Ministry of Environment,Forest and Climate Change
Government of India
Online Submission & Monitoring
of Forests and Wildlife Clearance Proposals
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Punjab FP/PB/Others/23031/2016 9-PBC315-2018-CHA Diversion of 29.8593 Ha. Forest Land [0.2889 Ha. Protected Forest & 29.5704 Ha. PLPA (Punjab Land Preservation Act)] for Laying of 12.75” OD Petroleum Product Branch Pipeline from Jhuggian T Point (Distt. S.B.S. Nagar, Punjab) to Proposed Pekhubela Tarminal Plant (Distt. Una, Himachal Pradesh) Others Indian Oil Corporation Limited (Pipelines Division) 29.8593 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Dec 2016
Stage-I Approval on : 27 Mar 2018
Compliance Report Submitted by User Agency on : 06 Jun 2018
21 Jun 2018
2 Punjab FP/PB/ROAD/10238/2015 9-PBB429-2015-CHA Construction of Bridge Over Ditch Drain at KM 413.400 of NH-10(New NH-07) section Fazilka-Sulemanke Border Near Fazilka in state of Punjab. proposal of bridge is for safe and smooth traffic movement and also as per drain discharge Road EXECUTIVE ENGINEER CENTRAL WORKS DIVISION PWD BR ABOHAR 0.255 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Apr 2015
Stage-I Approval on : 27 Oct 2015
Compliance Report Submitted by User Agency on : 22 Jun 2018
21 Jun 2018
3 Punjab FP/PB/ROAD/12081/2015 9-PBB397-2015-CHA Providing Service lane 5.5mtr. wide on both sides in km. 348.550 to 351.700 of NH-10( New NH-07) passing through Malout Town in state of Punjab. Road EXECUTIVE ENGINEER CENTRAL WORKS DIVISION PWD BR ABOHAR 4.725 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Apr 2015
Stage-I Approval on : 23 Sep 2015
Compliance Report Submitted by User Agency on : 22 Jun 2018
21 Jun 2018
4 Punjab FP/PB/ROAD/12548/2015 9-PBB424-2015-CHA Providing Service lane 5.5mtr. wide on both sides in km389.400 to 391.100 of NH-15 ( New NH-62) passing through Kallar Khera ICP Road EXECUTIVE ENGINEER CENTRAL WORKS DIVISION PWD BR ABOHAR 2.55 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 May 2015
Stage-I Approval on : 09 Oct 2015
Compliance Report Submitted by User Agency on : 22 Jun 2018
21 Jun 2018
5 Punjab FP/PB/ROAD/12563/2015 9-PBB427-2015-CHA Improvement of Accident Black Spot by Providing 5.5 mtr wide service lane on both sides on DHS-Road NH-10(New NH-07) at Malout -Abohar Section in km 365.800 to 367.050 Village Balluana in the State of Punjab. Road EXECUTIVE ENGINEER CENTRAL WORKS DIVISION PWD BR ABOHAR 1.875 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 May 2015
Stage-I Approval on : 09 Oct 2015
Compliance Report Submitted by User Agency on : 22 Jun 2018
21 Jun 2018
6 Punjab FP/PB/ROAD/12794/2015 9-PBB425-2015-CHA Improvement of Accident Black Spot by Providing 5.5 mtr wide service lane on both sides in Khuian Sarwar Sub Tehsil on section Abohar Usmankhera road at Km. 376.00 to 377.240 of NH-15 (New NH-62) in the State of Punjab. Road EXECUTIVE ENGINEER CENTRAL WORKS DIVISION PWD BR ABOHAR 1.86 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 May 2015
Stage-I Approval on : 27 Oct 2015
Compliance Report Submitted by User Agency on : 22 Jun 2018
21 Jun 2018
7 Punjab FP/PB/ROAD/13771/2015 9-PBB426-2015-CHA Improvement of Accident Black Spot by Providing 5.5 mtr wide service lane on both sides on DHS-Road NH-10(New NH-09) at Dabwali –Malout Section in km 328.00 to 329.00 Village Lambi in the State of Punjab. Road EXECUTIVE ENGINEER CENTRAL WORKS DIVISION PWD BR ABOHAR 1.7 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Jul 2015
Stage-I Approval on : 21 Oct 2015
Compliance Report Submitted by User Agency on : 22 Jun 2018
21 Jun 2018
8 Punjab FP/PB/ROAD/14529/2015 9-PBB452-2015-CHA Permission for construction of ROB at level crossing no.SPL1/299/14-15 at Bathinda at RD 287.950 crossing Delhi Bathinda Ferozpur Railway Line Road EXECUTIVE ENGINEER CENTRAL WORKS DIVISION PB PWD B AND R BRANCH BATHINDA 1.08078 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Aug 2015
Stage-I Approval on : 27 Nov 2015
Compliance Report Submitted by User Agency on : 28 May 2018
21 Jun 2018
9 Punjab FP/PB/TRANS/16018/2015 9-PBB372-2016-CHA Construction of 66 KV Line Ghattianwali Janttan to Chimnewala S/C on D/C Towerin favour of PSPCL is a part of Transmission Networks System which is being developed for the industrial, economical and overall development of the region by constructing the prestigious line. The line is the part of the T Transmission Line ADDITIONAL SE TL PSPCL 0.1368 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Oct 2015
Stage-I Approval on : 18 Dec 2017
Compliance Report Submitted by User Agency on : 18 May 2018
21 Jun 2018
10 Punjab FP/PB/TRANS/16509/2015 9-PBB360-2017-CHA Diversion of 0.23429 hectare of forest land in favour of PSTCL for Construction of 220KV Transmission Line from 400KV Sub-Station Rajpura to 220KV Sub-Station Devigarh DC on DC Towers. Transmission Line PSTCL TLSC 0.23429 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Nov 2015
Stage-I Approval on : 09 Mar 2018
Compliance Report Submitted by User Agency on : 09 May 2018
21 Jun 2018
11 Punjab FP/PB/TRANS/23168/2016 9-PBB431-2017-CHA Construction of 66 KV Line Abohar - Khuikhera T-OFF 66 KV GSS Churiwala Dhanna S/C on D/C Towerin favour of PSPCL is a part of Transmission Networks System which is being developed for the industrial, economical and overall development of the region by constructing the prestigious line. The line is Transmission Line ADDITIONAL SE TL PSPCL 0.0819 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Dec 2016
Stage-I Approval on : 03 Jan 2018
Compliance Report Submitted by User Agency on : 18 May 2018
21 Jun 2018
12 Himachal Pradesh FP/HP/DISP/23980/2017 8B/HP/09/44/2017/FC The 50 beded hospital of Ayurvedic department will imrove the medical facilities for the people of Bajaura and surroundings. Dispensary/Hospital a 0.8594 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Feb 2017
Stage-I Approval on : 03 Oct 2017
Compliance Report Submitted by User Agency on : 16 May 2018
19 Jun 2018
13 Himachal Pradesh FP/HP/HYD/27562/2017 8B/HP/01/115/2017/FC Proposed Daredi HEP project is a run of river scheme on Bhuar Nallah, a tributary of Ravi river. This is a run of river project. The project envisages the use of water from the stream called as Bhuar Nallah which involves construction of one diversion weirs at Bhuar Nallah from which the water is ta Hydel KARJI POWERGEN PVT LTD 0.709 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2017
Stage-I Approval on : 07 Mar 2018
Compliance Report Submitted by User Agency on : 16 May 2018
19 Jun 2018
14 Himachal Pradesh FP/HP/ROAD/15764/2015 8B/HPB/06/67/2016/FC The forest land is required for the construction of Chakti Dhadhara road. This road is being constructed to provide motor linke to the villages Chakti and Dhadhara. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 1.3497 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Oct 2015
Stage-I Approval on : 20 Jun 2017
Compliance Report Submitted by User Agency on : 27 Apr 2018
19 Jun 2018
15 Himachal Pradesh FP/HP/ROAD/18897/2016 8B/HPB/06/83/2016 C/O link road from Bagdhar to Chhunun KM 0/0 to 3/525. the total lengh of road involved in forest land is 3.525km and there is no private land involved in the allignment. Total forest land required for construction of road and dumping of muck is 2.60 hect. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 2.6 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Apr 2016
Stage-I Approval on : 28 Aug 2017
Compliance Report Submitted by User Agency on : 16 May 2018
19 Jun 2018
16 Himachal Pradesh FP/HP/ROAD/19053/2016 8B/HP/06/23/2017/FC C/O link road from Orru Mour to Kakiyana KM 0/00 to 5/360. Total lenght of the road is 5.360km, out of which 4.477km falls in forest land and .883km falls under private land. This road falls under the jurisdiction of forest division Dalhousie and HPPWD division dalhousie. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 3.2867 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Apr 2016
Stage-I Approval on : 14 Aug 2017
Compliance Report Submitted by User Agency on : 09 May 2018
19 Jun 2018
17 Himachal Pradesh FP/HP/ROAD/20499/2016 8B/HP/06/21/2017 The road project will connect the unconnected village Dabri after the completion of the project. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 1.8871 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Jul 2016
Stage-I Approval on : 08 Aug 2017
Compliance Report Submitted by User Agency on : 17 Apr 2018
19 Jun 2018
18 Himachal Pradesh FP/HP/ROAD/23327/2016 8B/HP/06/32/2017/FC Sharan Danuti area under Nankhari Sub-Tehsil is a remote area hitherto unconnected by road. This road is being constructed to provide motor link to the villages Sharan and Danuti. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 1.2821 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Dec 2016
Stage-I Approval on : 26 Sep 2017
Compliance Report Submitted by User Agency on : 27 Apr 2018
19 Jun 2018
19 Haryana FP/HR/ROAD/27718/2017 9-HRB009-2018-CHA Diversion of forest land for Improvement by 4-Lanning of Old NH-71A Gohana Town RD 33690 to 36000 M in Sonepat Distt. Road ENGINEER IN CHIEF HARYANA PWD B AND R CHANDIGARH 2.11 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Aug 2017
Stage-I Approval on : 01 Feb 2018
Compliance Report Submitted by User Agency on : 09 May 2018
15 Jun 2018
20 Haryana FP/HR/ROAD/29460/2017 9-HRB031-2018-CHA This is a proposal for diversion of forest land. Fores land is required for Construction of ROB at LC-76 on Hansi Tosham road in Distt. Hisar Road PWD B AND R HANSI 0.9112 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Nov 2017
Stage-I Approval on : 21 Feb 2018
Compliance Report Submitted by User Agency on : 23 Apr 2018
15 Jun 2018
21 Kerala FP/KL/Others/13159/2015 4- KLB 1086/2016- BAN KSPPL propose to lay a 12" dia cross country LPG pipeline from kochi refinery to palakkad(Kanjikode) connecting udhaymperoor IOC plant Others KOCHI SALEM PIPELINE PVT LTD 0.758 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Jun 2015
Stage-I Approval on : 18 Apr 2016
Compliance Report Submitted by User Agency on : 30 May 2018
15 Jun 2018
22 Punjab FP/PB/TRANS/13262/2015 9-PBB360-2016-CHA Replacement of Existing 66 KV Rail Pole Line Mallkatora to Arniwala on Double Circuitin favour of PSPCL is a part of Transmission Networks System which is being developed for the industrial, economical and overall development of the region by constructing the prestigious line. The line is the part Transmission Line ADDITIONAL SE TL PSPCL 0.3438 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Jun 2015
Stage-I Approval on : 08 Dec 2017
Compliance Report Submitted by User Agency on : 18 May 2018
15 Jun 2018
23 Punjab FP/PB/ROAD/29904/2017 9-PBB326-2018-CHA Diversion of 0.051137 Ha of forest land permission for approach road to Global Educational & Charitable Society(for construction of +2 Senior Secondry School) Vill: Inderpura Tehsil& Distt: Patiala on PFIIIrd Rd Kalyan pull to Uchha Pull Rouni B/S under forest Division Patiala,Punjab. Road GLOBAL EDUCATIONAL AND CHARITABAL SOCIETY 0.051137 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Oct 2017
Stage-I Approval on : 26 Apr 2018
Compliance Report Submitted by User Agency on : 01 Jun 2018
14 Jun 2018
24 Haryana FP/HR/ROAD/29202/2017 9-HRB041-2018-CHA The road adjacent to Gurgaon canal on Bypass road of sector 2 &3 will constructed by bitumen under CM announcement code No. 11028 dated 06.02.2016 Road FARIDABAD WATER DIVISION 3.31 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Sep 2017
Stage-I Approval on : 12 Apr 2018
Compliance Report Submitted by User Agency on : 12 Jun 2018
14 Jun 2018
25 Punjab FP/PB/TRANS/17012/2015 9-PBB373-2016-CHA Construction of 66 KV Line 66 KV G/S/S Lubanianwali to 66 KV G/S/S Mukand Singh Wala S/C on D/C Tower in favour of PSPCL is a part of Transmission Networks System which is being developed for the industrial, economical and overall development of the region by constructing the prestigious line. The Transmission Line ADDITIONAL SE TL PSPCL 0.1422 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Dec 2015
Stage-I Approval on : 18 Dec 2017
Compliance Report Submitted by User Agency on : 18 May 2018
13 Jun 2018
26 Punjab FP/PB/TRANS/13577/2015 9-PBB357-2017-CHA Diversion of 2.680 ha of Forest Land proposed for construction of proposed 66 KV Line from 132KV S/S Banga Road Phagwara to 33/66 KV S/S GT Road Phagwara, under Forest division Jalandhar at Phillaur, Punjab. Transmission Line PSPCL TL DIVISION JALANDHAR 2.68 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jun 2015
Stage-I Approval on : 29 Nov 2017
Compliance Report Submitted by User Agency on : 05 Jun 2018
12 Jun 2018
27 Haryana FP/HR/ROAD/29106/2017 9-HRB038-2018-CHA Four-lanning Sirsa-Ellenabad road (SH-23) Km 68.09 to 69.19 (Teh. complex to Ambedkar Chowk i.e. 1.10 Km) (Road ID: 5799) and four lanning of Ellenabad-Nohar road (ODR) Km 0.700 to 3.50 upto Village Kishanpura (Road ID:5903) with improvement of Junction on Amebekar Chowk on SH-23 at RD. 69.50 & Udha Road PUBLIC WORK DEPARTMENT 2.56 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Sep 2017
Stage-I Approval on : 13 Mar 2018
Compliance Report Submitted by User Agency on : 24 May 2018
12 Jun 2018
28 Haryana FP/HR/ROAD/29955/2017 9-HRB039-2018-CHA Widening & Stg. of Sirsa-Ottu-Rania-Dabwali road Km 4.80 to 5.50, 8.00 to 8.80, 10.20 to 11.80, 12.80 to 15.00, 15.40 to 16.40, 17.10 to 18.50, 20.60 to 22.00, 24.00 to 24.70 & 28.00 to 30.00 Sardulgarh-Sirsa-Ellenabad-Hanumangarh-Tibbi road upto Raj. Boarder in Km 31.40 to 33.80 in Sirsa Distt. Road PUBLIC WORK DEPARTMENT 3.195 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Oct 2017
Stage-I Approval on : 09 Mar 2018
Compliance Report Submitted by User Agency on : 24 May 2018
12 Jun 2018
29 Haryana FP/HR/ROAD/30134/2017 9-HRC026-2018-CHA Upgradation of road from Karnal, Assandh, Jind, Hansi, Tosham Sodiwas road (SH-12) in Hisar Distt. (Road Id 5179 & 5187). Road PWD B AND R HANSI 11.4911 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Nov 2017
Stage-I Approval on : 11 Apr 2018
Compliance Report Submitted by User Agency on : 25 May 2018
12 Jun 2018
30 Haryana FP/HR/TRANS/25120/2017 9-HRB036-2018-CHA PROPOSAL FOR DIVERSION OF ROUTE OF 765 KV S/C AGRA-JHATIKARA TRANSMISSION LINE DUE TO INFRIGNING THE ALIGNMENT OF M/S DEDICATED FREIGHT CORRIDOR CORPORATION (DFCCIL)OF INDIA LIMITED PASSING THROUGH ARAVALI HILLS Transmission Line POWERGRID CORPORATION OF INDIA LIMITED 12.9201 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Mar 2017
Stage-I Approval on : 28 Mar 2018
Compliance Report Submitted by User Agency on : 11 Jun 2018
12 Jun 2018
31 Haryana FP/HR/ROAD/26846/2017 9-HRC182-2017-CHA Widening to four lanne and strengthening of Surewala Chowk to Uklana Bhuna road km. 0.00 to 7.864 (SH-02) in Hisar Distt. (Road ID 5104) Road PWD B AND R HANSI 5.1116 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Jul 2017
Stage-I Approval on : 27 Mar 2018
Compliance Report Submitted by User Agency on : 28 May 2018
12 Jun 2018
32 Haryana FP/HR/ROAD/19666/2016 9-HRB134-2016-CHA CONSTRUCTION OF 2 LANE ROB AT LC No.18 AT K.M. 23/5-6 ON ROAD FROM KUND TO BEHROD FALLS BETWEEN RAILWAY STATION KUND TO KATHUWAS, DISTRICT REWARI IN STATE OF HARYANA Road HSRDC REWARI 0.96 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 May 2016
Stage-I Approval on : 02 Nov 2016
Compliance Report Submitted by User Agency on : 25 May 2018
12 Jun 2018
33 Haryana FP/HR/ROAD/29309/2017 9-HRB004-2018-CHA Diversion of forest land 0.0044 Hac. for access to the Proposed L.P.G. Gas Godown of B.L. Indane. Along at Khewat/Khatoni No.-233/274, Mustkil No.-25, Killa No.- 24/1 & Mustkil No. 29, Kila No. 4/1, Village- Raipur Kalan on Tigaon to Gharaunda Road, Tehsil Dayalpur & District- Faridabad, State - Ha Road Indian Oil Corporation Limited (IOCL) 0.0044 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Sep 2017
Stage-I Approval on : 16 Jan 2018
Compliance Report Submitted by User Agency on : 24 May 2018
11 Jun 2018
34 Haryana FP/HR/ROAD/30080/2017 9-HRBI5/2018-CHA diversion of 0.0253 Ha of forest land for passage to School at Ambala to Delhi road NH-1(New NH-44) Km 188-189 RHS, at village Mohri, Tehsil Shahbad , Distt Kurukeshtra (HR.) Road VIJAY VALLABH JAIN INTERNATIONAL SCHOOL 0.0253 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Nov 2017
Stage-I Approval on : 31 Jan 2018
Compliance Report Submitted by User Agency on : 17 May 2018
08 Jun 2018
35 Haryana FP/HR/Others/17236/2015 9-HRB011-2017-CHA TO ESTABLISHMENT MARRIAGE PALACE AT VILL AMARAWATI KHERA ON ROAD PANIPAT-JIND(SH-14) AT KM 54.00 Others HAVALI A MARRIAGE PALACE 0.00873 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Oct 2016
Stage-I Approval on : 12 Apr 2018
Compliance Report Submitted by User Agency on : 14 May 2018
08 Jun 2018
36 Punjab FP/PB/ROAD/29766/2017 9-PBB324-2018-CHA Diversion of 0.06386 Ha. of Forest land for the construction of access road to the proposed retail outlet of Essar Oil Ltd. situated at Village Hamjheri on Patran - Moonak road, SH - 10, Near KM Stone no. 129, at RD KM 129.300. Tehsil Patran & Distt. Patiala. Road ESSAR OIL LIMITED MOHALI 0.06386 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Nov 2017
Stage-I Approval on : 23 Apr 2018
Compliance Report Submitted by User Agency on : 04 Jun 2018
08 Jun 2018
37 Himachal Pradesh FP/HP/HYD/18038/2016 8B/HP/01/95/2016/FC Uhl Stage-III Hydro Electric Project (100MW) is under construction and is at completion stage. The Main components of this project are Intake Power Channel, Storage Reservoir, Aqueduct, Head Race Tunnel, Surge Shaft, Penstock and Power House for construction of these components 37.6318 Hact. Forest Hydel HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD 0.53 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Jun 2016
Stage-I Approval on : 08 Dec 2017
Compliance Report Submitted by User Agency on : 03 May 2018
07 Jun 2018
38 Bihar FP/BR/Others/19910/2016 FP/BR/Others/19910/2016 The road side land 0.0239 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc. Others SANJEET HAZARI 0.012 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Jun 2016
Stage-I Approval on : 20 Sep 2016
Compliance Report Submitted by User Agency on : 21 Aug 2017
06 Jun 2018
39 Punjab FP/PB/Others/18481/2016 9-PBB404-2016-CHA Diversion of 0.0058 hec of forest land for approach road to Singla Solvex Plant Distt Barnala Others SINGLA SOLVENT PLANT 0.0058 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Mar 2016
Stage-I Approval on : 17 Aug 2017
Compliance Report Submitted by User Agency on : 30 May 2018
06 Jun 2018
40 Bihar FP/BR/Others/28637/2017 FP/BR/Others/28637/2017 The proposal for establishment of retail out-let dealership of M/s Indian Oil Corporation Ltd. Located betewwn Khaira (T Point) and Nagra Chowk on Khaira-Sattarghat Road SH-90 at Mauza- Affaur, Khata No. 697, Taluka Chhapra. District Saran Bihar. The Road Side land of 390 Sq. Mts. is required only Others SMT SHAMI DEVI 0.012 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Aug 2017
Stage-I Approval on : 20 Mar 2018
Compliance Report Submitted by User Agency on : 07 May 2018
04 Jun 2018
41 Haryana FP/HR/Others/27482/2017 9-HRB007-2018-CHA Diversion of 0.82 Hectare of forest land for laying of sewer line from sewer treatment plant towards interiors of Sadhaura, Distt. Yamuna Nagar - CM ANNOUNCEMENT Others PUBLIC HEALTH ENGINEERING DEPARTMENT 0.82 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Jul 2017
Stage-I Approval on : 22 Jan 2018
Compliance Report Submitted by User Agency on : 14 May 2018
01 Jun 2018
42 Punjab FP/PB/TRANS/21303/2016 9-PBB382-2017-CHA Shifting of 66 KV Rail Pole transmission Line from 220 KV Grid Sub Station BBMB Sangrur to Patran near village Duggal with SC/DC Tower line. The line is being shifted due to the widening of National Highway-71 as this project is being funded by Govt. Of India, Ministry of Road Transport & Highways a Transmission Line ADDL S E TL DIV PSPCL PATIALA 0.02385 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Sep 2016
Stage-I Approval on : 02 Feb 2018
Compliance Report Submitted by User Agency on : 10 May 2018
01 Jun 2018
43 Punjab FP/PB/TRANS/20016/2016 9-PBB441-2016-CHA 66KV line from 220KV S/S Focal Point Nabha to 66KV S/S Samundgarh. It has 56 NO. of towers and Length of line is 11.913KM Transmission Line ADDL S E TL DIV PSPCL PATIALA 0.1287 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Jun 2016
Stage-I Approval on : 09 Mar 2018
Compliance Report Submitted by User Agency on : 23 May 2018
01 Jun 2018
44 Punjab FP/PB/TRANS/24997/2017 9-PBB303-2018-CHA 66 KV line from 220 KV G/S/S Malkatora to 66 KV G/S/S Madhir SC ON DC Tower line. Transmission Line ADDL S E TL DIV PSPCL PATIALA 0.1644 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Mar 2017
Stage-I Approval on : 15 Feb 2018
Compliance Report Submitted by User Agency on : 25 May 2018
01 Jun 2018
45 Punjab FP/PB/ROAD/30909/2017 9-PBB325-2018-CHA Diversion of 0.0980 Hectare forest land for construction of approach road for our proposed Retail Outlet along the NH-10(New NH-09), at village Abul Khurana, on Malout - Dabwali road, Khasra no. 231//1MIN(4-0), 2/1/1MIN(0-19),10MIN(0-8), CH. 10.482(LHS), Tehsil Malout, Distt. Muktsar Sahib. Road ESSAR OIL PETROL PUMP 0.098 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Jan 2018
Stage-I Approval on : 23 Apr 2018
Compliance Report Submitted by User Agency on : 25 May 2018
31 May 2018
46 Haryana FP/HR/ROAD/29549/2017 9-HRB154-2016-CHA FRONT LAND ON UMRI ROAD TO ACCSESS WISDOM WORLD SCHOOL, SECTOR-4, URBAN ESTATE, KURUKSHETRA Road WISDOM WORLD SCHOOL 0.0077 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Oct 2017
Stage-I Approval on : 13 Apr 2018
Compliance Report Submitted by User Agency on : 22 May 2018
31 May 2018
47 Haryana FP/HR/ROAD/29137/2017 9-HRB019-2018-CHA Access to SRC Agro Foods at Kalanwali along Kalanwali Singhpura (Takhatmal Road) Km. 1.12 LHS in Sirsa District Road SRC AGRO FOODS 0.0088 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Sep 2017
Stage-I Approval on : 28 Mar 2018
Compliance Report Submitted by User Agency on : 09 May 2018
30 May 2018
48 Orissa FP/OR/TRANS/12273/2015 5-ORA270/2015-BHU Two nos Independent Power producers ( IPPs) viz. East Coast Energy Private Ltd and NCC Power Projects Ltd are setting up 1320 MW each Power plants in Srikakulam district of Andhra Pradesh. As a part of planned and co-ordinated development of Inter- State transmission system, scheme of common trans Transmission Line POWER GRID CORPORATION OF INDIA LTD 60.058 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 May 2015
Stage-I Approval on : 23 Mar 2016
Compliance Report Submitted by User Agency on : 23 May 2018
30 May 2018
49 Haryana FP/HR/Others/17204/2015 9-HRB188-2016-CHA Access through forest strip (PF) is required for entry/exit in our commercial colony. Others KHANNA DEVELOPERS PVT LTD 0.017 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Dec 2015
Stage-I Approval on : 13 Apr 2018
Compliance Report Submitted by User Agency on : 21 May 2018
30 May 2018
50 Bihar FP/BR/Others/30645/2017 FP/BR/Others/30645/2017 Diversion of 0.0040 ha of forest land for construction of approach road for opening retail outlet of IOCL on side of Village - M. Salempur Damdamma in Munger district of Bihar. Others RAJIV KUMAR 0.004 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Dec 2017
Stage-I Approval on : 19 Feb 2018
Compliance Report Submitted by User Agency on : 07 May 2018
30 May 2018