/22498/2016 8B/HPB/06/04/2018 C/O link road from Golu to Palgade Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 5.3966 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Nov 2016
Stage-I Approval on : 20 Apr 2018
Compliance Report Submitted by User Agency on : 19 Dec 2023
28 Dec 2023
43 Himachal Pradesh FP/HP/ROAD/28594/2017 8B/HP/06/106/2019/FC C/o Shanad Shrikot Raod Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 5.18 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Aug 2017
Stage-I Approval on : 09 Mar 2020
Compliance Report Submitted by User Agency on : 11 Oct 2023
28 Dec 2023
44 Himachal Pradesh FP/HP/Others/32672/2018 8B/HP/09/72/2018/FC Construction of Judicial Courts Complex and Complete separate Court Block for Juvenile Justice Board at Shingla Others DISTRICT & SESSION JUDGE KINNAUR CIVIL AND SESSION DIVISION RAMPUR BUSHAHR DISTT. SHIMLA H.P. 1.4194 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Mar 2018
Stage-I Approval on : 06 Oct 2020
Compliance Report Submitted by User Agency on : 30 Sep 2023
28 Dec 2023
45 Himachal Pradesh FP/HP/ROAD/22377/2016 8B/HP/06/69/2018/FC CONTRUCTION OF SANOTI TO DHAWAS ROAD Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 1.61 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Nov 2016
Stage-I Approval on : 19 Aug 2021
Compliance Report Submitted by User Agency on : 06 Sep 2023
28 Dec 2023
46 Himachal Pradesh FP/HP/ROAD/9680/2015 8B/HP/06/30/2018/FC C/O Motorable Road Kun Kamlah Via Tourkhola KM 0/0 to 7/105 Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 2.8054 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Jun 2017
Stage-I Approval on : 11 Jul 2018
Compliance Report Submitted by User Agency on : 03 Dec 2018
28 Dec 2023
47 Himachal Pradesh FP/HP/Others/152523/2022 FC/HPB/09/32/2022 Construction of National centre of Excellence (Sports) at Hamirpur. for in favour of District Youth Services and Sports Hamirpur. Himachal Pradesh. Others District Youth Services & Sports Hamirpur 2.4264 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Feb 2022
Stage-I Approval on : 21 Dec 2022
Compliance Report Submitted by User Agency on : 11 Dec 2023
14 Dec 2023
48 Himachal Pradesh FP/HP/ROAD/148549/2021 FC/HPB/06/56/2022 The forest land is required for Diversion 1.2359 i.e. 1.0402ha Solan Forest Division & 0.1957 ha. Kunihar Forest Division of forest land for C/O Proposed Road From Jangeshu to Oda via Bhanet 0/00 to Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 1.2359 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Oct 2021
Stage-I Approval on : 15 Sep 2022
Compliance Report Submitted by User Agency on : 03 Nov 2023
14 Dec 2023
49 Himachal Pradesh FP/HP/TRANS/40307/2019 8B/HP/04/15/2020/FC CONSTRUCTION OF 33 KV TRANSMISSION LINE (LUNI-I SHEP TO 33 KV HPSEBL BAIJNATH SUB-STATION ) Transmission Line LUNI POWER COMPANY PRIVATE LIMITED 7.3991 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Jun 2019
Stage-I Approval on : 07 Aug 2023
Compliance Report Submitted by User Agency on : 13 Nov 2023
30 Nov 2023
50 Himachal Pradesh FP/HP/Others/30665/2017 8B/HP/09/29/2021 Himchal Sanskrit Academy Others DIRECTORATE OF HIGHER EDUCATION 1.1422 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Dec 2017
Stage-I Approval on : 16 Mar 2023
Compliance Report Submitted by User Agency on : 16 Oct 2023
22 Nov 2023
12345678910
Please wait ...