Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Gujarat FP/GJ/OFC/148825/2021 FC-6/GJB-27/2023-GNR Proposal for laying OFC for Jio Digital Fibre Private Limited 4G Dang South District Optical Fibre Cable JIO DIGITAL FIBER PRIVATE LIMITED 0.3073 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Oct 2021
Stage-I Approval on : 08 Jan 2025
Compliance Report Submitted by User Agency on : 03 Mar 2025
06 Jun 2025
2 Gujarat FP/GJ/ROAD/41444/2019 6-GJB005/2021-BHO New RCC/Black tarred Road Road RUCHIL AGRO FOOD PRODUCTS 0.459 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Aug 2019
Stage-I Approval on : 29 Jun 2021
Compliance Report Submitted by User Agency on : 30 Dec 2024
13 May 2025
3 Gujarat FP/GJ/ROAD/27051/2017 FC-6/GJC-78/2023-GNR Consultancy Services for Project Management Phase- I including Preparation of Detailed Project Report for Upgradation of Junction with NH-47-Limbdi-Surendranagar-Dhrangadhra of NH-51 in the State of Gujarat to Two Lane with Paved Shoulder Configuration (Package No: NH/IAHE/15). Road EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION 39.37 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Oct 2017
Stage-I Approval on : 31 Oct 2023
Compliance Report Submitted by User Agency on : 27 Dec 2024
24 Apr 2025
4 Gujarat FP/GJ/ROAD/149516/2021 FC-6/GJC-3/2023-GNR Widening and strengthening of existing carriageway from km. 265/200 to km. 266/200 and from km 273/002 to km 287/905 of NH-56 under NH division Vadodara in the state of Gujarat. Road NH DIVISION, VADODARA 7.283 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Nov 2021
Stage-I Approval on : 06 Feb 2023
Compliance Report Submitted by User Agency on : 15 Apr 2023
17 Mar 2025
5 Gujarat FP/GJ/Pipeline/155390/2022 FC-6/GJB-30/2023-GNR Vanthevad to Rajpipla Pipeline Section under the Rajpipla Pipeline Project Pipeline GUJARAT STATE PETRONET LTD 0.616 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 May 2022
Stage-I Approval on : 13 Jul 2023
Compliance Report Submitted by User Agency on : 04 Sep 2024
05 Feb 2025
6 Gujarat FP/GJ/Others/34353/2018 6-GJB045/2019-BHO Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Banaskantha District Others RELIANCE JIO INFOCOMM LTD 0.4117 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jun 2018
Stage-I Approval on : 06 Dec 2019
Compliance Report Submitted by User Agency on : 12 Sep 2023
16 Jan 2025
7 Gujarat FP/GJ/ROAD/50207/2020 FC-6/GJC-38/2022-GNR Development of Trumpet Interchange for Hirasar International Airport intersection with NH-27 Road EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION 8.5033 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Sep 2020
Stage-I Approval on : 03 Jun 2022
Compliance Report Submitted by User Agency on : 22 Jun 2022
18 Nov 2024
8 Gujarat FP/GJ/TRANS/82015/2020 6-GJB071/2021-BHO 220 kV TL from Adani Green Energy Limited PSS-II to Bhuj-II PGCIL SS Transmission Line ADANI GREEN ENERGY LIMITED 0.2498 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Dec 2020
Stage-I Approval on : 06 Sep 2021
Compliance Report Submitted by User Agency on : 10 Jul 2024
05 Nov 2024
9 Gujarat FP/GJ/ROAD/123541/2021 6-GJB090/2021-BHO Widening and Strengthening of Arek Sisodra Puni Sarbhon road - km 0/0 to 7/4, Ta-Bardoli, Dist-Surat Road EXECUTIVE ENGINEER 1.11 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Feb 2021
Stage-I Approval on : 06 Jan 2022
Compliance Report Submitted by User Agency on : 03 Oct 2024
30 Oct 2024
10 Gujarat FP/GJ/WATER/45275/2020 6-GJB073/2020-BHO Prachi Group Water Supply Scheme Drinking Water EE PHWDN VERAVAL 2.0074 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Jun 2020
Stage-I Approval on : 21 Jun 2021
Compliance Report Submitted by User Agency on : 06 Jan 2023
15 Oct 2024
11 Gujarat FP/GJ/RAIL/142369/2021 FC-6/GJB-28/2022-GNR Mumbai-Ahmedabad High Speed Railway Project Railway NATIONAL HIGH SPEED RAIL CORPORATION LTD 0.0562 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 May 2021
Stage-I Approval on : 13 Jun 2022
Compliance Report Submitted by User Agency on : 20 Sep 2024
14 Oct 2024
12 Gujarat FP/GJ/Others/51131/2020 FC-6/GJB-45/2022-GNR Proposed Under Pass at Sector 22/23, 22/21, for Smooth traffic flow in Gandhinagar City. Others GANDHINAGAR SMART CITY DEVELOPMENT LIMITED 0.6 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Oct 2020
Stage-I Approval on : 25 Jul 2022
Compliance Report Submitted by User Agency on : 13 May 2024
14 Oct 2024
13 Gujarat FP/GJ/ROAD/34035/2018 6-GJC046/2019-BHO Widening of Adwan – Raval – Kalyanpur - BhatiaRoad (SH 94 Road DY EXECUTIVE ENGINEER DWARKA 36.54 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Jun 2018
Stage-I Approval on : 13 Feb 2020
Compliance Report Submitted by User Agency on : 02 Aug 2024
14 Oct 2024
14 Gujarat FP/GJ/WATER/152269/2022 FC-6/GJB-22/2023-GNR Diversion of 0.9391 ha. (0.80 Ha) Reserved Forest land for the Construction of New Filter Plant, R.C.C. U/G Sump, Pump House and U/G Water Pipeline for drinking water supply facility in 20 Villages of Godhra Taluka. Village: Gollav & Achhala, Taluka: Godhra, District: Panchmahal in Gujarat State. Drinking Water GWSSB GANDHINAGAR 0.8 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Feb 2022
Stage-I Approval on : 23 Apr 2024
Compliance Report Submitted by User Agency on : 05 Sep 2024
10 Oct 2024
15 Gujarat FP/GJ/ROAD/46724/2020 FC-6/GJC-26/2023-GNR Design and construction of Smart Road by widening of Road No.6,Road No.7 and G Road in Gandhinagar city. Road GANDHINAGAR SMART CITY DEVELOPMENT LIMITED 20.41 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Jun 2020
Stage-I Approval on : 21 Apr 2023
Compliance Report Submitted by User Agency on : 13 May 2024
07 Oct 2024
16 Gujarat FP/GJ/ROAD/32356/2018 6-GJB011/2019-BHO Road Road MARUTI INDUSTRIES 0.21 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Mar 2018
Stage-I Approval on : 25 Nov 2019
Compliance Report Submitted by User Agency on : 30 Jan 2020
07 Oct 2024
17 Gujarat FP/GJ/Others/47974/2020 6-GJB003/2021-BHO Proposal for laying OFC for GFGNL Project for Bharat Net Phase II in Dahod District Hac. 0.27369 (Wild Life Vadadoara FCA) Others GFGNL 0.27369 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Jul 2020
Stage-I Approval on : 14 Mar 2022
Compliance Report Submitted by User Agency on : 12 Aug 2022
25 Sep 2024
18 Gujarat FP/GJ/Approach/140861/2021 6-GJB098/2021-BHO KPIG Energia Private Limited Approach Access KPIG ENERGIA PVT LTD. 0.0076 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Apr 2021
Stage-I Approval on : 29 Dec 2021
Compliance Report Submitted by User Agency on : 04 Jul 2024
25 Sep 2024
19 Gujarat FP/GJ/TRANS/49319/2020 FC-6/GJC-2/2023-GNR 765 kV D/C Khavda-Bhuj PSS1 Transmission Line for Adani Green Energy Thirty Limited Transmission Line ADANI GREEN ENERGY THIRTY LIMITED 226.3223 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Sep 2020
Stage-I Approval on : 06 Feb 2023
Compliance Report Submitted by User Agency on : 24 Jun 2024
25 Sep 2024
20 Gujarat FP/GJ/TRANS/120934/2021 6-GJB073/2021-BHO 33 kV S/C Transmission Line from AWEK1L PSS to Wind Turbine Areas. Transmission Line ADANI WIND ENERGY KUTCHH ONE LIMITED 0.0675 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jan 2021
Stage-I Approval on : 06 Sep 2021
Compliance Report Submitted by User Agency on : 03 Jul 2024
19 Sep 2024
21 Gujarat FP/GJ/ROAD/147435/2021 FC-6/GJC-21/2022-GNR Diversion of Protected forest land for the project of four lanning of BHaruch-shuklatirth road(Zadeshwar chokdi to tavara village) km 7/000 to 10/700 Road BAUDA BHARUCH 5.2725 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Sep 2021
Stage-I Approval on : 20 Apr 2022
Compliance Report Submitted by User Agency on : 18 Jul 2024
09 Sep 2024
22 Gujarat FP/GJ/ROAD/152353/2022 FC-6/GJC-42/2022-GNR Widening & Strengthening of Sutrapada Fatak-Dhamlej MDR Road Road EXECUTIVE ENGINEER ROAD AND BUILDING DIVISION GIRSOMNATH 5.5125 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Feb 2022
Stage-I Approval on : 21 Jul 2022
Compliance Report Submitted by User Agency on : 02 Jul 2024
30 Aug 2024
23 Gujarat FP/GJ/ROAD/26245/2017 6-GJB043/2017-BHO S. R. to Vadtal Zole Bakrol Road km. 0/0 to 9/6 (Widening of Road from 10.00 Mtr. to Four lane at km. 9/100 to 9/600) Road EXECUTIVE ENGINEER ANAND 0.5125 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 May 2017
Stage-I Approval on : 16 Nov 2017
Compliance Report Submitted by User Agency on : 27 Apr 2022
31 Jul 2024
24 Gujarat FP/GJ/TRANS/54477/2020 6-GJB072/2021-BHO Diversion of 0.0324 Ha Protected forest land for construction of 33 KV D/C Overhead Transmission Line Nr Village Ratadiya, Block Nakhatrana, Dist Kutch. Transmission Line ADANI RENEWABLE ENERGY(TN) LIMITED 0.0324 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Nov 2020
Stage-I Approval on : 06 Sep 2021
Compliance Report Submitted by User Agency on : 02 Jul 2024
31 Jul 2024
25 Gujarat FP/GJ/SubStation/49258/2020 6-GJB005/2022-FC Diversion of 0.49 Ha. Reserved Forest Land for 66 KV Munpur Substation At. Munpur, Ta. : Kadana, Dist.: Mahisagar in Favor of Gujarat Energy Transmission Corporation Limited (GETCO) Jambuva (Vadodara) Sub Station GUJARAT ENERGY TRANSMISSION CORP LTD 0.49 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Sep 2020
Stage-I Approval on : 11 Jan 2022
Compliance Report Submitted by User Agency on : 04 Jul 2024
31 Jul 2024
26 Gujarat FP/GJ/ROAD/30429/2017 6-GJB050/2018-BHO Segwa Sinor Malsar Road Km 14/600 to 17/250 Road EXECUTIVE ENGINEER 0.86125 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Nov 2017
Stage-I Approval on : 24 Sep 2019
Compliance Report Submitted by User Agency on : 10 Nov 2022
31 Jul 2024
27 Gujarat FP/GJ/Others/47648/2020 6-GJB069/2020-BHO Proposal for laying OFC for Jio Digital Fibre Private Limited 4G Gir West District (Ha. 0.1647) Others JIO DIGITAL FIBER PRIVATE LIMITED 0.1647 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Jul 2020
Stage-I Approval on : 23 Nov 2020
Compliance Report Submitted by User Agency on : 26 Apr 2024
24 Jul 2024
28 Gujarat FP/GJ/Others/149464/2021 FC-6/GJB-56/2023-GNR Grant Forest land for Drinking water and Visama Facility Others SHREE ANANDJI KALYANJI TRUST 0.238 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Jan 2022
Stage-I Approval on : 14 Jun 2023
Compliance Report Submitted by User Agency on : 15 Mar 2024
24 Jul 2024
29 Gujarat FP/GJ/Others/47885/2020 6-GJB078/2020-BHO Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Narmada District (Ha. 1.43527) Others RELIANCE JIO INFOCOMM LTD 1.43527 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Jul 2020
Stage-I Approval on : 19 May 2021
Compliance Report Submitted by User Agency on : 03 May 2024
19 Jul 2024
30 Gujarat FP/GJ/ROAD/141962/2021 FC-6/GJC-20/2022-GNR Four lanning of Vadodara-Padra-Jambusar Road Km. 44/00 to 52/575 Road EXICUTIVE ENGINEER 6.86 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 May 2021
Stage-I Approval on : 20 Apr 2022
Compliance Report Submitted by User Agency on : 03 Nov 2023
19 Jul 2024
31 Gujarat FP/GJ/WATER/149210/2021 FC-6/GJB-41/2022-GNR Diversion of 0.093 Ha. Reserved Forest Land for the project of Providing irrigation water facility and filling various tanks of eastern belt of Panchmahal district Taluka Shahera, Godhra, Kalol and Ghoghamba by lifting water by pumping from Panam Reservoir Village:-Mahuliya Drinking Water EXECUTIVE ENGINEER, PANAM PROJECT DIVISION, GODHRA 0.093 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Nov 2021
Stage-I Approval on : 30 Jun 2022
Compliance Report Submitted by User Agency on : 25 Jun 2024
19 Jul 2024
32 Gujarat FP/GJ/Others/42985/2019 6-GJB058/2020-BHO Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Narmada District Others RELIANCE JIO INFOCOMM LTD 1.18057 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Nov 2019
Stage-I Approval on : 31 Aug 2020
Compliance Report Submitted by User Agency on : 31 Aug 2023
19 Jul 2024
33 Gujarat FP/GJ/Others/40837/2019 6-GJB028/2021-BHO Grant permission for optical fiber cable Others JIO DIGITAL FIBER PRIVATE LIMITED 0.4014 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Aug 2019
Stage-I Approval on : 26 Feb 2021
Compliance Report Submitted by User Agency on : 03 May 2024
19 Jul 2024
34 Gujarat FP/GJ/ROAD/38740/2019 6-GJB067/2020-BHO Construction of two Bridges on Mahuva-Anaval road at chainage K.M. 20/0 to 20/4 across Ambika River and at chainage K.M.17/0 to 17/2 across Olan Khadi, TA-Mahuva, Dist-Surat. Road EXECUTIVE ENGINEER 1.639 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Feb 2019
Stage-I Approval on : 26 Feb 2021
Compliance Report Submitted by User Agency on : 10 May 2024
19 Jul 2024
35 Gujarat FP/GJ/Others/40768/2019 6-GJB004/2020-BHO Proposal for laying OFC for Jio Digital Fibre Private Limited 4G Panchamahal District Others JIO DIGITAL FIBER PRIVATE LIMITED 0.1411 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Jun 2019
Stage-I Approval on : 02 Mar 2020
Compliance Report Submitted by User Agency on : 09 Jun 2021
19 Jul 2024
36 Gujarat FP/GJ/Others/144639/2021 FC-6/GJB-50/2022-GNR Proposal for laying OFC for Reliance Jio Infocomm Limited 4G/5G Banaskantha RF District (Village Chikhla, Ranpur, Tarangda, Ganapipla,) Others JIO DIGITAL FIBER PRIVATE LIMITED 0.30996 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Jul 2021
Stage-I Approval on : 11 Aug 2022
Compliance Report Submitted by User Agency on : 12 Sep 2022
16 Jul 2024
37 Gujarat FP/GJ/Pipeline/149154/2021 FC-6/GJB-53/2022-JPR KGPL - IPS Pipeline IHB LIMITED 0.7524 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Nov 2021
Stage-I Approval on : 05 Jan 2023
Compliance Report Submitted by User Agency on : 20 Jun 2024
16 Jul 2024
38 Gujarat FP/GJ/OFC/143971/2021 6-GJB106/2021-BHO Setting up of 4G Telecommunication Towers & Laying of Optical Fibre Cable Routes under Universal Service Obligation Fund (USOF) – Govt. of India for mobile coverage of uncovered villages in Narmada Di Optical Fibre Cable Jio Digital Fibre Private Limited 0.701 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Jun 2021
Stage-I Approval on : 14 Mar 2022
Compliance Report Submitted by User Agency on : 03 May 2024
16 Jul 2024
39 Gujarat FP/GJ/OFC/141043/2021 FC-6/GJB-15/2022/GNR Proposal for grant of permission for laying Optical Fiber Cabel along with the routes mentiond here under shoolpaneshwar wildlife sanctuary (0.91656 Ha.) Optical Fibre Cable GFGNL 0.91656 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Apr 2021
Stage-I Approval on : 07 Mar 2022
Compliance Report Submitted by User Agency on : 10 Jul 2023
12 Jul 2024
40 Gujarat FP/GJ/ROAD/146151/2021 FC-6/GJC-19/2022-GNR Diversion of 7.60 ha. of Protected Forest for widening of Porbandar - Adityana - Ranavav Road (SH-95) Road EXECUTIVE ENGINEER R&B DIVISION PORBANDAR 7.6 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Aug 2021
Stage-I Approval on : 03 Jun 2022
Compliance Report Submitted by User Agency on : 03 Apr 2024
01 Jul 2024
41 Gujarat FP/GJ/ROAD/141857/2021 FC-6/GJC-76/2023-GNR Four lanning of Vadodara-Padra-Jambusar Road Km. 16/280 to 44/00 Road EXECUTIVE ENGINEER 22.176 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Apr 2021
Stage-I Approval on : 31 Oct 2023
Compliance Report Submitted by User Agency on : 16 May 2024
01 Jul 2024
42 Gujarat FP/GJ/ROAD/145850/2021 FC-6/GJC-75/2023-GNR Construction of Six lane With Paved Shoulder from Km 165+925 to 172+275 in Chotila Road EXECUTIVE ENGINEER NATIONAL HIGHWAY DIVISION 10.08 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Sep 2021
Stage-I Approval on : 31 Oct 2023
Compliance Report Submitted by User Agency on : 05 Mar 2024
01 Jul 2024
43 Gujarat FP/GJ/ROAD/19697/2016 6-GJB034/2017-BHO Bharuch-Jambusar Road N.H.64 Road EXICUTIVE ENGINEER 1.21125 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Jul 2016
Stage-I Approval on : 19 Jan 2018
Compliance Report Submitted by User Agency on : 04 Jul 2020
14 Jun 2024
44 Gujarat FP/GJ/Others/28769/2017 6-GJB044/2019-BHO Proposal for laying OFC for Reliance Jio Infocomm Limited 4G Banaskantha District Others RELIANCE JIO INFOCOMM LTD 1.1165 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Aug 2017
Stage-I Approval on : 17 Oct 2019
Compliance Report Submitted by User Agency on : 12 Sep 2023
14 Jun 2024
45 Gujarat FP/GJ/Pipeline/157653/2022 FC-6/GJB-72/2023-GNR Laying of 250 mm Dia Steel Water Pipeline by GIDC Along and Across on various Roads of Gandhinagar Pipeline GUJARAT INDUSTRIAL DEVELOPMENT CORPORATION 0.0915 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jun 2022
Stage-I Approval on : 16 Aug 2023
Compliance Report Submitted by User Agency on : 29 Jan 2024
13 Jun 2024
46 Gujarat FP/GJ/TRANS/50017/2020 FC-6/GJC-27/2022-GNR 66kV Ubsal Vijaynagar line Transmission Line GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED 7.173 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Sep 2020
Stage-I Approval on : 30 Oct 2022
Compliance Report Submitted by User Agency on : 26 Jul 2023
24 May 2024
47 Gujarat FP/GJ/ROAD/40420/2019 6-GJC003/2021-BHO Widening of Bhiloda- Chithoda - Pal-Vijaynagar Road ,(SH -10 )Km Road Km 0/0 to 18/00 in Arvalli dist. Road EXECUTIVE ENGINEER ROAD AND BUILDING ARVALLI 10.8 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 May 2019
Stage-I Approval on : 08 Sep 2021
Compliance Report Submitted by User Agency on : 09 May 2023
24 May 2024
48 Gujarat FP/GJ/TRANS/155387/2022 FC-6/GJA-82/2023-GNR Navsari (New) (South Gujarat) (GIS) - Padghe (GIS) 765 kV D/c Transmission line Transmission Line POWER GRID CORPORATION OF INDIA LTD 109.689 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 May 2022
Stage-I Approval on : 19 Dec 2023
Compliance Report Submitted by User Agency on : 14 Mar 2024
22 May 2024
49 Gujarat FP/GJ/ROAD/142348/2021 FC-6/GJC-61/2022-GNR Widening & Strengthening to four lane of Vav cross road (Ch. Km. 92/320) to Kheralu Cross road (Ch. Km. 115/320) section on NH 58 in the state of Gujarat (Area 46 ha.) Road NH SUB DIVISION IDAR 46 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 May 2021
Stage-I Approval on : 30 Oct 2022
Compliance Report Submitted by User Agency on : 21 Jun 2023
22 May 2024
50 Gujarat FP/GJ/Others/144748/2021 FC-6/GJB-32/2022-GNR Proposal for laying OFC for Jio Digital Fibre Pvt Ltd. 4G/5G Porbandar/Dev Bhumi Dwarka Reserve Forest District (Village Jampar Ghumli,) Others JIO DIGITAL FIBER PRIVATE LIMITED 0.0205 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Jul 2021
Stage-I Approval on : 20 May 2022
Compliance Report Submitted by User Agency on : 26 Aug 2022
22 May 2024
1234567