| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Bihar
|
FP/BR/Others/141318/2021
|
FP/BR/Others/141318/2021
|
Diversion of 0.01275 ha of forest land for construction of approach road for opening retail outlet of HPCL on Mashrakh-Gauda Bazar SH-90 Road in Saran district of Bihar.
|
Others
|
ABHIMANYU KUMAR
|
0.01275
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Apr 2021
|
|
Stage-I Approval on
|
:
|
21 Aug 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Oct 2025
|
|
|
|
28 Jan 2026
|
|
2
|
Bihar
|
FP/BR/Others/44447/2020
|
FP/BR/Others/44447/2020
|
Diversion of 0.02025 ha of forest land for construction of approach road for opening retail outlet of HPCL on Samastipur-Patori Road in Samastipur district of Bihar.
|
Others
|
DINESH PASWAN
|
0.02025
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2020
|
|
Stage-I Approval on
|
:
|
15 Jun 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Mar 2025
|
|
|
|
28 Jan 2026
|
|
3
|
Himachal Pradesh
|
FP/HP/ROAD/37858/2018
|
8B/HP/06/90/2020/FC
|
SLAPPER TATAPANI ROAD KM.8/500 TO 61/600
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
33.3292
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2019
|
|
Stage-I Approval on
|
:
|
24 Feb 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jan 2026
|
|
|
|
27 Jan 2026
|
|
4
|
Karnataka
|
FP/KA/WATER/146299/2021
|
F.No.4-KRC1385/2022-BAN
|
For construction New Tank with Check Dam & Connectivity Road at Sy No.17 (20 New) of Ittigehalli Village, Bhadravathi Division for recharge of Ground Water surrounding of Ittigehalli Villages in favour of EE, KNNL No.3, Bhadra Canal Division, Malebennur.
|
Drinking Water
|
CHIEF ENGINEER KARNATAKA NEERAVARI NIGAM LIMITED UPPER TUNGA PROJECT ZONE SHIVAMOGGA
|
12.1801
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2021
|
|
Stage-I Approval on
|
:
|
03 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Nov 2025
|
|
|
|
23 Jan 2026
|
|
5
|
Karnataka
|
FP/KA/Others/36295/2018
|
F.No.4-KRB1288/2021-BAN/
|
Construction of Solid Waste Unit and Faecal Sludge treatment Plant at Gokarna
|
Others
|
GRAMA PANCHAYAT GOKARNA
|
0.98
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Oct 2018
|
|
Stage-I Approval on
|
:
|
25 Feb 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jun 2024
|
|
|
|
23 Jan 2026
|
|
6
|
Karnataka
|
FP/KA/IRRIG/35763/2018
|
4-KRB1221/2020
|
Laying of pipeline to fill 60 tanks of Harpanahalli Taluk from Tungabhadra River
|
Irrigation
|
EXECUTIVE ENGINEER KNNL BHADRA CANAL DIVISION DAVANGERE
|
0.54
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Sep 2018
|
|
Stage-I Approval on
|
:
|
29 Jan 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Aug 2025
|
|
|
|
20 Jan 2026
|
|
7
|
Madhya Pradesh
|
FP/MP/ROAD/149532/2021
|
6-MPR015/2022-BHO
|
Constrcution of Bypass on WESTERN side of Gwalior City (design km 0.000 to 27.800)
|
Road
|
PDPIUGWALIOR
|
42.83
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Nov 2021
|
|
Stage-I Approval on
|
:
|
07 May 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Oct 2025
|
|
|
|
20 Jan 2026
|
|
8
|
Jammu and Kashmir
|
FP/JK/Approach/44582/2020
|
Fst/Land/Parivesh/38/2020
|
60 mtr single span major pmt bridge at chak nallah
|
Approach Access
|
HQ 56 ROAD CONSTRUCTION COY (BEACON-BRO))
|
0.045
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2020
|
|
Stage-I Approval on
|
:
|
17 Mar 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2025
|
|
|
|
15 Jan 2026
|
|
9
|
Madhya Pradesh
|
FP/MP/IRRIG/33438/2018
|
6-MPC014/2019-BHO
|
Prabhudhana Tank..
|
Irrigation
|
EXECUTIVE ENGINEER WATER RESOURCES DIVISION NO II BETUL
|
7.002
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 May 2018
|
|
Stage-I Approval on
|
:
|
30 May 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 Nov 2025
|
|
|
|
13 Jan 2026
|
|
10
|
Uttarakhand
|
FP/UK/ROAD/24737/2017
|
8B/UCP/06/97/2017/FC
|
Construction of 4.00Km long motor road for Kargil Martyr Sri Ramesh Parihar Village-Dungarpur from Amtora Village in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
1.991
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Mar 2017
|
|
Stage-I Approval on
|
:
|
11 May 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2024
|
|
|
|
13 Jan 2026
|
|
11
|
Uttarakhand
|
FP/UK/ROAD/154869/2022
|
8B/UCP/06/40/2023/FC
|
Construction of road from Km 15 of BaijnathBageshwar motor road to Udalgaon in District Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.261
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Apr 2022
|
|
Stage-I Approval on
|
:
|
31 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Oct 2025
|
|
|
|
13 Jan 2026
|
|
12
|
Jharkhand
|
FP/JH/TRANS/45077/2020
|
FP/JH/TRANS/45077/2020
|
132kV DC Jamua-Gawan Transmission Line (NIT-253)
|
Transmission Line
|
JUSNL
|
54.407
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Mar 2020
|
|
Stage-I Approval on
|
:
|
09 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jul 2025
|
|
|
|
13 Jan 2026
|
|
13
|
Uttarakhand
|
FP/UK/ROAD/146204/2021
|
8b/UCP/06/17/2022/FC
|
Sumalta to koladungri motor road
|
Road
|
TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR
|
0.861
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2021
|
|
Stage-I Approval on
|
:
|
11 Dec 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 Apr 2025
|
|
|
|
13 Jan 2026
|
|
14
|
Jammu and Kashmir
|
FP/JK/Approach/143480/2021
|
FST-Land/0FC/87/2021-02
|
Construction of 45 m span bridge over Gurai nallah
|
Approach Access
|
HQ 56 ROAD CONSTRUCTION COY (BEACON-BRO))
|
0.25
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Jun 2021
|
|
Stage-I Approval on
|
:
|
12 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2025
|
|
|
|
12 Jan 2026
|
|
15
|
Uttarakhand
|
FP/UK/Others/150277/2021
|
8B/UCP/09/19/2022/FC
|
Construction of judiciary building in Ranikhet
|
Others
|
CIVIL JUDGE (J.D.) RANIKHET
|
0.98
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Dec 2021
|
|
Stage-I Approval on
|
:
|
26 Mar 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Dec 2025
|
|
|
|
12 Jan 2026
|
|
16
|
Uttarakhand
|
FP/UK/ROAD/19460/2016
|
8B/UCP/06/166/2020/FC
|
Construction of Motor Road for connecting of Nadgal Village under CM Scheme at District Nainital
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.33
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2016
|
|
Stage-I Approval on
|
:
|
25 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 May 2025
|
|
|
|
09 Jan 2026
|
|
17
|
Himachal Pradesh
|
FP/HP/Others/14799/2015
|
8B/HP/09/90/2017
|
Development of Paragliding Site at Bir Billing in Tehsil Baijnath, District Kangra, Himachal Pradesh
|
Others
|
TOURISM AND CIVIL AVIATION DEPARTMENT
|
0.9925
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Aug 2015
|
|
Stage-I Approval on
|
:
|
22 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Dec 2025
|
|
|
|
09 Jan 2026
|
|
18
|
Tamil Nadu
|
FP/TN/ROAD/28608/2017
|
4-TNB075/2021-CHN
|
L.Malaiyur Forest Road
|
Road
|
RURAL DEVELOPMENT DEPARTMENT
|
1.68
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2017
|
|
Stage-I Approval on
|
:
|
17 Aug 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Dec 2025
|
|
|
|
02 Jan 2026
|
|
19
|
Tamil Nadu
|
FP/TN/OFC/38837/2019
|
4-TNB121/2024-CHN
|
BSNL
|
Optical Fibre Cable
|
BBHARAT SANCHAR NIGAM LIMITED
|
0.045
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Feb 2019
|
|
Stage-I Approval on
|
:
|
04 Apr 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2025
|
|
|
|
02 Jan 2026
|
|
20
|
Karnataka
|
FP/KA/WATER/48609/2020
|
F.No.4-KRB1481/2023-BAN
|
Work of Construction of Kadugodi GLR (Ground Level Reservoir) in 2.4281 Hac of forest land at Kadugodi Plantation Village, Sy No. 1/P, Bidarahalli Hobali, Bangaluru East Taluk, Bangaluru Urban Dist, Under Contract Package-12 of Cauvery water supply scheme (CWSS) Stage-V Project, JICA Funded in favor of Bangalore Water Supply and Sewerage Board.
|
Drinking Water
|
BANGALORE WATER SUPPLY AND SEWERAGE BOARD
|
2.4281
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Aug 2020
|
|
Stage-I Approval on
|
:
|
03 Apr 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Dec 2025
|
|
|
|
01 Jan 2026
|
|
21
|
Jammu and Kashmir
|
FP/JK/Approach/125807/2021
|
9-JKA-074/2021-Jammu
|
70 mtr pmt br at km 66.95 on BG road (TOTA Br)
|
Approach Access
|
HQ 56 ROAD CONSTRUCTION COY (BEACON-BRO))
|
0.45
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Mar 2021
|
|
Stage-I Approval on
|
:
|
29 Sep 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2025
|
|
|
|
31 Dec 2025
|
|
22
|
Haryana
|
FP/HR/TRANS/147539/2021
|
9-HRB162-2023-CHA
|
Construction of 66KV Transmission line from 220 KV Sub Station Panchgaon to 66 KV sub station Farrukhnagar and Jamalpur district Gurugram Hayana.
|
Transmission Line
|
HVPNL MANESAR
|
0.1539
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Sep 2021
|
|
Stage-I Approval on
|
:
|
30 Apr 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Nov 2025
|
|
|
|
31 Dec 2025
|
|
23
|
Uttarakhand
|
FP/UK/ROAD/47038/2020
|
8B/UCP/06/121/2020/FC
|
C/0 of Link Motor Road from kasardevi (Tiwarikhan) to village Math
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
2.565
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jul 2020
|
|
Stage-I Approval on
|
:
|
14 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Sep 2025
|
|
|
|
26 Dec 2025
|
|
24
|
Uttarakhand
|
FP/UK/ROAD/12313/2015
|
8B/UCP/06/180/2016/FC
|
Construction of Ghurshal to Saikot motor road. Under State Sector
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.772
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2015
|
|
Stage-I Approval on
|
:
|
17 Jan 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2024
|
|
|
|
23 Dec 2025
|
|
25
|
Bihar
|
FP/BR/Others/42268/2019
|
FP/BR/Others/42268/2019
|
The Tourism Department , Govt. of Bihar has been promoting tourist for ritual worship in the Maa Mundeshwari Devi temple situated at the top of Mundeshwari Hill in Bhagwanpur Block under Kaimur Distri
|
Others
|
BIHAR RAJYA PUL NIRMAN NIGAM LTD WORKS DIVISION ARA
|
1.3094
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Sep 2019
|
|
Stage-I Approval on
|
:
|
30 Aug 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Sep 2025
|
|
|
|
23 Dec 2025
|
|
26
|
Haryana
|
FP/HR/TRANS/41327/2019
|
9-HRB001-2020-CHA
|
Construction of 220 KV D/C Kaithal (PGCIL)
|
Transmission Line
|
HVPNL KAITHAL
|
0.457
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jul 2019
|
|
Stage-I Approval on
|
:
|
24 Jul 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Nov 2025
|
|
|
|
23 Dec 2025
|
|
27
|
Uttarakhand
|
FP/UK/ROAD/48583/2020
|
8B/UCP/06/172/2020/FC
|
Gauchar Sidoli to Panai M/R
|
Road
|
TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR
|
0.26
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2020
|
|
Stage-I Approval on
|
:
|
31 Dec 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Sep 2025
|
|
|
|
23 Dec 2025
|
|
28
|
Haryana
|
FP/HR/ROAD/48568/2020
|
9-HRB076-2021-CHA
|
Construction of 6 Lane access controlled Highway from DND- Faridabad-Ballabhgarh Bypass Junction with Delhi-Vadodara Expressway KMP- Interchange (NH-148 NA) under Bharatmala Pariyojana (Lot-4/Pkg-I)
|
Road
|
CMU, MATHURA, NHAI
|
3.9
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2020
|
|
Stage-I Approval on
|
:
|
22 Jun 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Nov 2025
|
|
|
|
23 Dec 2025
|
|
29
|
Andhra Pradesh
|
FP/AP/RAIL/149334/2021
|
4-APB167/2022-VIJ
|
Proposal for Diversion of 1.36 Ha. Forest Land for Construction of new double line and electrification of track between Guntur and Guntakal stations at Dhone (Rly Km.325/4 to 329/2) in Comp.No. 238 & 239 of North Dhone RF, in Dhone Range, Kurnool Division in favour of S.C. Railway, under FC Act 1980.
|
Railway
|
SOUTH CENTRAL RAILWAY,GUNTAKAL.
|
2.21
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Nov 2021
|
|
Stage-I Approval on
|
:
|
21 Jun 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2025
|
|
|
|
18 Dec 2025
|
|
30
|
Maharashtra
|
FP/MH/ROAD/118805/2021
|
FC-III/MH-51/2022-NGP
|
Upgradation of NH 353 C From Ashti to Sironcha in Section Allaplli to Sironcha
|
Road
|
NATIONAL HIGHWAY DIVISION GADCHIROLI
|
132.102
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2021
|
|
Stage-I Approval on
|
:
|
30 Jan 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2025
|
|
|
|
17 Dec 2025
|
|
31
|
Maharashtra
|
FP/MH/ROAD/119248/2021
|
FC-III/MH-54/2022-NGP
|
Up-gradation to2/4 lane with paved shoulder configuration of Gadichiroli-Sironcha of NH- 353 C in the State of Maharashtra by Ministry of Road Transport & Highways from Ashti to Sironcha in Gadhciroli
|
Road
|
NATIONAL HIGHWAY DIVISION GADCHIROLI
|
54.274
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jan 2021
|
|
Stage-I Approval on
|
:
|
21 Nov 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2025
|
|
|
|
17 Dec 2025
|
|
32
|
Madhya Pradesh
|
FP/MP/IRRIG/150918/2022
|
6-MPR002/2024-BHO
|
Kuwajhagar Tank Project
|
Irrigation
|
Madhya Pradesh Water Resources Department
|
20.512
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2022
|
|
Stage-I Approval on
|
:
|
26 Jul 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Nov 2025
|
|
|
|
16 Dec 2025
|
|
33
|
Andhra Pradesh
|
FP/AP/RAIL/154617/2022
|
4-APB213/2023-VIJ
|
Proposal for Diversion of 3.21 Ha. Forest land for construction of New Double line and Electrification of track between Guntur and Guntakal stations at Konided & Panyam (Rly.Km.275-281 & 285-288) in Comp.No.145, 147, 137 & 138 of Panyam RF in Kurnool Range, Kurnool Division in favour of S.C.Railway under FC Act 1980.
|
Railway
|
SOUTH CENTRAL RAILWAY,GUNTAKAL.
|
3.21
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2022
|
|
Stage-I Approval on
|
:
|
26 Jun 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2025
|
|
|
|
16 Dec 2025
|
|
34
|
Haryana
|
FP/HR/ROAD/27251/2017
|
9-HRB062-2018-CHA
|
construction of Ring road from Tauru road to Alwar road via Engineering College, Medical College and Navodaya School Bai in Nuh Distt. (C.M. Announcement 15242)
|
Road
|
PWD BANDR MEWAT
|
1.8239232
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Aug 2017
|
|
Stage-I Approval on
|
:
|
20 Aug 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Sep 2025
|
|
|
|
16 Dec 2025
|
|
35
|
Karnataka
|
FP/KA/TRANS/152682/2022
|
F. No.4-KRC1468/2023-BAN
|
Construction of 137.701 Kms of 400 KV Quad D/C Koppal PS- Narendra (New) Transmission Line passing through forest land in Sy No. 50/1 Mannerala Village and Sy No. 70/1,70/2, 70/3, 71, 73 and 89 of Mavinaitagi Village, Hanamasagara Hobli, Kushtagi Taluk, Koppal District for a length of 1.644 Kms (7.562 Ha.) by Koppal-Narendra Transmission Limited
|
Transmission Line
|
KOPPAL-NARENDRA TRANSMISSION LIMITED
|
7.562
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Feb 2022
|
|
Stage-I Approval on
|
:
|
02 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Sep 2025
|
|
|
|
15 Dec 2025
|
|
36
|
Telangana
|
FP/TG/ROAD/47266/2020
|
4-TSB226/2021-HYD
|
Improvement of existing road from earthen road to BT standards from Laxmipur to Baddampally in Mancherial District - 4.8408 Ha
|
Road
|
PANCHAYAT RAJ ENGINEERING DEPARTMENT
|
4.8408
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jul 2020
|
|
Stage-I Approval on
|
:
|
15 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2023
|
|
|
|
15 Dec 2025
|
|
37
|
Orissa
|
FP/OR/IRRIG/12731/2015
|
5-ORC307/2017-BHU
|
Sono Barrage Project
|
Irrigation
|
MAYURBHANJ INVESTIGATION DIVISION DEPARTMENT OF WATER RESOURCES ODISHA
|
14.928
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Oct 2015
|
|
Stage-I Approval on
|
:
|
04 Aug 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Nov 2025
|
|
|
|
10 Dec 2025
|
|
38
|
Madhya Pradesh
|
FP/MP/IRRIG/38634/2019
|
6-MPB005/2022-BHO
|
Bahuti Canal Scheme
|
Irrigation
|
Madhya Pradesh Water Resources Department
|
1.4002
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Mar 2019
|
|
Stage-I Approval on
|
:
|
05 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Sep 2022
|
|
|
|
09 Dec 2025
|
|
39
|
Madhya Pradesh
|
FP/MP/Others/38197/2019
|
6-MPB060/2020-BHO
|
Neoteric Education Society Institute & Rehabilitation Center for Paralysis & Paraplegic
|
Others
|
NEOTERIC EDUCATION AND SERVICE SOCIETY
|
0.99
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2019
|
|
Stage-I Approval on
|
:
|
18 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Aug 2025
|
|
|
|
09 Dec 2025
|
|
40
|
Himachal Pradesh
|
FP/HP/HYD/37189/2018
|
8B/HP/01/71/2020/FC
|
Kasol Hydro Power Project
|
Hydel
|
MS BEENA BUTAIL PALMPUR
|
1.496448
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Nov 2018
|
|
Stage-I Approval on
|
:
|
12 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Nov 2025
|
|
|
|
05 Dec 2025
|
|
41
|
Uttarakhand
|
FP/UK/ROAD/9480/2015
|
8B/UCP/06/85/2016/FC
|
Constt. of Bagdawar Bend to Duni Veer Singgiya Motor Road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
3.78
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jan 2015
|
|
Stage-I Approval on
|
:
|
19 Jul 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Oct 2025
|
|
|
|
04 Dec 2025
|
|
42
|
Uttarakhand
|
FP/UK/ROAD/38366/2019
|
8B/UCP/06/85/2020/FC
|
Construction of Dewal kheta MR Km-10(suyalkot) to Mopata Link motor road under PMGSY.
|
Road
|
RES PMGSY KARANPERAYAG
|
3.008
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Feb 2019
|
|
Stage-I Approval on
|
:
|
14 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2025
|
|
|
|
04 Dec 2025
|
|
43
|
Madhya Pradesh
|
FP/MP/ROAD/152685/2022
|
6-MPB015/2022-BHO
|
Suktanawad-Jhirpanjariya road
|
Road
|
PWD DIVISION BURHANPUR
|
2.38
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Feb 2022
|
|
Stage-I Approval on
|
:
|
01 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2023
|
|
|
|
04 Dec 2025
|
|
44
|
Haryana
|
FP/HR/Approach/149450/2021
|
9-HRB154-2023-CHA
|
M/s Panchkula Foils
|
Approach Access
|
M/S PANCHKULA FOILS
|
0.0084
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Nov 2021
|
|
Stage-I Approval on
|
:
|
10 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Oct 2024
|
|
|
|
04 Dec 2025
|
|
45
|
Uttarakhand
|
FP/UK/ROAD/11292/2015
|
8B/UCP/06/222/2015
|
Construction of Farsali Palli To Kharkanatoli
|
Road
|
PMGSY
|
8.931
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Mar 2015
|
|
Stage-I Approval on
|
:
|
14 Mar 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2025
|
|
|
|
04 Dec 2025
|
|
46
|
Uttarakhand
|
FP/UK/ROAD/21140/2016
|
8B/UCP/06/118/2018/FC
|
Sahid Hari Singh Tuolbudhand to Ratkhal Motor Road Sanction Under CM Ghosana no. 492/201
|
Road
|
EXECUTIVE ENGINEER
|
2.52
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Aug 2016
|
|
Stage-I Approval on
|
:
|
29 Sep 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Aug 2025
|
|
|
|
02 Dec 2025
|
|
47
|
Karnataka
|
FP/KA/ROAD/142140/2021
|
F.No.4-KRB1347/2022-BAN/
|
Dviersion of 0.06 Ha of forest land in sy no 14 of Benavalli, Village, Kerehalli Hobali, Hosanagara taluk Shivamogga dist, (Shivamogga forest division) for construction of low cost ROB and Birur-Talguppa section great seperator at Km 105/100-200 and Km 133/700-800 in favour of Assistant divisional engineer, Shivmaogga
|
Road
|
ASSISTANT DIVISIONAL ENGINEER SHIVAMOGGA
|
0.06
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 May 2021
|
|
Stage-I Approval on
|
:
|
24 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2025
|
|
|
|
02 Dec 2025
|
|
48
|
Rajasthan
|
FP/RJ/ROAD/149560/2021
|
8B/RAJ017/2023-JPR
|
“Construction of Widening ,Strengthening on SH-32A From Jhameshwarji to Jagat Road KM Stone No-67/0 to 80/0, Tehsil–Girwa, District -Udaipur (Rajasthan)”
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN
|
6.75
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Dec 2021
|
|
Stage-I Approval on
|
:
|
30 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jan 2025
|
|
|
|
01 Dec 2025
|
|
49
|
Kerala
|
FP/KL/ROAD/38879/2019
|
F.No.4-KLB1255/2020-BAN/
|
REHABILITATION & UPGRADATION of NH 85 from Km 119/017 to 161/300(Design chainage Km 119/017 to 160/800) Bodimettu to Munnar on EPC mode in the State of Kerala
|
Road
|
ASSISTANT EXECUTIVE ENGINEER NH SUBDIVISION
|
1.495
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Sep 2019
|
|
Stage-I Approval on
|
:
|
09 Apr 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Aug 2025
|
|
|
|
01 Dec 2025
|
|
50
|
Madhya Pradesh
|
FP/MP/ROAD/155399/2022
|
6-MPB031/2023-BHO
|
Construction of road from KM28 of T01 to Banjaritola under RCPLWEA scheme
|
Road
|
MPRRDA PIU-1 BALAGHAT
|
1.523
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 May 2022
|
|
Stage-I Approval on
|
:
|
22 Nov 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
30 Nov 2025
|
|