Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Himachal Pradesh
|
FP/HP/TRANS/148907/2021
|
FC/HPB/91/2023
|
66KV D/C Transmission line from Pragati Nagar to 66/22KV Sub-Station Hulli (Kotkhai) Shimla. (H.P)
|
Transmission Line
|
HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD
|
3.613
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2022
|
Stage-I Approval on
|
:
|
10 Jan 2025
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jun 2025
|
|
|
|
26 Jun 2025
|
2
|
Himachal Pradesh
|
FP/HP/ROAD/151416/2022
|
FC/HPB/06/124/2022
|
C/O road from Shamshar to Chalohan
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.668
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jan 2022
|
Stage-I Approval on
|
:
|
31 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jun 2025
|
|
|
|
13 Jun 2025
|
3
|
Himachal Pradesh
|
FP/HP/Others/51314/2020
|
FC/HPB/06/42/2021
|
Construction of Sewerage Treatment Plant at Naddi, in Tehsil Dharamshala, District Kangra
|
Others
|
IRRIGATION AND PUBLIC HEALTH GOVT OF HP
|
0.3
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Oct 2020
|
Stage-I Approval on
|
:
|
06 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jun 2025
|
|
|
|
11 Jun 2025
|
4
|
Himachal Pradesh
|
FP/HP/ROAD/48987/2020
|
FC/HPB/73/2023
|
C/O CHILLON TO CHOWKIMRIGWAL ROAD KM 0/00 TO 8/00
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.92
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Aug 2020
|
Stage-I Approval on
|
:
|
22 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
08 May 2025
|
|
|
|
30 May 2025
|
5
|
Himachal Pradesh
|
FP/HP/Others/123920/2021
|
8B/HP/09/86/2021/FC
|
Diversion of 0.3253 Ha. Forest Land for Augmentation of Sewerage Scheme to Mandi Town and Providing sewerage facility to adjoing villages of Mandi Town HP
|
Others
|
JAL SHAKTI VIBHAG GOVT. OF HIMACHAL PRADESH
|
0.3253
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Feb 2021
|
Stage-I Approval on
|
:
|
29 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
07 May 2025
|
|
|
|
29 May 2025
|
6
|
Himachal Pradesh
|
FP/HP/ROAD/25347/2017
|
FC/HPB/64/2023
|
C/o Link Road from Domehar-Navi Road Km 0/0 to 5/241
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
3.2322
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2020
|
Stage-I Approval on
|
:
|
18 Apr 2024
|
Compliance Report Submitted by User Agency on
|
:
|
26 Mar 2025
|
|
|
|
21 Apr 2025
|
7
|
Himachal Pradesh
|
FP/HP/HYD/14396/2015
|
8B/HP/01/116/2017
|
MANIMAHESH ENTERPRISES
|
Hydel
|
M/S MANIMAHESH ENTERPRISES
|
0.7649
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Aug 2015
|
Stage-I Approval on
|
:
|
01 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
12 Mar 2025
|
|
|
|
11 Apr 2025
|
8
|
Himachal Pradesh
|
FP/HP/Others/123004/2021
|
FC/HPB/09/52/2021
|
Diversion of 0.561098 hectare of Forest Land for the Construction of Sewerage Treatment Plant 5.00 MLD for Zone No. 1 within the Jurisdiction of Bilaspur Forest Division
|
Others
|
JAL SHAKTI VIBHAG GOVT. OF HIMACHAL PRADESH
|
0.56109
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Feb 2021
|
Stage-I Approval on
|
:
|
07 Mar 2022
|
Compliance Report Submitted by User Agency on
|
:
|
15 Mar 2025
|
|
|
|
08 Apr 2025
|
9
|
Himachal Pradesh
|
FP/HP/ROAD/32474/2018
|
8B/HP/06/99/2019/FC
|
BANOUN KANCHI SE GHARA ROAD KM 0/0 TO 4/00
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
2.27
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2018
|
Stage-I Approval on
|
:
|
21 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
17 Mar 2025
|
|
|
|
08 Apr 2025
|
10
|
Himachal Pradesh
|
FP/HP/ROAD/147914/2021
|
FC/HPB/50/2023
|
C/O Ambulance road from NH-205 to Kamna Devi of portion vinod sharma house to Kamna Devi Ward No.8 Boileauganj Shimla RD 0/0 to 0/425.
|
Road
|
Commissioner MCS
|
0.2143
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Sep 2021
|
Stage-I Approval on
|
:
|
05 Jul 2024
|
Compliance Report Submitted by User Agency on
|
:
|
12 Mar 2025
|
|
|
|
02 Apr 2025
|
11
|
Himachal Pradesh
|
FP/HP/ROAD/120302/2021
|
FC/HPB/06/13/2022
|
Proposal for Diversion of forest land measuring 2.4589 ha. in Village Kathali from R/D 127/450 to 128/250 for four laning of Solan-Kaitlighat section of NH-22 (Now NH-05) from Km. 106.139 to Km 129.05
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA PIU SHIMLA
|
2.4589
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2021
|
Stage-I Approval on
|
:
|
07 Jul 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 Feb 2025
|
|
|
|
02 Apr 2025
|
12
|
Himachal Pradesh
|
FP/HP/ROAD/152261/2022
|
FC/HPC/06/155/2022
|
Diversion of 7.2834 Ha. Forest land for Rehabilitation and Upgradation to Four Lane configuration & Strengthening of Sihuni to Rajol from Km 51.00 to Km 72.00 (Package IIA) (Design Length 18.450 km) of NH-20 (New NH-154) of Pathankot-Mandi Section in the state of Himachal Pradesh.
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA, PIU-PALAMPUR
|
7.2834
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jul 2022
|
Stage-I Approval on
|
:
|
05 Apr 2023
|
Compliance Report Submitted by User Agency on
|
:
|
17 Mar 2025
|
|
|
|
01 Apr 2025
|
13
|
Himachal Pradesh
|
FP/HP/ROAD/15861/2015
|
B/HP/06/27/2018/FC
|
Construction of link road from Upper Jamli to Baron Kathana road km.0/0 to 6/700
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.276
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Oct 2015
|
Stage-I Approval on
|
:
|
21 Jun 2024
|
Compliance Report Submitted by User Agency on
|
:
|
18 Feb 2025
|
|
|
|
23 Mar 2025
|
14
|
Himachal Pradesh
|
FP/HP/ROAD/148886/2021
|
FC/HPB/06/153/2022
|
Two laning with paved shoulders from End of Hamirpur Bypass (Chil Bahal) to Bhangbar section via Jwalamukhi from km 138+295 to Km 175+270 (Package IV) of existing NH 88 (New NH-3 & 303)
|
Road
|
National Highways Authority of India
|
2.1338
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Oct 2021
|
Stage-I Approval on
|
:
|
23 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
21 Feb 2025
|
|
|
|
23 Mar 2025
|
15
|
Himachal Pradesh
|
FP/HP/HYD/49792/2020
|
FC/HPB/01/77/2021
|
Lower Bhagair 1 MW SHEP
|
Hydel
|
SHIV SHAKTI ENTERPRISES
|
0.7903
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Oct 2020
|
Stage-I Approval on
|
:
|
09 Jan 2024
|
Compliance Report Submitted by User Agency on
|
:
|
24 Sep 2024
|
|
|
|
25 Feb 2025
|
16
|
Himachal Pradesh
|
FP/HP/ROAD/25608/2017
|
8B/HP/06/80/2019/FC
|
CONSTRUCTION OF LINK ROAD TO KUFRI-NIHON-KHEEL-DEMELA IN G.P. – KUFRI KM. 0/0 TO 8/100.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
4
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2017
|
Stage-I Approval on
|
:
|
22 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
14 Jan 2025
|
|
|
|
19 Feb 2025
|
17
|
Himachal Pradesh
|
FP/HP/Pipeline/39422/2019
|
8B/HP/02/29/2020
|
C/O BALI CHOWKI AND MULTI VILLAGE GROUP PIPED WATER SUPPLY SCHEME FOR PART OF SERAJ BLOCK OF MANDI DISTRICT. (H.P.)
|
Pipeline
|
EXECUTIVE ENGINEER IPH DIVISION THUNAG
|
4.32
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 May 2019
|
Stage-I Approval on
|
:
|
30 Apr 2020
|
Compliance Report Submitted by User Agency on
|
:
|
05 Nov 2024
|
|
|
|
18 Feb 2025
|
18
|
Himachal Pradesh
|
FP/HP/ROAD/37860/2018
|
8b/hp//06/47/2021/FC
|
C/O LINK ROAD FROM DANDHAL TO JARAL KM 0/0 TO 2/00.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.2222
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jan 2019
|
Stage-I Approval on
|
:
|
26 Nov 2021
|
Compliance Report Submitted by User Agency on
|
:
|
01 Dec 2024
|
|
|
|
18 Feb 2025
|
19
|
Himachal Pradesh
|
FP/HP/ROAD/20377/2016
|
8B/HP/06/41/2017/FC
|
Construction of Link Road to Harizan Basti Kalehri.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
0.6123
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jul 2016
|
Stage-I Approval on
|
:
|
10 Oct 2017
|
Compliance Report Submitted by User Agency on
|
:
|
17 Dec 2024
|
|
|
|
18 Feb 2025
|
20
|
Himachal Pradesh
|
FP/HP/WATER/43930/2020
|
8B/HP/09/63/2020/FC
|
Augmentation of various Water Supply Schemes in GP Tandi, Saroa, Tharjoon, Musrani, Bassi, Devdhar, Kharshi and Kotla in Gohar Block Tehsil Chachiot District Mandi.
|
Drinking Water
|
EXECUTIVE ENGINEER IPH DIVISION THUNAG
|
3.6
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Jan 2020
|
Stage-I Approval on
|
:
|
13 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
29 Nov 2024
|
|
|
|
18 Feb 2025
|
21
|
Himachal Pradesh
|
FP/HP/ROAD/154466/2022
|
FC/HPC/79/2023
|
Diversion of 19.5896 Ha. Forest land for Rehabilitation and Upgradation to Two lane with paved shoulder configuration & Strengthening of Padhar to Bijni (Package-VA) from Km 180.00 to Km 202.815 (Design Length 19.050 km) of NH-20 (New NH-154) of Pathankot-Mandi Section in the state of Himachal Pradesh.
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA, PIU-PALAMPUR
|
19.5896
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Jul 2022
|
Stage-I Approval on
|
:
|
22 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
27 Jan 2025
|
|
|
|
04 Feb 2025
|
22
|
Himachal Pradesh
|
FP/HP/Others/40164/2019
|
8B/HP/09/36/2020/FC
|
C/O AE office at Kelodhar in Tehsil Chachiot District Mandi.
|
Others
|
EXECUTIVE ENGINEER IPH DIVISION THUNAG
|
0.0576
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 May 2019
|
Stage-I Approval on
|
:
|
14 Jan 2022
|
Compliance Report Submitted by User Agency on
|
:
|
05 Nov 2024
|
|
|
|
17 Jan 2025
|
23
|
Himachal Pradesh
|
FP/HP/MIN/129370/2021
|
FC/HPB/47/2023
|
Mining Lease of Sh. Vinod Kumar Auctioned Area for extraction of minor minerals like Sand, Stone and Bajri from river bed of son khad
|
Mining
|
M/S VINOD KUMAR (MINING)
|
0.7984
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Mar 2021
|
Stage-I Approval on
|
:
|
17 Sep 2024
|
Compliance Report Submitted by User Agency on
|
:
|
05 Dec 2024
|
|
|
|
19 Dec 2024
|
24
|
Himachal Pradesh
|
FP/HP/SCH/21873/2016
|
8B/HP/09/30/2017
|
Govt. Degree College Sihunta
|
School
|
DIRECTORATE OF HIGHER EDUCATION
|
1.5298
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Oct 2016
|
Stage-I Approval on
|
:
|
31 Jul 2024
|
Compliance Report Submitted by User Agency on
|
:
|
24 Nov 2024
|
|
|
|
19 Dec 2024
|
25
|
Himachal Pradesh
|
FP/HP/MIN/119019/2021
|
FC/HPB/56/2023
|
Mining Lease of Sh. Vinod Kumar Auctioned Area for extraction of minor minerals like Sand, Stone and Bajri from river bed of son khad.
|
Mining
|
M/S VINOD KUMAR (MINING)
|
1.7674
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jan 2021
|
Stage-I Approval on
|
:
|
17 Sep 2024
|
Compliance Report Submitted by User Agency on
|
:
|
25 Oct 2024
|
|
|
|
27 Nov 2024
|
26
|
Himachal Pradesh
|
FP/HP/Others/122895/2021
|
FC/HPC/09/53/2022
|
Construction of Setting up of National Disaster Response Force (NDRF) Battalion at Tehsil Balh District Mandi (HP)
|
Others
|
COMMANDANT 14TH BN NDRF
|
23.97
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Feb 2021
|
Stage-I Approval on
|
:
|
11 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
26 Oct 2024
|
|
|
|
25 Nov 2024
|
27
|
Himachal Pradesh
|
FP/HP/Others/42960/2019
|
8B/HP/09/60/2020/FC
|
C/o Building and Campus of GDC Telka, Distt. Chamba, H.P.
|
Others
|
DIRECTOR OF HIGHER EDUCATION
|
2.83
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Nov 2019
|
Stage-I Approval on
|
:
|
30 Sep 2021
|
Compliance Report Submitted by User Agency on
|
:
|
31 Aug 2024
|
|
|
|
18 Nov 2024
|
28
|
Himachal Pradesh
|
FP/HP/WATER/151171/2022
|
FC/HPB/08/110/2022
|
Source Augmentation & Improvement of LWSS Kathwari & its adjoining villages in GP Bie, BariGumanoo, Sadhyana, Sehli, Sai, kashan, Sadoh and Tarnoh Tehsil Sadar Distt. Mandi (H.P).
|
Drinking Water
|
JAL SHAKTI VIBHAG GOVT. OF HIMACHAL PRADESH
|
0.5214
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Jan 2022
|
Stage-I Approval on
|
:
|
13 Sep 2023
|
Compliance Report Submitted by User Agency on
|
:
|
12 Sep 2024
|
|
|
|
18 Nov 2024
|
29
|
Himachal Pradesh
|
FP/HP/ROAD/47684/2020
|
FC/HPB/62/2023
|
C/O Ambulance road Dhali Chowk to Durga Colony
|
Road
|
Commissioner MCS
|
0.1287
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jul 2020
|
Stage-I Approval on
|
:
|
01 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Aug 2024
|
|
|
|
10 Nov 2024
|
30
|
Himachal Pradesh
|
FP/HP/HYD/34393/2018
|
8B/HP/01/127/2019/FC
|
C/o Baada Deo Small Hydro Project (1.5 MW)
|
Hydel
|
Baada Deo Small Hydel Project Pvt. Ltd
|
0.9991
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jul 2018
|
Stage-I Approval on
|
:
|
15 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
10 Sep 2024
|
|
|
|
28 Oct 2024
|
31
|
Himachal Pradesh
|
FP/HP/ROAD/119280/2021
|
FC/HPB/06/49/2022
|
C/O Ambulance Road from Anji road to Gautam Niwas Via Govt. Primary School Ghora Chowki in ward No.9 Kachighati KM 0/0 to 0/800.
|
Road
|
Commissioner MCS
|
0.2701
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jan 2021
|
Stage-I Approval on
|
:
|
16 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
31 Aug 2024
|
|
|
|
21 Oct 2024
|
32
|
Himachal Pradesh
|
FP/HP/SCH/49067/2020
|
FC/HPB/09/14/2021
|
CONSTRUCTION OF KENDRIYA VIDYALAYA IN TEHSIL DHARMPUR, DISTRICT MANDI H.P
|
School
|
DIRECTOR OF HIGHER EDUCATION
|
1
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Aug 2020
|
Stage-I Approval on
|
:
|
10 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jul 2024
|
|
|
|
06 Sep 2024
|
33
|
Himachal Pradesh
|
FP/HP/ROAD/33116/2018
|
8B/HP/06/39/2021/FC
|
construction of Lakhwan Dahanu Hawanu Bhangot Rathol Andreta Meramsit Road km.0/0 To 8/010.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
2.3698
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Sep 2019
|
Stage-I Approval on
|
:
|
25 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jun 2024
|
|
|
|
03 Sep 2024
|
34
|
Himachal Pradesh
|
FP/HP/ROAD/42899/2019
|
FC/HPC/06/30/2021
|
C/O shamshar to Panai km 0/0 to 9/390
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
5.31
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Nov 2019
|
Stage-I Approval on
|
:
|
15 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jun 2024
|
|
|
|
20 Aug 2024
|
35
|
Himachal Pradesh
|
FP/HP/Others/149118/2021
|
FC/HPB/09/148/2022
|
Construction of Sewerage Treatment Plant 3.10 MLD at Ashwani Khad (0.4122 Hectares)
|
Others
|
SHIMLA JAL PARBANDHAN NIGAM LIMITED
|
0.4122
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Nov 2021
|
Stage-I Approval on
|
:
|
04 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
19 Mar 2024
|
|
|
|
03 Jul 2024
|
36
|
Himachal Pradesh
|
FP/HP/SubStation/46229/2020
|
FC/HPB/12/75/2022
|
Construction of 220/66kv Sub-Station Nadukhar & 220kv LILO Tower for LILO of 220kv Bhaba-Kunihar line.
|
Sub Station
|
HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD
|
1.1333
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jun 2020
|
Stage-I Approval on
|
:
|
11 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
15 May 2024
|
|
|
|
02 Jul 2024
|
37
|
Himachal Pradesh
|
FP/HP/ROAD/144814/2021
|
FC/HPB/06/179/2022
|
Up-gradation of Paonta Saheb-Ballupur (Dehradun) section from km 97.000 to km 149.000 of NH-72 in the State of Uttarakhand and Himachal Pradesh
|
Road
|
NATIONAL HIGHWAY AUTHORITY OF INDIA, VASANT VIHAR, PIU, DEHRADUN
|
1.8916
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Aug 2021
|
Stage-I Approval on
|
:
|
07 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 May 2024
|
|
|
|
24 Jun 2024
|
38
|
Himachal Pradesh
|
FP/HP/Others/34070/2018
|
8B/HP/09/79/2020/FC
|
Construction of Office Building of Home Guard 2/4 Company Kumarsain
|
Others
|
ADG CUM COMMANDANT GENRAL HOME GUARD CIVIL DEFENCE HIMACHAL PRADESH SHIMLA
|
0.0357
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jun 2018
|
Stage-I Approval on
|
:
|
11 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jan 2024
|
|
|
|
25 Apr 2024
|
39
|
Himachal Pradesh
|
FP/HP/ROAD/118872/2021
|
FC/HPB/06/63/2022
|
link Road From Bharari to Padhya Mata Mandir RD 0/0 to 1/210
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
0.7574
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jan 2021
|
Stage-I Approval on
|
:
|
29 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
26 Mar 2024
|
|
|
|
15 Apr 2024
|
40
|
Himachal Pradesh
|
FP/HP/ROAD/44200/2020
|
FC/HPB/06/33/2022
|
C/o road from Kufar to Kanda Shilyar Gavan Sunna Bathal in G.P Halau KM 0/0 to 4/0
|
Road
|
PUBLIC WORK DEPARTMENT
|
2.4037
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2020
|
Stage-I Approval on
|
:
|
15 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Mar 2024
|
|
|
|
14 Apr 2024
|
41
|
Himachal Pradesh
|
FP/HP/TRANS/157184/2022
|
FC/HPC/71/2023
|
Diversion of 17.84 Hectare of forest land for construction of 132 kV MCT line on 220kV MCTs with ACSR ZEBRA conductor from 220/132 kV Substation proposed at Andheri to Tower No. 20/21 of existing 132 kV Jamta-Kala Amb transmission line at Kala Amb Distt. Sirmaur (HP)
|
Transmission Line
|
HP POWER TRANSMISSION CORPORATION LIMITED
|
17.84
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jun 2022
|
Stage-I Approval on
|
:
|
10 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
08 Dec 2023
|
|
|
|
09 Jan 2024
|
42
|
Himachal Pradesh
|
FP/HP/ROAD/22498/2016
|
8B/HPB/06/04/2018
|
C/O link road from Golu to Palgade
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
5.3966
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Nov 2016
|
Stage-I Approval on
|
:
|
20 Apr 2018
|
Compliance Report Submitted by User Agency on
|
:
|
19 Dec 2023
|
|
|
|
28 Dec 2023
|
43
|
Himachal Pradesh
|
FP/HP/ROAD/28594/2017
|
8B/HP/06/106/2019/FC
|
C/o Shanad Shrikot Raod
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
5.18
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Aug 2017
|
Stage-I Approval on
|
:
|
09 Mar 2020
|
Compliance Report Submitted by User Agency on
|
:
|
11 Oct 2023
|
|
|
|
28 Dec 2023
|
44
|
Himachal Pradesh
|
FP/HP/Others/32672/2018
|
8B/HP/09/72/2018/FC
|
Construction of Judicial Courts Complex and Complete separate Court Block for Juvenile Justice Board at Shingla
|
Others
|
DISTRICT & SESSION JUDGE KINNAUR CIVIL AND SESSION DIVISION RAMPUR BUSHAHR DISTT. SHIMLA H.P.
|
1.4194
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Mar 2018
|
Stage-I Approval on
|
:
|
06 Oct 2020
|
Compliance Report Submitted by User Agency on
|
:
|
30 Sep 2023
|
|
|
|
28 Dec 2023
|
45
|
Himachal Pradesh
|
FP/HP/ROAD/22377/2016
|
8B/HP/06/69/2018/FC
|
CONTRUCTION OF SANOTI TO DHAWAS ROAD
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.61
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Nov 2016
|
Stage-I Approval on
|
:
|
19 Aug 2021
|
Compliance Report Submitted by User Agency on
|
:
|
06 Sep 2023
|
|
|
|
28 Dec 2023
|
46
|
Himachal Pradesh
|
FP/HP/ROAD/9680/2015
|
8B/HP/06/30/2018/FC
|
C/O Motorable Road Kun Kamlah Via Tourkhola KM 0/0 to 7/105
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
2.8054
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jun 2017
|
Stage-I Approval on
|
:
|
11 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
03 Dec 2018
|
|
|
|
28 Dec 2023
|
47
|
Himachal Pradesh
|
FP/HP/Others/152523/2022
|
FC/HPB/09/32/2022
|
Construction of National centre of Excellence (Sports) at Hamirpur. for in favour of District Youth Services and Sports Hamirpur. Himachal Pradesh.
|
Others
|
District Youth Services & Sports Hamirpur
|
2.4264
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Feb 2022
|
Stage-I Approval on
|
:
|
21 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
11 Dec 2023
|
|
|
|
14 Dec 2023
|
48
|
Himachal Pradesh
|
FP/HP/ROAD/148549/2021
|
FC/HPB/06/56/2022
|
The forest land is required for Diversion 1.2359 i.e. 1.0402ha Solan Forest Division & 0.1957 ha. Kunihar Forest Division of forest land for C/O Proposed Road From Jangeshu to Oda via Bhanet 0/00 to
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.2359
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Oct 2021
|
Stage-I Approval on
|
:
|
15 Sep 2022
|
Compliance Report Submitted by User Agency on
|
:
|
03 Nov 2023
|
|
|
|
14 Dec 2023
|
49
|
Himachal Pradesh
|
FP/HP/TRANS/40307/2019
|
8B/HP/04/15/2020/FC
|
CONSTRUCTION OF 33 KV TRANSMISSION LINE (LUNI-I SHEP TO 33 KV HPSEBL BAIJNATH SUB-STATION )
|
Transmission Line
|
LUNI POWER COMPANY PRIVATE LIMITED
|
7.3991
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2019
|
Stage-I Approval on
|
:
|
07 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2023
|
|
|
|
30 Nov 2023
|
50
|
Himachal Pradesh
|
FP/HP/Others/30665/2017
|
8B/HP/09/29/2021
|
Himchal Sanskrit Academy
|
Others
|
DIRECTORATE OF HIGHER EDUCATION
|
1.1422
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Dec 2017
|
Stage-I Approval on
|
:
|
16 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
16 Oct 2023
|
|
|
|
22 Nov 2023
|
|