| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Karnataka
|
FP/KA/RAIL/142190/2021
|
F.No.4-KRC 1497/2024-BAN
|
Construction of the Rail Depot under Bengaluru Sub-urban Rail project (BSRP) in Sy No. 124 Akkupete Village of Kasaba Hobli Devanahalli Taluk, Bangaloe Rural District.
|
Railway
|
KRIDE (RAIL INFRASTRUCTURE DEVELOPMENT COMPANY (KARNATAKA) LTD.
|
18.6
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 May 2021
|
|
Stage-I Approval on
|
:
|
28 Oct 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 May 2026
|
|
|
|
23 May 2026
|
|
2
|
Goa
|
FP/GA/TRANS/146162/2021
|
F.No.4-GOB1380/2022-BAN
|
Netravali UG Cabling
|
Transmission Line
|
GOA ELECTRICITY DEPARTMENT
|
0.85632
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2021
|
|
Stage-I Approval on
|
:
|
10 Oct 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 Apr 2026
|
|
|
|
14 May 2026
|
|
3
|
Karnataka
|
FP/KA/ROAD/29278/2017
|
F.No.4-KRB1161/2018-BAN
|
For formation of approach road connecting existing road to our crusher in Chitradurga District in favour of Veeresh, Partner, M/s SHIVAPARAM CONSTRUCTIONS STONE CRUSHER, T. Yammiganuru Grama, Holalkere Taluk, Chitradurga District.
|
Road
|
SHIVAPARAM CONSTRACTION
|
0.692
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2017
|
|
Stage-I Approval on
|
:
|
18 Feb 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jan 2026
|
|
|
|
14 May 2026
|
|
4
|
Meghalaya
|
FP/ML/MIN/40422/2019
|
3-MGC017/2022-SHI
|
Madan Pyrda Chiehruphi Block -2 Limestone Mines
|
Mining
|
GREEN VALLIEY INDUTRIES LIMITED
|
11.09
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Oct 2019
|
|
Stage-I Approval on
|
:
|
01 Oct 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jun 2025
|
|
|
|
14 May 2026
|
|
5
|
Karnataka
|
FP/KA/IND/26447/2017
|
F.No.4-KRB 1346/2022-BAN
|
BALDOTA STEEL AND POWER LIMITED
|
Industry
|
AARESS IRON AND STEEL LIMITED
|
1.745
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jun 2017
|
|
Stage-I Approval on
|
:
|
21 Feb 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2025
|
|
|
|
13 May 2026
|
|
6
|
Uttarakhand
|
FP/UK/ROAD/15295/2015
|
8B/UCP/06/58/2017/FC
|
Soliya-Bajani-Majuliya motor road in District-Bageshwar (CM Ghosna-803/2014)
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
2.148
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Sep 2015
|
|
Stage-I Approval on
|
:
|
05 Aug 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2025
|
|
|
|
11 May 2026
|
|
7
|
Uttar Pradesh
|
FP/UP/ROAD/23560/2017
|
8B/UP/06/203/2023
|
Forest Land Proposed to be Diverted for Construction of Bridge and Approach over Kuano River on Border of District Balrampur & Shiddarthnagar at Chorghata Ghat from Ramghosi(Utraula-Sadullanagar) badhani Chafa Road
|
Road
|
CDPWDBALRAMPUR
|
0.552
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jan 2017
|
|
Stage-I Approval on
|
:
|
27 Jun 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Apr 2026
|
|
|
|
08 May 2026
|
|
8
|
Maharashtra
|
FP/MH/Pipeline/155612/2022
|
FC-I/MH-392/2024-NGP
|
Diversion of forest land for Uran Usar Pipeline Project
|
Pipeline
|
GAIL INDIA LTD
|
3.9443
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 May 2022
|
|
Stage-I Approval on
|
:
|
16 Jul 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Feb 2026
|
|
|
|
06 May 2026
|
|
9
|
Assam
|
FP/AS/TRANS/119559/2021
|
3-AS-C-096/2022/GHY
|
Diversion of Forest Land for 11 nos. of Tower Location (123 to 136A) against “Diversion work of 132KV S/C Haflong-Jiribam transmission line of POWERGRID in the section between tower location no. 104 to location no. 164 for facilitating the construction of NH-54 (E) under Borail Wildlife Sanctuary under Cachar Dist. of Assam State
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
9.23
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Jan 2021
|
|
Stage-I Approval on
|
:
|
09 Feb 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
16 Oct 2025
|
|
|
|
06 May 2026
|
|
10
|
Chhattisgarh
|
FP/CG/Others/152258/2022
|
FC-I/IROCH-15/2022
|
New District Court Buillding
|
Others
|
PWD B AND R DIVISION SURAJPUR
|
1.82
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Feb 2022
|
|
Stage-I Approval on
|
:
|
12 Oct 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Mar 2026
|
|
|
|
06 May 2026
|
|
11
|
Arunachal Pradesh
|
FP/AR/ROAD/153722/2022
|
3 ANC/268/2024/GHY
|
Proposal for diversion of 27.19 ha of forest land for construction of Tamen to Dollungmukh Road (Phase 1) 42.03 km to 72.03 km
|
Road
|
BAMANG RAJU
|
27.19
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2022
|
|
Stage-I Approval on
|
:
|
12 Mar 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Apr 2026
|
|
|
|
06 May 2026
|
|
12
|
Assam
|
FP/AS/MIN/146691/2021
|
3-AS-B-103/2022/GHY
|
Forest diversion proposal to drill 06 Development wells from DPDU cluster of area 2.75 ha in Kasomarigaon Addl PML
|
Mining
|
JORHAT ASSET ONGC
|
2.75
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Sep 2021
|
|
Stage-I Approval on
|
:
|
16 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Feb 2026
|
|
|
|
06 May 2026
|
|
13
|
Madhya Pradesh
|
FP/MP/IRRIG/139995/2021
|
6-MPA016/2021-BHO
|
ISP KALISINDH PHASE-II MICRO LIFT IRRIGATION PROJECT SCHEME (PIPELINE)
|
Irrigation
|
EE ND DIVISION NO TWENTY MANDLESHWAR
|
147.09
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Apr 2021
|
|
Stage-I Approval on
|
:
|
07 Feb 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Jul 2022
|
|
|
|
05 May 2026
|
|
14
|
Ladakh
|
FP/LA/ROAD/152696/2022
|
o 9-JKA-001/2024-Jammu
|
Construction of Re-Alignment Of Various Stretches Between Pandrass - Pashkyum (Net Length – 31.00 Kms) on Road Zozila – Kargil – Leh (NH-1) To NHDL Specifications Through EPC Mode Under Project Vijay
|
Road
|
HQ 762 BRTF C/O 56 APO
|
0.3625
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2022
|
|
Stage-I Approval on
|
:
|
04 Oct 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Apr 2026
|
|
|
|
30 Apr 2026
|
|
15
|
Himachal Pradesh
|
FP/HP/ROAD/70377/2020
|
FC/HPB/06/50/2021
|
Construction of Link Road from Kanol to Morch Road Km 0/0 to 9/140.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
4.5259
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Dec 2020
|
|
Stage-I Approval on
|
:
|
19 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
28 Feb 2026
|
|
|
|
30 Apr 2026
|
|
16
|
Himachal Pradesh
|
FP/HP/ROAD/51576/2020
|
FC/HPB/85/2023
|
C/O Link road from Garbage Collection Centre Totu Bye pass road to Village Matholi KM 0/0 to 1/00.
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
0.4635
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Oct 2020
|
|
Stage-I Approval on
|
:
|
19 Jan 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Mar 2026
|
|
|
|
30 Apr 2026
|
|
17
|
Bihar
|
FP/BR/Others/32677/2018
|
FP/BR/Others/32677/2018
|
The proposal for establishment of retail out-let dealership of M/S HPCL
|
Others
|
SIDHARTH SINGH
|
0.006
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2018
|
|
Stage-I Approval on
|
:
|
05 Mar 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Feb 2026
|
|
|
|
29 Apr 2026
|
|
18
|
Bihar
|
FP/BR/Approach/156110/2022
|
FP/BR/Approach/156110/2022
|
Diversion of 0.03975 ha of forest land for construction of approach road for opening retail outlet of HPCL on NH-19 Chhapra-Majhi Road in Saran district of Bihar.
|
Approach Access
|
RANA SINGH
|
0.03975
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jun 2022
|
|
Stage-I Approval on
|
:
|
13 Jul 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Dec 2025
|
|
|
|
29 Apr 2026
|
|
19
|
Jammu and Kashmir
|
FP/JK/ROAD/142163/2021
|
FST-Land0FC/91/2021-02
|
BRO PROJECT SAMPARK 31TF 110 RCC CONSTRUCTION OF MALAI BRIDGE(KM 55.05),KHURD(KM 53.45) BRIDGE ON RAM(REASI ARNAS MAHORE) ROAD
|
Road
|
BRO, 110 RCC
|
0.362
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2021
|
|
Stage-I Approval on
|
:
|
06 Oct 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Mar 2026
|
|
|
|
29 Apr 2026
|
|
20
|
Uttar Pradesh
|
FP/UP/ROAD/147420/2021
|
8B/UP/06/38/2022/FC
|
Proposed Protected Forest Land to be diverted for development of Road Widening four lan along old road Carriage Way from km 0.800 to 5.100 0f Bareilly Cantt Road in District - Bareilly (U.P.)
|
Road
|
CONSTRUCTION DIVISION BUILDING PWD BAREILLY
|
7.055
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Sep 2021
|
|
Stage-I Approval on
|
:
|
07 Nov 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Mar 2026
|
|
|
|
29 Apr 2026
|
|
21
|
Uttarakhand
|
FP/UK/ROAD/39655/2019
|
8B/UCP/06/86/2020/FC
|
Construction of approach road from Nawali from Km. 11 of Laxmikhan-Nathuwakhan-Pura-Qurab motor road to Losgayani in Ramgarh Block of District Nainital
|
Road
|
EE CD NAINITAL
|
0.936
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Apr 2019
|
|
Stage-I Approval on
|
:
|
27 Jan 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Feb 2026
|
|
|
|
23 Apr 2026
|
|
22
|
Himachal Pradesh
|
FP/HP/ROAD/143552/2021
|
FC/HPC/65/2023
|
C/O link road from Drawl to Jaishi Km 0/0 to 7/965
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
5.4794
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jul 2021
|
|
Stage-I Approval on
|
:
|
07 Aug 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
02 Apr 2026
|
|
|
|
23 Apr 2026
|
|
23
|
Uttar Pradesh
|
FP/UP/ROAD/144793/2021
|
8B/UP/06/295/2021/FC
|
Construction of 6 Lane 'Ganga Expressway' (Expandable upto 8 Lane), an access controlled Green field Expressway in district Meerut, Hapur, Bulandsahar, Amroha, Sambhal, Badaun, Shahjahanpur, Hardoi, Unnao, Raibareli, Partapgarh & Paryagraj, (CH 7+900-CH 601+847 Km) total length 593.947 Kms.
|
Road
|
UPEIDA (GANGA EXPRESSWAY)
|
121.4716
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Oct 2021
|
|
Stage-I Approval on
|
:
|
16 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Apr 2026
|
|
|
|
22 Apr 2026
|
|
24
|
Telangana
|
FP/TG/ROAD/40154/2019
|
4-TSC181/2021-HYD
|
Widening and Strengthening of NH-63 to Two Lane with paved shoulders in Mancherial District - 14.294 Ha
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
14.294
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 May 2019
|
|
Stage-I Approval on
|
:
|
07 Apr 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jan 2026
|
|
|
|
17 Apr 2026
|
|
25
|
Uttarakhand
|
FP/UK/ROAD/49632/2020
|
8B/UCP/06/57/2021/FC
|
Construction of Jaspur Silyan Nirakot Motor road
|
Road
|
PROVINCIAL DIVISION PWD BHATWARI
|
2.125
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Sep 2020
|
|
Stage-I Approval on
|
:
|
13 Jul 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Dec 2025
|
|
|
|
16 Apr 2026
|
|
26
|
Arunachal Pradesh
|
FP/AR/Others/122946/2021
|
3 ANC /257/2024/SHI
|
Proposal for diversion of 6.18Ha of forestland for Flood Protection Work near General ground at Up-Stream side of Decorai Irrigation Project at Seijosa in Pakke Kessang District, Arunachal Pradesh
|
Others
|
WATER RESOURCES DEPARTMENT, LEMMI
|
6.18
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Feb 2021
|
|
Stage-I Approval on
|
:
|
25 Jul 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jan 2026
|
|
|
|
15 Apr 2026
|
|
27
|
Jammu and Kashmir
|
FP/JK/ROAD/52321/2020
|
9-JKB-057/2021-Jammu
|
Construction of road from Dabatli to Choatra Lahar & Sathla to Sarthan under NABARD
|
Road
|
XEN PWD BASOHLI
|
3.0375
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Oct 2020
|
|
Stage-I Approval on
|
:
|
09 Feb 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Dec 2025
|
|
|
|
10 Apr 2026
|
|
28
|
Rajasthan
|
FP/RJ/TRANS/28622/2017
|
8B/Raj/04/11/2018/FC
|
Babai (RRPVNL) - Bhiwani (PG) 400kV D/C Transmission Line
|
Transmission Line
|
NRSS XXXVI TRANSMISSION LIMITED
|
13.015
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Aug 2017
|
|
Stage-I Approval on
|
:
|
06 Jul 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jan 2026
|
|
|
|
10 Apr 2026
|
|
29
|
Jammu and Kashmir
|
FP/JK/ROAD/148576/2021
|
9-JKA-062/2022-Jammu
|
Link Road from Shangroo to Nagni Gujjar Basti.
|
Road
|
PWD(R&B) DIVISION BHADERWAH
|
0.43
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Oct 2021
|
|
Stage-I Approval on
|
:
|
01 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jan 2026
|
|
|
|
10 Apr 2026
|
|
30
|
Jammu and Kashmir
|
FP/JK/ROAD/121506/2021
|
9-JKB-011/2022-Jammu
|
Construction of road from Bani to Billawar via Dhaggar, Dhaman & Deri Galla under CRF Phase 1st.
|
Road
|
XEN PWD BASOHLI
|
1.505
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Feb 2021
|
|
Stage-I Approval on
|
:
|
22 Jun 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Dec 2025
|
|
|
|
10 Apr 2026
|
|
31
|
Karnataka
|
FP/KA/ROAD/154088/2022
|
F.No.4-KRB1487/2024-BAN
|
Diversion of 0.02460 ha of forest land for connectivity road [for residential Layout purpose] falls in Sy No.81 of Bachaganv Village, Bachaganv Deemed Forest, Sirsi Hobli, & Taluk, U.K District, Sirsi
|
Road
|
VENKATARAMAN GOVIND BHAT, TUDUGUNI VILLAGE, SIRSI TALUK, KUMTA ROAD, UTTARA KANNADA DISTRICT
|
0.0246
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Apr 2022
|
|
Stage-I Approval on
|
:
|
21 Feb 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Feb 2026
|
|
|
|
10 Apr 2026
|
|
32
|
Uttarakhand
|
FP/UK/ROAD/42523/2019
|
8B/UCP/06/132/2020/FC
|
Construction of motor road from Matiyali to Prachin Mandir Kaliro through Km. 10 of Mauna-Lweshal- Kalapatal and Prathmik Pathshala in Ramgarh Block under Nainital district.
|
Road
|
EE CD NAINITAL
|
0.9
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Nov 2019
|
|
Stage-I Approval on
|
:
|
20 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Mar 2026
|
|
|
|
06 Apr 2026
|
|
33
|
Jammu and Kashmir
|
FP/JK/ROAD/149888/2021
|
9-JKC-004/2023- Jammu
|
Construction/Improvement from CL-09 to NHDL specifications of road Dayalchak-Ramkot (Challan) KM 8.00 to KM 25.421 (Net length 17.421 Km) in J&K (UT)
|
Road
|
69 RCC BORDER ROADS ORGANIZATION
|
12.0147
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Dec 2021
|
|
Stage-I Approval on
|
:
|
12 Jun 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
02 Mar 2026
|
|
|
|
01 Apr 2026
|
|
34
|
Jammu and Kashmir
|
FP/JK/ROAD/155310/2022
|
9-JKB-002/2023-Jammu
|
Construction of road from kha to kherian under PWD(R&B) Division Rajouri
|
Road
|
EXECUTIVE ENGINEER
|
2.28
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2022
|
|
Stage-I Approval on
|
:
|
10 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Feb 2026
|
|
|
|
01 Apr 2026
|
|
35
|
Jammu and Kashmir
|
FP/JK/ROAD/157064/2022
|
9-JKB-058/2022 -Jammu
|
Construction Of Road from Bawa To Mangit
|
Road
|
PWD R&B JAMMU
|
1.05
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jun 2022
|
|
Stage-I Approval on
|
:
|
09 Nov 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Mar 2023
|
|
|
|
01 Apr 2026
|
|
36
|
Karnataka
|
FP/KA/MIN/39765/2019
|
F.No.4-KRB1386/2022-BAN
|
Diversion of 0.8148 Ha (revised from 1.4406 ha) of forestland for Approach Road to and from Ubbalagundi Iron Ore Mine ML No. 008 in Ubbalagundi RF of Ballari Range, Ubbalagundi Village, Sandur Taluk, Ballari District
|
Mining
|
JSW Steel Limited
|
0.8148
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Apr 2019
|
|
Stage-I Approval on
|
:
|
16 Oct 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jan 2026
|
|
|
|
27 Mar 2026
|
|
37
|
Arunachal Pradesh
|
FP/AR/HYD/156579/2022
|
3-ANB/161/2023/GHY
|
Halaipani Hydro Electric Project (16 MW)
|
Hydel
|
HALAIPANI HYDRO PROJECT PRIVATE LIMITED
|
4.75
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jun 2022
|
|
Stage-I Approval on
|
:
|
14 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jan 2026
|
|
|
|
27 Mar 2026
|
|
38
|
Jammu and Kashmir
|
FP/JK/ROAD/146187/2021
|
9-JKB-092/2021-Jammu
|
Construction and Upgradation to 2 lane with paved Shoulder of road from design Chainage 31.449 (Khellani, Pariyot) to Km 51.700 (Prem Nagar) (Design length 20.251 Km.) in the Union territory of Jammu and Kashmir Package-1 of NH-24
|
Road
|
NHIDCL PMU DODA
|
3.2549356
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2021
|
|
Stage-I Approval on
|
:
|
10 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jun 2022
|
|
|
|
18 Mar 2026
|
|
39
|
Uttarakhand
|
FP/UK/ROAD/9552/2015
|
8B/UCP/06/61/2015-FC
|
Jwarnari Buksar Motor Road
|
Road
|
EXECUTIVE ENGINEER
|
4.8338
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2015
|
|
Stage-I Approval on
|
:
|
08 Oct 2015
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Feb 2026
|
|
|
|
17 Mar 2026
|
|
40
|
Assam
|
FP/AS/MIN/32798/2018
|
3-AS-B-138/2022/GHY
|
Proposed Development Drilling Wells and Testing of Hydrocarbons in Dipling Block-AA/ONDSF/DIPLING/2016 in Sivasagar (Charaideo) and Dibrugarh District,Assam
|
Mining
|
RAMAYANA ISPAT PVT LTD
|
3.06
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Apr 2018
|
|
Stage-I Approval on
|
:
|
11 Apr 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Feb 2025
|
|
|
|
16 Mar 2026
|
|
41
|
Karnataka
|
FP/KA/ROAD/44184/2020
|
F.No.4-KRB1357/2022-BAN/
|
Diversion of 0.1218 ha. Forest land for construction of access road from forest land Sy. No. 24 of Village Herajenahalli, Hobli: Chennarayanadurga, Taluk: Koratagere, Dist. Tumkuru. to approach Private land located at survey no. 28 of Village Herajenahalli, Hobli: Chennarayanadurga, Taluk: Koratagere, Dist. Tumakuru by Mr. Vikram K M
|
Road
|
SHRI VIKRAM K M
|
0.1218
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Feb 2020
|
|
Stage-I Approval on
|
:
|
23 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Mar 2025
|
|
|
|
16 Mar 2026
|
|
42
|
Kerala
|
FP/KL/TRANS/50187/2020
|
F.No.4-KLC1436/2023-BAN
|
UPGRADATION OF 9.93 KM EXISTING 66 KV ATTINGAL - PALODE SC FEEDER TO 110 KV DOUBLE CIRCUIT FROM MITHIRMALA TO PALODE
|
Transmission Line
|
TC SECTION, NEDUMANGAD
|
7.414
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Nov 2020
|
|
Stage-I Approval on
|
:
|
11 Jul 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2025
|
|
|
|
16 Mar 2026
|
|
43
|
Andhra Pradesh
|
FP/AP/QRY/37853/2018
|
4-APB095/2019-CHNpart
|
Dara Apparao Quarry Lease
|
Quarrying
|
DARA APPARAO
|
4.49
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Dec 2018
|
|
Stage-I Approval on
|
:
|
13 Dec 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 May 2025
|
|
|
|
16 Mar 2026
|
|
44
|
Himachal Pradesh
|
FP/HP/TRANS/151522/2022
|
FC/HPB/114/2023
|
Construction of 66kV S/C transmission line from Proposed 220/66kV S/Stn. Nadukhar to Shakrori, Shimla (H.P
|
Transmission Line
|
HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD
|
1.6681
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jun 2022
|
|
Stage-I Approval on
|
:
|
25 Mar 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jan 2026
|
|
|
|
13 Mar 2026
|
|
45
|
Punjab
|
FP/PB/Approach/39290/2019
|
9-PBB414-2017-CHA
|
Plot of Lalita Gupta at Village Katana, Tehsil Payal, DIstt Ludhiana.
|
Approach Access
|
PLOT FARM HOUSE OF LALITA GUPTA AT VILLAGE KATANA
|
0.0192
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Mar 2019
|
|
Stage-I Approval on
|
:
|
25 Oct 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Oct 2025
|
|
|
|
13 Mar 2026
|
|
46
|
Punjab
|
FP/PB/ROAD/42364/2019
|
9-PBB460-2021-CHA
|
Construction of Chandigarh Barrier, Jainti Majri, Gura, Kasouli Karondewala up to Haryana Border link road
|
Road
|
EXECUTIVE ENGINEER CENTRAL WORKS DIVISION PWD
|
1.23
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Oct 2019
|
|
Stage-I Approval on
|
:
|
23 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Feb 2026
|
|
|
|
10 Mar 2026
|
|
47
|
Orissa
|
FP/OR/ROAD/141543/2021
|
5-ORB586/2023-BHU
|
Improvement (RCPLWE Phase-II Scheme) to Narigaon-Gillaguntha-Betabadi Road from Ch.0/00 KM to 5/087 Km in the District of Koraput.
|
Road
|
EXECUTIVE ENGINEER
|
3.003
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Apr 2021
|
|
Stage-I Approval on
|
:
|
31 Jul 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jan 2026
|
|
|
|
10 Mar 2026
|
|
48
|
Karnataka
|
FP/KA/Others/29220/2017
|
F.No.4-KRB1274/2021-BAN
|
Construction Of Ambhedkar Bhavan
|
Others
|
ASSISTANT DIRECTOR DEPT OF SOCIAL WELFARE PANDAVAPURA
|
0.0909
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Sep 2017
|
|
Stage-I Approval on
|
:
|
14 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Jul 2025
|
|
|
|
06 Mar 2026
|
|
49
|
Karnataka
|
FP/KA/WATER/39356/2019
|
F.No.4-KRB1309/2021-BAN
|
Construction of Jack well, Panel Room with allied components and laying of Pipe lines in Chliandavadi State Forest, Muguru State Forest, Bilikal State Forest for Providing Drinking Water supply for Kodihalli & 298 Habitations under DBOT in Kanakapura Taluka Ramanagara District”
|
Drinking Water
|
EXECUTIVE ENGINEER RDWSD RAMNAGARA
|
3.61
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Mar 2019
|
|
Stage-I Approval on
|
:
|
25 Sep 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Feb 2026
|
|
|
|
06 Mar 2026
|
|
50
|
Kerala
|
FP/KL/ROAD/148616/2021
|
4-KLC1368/2022-BAN
|
Construction of Twin Tunnel (2+2 lane) with Four Lane Approaches (from existing roads) for providing direct connectivity between Aanakampoyil Kalladi-Meppadi in Kozhikode and Wayanad Districts of Ker
|
Road
|
EXECUTIVE ENGINEER KERALA PUBLIC WORKS DEPARTMENT ROADS DIVISION, KOZHIKODE
|
17.263
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Oct 2021
|
|
Stage-I Approval on
|
:
|
31 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Feb 2025
|
|
|
|
24 Feb 2026
|
|