| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Uttar Pradesh
|
FP/UP/ROAD/35985/2018
|
8B/UP/06/97/2019/FC
|
0.310 Ha. PF Land Proposed to Transfer, for construction of Bridge and aproach road for Bridge, by Bridge Corporation along the Muzaffarnagr-Jansath Roadh (SH-12A) Km. 15 to 16 near village Kawal at U
|
Road
|
UTTAR PRADESH STATE BRIDGE CORRPORATION LTD CONSTRUCTION UNIT SAHARANPUR
|
0.31
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Sep 2018
|
|
Stage-I Approval on
|
:
|
29 Nov 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Oct 2025
|
|
|
|
21 Nov 2025
|
|
2
|
Himachal Pradesh
|
FP/HP/ROAD/37428/2018
|
8b/hp/06/07/2021
|
C/O TANDI SIRIM BATAHAN ROAD KM 0/0 TO 4/00
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.6231
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Dec 2018
|
|
Stage-I Approval on
|
:
|
21 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Oct 2025
|
|
|
|
21 Nov 2025
|
|
3
|
Uttar Pradesh
|
FP/UP/TRANS/42524/2019
|
8B/UP/04/169/2020
|
765 kV Ghatampur-Hapur S/C Transmission Line
|
Transmission Line
|
GHATAMPUR TRANSMISSION LIMITED
|
16.5761
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Dec 2019
|
|
Stage-I Approval on
|
:
|
24 Dec 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Nov 2025
|
|
|
|
21 Nov 2025
|
|
4
|
Maharashtra
|
FP/MH/TRANS/38296/2019
|
FC-II/MH-216/2023-NGP
|
construction of220KV Kalmeshwar - Warud transmission Line
|
Transmission Line
|
MAHARASHTRA STATE ELECTRICITY TRANSMISSION COMPANY LTD CIN NO U40109MH2005SGC153646
|
6.076
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Feb 2019
|
|
Stage-I Approval on
|
:
|
20 Mar 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Sep 2025
|
|
|
|
20 Nov 2025
|
|
5
|
Orissa
|
FP/OR/Pipeline/148595/2021
|
5-ORB557/2023-BHU
|
Dhamra - Haldia Pipeline Project (Odisha)
|
Pipeline
|
GAIL (INDIA) LIMITED (DHPL-OD)
|
1.849
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Oct 2021
|
|
Stage-I Approval on
|
:
|
08 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Apr 2025
|
|
|
|
20 Nov 2025
|
|
6
|
Orissa
|
FP/OR/TRANS/50828/2020
|
5-ORA487/2021-BHU
|
220 kV LILO Transmission Line from Existing LoC No. 70 of 220 KvMalkangiri – Balimela Transmission Line to 220/ 33 kV Grid Sub - Station, Khairput, Govindapalli of OPTCL in Malkangiri District, Odisha
|
Transmission Line
|
ODISHA POWER TRANSMISSION CORPORATION LIMITED
|
48.782
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Oct 2020
|
|
Stage-I Approval on
|
:
|
27 Nov 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2025
|
|
|
|
20 Nov 2025
|
|
7
|
Himachal Pradesh
|
FP/HP/ROAD/150882/2022
|
FC/HPB/06/06/144/2022
|
Construction of Ghat Paucha Pai Road
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
2.462
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jan 2022
|
|
Stage-I Approval on
|
:
|
01 Mar 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2025
|
|
|
|
20 Nov 2025
|
|
8
|
Himachal Pradesh
|
FP/HP/HYD/150023/2021
|
FC/HPB/04/2023
|
Sajla SHEP (2.00 MW)
|
Hydel
|
SERAJ HYDRO POWER DEVELOPERS
|
0.7995
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Feb 2022
|
|
Stage-I Approval on
|
:
|
12 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Sep 2025
|
|
|
|
18 Nov 2025
|
|
9
|
Himachal Pradesh
|
FP/HP/ROAD/146729/2021
|
FC/HPC/06/112/2022
|
WIDENING & STRENGTHENING TO DOUBLE LANE OF POANTA-RAJBAN-SHILAI-MINUS-HATKOTI ROAD, PORTION SNAIL TO HATKOTI FROM RD 149/00 TO 161/715 NH-707 (OLD NH-72B), DISTRICT SHIMLA, H.P.
|
Road
|
HIMACHAL PRADESH PUBLIC WORKS DEPARTMENT
|
5.368
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Sep 2021
|
|
Stage-I Approval on
|
:
|
14 Apr 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
15 Oct 2025
|
|
|
|
15 Nov 2025
|
|
10
|
Madhya Pradesh
|
FP/MP/ROAD/156454/2022
|
6-MPR044/2023-BHO
|
UPGRADATION/CONSTRUCTION OF TIKARIYA-SINGODHA-PATHA-CHUTKA ROAD
|
Road
|
EE PWD DIVISION MANDLA
|
8.2
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Sep 2022
|
|
Stage-I Approval on
|
:
|
24 Apr 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Oct 2025
|
|
|
|
14 Nov 2025
|
|
11
|
Uttarakhand
|
FP/UK/ROAD/23941/2017
|
8B/UCP/06/63/2019/FC
|
Construction of Km-35 of Raipur-Kumalda-Kaddukhal Motor Road to Ghena
|
Road
|
PMGSY ID IIND NEW TEHRI
|
2.0825
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Feb 2017
|
|
Stage-I Approval on
|
:
|
17 Dec 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Sep 2025
|
|
|
|
14 Nov 2025
|
|
12
|
Punjab
|
FP/PB/Approach/120478/2021
|
9-PBB405-2023-CHA
|
RESIDENTIAL COLONY NAMED EMPIRE ESTATE AT RAM TIRATH ROAD
|
Approach Access
|
RESIDENTIAL COLONY NAMED EMPIRE ESTATE
|
0.0116
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2021
|
|
Stage-I Approval on
|
:
|
29 May 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2025
|
|
|
|
14 Nov 2025
|
|
13
|
Madhya Pradesh
|
FP/MP/ROAD/149883/2021
|
6-MPR043/2023-BHO
|
Four laning of Indore-Harda Section of NH-59 A (New NH-47)
|
Road
|
NHAI PIU HARDA
|
40.053
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2021
|
|
Stage-I Approval on
|
:
|
18 Jun 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Mar 2025
|
|
|
|
14 Nov 2025
|
|
14
|
Himachal Pradesh
|
FP/HP/ROAD/45203/2020
|
FC/HPB/06/03/2022
|
C/O motorable link road from Dhakyara to Bharni Km 0/0 to 6/750
|
Road
|
HPPWD
|
3.65
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Mar 2020
|
|
Stage-I Approval on
|
:
|
25 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Oct 2025
|
|
|
|
11 Nov 2025
|
|
15
|
Maharashtra
|
FP/MH/Others/30392/2017
|
FC-I-MH-133-2018-NGP
|
laying OFC in Yavatmal-kita-kapra-sawar-chondi fata-babulgaon-mehamudpur fata-devgaon-pulgaon On ODR 17 From KM 0/00 to KM 15/00 forest area
|
Others
|
RJIL
|
0.16
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2018
|
|
Stage-I Approval on
|
:
|
07 Jan 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Oct 2025
|
|
|
|
11 Nov 2025
|
|
16
|
Maharashtra
|
FP/MH/ROAD/146738/2021
|
FC-I/MH-398/2025-NGP
|
Proposed construction of Bridge over Ramchandra Nalla near Evershine Nagar to Marve road in P/N ward by Municipal Corporation of Greater Mumbai.
|
Road
|
MUNICIPAL CORPORATION OF GREATER MUMBAI BRIDGES DEPARTMENT
|
0.7112
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Sep 2021
|
|
Stage-I Approval on
|
:
|
23 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Oct 2025
|
|
|
|
11 Nov 2025
|
|
17
|
Maharashtra
|
FP/MH/RAIL/43265/2019
|
FC-II/MH-156/2021-NGP
|
Diversion Of Forest Land For Panvel - Karjat Doubling Railway Line (Panvel - Karjat Section) In Raigad Dist
|
Railway
|
MUMBAI RAILWAY VIKAS CORPORATION LIMITED
|
9.1321
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Dec 2019
|
|
Stage-I Approval on
|
:
|
30 May 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Sep 2025
|
|
|
|
11 Nov 2025
|
|
18
|
Arunachal Pradesh
|
FP/AR/Others/153600/2022
|
3-AN-B-273/2024/GHY
|
Establishment of BPCL Retail Outlet within 7 km of Bhalukpong Check Gate
|
Others
|
ABRAY SAGRO
|
0.25
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Mar 2022
|
|
Stage-I Approval on
|
:
|
05 May 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Oct 2025
|
|
|
|
10 Nov 2025
|
|
19
|
Karnataka
|
FP/KA/TRANS/115396/2020
|
F.No.4-KRC1378/2022-BAN
|
Construction of 400 KV Quad D/C Transmission Line in forest lands of Kallumundkuru, Thenkamijaru Villages in Karkal Taluk of Udupi District, Ulipadi Village in Mangalore Taluk, Virakhamba, Vitlamudnuru Villages in Bantwal Taluk of Dakshina Kannada District for a length of 6.756 Km in favour of Udupi Kasargode Transmission Limited, New Delhi
|
Transmission Line
|
UDUPI KASARGODE TRANSMISSION LIMITED
|
31.079
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2020
|
|
Stage-I Approval on
|
:
|
27 Oct 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 Sep 2025
|
|
|
|
08 Nov 2025
|
|
20
|
Himachal Pradesh
|
FP/HP/HYD/36856/2018
|
8B/HP/01/57/2020/FC
|
Grahan Kasol Hydro Power
|
Hydel
|
M/S DINESH BUTAIL
|
1.6201
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Nov 2018
|
|
Stage-I Approval on
|
:
|
22 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2025
|
|
|
|
08 Nov 2025
|
|
21
|
Madhya Pradesh
|
FP/MP/ROAD/49265/2020
|
6-MPR013/2022-BHO
|
Proposal for diversion of Forest Land, under DFO Sagar for Improvements and Widening of Sagar - Rehli Road SH-21 (KM 0/000 to KM 39/165) Section Sagar to Rehli under MPRDC, Division - Sagar with Fina
|
Road
|
MP ROAD DEVELOPMENT CORPORATION LTD
|
6.08
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Oct 2020
|
|
Stage-I Approval on
|
:
|
22 May 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Jun 2023
|
|
|
|
07 Nov 2025
|
|
22
|
Haryana
|
FP/HR/ROAD/153617/2022
|
9-HRB023-2023-CHA
|
Diversion of forest land for construction of road from Nuh Palwal road (Mannaki) to Jogipur Hathin road (Tain) in Nuh Distt. (CMA No.22706) (Section Tain Hussainpur to Jogipur Hathin road)
|
Road
|
PWD BANDR MEWAT
|
0.1525
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2022
|
|
Stage-I Approval on
|
:
|
15 May 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Sep 2025
|
|
|
|
07 Nov 2025
|
|
23
|
Madhya Pradesh
|
FP/MP/TRANS/143221/2021
|
6-MPC057/2021-BHO
|
Kodwar 33 KV Transmission line to Pump House 1 and Pump House 2
|
Transmission Line
|
EE ND DIVISION NO TWENTY FIVE NARMADA NAGAR
|
5.7
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jun 2021
|
|
Stage-I Approval on
|
:
|
09 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jan 2022
|
|
|
|
28 Oct 2025
|
|
24
|
Maharashtra
|
FP/MH/Others/40665/2019
|
FC-I/MH-243/2021-NGP
|
Berthing Jetty, Conveyor Corridor with Backup Facilities and Approach Road for Raigad Cement Bulk Terminal of ACL
|
Others
|
ADANI CEMENTATION LIMITED
|
0.6497
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Jun 2019
|
|
Stage-I Approval on
|
:
|
29 Oct 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jul 2022
|
|
|
|
24 Oct 2025
|
|
25
|
Uttar Pradesh
|
FP/UP/IRRIG/20269/2016
|
8B/UP/02/31/2018/FC
|
FOREST LAND PROPOSED TO BE DIVERTED FOR CONSTRUCTION OF KANHAR IRRIGATION PROJECT FOR AREA OF 127.1637 HA. IN SONEBHADRA DISTRICT (UP)
|
Irrigation
|
Kanhar Irrigation Project
|
127.1637
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Feb 2017
|
|
Stage-I Approval on
|
:
|
28 May 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2025
|
|
|
|
23 Oct 2025
|
|
26
|
Uttarakhand
|
FP/UK/ROAD/151552/2022
|
8B/UCP/06/51/2022/FC
|
c/o Manan to Chandrapur Link Motor road
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
1.08
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jan 2022
|
|
Stage-I Approval on
|
:
|
04 Sep 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Sep 2025
|
|
|
|
22 Oct 2025
|
|
27
|
Jammu and Kashmir
|
FP/JK/ROAD/154608/2022
|
9-JKA-041/2022-Jammu
|
Construction of Road Hari Katha to Moh Sheikhan
|
Road
|
RURAL DEVELOPMENT DEPARTMENT POONCH
|
0.1375
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2022
|
|
Stage-I Approval on
|
:
|
16 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2023
|
|
|
|
22 Oct 2025
|
|
28
|
Uttarakhand
|
FP/UK/ROAD/20224/2016
|
8B/UCP/06/03/2017/FC
|
Margaon-Jaspur-Chamiyari to Ulan motor road.
|
Road
|
EXECUTIVE ENGINEER
|
4.879
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jun 2016
|
|
Stage-I Approval on
|
:
|
12 Mar 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Sep 2025
|
|
|
|
21 Oct 2025
|
|
29
|
Himachal Pradesh
|
FP/HP/Others/42429/2019
|
8B/HP/09/28/2020/FC
|
Construction of Judicial Court Complex in Mandi (H.P.)
|
Others
|
HIGH COURT OF HP
|
9.6
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Oct 2019
|
|
Stage-I Approval on
|
:
|
11 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Sep 2025
|
|
|
|
19 Oct 2025
|
|
30
|
Punjab
|
FP/PB/Approach/149545/2021
|
9-PBB363-2022-CHA
|
DIVERSION OF 0.0041 HA OF FOREST LAND FOR APPROACH ROAD TO GURU NANAK DEV NURSING COLLEGE
|
Approach Access
|
GURU NANAK DEV NURSING COLLEGE
|
0.0041
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Nov 2021
|
|
Stage-I Approval on
|
:
|
02 Jun 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jul 2025
|
|
|
|
16 Oct 2025
|
|
31
|
Punjab
|
FP/PB/Approach/49740/2020
|
9-PBB348-2021-CHA
|
Diversion of 0.0551 ha of forest land permission for construction of approach Access M/S R.K Enterprises (Proposed Hotel By Rohit Garg S/o Sh Gian Chand) Vill: Rohti Khas Tehsil: Nabha & Distt: Patia
|
Approach Access
|
M/S R.K ENTERPRISES (PROPOSED HOTEL BY ROHIT GARG S/O SH GIAN CHAND) VILL: ROHTI KHAS TEHSIL: NABHA & DISTT: PATIALA.
|
0.0551
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Sep 2020
|
|
Stage-I Approval on
|
:
|
19 May 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Mar 2024
|
|
|
|
16 Oct 2025
|
|
32
|
Madhya Pradesh
|
FP/MP/Pipeline/145842/2021
|
6-MPB017/2022-BHO
|
WATER PIPELINE MALIPURA TO SULIBARDI VILLAGE
|
Pipeline
|
MANDAVGARH HOTEL PVT LTD
|
0.0671322
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Oct 2021
|
|
Stage-I Approval on
|
:
|
11 Nov 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Dec 2024
|
|
|
|
13 Oct 2025
|
|
33
|
Daman and Diu
|
FP/DD/ROAD/143323/2021
|
FC-6/DDB-73/2023-GNR
|
Construction of Protection wall with Jampore Ghat for Extension of Jampore Sea front upto Varliwad School at Jampore, Moti Daman on forest land in Daman District.
|
Road
|
EXECUTIVE ENGINEER PUBLIC WORKS DEPARTMENT WD I DAMAN
|
1.592
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jun 2021
|
|
Stage-I Approval on
|
:
|
03 Jan 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Mar 2025
|
|
|
|
09 Oct 2025
|
|
34
|
Dadar & Nagar Haveli
|
FP/DN/ROAD/35770/2018
|
FC-6/GJC-49/2022-GNR
|
Diversion of Road side protected Forest land from Khanvel Chowk upto Dudhani Junction (Chainage 19/6 to 35/8 Kms)
|
Road
|
EXECUTIVE ENGINEER ROAD DIVISION
|
17.82
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Sep 2018
|
|
Stage-I Approval on
|
:
|
30 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Sep 2025
|
|
|
|
09 Oct 2025
|
|
35
|
Jammu and Kashmir
|
FP/JK/TRANS/155098/2022
|
9-JKB-026/2023-Jammu
|
Stabilization of existing 220 KV Single Circuit Gladni Udhampur Transmission Line alongwith realignment on double circuit towers from location no. 158 upto Grid Station Udhampur laying foundations and
|
Transmission Line
|
JKPTCL(PDD), JAMMU AND KASHMIR
|
1.45
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Dec 2022
|
|
Stage-I Approval on
|
:
|
24 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jun 2025
|
|
|
|
07 Oct 2025
|
|
36
|
Chhattisgarh
|
FP/CG/ROAD/126719/2021
|
FC-II/IROCH-19/2023
|
Rehabilitation & Upgrading to 2/4 laning with paved shoulder Under corridor Scheme on EPC Basis of Keonchi to Ratanpur Section on NH-45(Ex.) in the State of Chhattisgarh.
|
Road
|
CHIEF ENGINEER PWD NH RAIPUR CG
|
28.811
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2021
|
|
Stage-I Approval on
|
:
|
24 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Aug 2025
|
|
|
|
06 Oct 2025
|
|
37
|
Chhattisgarh
|
FP/CG/ROAD/147299/2021
|
FC-III/IROCH-06/2023
|
Widening of Existing Road from Ambikapur toRamanujganj 2-Lane/4-Lane Road NH No. 343
|
Road
|
EXECUTIVE ENGINEER PWD NH DIVISION AMBIKAPUR
|
102.324
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Sep 2021
|
|
Stage-I Approval on
|
:
|
09 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2025
|
|
|
|
06 Oct 2025
|
|
38
|
Maharashtra
|
FP/MH/ROAD/115156/2020
|
FC-I/MH-269/2022-NGP
|
Improvement to Kerli - Kotoli - Nandgaon - Nandari Road SH-191 (Km 00/00 to Km 29/500) Part of Kerli Phata to Nandari Dist Kolhapur.
|
Road
|
SPECIAL PROJECT (P.W.) DIVISION, KOLHAPUR
|
2.15
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jan 2021
|
|
Stage-I Approval on
|
:
|
24 May 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jul 2025
|
|
|
|
06 Oct 2025
|
|
39
|
Rajasthan
|
FP/RJ/WATER/154215/2022
|
8B/RAJ/028/2023-JPR
|
Laying of Pipe Line Hindoli-Nainwa Water Supply Project District-Bundi From Chambal-Bhilwara WSP (PHASE-I) District -Bundi (Rajasthan)
|
Drinking Water
|
PUBLIC HEALTH ENGINEERING DEPARMENT RAJASTHAN
|
4.9975
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Jul 2022
|
|
Stage-I Approval on
|
:
|
10 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Aug 2025
|
|
|
|
03 Oct 2025
|
|
40
|
Assam
|
FP/AS/Pipeline/49586/2020
|
F. NO 3 AS C 089/2022/GHY
|
Laying of Proposed 18" Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Guwahati to Panisagar.
|
Pipeline
|
INDRADHANUSH GAS GRID LIMITED
|
9.2755
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Sep 2020
|
|
Stage-I Approval on
|
:
|
24 May 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jul 2022
|
|
|
|
03 Oct 2025
|
|
41
|
Orissa
|
FP/OR/MIN/16453/2015
|
5-ORC288/2016-BHU
|
Kalarangiatta Chromite Mines of M/s Ferro Alloys Corporation Ltd
|
Mining
|
FERRO ALLOYS CORPORATION LTD
|
23.8
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Nov 2015
|
|
Stage-I Approval on
|
:
|
21 Mar 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Sep 2025
|
|
|
|
03 Oct 2025
|
|
42
|
Maharashtra
|
FP/MH/ROAD/31292/2018
|
FC-I-MH-86-2018-NGP
|
NH-66 Kalmath to Zarap section
|
Road
|
NH DIVISION
|
2.8715
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2018
|
|
Stage-I Approval on
|
:
|
27 Feb 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jul 2025
|
|
|
|
30 Sep 2025
|
|
43
|
Bihar
|
FP/BR/Approach/156522/2022
|
FP/BR/Approach/156522/2022
|
Diversion of 0.020625 ha of forest land for construction of approach road for opening retail outlet of IOCL on Bachhota-Alauli M.D.R. Road in Khagaria district of Bihar.
|
Approach Access
|
KHUSHI KUMARI
|
0.02063
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jun 2022
|
|
Stage-I Approval on
|
:
|
06 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Sep 2025
|
|
|
|
30 Sep 2025
|
|
44
|
Tamil Nadu
|
FP/TN/IRRIG/118339/2021
|
4-TNB097/2022-CHN
|
Construction of Fuse Plug pertaining to Thandarampattu Taluk of Tiruvannamalai District
|
Irrigation
|
AEE PWD SATHANUR DAM
|
0.9
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jan 2021
|
|
Stage-I Approval on
|
:
|
03 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Apr 2025
|
|
|
|
30 Sep 2025
|
|
45
|
Uttar Pradesh
|
FP/UP/Others/47337/2020
|
8B/UP/06/90/2022/FC
|
Protected Forest Land Proposed to be Diverted for Exit/Entry Approach to Bharat Petroleum Corporation LTD. Retail Outlet on Sambhal-Bahjoi Road (SH-51) Km Stone No 79 (L.H.S) Khasra No-325, Village-Panwasa, Tehsil-Sambhal, District-Sambhal
|
Others
|
BHARAT PETROLEUM CORPORATION LIMITED MEERUT
|
0.1041
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Dec 2020
|
|
Stage-I Approval on
|
:
|
29 Aug 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Sep 2025
|
|
|
|
27 Sep 2025
|
|
46
|
Tamil Nadu
|
FP/TN/IRRIG/51078/2020
|
4-TNB119/2024-CHN
|
Reconstruction of dilapidated Head Sluice,Bed Dam, Retaining wall and Culvert in Malattar Channel in Villupuram District
|
Irrigation
|
EE, WRD., VILUPPURAM
|
0.186
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Oct 2020
|
|
Stage-I Approval on
|
:
|
13 Mar 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jul 2025
|
|
|
|
26 Sep 2025
|
|
47
|
Assam
|
FP/AS/TRANS/142618/2021
|
3-AS-C-093/2022/GHY
|
DIVERSION PROPOSAL OF PROPOSED 18.028 HA AREA OF FOREST LAND FOR CONSTRUCTION AND COMMISSIONING OF 132 KV TRANSMISSION LINE FROM AGIA GSS TO GOALPARA TSS AT RAKHAYASHINI PRF UNDER GOALPARA FOREST DIVISION
|
Transmission Line
|
O/O THE CHIEF PROJECT DIRECTOR, CENTRAL ORGANIZATION FOR RAILWAY ELECTRIFICATION, GUWAHATI
|
18.028
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 May 2021
|
|
Stage-I Approval on
|
:
|
01 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Jun 2024
|
|
|
|
25 Sep 2025
|
|
48
|
Telangana
|
FP/TG/ROAD/32933/2018
|
4-TSC160/2019-CHN
|
Diversion of Forest land in Bhupalpally Division for Widening from Single lane to Double lane road of Khammampally to Bhupalpally road from km 12/2 to 19/6 in Jayashanker Bhupalpally Dist - 4.2339 Ha
|
Road
|
R AND B DIVISION WARANGAL
|
8.5
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Apr 2018
|
|
Stage-I Approval on
|
:
|
27 Sep 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Aug 2025
|
|
|
|
23 Sep 2025
|
|
49
|
Karnataka
|
FP/KA/TRANS/38788/2019
|
F.No.KRC1287/2021-BAN
|
Construction of the Proposed 110kV S/c Line on DC Towers from the existing 110/11kV Thogarsi sub-station to the proposed 10MVA 110/11kV sub-station at Kuppagudde in Soraba Taluk, Shivamogga District.
|
Transmission Line
|
KARNATAKA POWER TRANSMISSION CORPORATION LIMITED
|
6.073276
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2019
|
|
Stage-I Approval on
|
:
|
02 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Aug 2025
|
|
|
|
18 Sep 2025
|
|
50
|
Jammu and Kashmir
|
FP/JK/Others/153306/2022
|
9-JKA-060/2022-Jammu
|
Ms Prince Fuel Station
|
Others
|
CHETAN MAHAJAN
|
0.208
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Mar 2022
|
|
Stage-I Approval on
|
:
|
22 Jun 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
02 May 2025
|
|
|
|
18 Sep 2025
|
|