Ministry of Environment,Forest and Climate Change
Government of India
Online Submission & Monitoring
of Forests and Wildlife Clearance Proposals
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Himachal Pradesh FP/HP/Others/14774/2015 8B/HPB/09/17/2016/FC C/o Construction of Sub Market Yard Antrawali(Nerwa) Others AGRICULTURAL PRODUCE MARKET COMMITTEE SHIMLA AND KINNAUR DHALLI SHIMLA 4.0265 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Sep 2015
Stage-I Approval on : 16 Jan 2017
Compliance Report Submitted by User Agency on : 21 Mar 2017
20 Jun 2017
2 Punjab FP/PB/Others/19618/2016 9-PBB409-2016-CHA TOLL PALZA ON PATIALA-SANGRUR-BARNALA-BATHINDA ROAD AT VILL BADBAR KM132-133ON NH 64(NEW NH 7) Others PWD 0.2878 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 May 2016
Stage-I Approval on : 09 Mar 2017
Compliance Report Submitted by User Agency on : 07 Jun 2017
19 Jun 2017
3 Haryana FP/HR/RAIL/23676/2017 9-HRB060-2017-CHA Merging of level crossing no. 153 & 154 in level crossing no 154 on RE-BTI Section under ADEN/N.W.Railway/Sirsa Railway NORTH WESTERN RAILWAY 0.511 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jan 2017
Stage-I Approval on : 18 Apr 2017
Compliance Report Submitted by User Agency on : 17 May 2017
19 Jun 2017
4 Punjab FP/PB/Others/20190/2016 9-pbb456-2016-cha Diversion of 0.00333 Ha. of Forest land for access to proposed Retail Outlet of Essar Oil Ltd. Situated at Village Amargarh and Nahianwala, From RD KM 278.613 to 278.648 RHS, on NH - 15 (New NH - 54), on Amritsar to Bathinda Road, Tehsil & Distt. Bathinda. Others ESSAR OIL LIMITED MOHALI 0.00333 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Jun 2016
Stage-I Approval on : 20 Dec 2016
Compliance Report Submitted by User Agency on : 11 Mar 2017
16 Jun 2017
5 Haryana FP/HR/ROAD/19853/2016 9-HRB159-2016-CHA Widening of Road (Ladwa Mustafabad Road, KM. 0 to 1.20), District Kurukshetra (Haryana). Road PWD PROVINCIAL DIV NO II 0.54 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Jun 2016
Stage-I Approval on : 30 Mar 2017
Compliance Report Submitted by User Agency on : 03 May 2017
15 Jun 2017
6 Punjab FP/PB/ROAD/22335/2016 9-PBC371-2017-CHA THE PROJECT ROAD VIZ ROPAR - NAWASHAHR- BANGA- PHAGWARA SECTION OF NH 344 1 STARTS FROM KM 17.865 OF SH 8, JUNCTION OF PROJECT ROAD WITH NH 1 AND AFTER TRAVERSING A LENGTH OF 80.820 KM , ENDS NEAR START OF ROOPNAGAR BYPASS I.E. KM 6/600 OF SH 24 Road National Highways Authority of India 109.9021 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Nov 2016
Stage-I Approval on : 24 May 2017
Compliance Report Submitted by User Agency on : 05 Jun 2017
13 Jun 2017
7 Punjab FP/PB/Others/22164/2016 9-PBB347-2017-CHA Diversion of 0.134 ha. forest land for construction of a L.P.G. GODOWN at Talwara to Khatiar road L/ side at closed under section 4 of PLPA 1900 , Tehsil Mukerian, District Hoshiarpur. Others NEHA SHARMA 0.134 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Nov 2016
Stage-I Approval on : 31 May 2017
Compliance Report Submitted by User Agency on : 05 Jun 2017
09 Jun 2017
8 Haryana FP/HR/ROAD/24840/2017 9-HRB074-2017-CHA Government Road PWD GURGAON 4.59 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Mar 2017
Stage-I Approval on : 24 Apr 2017
Compliance Report Submitted by User Agency on : 12 May 2017
05 Jun 2017
9 Himachal Pradesh FP/HP/WATER/11485/2015 8B/HPB/09/13/2016 The scheme is for lifting the water from Ulh river to supply drinking water to the peoples of Mandi town. Drinking Water IRRIGATION AND PUBLIC HEALTH GOVT OF HP 6.31 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Apr 2015
Stage-I Approval on : 23 Mar 2017
Compliance Report Submitted by User Agency on : 12 May 2017
05 Jun 2017
10 Haryana FP/HR/Others/20572/2016 9-HRB201-2016-CHA Diversion of 0.53 ha. of Forest Land for laying of R.C.C. Pipeline from Narwana Branch RD 290000/L to Braham Sarover and Sannehit Sarover in Distt. Kurukshetra Others WATER SERVICES SUB DIVISION 0.53 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Jul 2016
Stage-I Approval on : 30 Mar 2017
Compliance Report Submitted by User Agency on : 04 May 2017
01 Jun 2017
11 Himachal Pradesh FP/HP/Others/17318/2015 8B/HPB/09/41/2016 The proposal involves construction of Ropeway from Dharamshala to Mcleodganj in Tehsil Dharamshala, District Kangra, Himachal Pradesh. The proposal requires total land of 2.2438 Hactare, comprising of 0.3528 Hactare Private Land, 0.1953 Hactare of Non Forest Land and 1.6958 Hactare of Forest Land fo Others DHARAMSHALA ROPEWAY LIMITED 1.6958 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Dec 2015
Stage-I Approval on : 23 Sep 2016
Compliance Report Submitted by User Agency on : 28 Mar 2017
01 Jun 2017
12 Himachal Pradesh FP/HP/Others/9794/2015 8B/HPB/09/61/2015/307 Proposal for the construction of Police Post building at Jalog District Shimla HP involving forest area 0.109 ha in U-13 Ogli suma Charagah Dharkhan. Establishing of this project will give protection to the locals. Others POLICE 0.109 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2015
Stage-I Approval on : 12 May 2016
Compliance Report Submitted by User Agency on : 21 Jan 2017
31 May 2017
13 Haryana FP/HR/Others/22099/2016 9-HRB032-2017-CHA FOR M/S UTSAV HP GAS SERVICE ON NAULTHA URLANA ROAD UP TO SH-11, BETWEEN 2-3 KM STONE (RIGHT HAND SIDE), AT VILLAGE NAULTHA, TEHSIL ISRANA, DISTT. PANIPAT, (HARYANA). Others UTSAV HP GAS SERVICE 0.0014 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Oct 2016
Stage-I Approval on : 15 May 2017
Compliance Report Submitted by User Agency on : 18 May 2017
31 May 2017
14 Haryana FP/HR/Others/20532/2016 9-HRB192-2016-CHA Requirement of Forest Land for Beautification of Road from Gurudwara 6th Pathsahhi to ROB (Sharma Type College via Parshuram Chowk - Railway Road (I.D. 8035) in Distt. Kurukshetra. Others SATYA PAL SIROHA 1.716 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Jul 2016
Stage-I Approval on : 30 Mar 2017
Compliance Report Submitted by User Agency on : 04 May 2017
31 May 2017
15 Himachal Pradesh FP/HP/Others/22083/2016 8B/HPB/09/12/2017 DAV College Banikhet has been proposed to provided better education facility in the surrounding area. The location of DAV College Additional building is always to be selected at nearby existing college so that a noise free environment may be created. The area to be involved for the additional constr Others B.T.C.D.A.V COLLEGE BANIKHET DALHOUSIE DISTT.CHAMBA 0.4085 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Nov 2016
Stage-I Approval on : 07 Mar 2017
Compliance Report Submitted by User Agency on : 20 Apr 2017
31 May 2017
16 Haryana FP/HR/ROAD/19777/2016 9-HRB173-2016-CHA Diversion of 1.70 Hectare forest land for widening of NH-73 to SH-01 via Sadiqpur Harbon Road Road PWD B AND R HARYANA 1.7 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2016
Stage-I Approval on : 10 Mar 2017
Compliance Report Submitted by User Agency on : 18 Apr 2017
31 May 2017
17 Punjab FP/PB/Others/21430/2016 9-PBB476-2016-CHA Permission for passage to M/S Dashmesh Luxury wedding resorts Vill: Bagrian Tehsil & Distt: Fatehgarh sahib Others DASHMESH LUXURY WEDDING RESORTS VILL BAGRIAN 0.1378 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Sep 2016
Stage-I Approval on : 24 Mar 2017
Compliance Report Submitted by User Agency on : 12 May 2017
24 May 2017
18 Haryana FP/HR/ROAD/21700/2016 9-HRB021-2017-CHA Diversion of 1.233 ha of forest land for improvement of link road B&R village Barwala Tehsil and Distt. Panchkula Haryana Road HARYANA ROADWAYS 1.233 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Oct 2016
Stage-I Approval on : 30 Mar 2017
Compliance Report Submitted by User Agency on : 19 Apr 2017
24 May 2017
19 Haryana FP/HR/ROAD/17467/2016 9-HRB095-2016-CHA Widening & Strengthening of Kapal Mochan Danaura road in Yamuna Nagar Distt. ID.751 Road PWD B AND R HARYANA 4.95 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Jan 2016
Stage-I Approval on : 03 Mar 2017
Compliance Report Submitted by User Agency on : 17 Apr 2017
24 May 2017
20 Punjab FP/PB/TRANS/19647/2016 9-PBB417-2016-CHA LILO of 220KV Patran – Rajla Line and 220 KV Patran – Kakrala Line at 400 KV S/S PGCIL Patran Transmission Line PSTCL TLSC 0.091 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 May 2016
Stage-I Approval on : 28 Apr 2017
Compliance Report Submitted by User Agency on : 12 May 2017
24 May 2017
21 Punjab FP/PB/ROAD/17663/2016 9-PBB371-2016-CHA Diversion of 4.80 Ha of Forest Land for Widening and Strengthening two lane to Four Lane with Paved side Shoulders of Amritsar - Taran taran to Harike Section of NH -15 from KM 112.575 to 158.500 in Punjab State. Under NHDP 4. Road CENTRAL WORK DIVISION 4.8 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Jan 2016
Stage-I Approval on : 13 Dec 2016
Compliance Report Submitted by User Agency on : 11 Apr 2017
24 May 2017
22 Punjab FP/PB/ROAD/18634/2016 9-PBC405-2016-CHA permission for road widening of NH-64 Zirakpura patiala Section Km 0-50 b/s under forest division Pataial & SAS nagar Road CENTRAL WORKS DIVISION PB PWD BRANCH PATIALA 9.5876 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Mar 2016
Stage-I Approval on : 02 Nov 2016
Compliance Report Submitted by User Agency on : 22 Feb 2017
18 May 2017
23 Punjab FP/PB/Others/15525/2015 9-PBB423-2016-CHA There is 0.00422 Ha. Forest Land Proposed for approach road to resort & There is no trees effected in this case. Others TAJ RESORT UDYOG SAMITI 0.00422 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Sep 2015
Stage-I Approval on : 30 Sep 2016
Compliance Report Submitted by User Agency on : 06 Feb 2017
18 May 2017
24 Himachal Pradesh FP/HP/Others/20393/2016 8B/HPB/09/58/2016 Mahaseer Hatechery-cum-carp Breeding unit Vill. Nagar, Teh. Suni Distt. Shimla H.P Others FISHERIES DIVISON SHIMLA 0.766 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Jul 2016
Stage-I Approval on : 08 Feb 2017
Compliance Report Submitted by User Agency on : 17 Apr 2017
05 May 2017
25 Himachal Pradesh FP/HP/Others/23209/2016 8B/HP/09/10/2017 The proposal involves construction of Bus Stand in Baba Baroh in district Kangra. The proposal requires 0.4608 hectare of forest land for construction of different components viz., Bus Parking, Building for Office Complex including Office Rest Room, Booking Counters, Toilets Block, etc. Due to the i Others HP BUS STANDS MANAGEMENT AND DEVELOPMENT AUTHORITY 0.4608 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Dec 2016
Stage-I Approval on : 10 Mar 2017
Compliance Report Submitted by User Agency on : 28 Mar 2017
05 May 2017
26 Rajasthan FP/RJ/ROAD/18837/2016 8B/RJ/06/06/2016 Diversion of 0.1513hectare forest land for construction of approach road for a proposed retail outlet of Essar Oil Limited along the SH-21A(BHERUNDA-DODIYANA ROAD), village Bherunda , khasra no. 1560/584/1, Tehsil Degana, Distt. Nagaur, (Rajasthan)L.H.S Between k.m. stone 52 & 53 ( CH. 52.791-52.826 Road Essar Oil Limited 0.1513 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Apr 2016
Stage-I Approval on : 17 Feb 2017
Compliance Report Submitted by User Agency on : 22 Mar 2017
02 May 2017
27 Haryana FP/HR/Others/23718/2017 9-HRB042-2017-CHA Diversion of 0.003896 Hect. of Forest Land for passage for path for construction of godown for storage of gas cylinders at Vill. Haibatpur, Tehsil Bilaspur, Distt. Yamuna Nagar Others MAA BHAWANI 0.003896 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Jan 2017
Stage-I Approval on : 21 Apr 2017
Compliance Report Submitted by User Agency on : 25 Apr 2017
28 Apr 2017
28 Uttarakhand FP/UK/RAIL/14375/2015 8B/UCP/07/196/2015-FC The diversion of Forest land proposal in favour of Indian Railways for the entire project is being submitted in two parts. In Part-I, from Km 0 to Km 6 falling in Dehradun F.D. and in Part-II from Km 6 to Km 126 falling in various other F.D. Railway RAIL VIKAS NIGAM LIMITED 63.422 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Aug 2015
Stage-I Approval on : 10 Oct 2016
Compliance Report Submitted by User Agency on : 12 Jan 2017
27 Apr 2017
29 Himachal Pradesh FP/HP/QRY/10914/2015 8B/HPB/08/47/2015/108 diversion of 0-99-12 ha. of forest land for establishment of stone crusher and quiry at khasra No. muhal Pashada out of this area 0.4550 ha. was already diverted in favour of the user agency. Now the area enhanced upto 0.9912 ha. as per the requirement of local public and mining plan. Quarrying SATYA SURYA SHIV SHAKTI STONE CRUSHER 0.9912 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Mar 2015
Stage-I Approval on : 19 Apr 2016
Compliance Report Submitted by User Agency on : 29 Apr 2016
27 Apr 2017
30 Himachal Pradesh FP/HP/Others/13575/2015 8B/HPB/09/67/2015 Final construction of New Model Degree College LyhlKothi District CHAMBA (H.P.)30/08/2015 Others DIRECTOR OF HIGHER EDUCATION 1.2 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jun 2015
Stage-I Approval on : 15 Feb 2016
Compliance Report Submitted by User Agency on : 09 Mar 2017
12 Apr 2017
31 Uttarakhand FP/UK/Others/15401/2015 8B/UCP/09/57/2016/FC/937 Land required for development of tourist infrastructure ie 3 view points/rest Shelters from existing Tanki China to Cheena Peak pathway for local community & tourist facility. Others UTTARAKHAND TOURISM DEVELOPMENT BOARD 0.0075 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Sep 2015
Stage-I Approval on : 09 Sep 2016
Compliance Report Submitted by User Agency on : 18 Jan 2017
12 Apr 2017
32 Himachal Pradesh FP/HP/HYD/13551/2015 8B/HPB/01/02/2016 Rana SHEP(1.2MW)is run of the river scheme envisaged to utilize water of Bajgar (Rana ) khad Jangle kuhal for power generation.The scheme involves the construction of diversion weir at Bajgar Khad at EL 955m.Water conductor system comprising of both covered water channel and pipe to be taken to desi Hydel MANAK POWER SYSTEMS 1.0446 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Jul 2015
Stage-I Approval on : 20 Jan 2017
Compliance Report Submitted by User Agency on : 20 Mar 2017
12 Apr 2017
33 Uttarakhand FP/UK/ROAD/7876/2014 8B/UCP/06/254/2015/FC Rehabilitation & Upgradation of existing 2-lane of Haridwar- Nagina section of NH-74 from KM0.000 KM 30.000 into 4-lane with paved shoulders in Haridwar District of Uttarakhand State Road NATIONAL HIGHWAY AUTHORTY OF INDIA PIU DEHRADUN 64.748 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Nov 2014
Stage-I Approval on : 03 Oct 2016
Compliance Report Submitted by User Agency on : 05 Jan 2017
07 Apr 2017
34 Himachal Pradesh FP/HP/ROAD/11990/2015 8B/HPB/06/44/2016 This road has been declared as NH-305 by the Govt.of India vide Gazette Notification dated 22.2.2012 and 7.3.2012 as intimated by the Special Secretary (PW)to the Govt. of Himachal Pradesh vide Notification No. PBW B&R) (B) 3 (5) 3/2004- L dated 26 th April 2012. This road bifurcates from Sainj at R Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 3.856 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Jul 2015
Stage-I Approval on : 19 Oct 2016
Compliance Report Submitted by User Agency on : 16 Feb 2017
03 Apr 2017
35 Punjab FP/PB/Others/19491/2016 9-PBB421-2016-CHA Diversion of 0.0416 Ha. of Forest Land for Access road to the Proposed retail outlet of Essar Oil Limited Situated at Village Chalheri on Ambala - rajpura road, Between KM Stone No 221 - 222 LHS, Tehsil Rajpura Distt, Patiala. Others ESSAR OIL LIMITED MOHALI 0.0416 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 May 2016
Stage-I Approval on : 17 Nov 2016
Compliance Report Submitted by User Agency on : 15 Jan 2017
30 Mar 2017
36 Punjab FP/PB/Others/19670/2016 9-PBB470-2016-CHA Diversion of 0.0125 Ha. of Forest land for Access to the Proposed Retail Outlet of Essar Oil Ltd. at Village Batala Garbi, Umarpura on Jalandhar - Batala Road, Tehsil Batala, Distt. Gurdaspur. Under Forest Division Gurdaspur. Others ESSAR OIL LIMITED MOHALI 0.0125 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 May 2016
Stage-I Approval on : 28 Dec 2016
Compliance Report Submitted by User Agency on : 18 Mar 2017
30 Mar 2017
37 Uttarakhand FP/UK/ROAD/13608/2015 8B/UCP/06/220/2015/908 Construction of Mulakot Kande Bhueya Motor Road in district Champawat Road PUBLIC WORKS DEPARTMENT 3.15 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jul 2015
Stage-I Approval on : 05 Sep 2016
Compliance Report Submitted by User Agency on : 10 Mar 2017
29 Mar 2017
38 Punjab FP/PB/TRANS/17210/2015 9-PBB389-2016-CHA 220KV line from 220 KV Focal Point Nabha to 220 KV Bhawanigarh SC on DC Towers Transmission Line PSTCL TLSC 0.1575 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Dec 2015
Stage-I Approval on : 07 Sep 2016
Compliance Report Submitted by User Agency on : 30 Sep 2016
27 Mar 2017
39 Punjab FP/PB/Others/18157/2016 9-PBB364-2016-CHA Diversion of 0.0037 ha of forest land for approach road to Century Plyboards India Ltd. at village Daulowal (Hoshiarpur) Others CENTURY PLYBOARDS IND LTD 0.0037 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Feb 2016
Stage-I Approval on : 19 Aug 2016
Compliance Report Submitted by User Agency on : 22 Feb 2017
27 Mar 2017
40 Punjab FP/PB/Others/19410/2016 9-PBB424-2016-CHA Permission for Passage to Retail Outlet By Essar Oil Ltd on GT road NH-1 Km 231-232 R/S Tehsil: Rajpura, Distt: Patiala Others ESSAR OIL LTD RAJPURA 0.0286 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 May 2016
Stage-I Approval on : 29 Dec 2016
Compliance Report Submitted by User Agency on : 23 Feb 2017
27 Mar 2017
41 Punjab FP/PB/Others/19830/2016 9-PBB449-2016-CHA Diversion of 0.0142 hec. of forest area for approach road to Proposed retail outlet Essar Oil Ltd at village Sardulgarh Existing SH-13 (NEW NH-703) CH. 227.222 To 227.248(LHS) on Mansa-Sirsa Road ,Tehsil Sardulgarh Distt Mansa ( Punjab Others ESSAR OIL LTD 0.0142 APPROVED
Proposal received(at Nodal Officer)electronically on : 02 Jun 2016
Stage-I Approval on : 06 Jan 2017
Compliance Report Submitted by User Agency on : 07 Feb 2017
27 Mar 2017
42 Himachal Pradesh FP/HP/ROAD/9663/2015 8B/HPB/06/76/2015 This road is being constructed to provide the motor link to villages Kuni & Shahdhar. The road will cater the needs of population of about 600 and will give a boost to the local economy. Road HIMACHAL PRADESH PUBLIC WORK DEPARTMENT 2.3809 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Jan 2015
Stage-I Approval on : 17 Nov 2016
Compliance Report Submitted by User Agency on : 18 Jan 2017
27 Mar 2017
43 Punjab FP/PB/Others/18076/2016 9-PBB438-2016-CHA Laying of 12" dia natural gas pipeline to set up city gas distribution in Amritsar City, Punjab State Others GUJARAT STATE PETRONET LIMITED 0.6329 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Feb 2016
Stage-I Approval on : 17 Oct 2016
Compliance Report Submitted by User Agency on : 11 Feb 2017
24 Mar 2017
44 Punjab FP/PB/ROAD/22117/2016 9-PBC463-2016-CHA DIVERSION OF 9.28 HA OF FOREST LAND FOR CONSTRUCTION OF ROAD WIDENING FROM AMRITSAR-CHOWGAWAN RANIAN ROAD RD KM 0.00 TO 14.00 KM TO BOTH SIDE, TEHSIL AMRITSAR & AJNALA, DISTRICT & DIVISION AMRITSAR. Road PWD 9.28 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Nov 2016
Stage-I Approval on : 28 Dec 2016
Compliance Report Submitted by User Agency on : 06 Feb 2017
24 Mar 2017
45 Haryana FP/HR/ROAD/17470/2016 9-HRC127-2016-CHA Diversion of 5.846 ha of forest land for construction of 4 lane by wdg. on Dhan Pundri Rajound Alewa road (MDR-118) km. 11.45 to 15.40 n Pundri Town in Kaithal Distt (ID 10151) (C.M. Announcement No. 10317 & 10320) Road EXECUTIVE ENGINEER 5.846 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Jan 2016
Stage-I Approval on : 30 Dec 2016
Compliance Report Submitted by User Agency on : 03 Mar 2017
22 Mar 2017
46 Himachal Pradesh FP/HP/Others/18885/2016 8B/HPB/09/22/2016 Daughter Booster Station for supply of CNG to the vehicles as per direction of the Hon'ble National Green Tribunal Others DIRECTORATE OF TRANSPORT OF HP 0.7783 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Apr 2016
Stage-I Approval on : 05 Jul 2016
Compliance Report Submitted by User Agency on : 04 Feb 2017
22 Mar 2017
47 Haryana FP/HR/Others/17607/2016 9-HRB064-2016-CHA Green Park Bar & Restaurant main Gurgaon - Pataudi road, Village-Jori Sanpaka, Gurgaon-122503 Others GREEN PARK BAR AND RESTAURANT 0.005 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Jan 2016
Stage-I Approval on : 30 Aug 2016
Compliance Report Submitted by User Agency on : 05 Jan 2017
10 Mar 2017
48 Punjab FP/PB/Others/11331/2015 9-PBB363-2016-CHA Diversion of 0.0096 ha of forest land in favour of Bathinda Indane Bottling Plant, IOCL (M.D.), Bathinda for approach way to said indane bottling plant on Phoosmandi-Talwandi Road towards Jassi Chowk to Left Hand side at Village Phoosmandi Falling under forest division and distt. Bathinda, Punjab Others INDIAN OIL CORPORATION LIMITED 0.0096 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Mar 2015
Stage-I Approval on : 17 Oct 2016
Compliance Report Submitted by User Agency on : 18 Jan 2017
10 Mar 2017
49 Haryana FP/HR/Others/20420/2016 9-HRB170-2016-CHA Diversion of forest land 0.0072 Hac. for access to the Proposed Petrol Pump of Essar Oil Ltd. Along at KM Stone No 13 (LHS) Chainage 13.529 at Khasra No. 33//20/2/2, Village-Berli Kalan, Tehsil & District - Rewari (Haryana) Others Essar Oil Limited 0.0072 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Jul 2016
Stage-I Approval on : 30 Dec 2016
Compliance Report Submitted by User Agency on : 13 Feb 2017
10 Mar 2017
50 Haryana FP/HR/ROAD/20363/2016 9-HRB160-2016-CHA Diversion of 0.2764 Ha of forest land for const. of ROB on Bhattu ludesar road between km 1.00 to 2.00 under forest division and Distt. Fatehabad Road PWD 0.2764 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Jul 2016
Stage-I Approval on : 14 Dec 2016
Compliance Report Submitted by User Agency on : 17 Jan 2017
10 Mar 2017
123456