| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Jammu and Kashmir
|
FP/JK/ROAD/146187/2021
|
9-JKB-092/2021-Jammu
|
Construction and Upgradation to 2 lane with paved Shoulder of road from design Chainage 31.449 (Khellani, Pariyot) to Km 51.700 (Prem Nagar) (Design length 20.251 Km.) in the Union territory of Jammu and Kashmir Package-1 of NH-24
|
Road
|
NHIDCL PMU DODA
|
3.2549356
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2021
|
|
Stage-I Approval on
|
:
|
10 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jun 2022
|
|
|
|
18 Mar 2026
|
|
2
|
Uttarakhand
|
FP/UK/ROAD/9552/2015
|
8B/UCP/06/61/2015-FC
|
Jwarnari Buksar Motor Road
|
Road
|
EXECUTIVE ENGINEER
|
4.8338
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jan 2015
|
|
Stage-I Approval on
|
:
|
08 Oct 2015
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Feb 2026
|
|
|
|
17 Mar 2026
|
|
3
|
Assam
|
FP/AS/MIN/32798/2018
|
3-AS-B-138/2022/GHY
|
Proposed Development Drilling Wells and Testing of Hydrocarbons in Dipling Block-AA/ONDSF/DIPLING/2016 in Sivasagar (Charaideo) and Dibrugarh District,Assam
|
Mining
|
RAMAYANA ISPAT PVT LTD
|
3.06
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Apr 2018
|
|
Stage-I Approval on
|
:
|
11 Apr 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Feb 2025
|
|
|
|
16 Mar 2026
|
|
4
|
Kerala
|
FP/KL/TRANS/50187/2020
|
F.No.4-KLC1436/2023-BAN
|
UPGRADATION OF 9.93 KM EXISTING 66 KV ATTINGAL - PALODE SC FEEDER TO 110 KV DOUBLE CIRCUIT FROM MITHIRMALA TO PALODE
|
Transmission Line
|
TC SECTION, NEDUMANGAD
|
7.414
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Nov 2020
|
|
Stage-I Approval on
|
:
|
11 Jul 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jul 2025
|
|
|
|
16 Mar 2026
|
|
5
|
Karnataka
|
FP/KA/ROAD/44184/2020
|
F.No.4-KRB1357/2022-BAN/
|
Diversion of 0.1218 ha. Forest land for construction of access road from forest land Sy. No. 24 of Village Herajenahalli, Hobli: Chennarayanadurga, Taluk: Koratagere, Dist. Tumkuru. to approach Private land located at survey no. 28 of Village Herajenahalli, Hobli: Chennarayanadurga, Taluk: Koratagere, Dist. Tumakuru by Mr. Vikram K M
|
Road
|
SHRI VIKRAM K M
|
0.1218
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Feb 2020
|
|
Stage-I Approval on
|
:
|
23 Jun 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Mar 2025
|
|
|
|
16 Mar 2026
|
|
6
|
Andhra Pradesh
|
FP/AP/QRY/37853/2018
|
4-APB095/2019-CHNpart
|
Dara Apparao Quarry Lease
|
Quarrying
|
DARA APPARAO
|
4.49
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Dec 2018
|
|
Stage-I Approval on
|
:
|
13 Dec 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 May 2025
|
|
|
|
16 Mar 2026
|
|
7
|
Himachal Pradesh
|
FP/HP/TRANS/151522/2022
|
FC/HPB/114/2023
|
Construction of 66kV S/C transmission line from Proposed 220/66kV S/Stn. Nadukhar to Shakrori, Shimla (H.P
|
Transmission Line
|
HIMACHAL PRADESH STATE ELECTRICITY BOARD LTD
|
1.6681
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jun 2022
|
|
Stage-I Approval on
|
:
|
25 Mar 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jan 2026
|
|
|
|
13 Mar 2026
|
|
8
|
Punjab
|
FP/PB/Approach/39290/2019
|
9-PBB414-2017-CHA
|
Plot of Lalita Gupta at Village Katana, Tehsil Payal, DIstt Ludhiana.
|
Approach Access
|
PLOT FARM HOUSE OF LALITA GUPTA AT VILLAGE KATANA
|
0.0192
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Mar 2019
|
|
Stage-I Approval on
|
:
|
25 Oct 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Oct 2025
|
|
|
|
13 Mar 2026
|
|
9
|
Punjab
|
FP/PB/ROAD/42364/2019
|
9-PBB460-2021-CHA
|
Construction of Chandigarh Barrier, Jainti Majri, Gura, Kasouli Karondewala up to Haryana Border link road
|
Road
|
EXECUTIVE ENGINEER CENTRAL WORKS DIVISION PWD
|
1.23
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Oct 2019
|
|
Stage-I Approval on
|
:
|
23 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Feb 2026
|
|
|
|
10 Mar 2026
|
|
10
|
Orissa
|
FP/OR/ROAD/141543/2021
|
5-ORB586/2023-BHU
|
Improvement (RCPLWE Phase-II Scheme) to Narigaon-Gillaguntha-Betabadi Road from Ch.0/00 KM to 5/087 Km in the District of Koraput.
|
Road
|
EXECUTIVE ENGINEER
|
3.003
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Apr 2021
|
|
Stage-I Approval on
|
:
|
31 Jul 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jan 2026
|
|
|
|
10 Mar 2026
|
|
11
|
Karnataka
|
FP/KA/Others/29220/2017
|
F.No.4-KRB1274/2021-BAN
|
Construction Of Ambhedkar Bhavan
|
Others
|
ASSISTANT DIRECTOR DEPT OF SOCIAL WELFARE PANDAVAPURA
|
0.0909
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Sep 2017
|
|
Stage-I Approval on
|
:
|
14 Sep 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Jul 2025
|
|
|
|
06 Mar 2026
|
|
12
|
Karnataka
|
FP/KA/WATER/39356/2019
|
F.No.4-KRB1309/2021-BAN
|
Construction of Jack well, Panel Room with allied components and laying of Pipe lines in Chliandavadi State Forest, Muguru State Forest, Bilikal State Forest for Providing Drinking Water supply for Kodihalli & 298 Habitations under DBOT in Kanakapura Taluka Ramanagara District”
|
Drinking Water
|
EXECUTIVE ENGINEER RDWSD RAMNAGARA
|
3.61
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Mar 2019
|
|
Stage-I Approval on
|
:
|
25 Sep 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
19 Feb 2026
|
|
|
|
06 Mar 2026
|
|
13
|
Kerala
|
FP/KL/ROAD/148616/2021
|
4-KLC1368/2022-BAN
|
Construction of Twin Tunnel (2+2 lane) with Four Lane Approaches (from existing roads) for providing direct connectivity between Aanakampoyil Kalladi-Meppadi in Kozhikode and Wayanad Districts of Ker
|
Road
|
EXECUTIVE ENGINEER KERALA PUBLIC WORKS DEPARTMENT ROADS DIVISION, KOZHIKODE
|
17.263
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Oct 2021
|
|
Stage-I Approval on
|
:
|
31 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Feb 2025
|
|
|
|
24 Feb 2026
|
|
14
|
Jammu and Kashmir
|
FP/JK/ROAD/52199/2020
|
9-JKB022-2021-JAMMU
|
RIAR TO BAGGAN (PART-II)
|
Road
|
PIU BILLAWAR
|
0.855
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Oct 2020
|
|
Stage-I Approval on
|
:
|
26 Apr 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Dec 2025
|
|
|
|
20 Feb 2026
|
|
15
|
Jammu and Kashmir
|
FP/JK/ROAD/47637/2020
|
9-JKC-056/2021-Jammu
|
MALHAR TO MARHOON (PART-I)
|
Road
|
PIU BILLAWAR
|
6.938
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2020
|
|
Stage-I Approval on
|
:
|
13 Jul 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Nov 2025
|
|
|
|
19 Feb 2026
|
|
16
|
Himachal Pradesh
|
FP/HP/ROAD/151932/2022
|
FC/HPB/48/2023
|
Construction of New 2 Lane with Paved Shoulder of Hamirpur Bypass of NH-88 (New NH-103 & 3 ) (Design Chainage-Km.121+175 to Km.138+295, Design Length-17.120 Km) in the State of Himachal Pradesh
|
Road
|
National Highways Authority of India
|
12.8537
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Feb 2022
|
|
Stage-I Approval on
|
:
|
03 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jan 2026
|
|
|
|
19 Feb 2026
|
|
17
|
Rajasthan
|
FP/RJ/ROAD/29812/2017
|
8B/RAJ004/2022-JPR
|
Laxmipura-Dora-Dabi-Ranaji Ka Guda NH-12
|
Road
|
ADD. CHIEF ENGINEER PPP PWD
|
32.3264
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jun 2018
|
|
Stage-I Approval on
|
:
|
31 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jan 2026
|
|
|
|
18 Feb 2026
|
|
18
|
Delhi
|
FP/DL/ROAD/48557/2020
|
8B/DLI/06/02/2021/FC
|
Construction of 6 Lane access controlled Highway from DND- Faridabad-Ballabhgarh Bypass Junction with Delhi-Vadodara Expressway KMP- Interchange (NH-148 NA) under Bharatmala Pariyojana (Lot-4/Package-
|
Road
|
CMU, MATHURA, NHAI
|
35.16
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2020
|
|
Stage-I Approval on
|
:
|
06 Apr 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Nov 2025
|
|
|
|
18 Feb 2026
|
|
19
|
Orissa
|
FP/OR/RAIL/156513/2022
|
5-ORA626/2024-BHU
|
Jeypore- Malkangiri New BG Line,East Coast Railway.
|
Railway
|
EAST COAST RAILWAY
|
452.705
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jul 2022
|
|
Stage-I Approval on
|
:
|
14 Mar 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jan 2026
|
|
|
|
18 Feb 2026
|
|
20
|
Uttar Pradesh
|
FP/UP/ROAD/41235/2019
|
8B/UP/06/38/2020
|
Protected Forest Land Proposed to be diverted for 4-Laning and Strengthening of Bilraya-Panwari Road(SH21) From Ch..399.600 to 427.00, in District:Hamirpur
|
Road
|
EXECUTIVE ENGINEER CONSTRUCTION DIVISION TWO PWD HAMIRPUR
|
49.32
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jul 2019
|
|
Stage-I Approval on
|
:
|
20 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2025
|
|
|
|
16 Feb 2026
|
|
21
|
Uttarakhand
|
FP/UK/ROAD/21822/2016
|
8B/UCP/06/94/2019/FC
|
Maroda Banali Motor Road Km 3.00 to Kund Motor Road
|
Road
|
PMGSY ID IIND NEW TEHRI
|
5.1415
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Oct 2016
|
|
Stage-I Approval on
|
:
|
08 Nov 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Dec 2025
|
|
|
|
13 Feb 2026
|
|
22
|
Goa
|
FP/GA/ROAD/19984/2016
|
F.No.GOC1237/2020-BAN
|
FDP:NH-17, Goa
|
Road
|
PUBLIC WORKS DEPARTMENT
|
29.836
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jun 2016
|
|
Stage-I Approval on
|
:
|
10 Oct 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Dec 2024
|
|
|
|
13 Feb 2026
|
|
23
|
Uttarakhand
|
FP/UK/ROAD/20005/2016
|
8B/UCP/06/59/2021/FC
|
Construction of Darimkhet-Kanyalikot Motor road (Length 5.00)
|
Road
|
PWDKAPKOT
|
1.98
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jun 2016
|
|
Stage-I Approval on
|
:
|
07 Mar 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 May 2025
|
|
|
|
13 Feb 2026
|
|
24
|
Uttar Pradesh
|
FP/UP/THE/14236/2015
|
8B/UP/08/38/2016/FC
|
WATER PIPELINE CORRIDOR AND APPROACH ROAD FOR MIRZAPUR 1320 MW THERMAL POWER PROJECT
|
Thermal
|
WELSPUN ENERGY UP PRIVATE LIMITED
|
8.3581
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jul 2015
|
|
Stage-I Approval on
|
:
|
09 Sep 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
31 Dec 2025
|
|
|
|
10 Feb 2026
|
|
25
|
Uttarakhand
|
FP/UK/ROAD/31090/2017
|
8B/UCP/06/112/2018/FC
|
Diversion of forest land for construction of Champawat bypass in Tanakpur Pithoragarh NH 125 (New 09) under Chardham Project.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
|
8.94
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2018
|
|
Stage-I Approval on
|
:
|
17 Jul 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2026
|
|
|
|
09 Feb 2026
|
|
26
|
Uttarakhand
|
FP/UK/ROAD/15461/2015
|
8B/UCP/06/04/2017
|
Jaulkandey-Sisakhani motor road in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
2.2354
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2015
|
|
Stage-I Approval on
|
:
|
29 Nov 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
06 Feb 2026
|
|
27
|
Chhattisgarh
|
FP/CG/Pipeline/37602/2018
|
FC-I/IROCH-06/2021
|
Singhal Energy Pvt. Ltd.
|
Pipeline
|
SINGHAL ENERGY PRIVATE LIMITED
|
0.117
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Feb 2019
|
|
Stage-I Approval on
|
:
|
26 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Jan 2026
|
|
|
|
06 Feb 2026
|
|
28
|
Maharashtra
|
FP/MH/ROAD/152830/2022
|
FC-II/MH-240/2024-NGP
|
Diversion of 6.3912 Ha of Forest Land for Satana Mangrul Road
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
6.3912
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Mar 2022
|
|
Stage-I Approval on
|
:
|
26 Sep 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
06 Feb 2026
|
|
29
|
Uttarakhand
|
FP/UK/ROAD/45296/2020
|
8B/UCP/06/38/2022/FC
|
Satpuli to Srinagar (National Highway-119) Civil Soyam Forest 20.115 Ha., Panchayat Forest 0.151 Ha., Reserved Forest 4.367 Ha., Muck Disposal 7.92 Ha.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAY CANAL ROAD DEHRADUN
|
32.553
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 May 2020
|
|
Stage-I Approval on
|
:
|
16 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2025
|
|
|
|
03 Feb 2026
|
|
30
|
Madhya Pradesh
|
FP/MP/ROAD/30762/2017
|
6-MPC026/2019-BHO
|
Gulganj - Amanganj (NH-43Ext.) KM 0.00 to KM 43.00
|
Road
|
NHMP
|
30.426
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Dec 2017
|
|
Stage-I Approval on
|
:
|
23 Sep 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jan 2026
|
|
|
|
29 Jan 2026
|
|
31
|
Madhya Pradesh
|
FP/MP/Others/156029/2022
|
6-MPC022/2022-BHO
|
Extension of Acharya Shankar International Institute of Adwaita Vedanta
|
Others
|
GOVT. OF M.P. CULTURE DEPARTMENT
|
17.28
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 May 2022
|
|
Stage-I Approval on
|
:
|
12 Sep 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
29 Jan 2026
|
|
32
|
Madhya Pradesh
|
FP/MP/Others/156029/2022
|
6-MPC022/2022-BHO
|
Extension of Acharya Shankar International Institute of Adwaita Vedanta
|
Others
|
GOVT. OF M.P. CULTURE DEPARTMENT
|
17.28
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 May 2022
|
|
Stage-I Approval on
|
:
|
12 Sep 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
29 Jan 2026
|
|
33
|
Bihar
|
FP/BR/Others/141318/2021
|
FP/BR/Others/141318/2021
|
Diversion of 0.01275 ha of forest land for construction of approach road for opening retail outlet of HPCL on Mashrakh-Gauda Bazar SH-90 Road in Saran district of Bihar.
|
Others
|
ABHIMANYU KUMAR
|
0.01275
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Apr 2021
|
|
Stage-I Approval on
|
:
|
21 Aug 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Oct 2025
|
|
|
|
28 Jan 2026
|
|
34
|
Bihar
|
FP/BR/Others/44447/2020
|
FP/BR/Others/44447/2020
|
Diversion of 0.02025 ha of forest land for construction of approach road for opening retail outlet of HPCL on Samastipur-Patori Road in Samastipur district of Bihar.
|
Others
|
DINESH PASWAN
|
0.02025
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2020
|
|
Stage-I Approval on
|
:
|
15 Jun 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Mar 2025
|
|
|
|
28 Jan 2026
|
|
35
|
Himachal Pradesh
|
FP/HP/ROAD/37858/2018
|
8B/HP/06/90/2020/FC
|
SLAPPER TATAPANI ROAD KM.8/500 TO 61/600
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
33.3292
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2019
|
|
Stage-I Approval on
|
:
|
24 Feb 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jan 2026
|
|
|
|
27 Jan 2026
|
|
36
|
Karnataka
|
FP/KA/Others/36295/2018
|
F.No.4-KRB1288/2021-BAN/
|
Construction of Solid Waste Unit and Faecal Sludge treatment Plant at Gokarna
|
Others
|
GRAMA PANCHAYAT GOKARNA
|
0.98
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Oct 2018
|
|
Stage-I Approval on
|
:
|
25 Feb 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jun 2024
|
|
|
|
23 Jan 2026
|
|
37
|
Karnataka
|
FP/KA/WATER/146299/2021
|
F.No.4-KRC1385/2022-BAN
|
For construction New Tank with Check Dam & Connectivity Road at Sy No.17 (20 New) of Ittigehalli Village, Bhadravathi Division for recharge of Ground Water surrounding of Ittigehalli Villages in favour of EE, KNNL No.3, Bhadra Canal Division, Malebennur.
|
Drinking Water
|
CHIEF ENGINEER KARNATAKA NEERAVARI NIGAM LIMITED UPPER TUNGA PROJECT ZONE SHIVAMOGGA
|
12.1801
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2021
|
|
Stage-I Approval on
|
:
|
03 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Nov 2025
|
|
|
|
23 Jan 2026
|
|
38
|
Madhya Pradesh
|
FP/MP/ROAD/149532/2021
|
6-MPR015/2022-BHO
|
Constrcution of Bypass on WESTERN side of Gwalior City (design km 0.000 to 27.800)
|
Road
|
PDPIUGWALIOR
|
42.83
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Nov 2021
|
|
Stage-I Approval on
|
:
|
07 May 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Oct 2025
|
|
|
|
20 Jan 2026
|
|
39
|
Karnataka
|
FP/KA/IRRIG/35763/2018
|
4-KRB1221/2020
|
Laying of pipeline to fill 60 tanks of Harpanahalli Taluk from Tungabhadra River
|
Irrigation
|
EXECUTIVE ENGINEER KNNL BHADRA CANAL DIVISION DAVANGERE
|
0.54
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Sep 2018
|
|
Stage-I Approval on
|
:
|
29 Jan 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Aug 2025
|
|
|
|
20 Jan 2026
|
|
40
|
Jammu and Kashmir
|
FP/JK/Approach/44582/2020
|
Fst/Land/Parivesh/38/2020
|
60 mtr single span major pmt bridge at chak nallah
|
Approach Access
|
HQ 56 ROAD CONSTRUCTION COY (BEACON-BRO))
|
0.045
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2020
|
|
Stage-I Approval on
|
:
|
17 Mar 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2025
|
|
|
|
15 Jan 2026
|
|
41
|
Madhya Pradesh
|
FP/MP/IRRIG/33438/2018
|
6-MPC014/2019-BHO
|
Prabhudhana Tank..
|
Irrigation
|
EXECUTIVE ENGINEER WATER RESOURCES DIVISION NO II BETUL
|
7.002
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 May 2018
|
|
Stage-I Approval on
|
:
|
30 May 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 Nov 2025
|
|
|
|
13 Jan 2026
|
|
42
|
Uttarakhand
|
FP/UK/ROAD/24737/2017
|
8B/UCP/06/97/2017/FC
|
Construction of 4.00Km long motor road for Kargil Martyr Sri Ramesh Parihar Village-Dungarpur from Amtora Village in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
1.991
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Mar 2017
|
|
Stage-I Approval on
|
:
|
11 May 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2024
|
|
|
|
13 Jan 2026
|
|
43
|
Uttarakhand
|
FP/UK/ROAD/154869/2022
|
8B/UCP/06/40/2023/FC
|
Construction of road from Km 15 of BaijnathBageshwar motor road to Udalgaon in District Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.261
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Apr 2022
|
|
Stage-I Approval on
|
:
|
31 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Oct 2025
|
|
|
|
13 Jan 2026
|
|
44
|
Jharkhand
|
FP/JH/TRANS/45077/2020
|
FP/JH/TRANS/45077/2020
|
132kV DC Jamua-Gawan Transmission Line (NIT-253)
|
Transmission Line
|
JUSNL
|
54.407
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Mar 2020
|
|
Stage-I Approval on
|
:
|
09 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jul 2025
|
|
|
|
13 Jan 2026
|
|
45
|
Uttarakhand
|
FP/UK/ROAD/146204/2021
|
8b/UCP/06/17/2022/FC
|
Sumalta to koladungri motor road
|
Road
|
TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR
|
0.861
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2021
|
|
Stage-I Approval on
|
:
|
11 Dec 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 Apr 2025
|
|
|
|
13 Jan 2026
|
|
46
|
Jammu and Kashmir
|
FP/JK/Approach/143480/2021
|
FST-Land/0FC/87/2021-02
|
Construction of 45 m span bridge over Gurai nallah
|
Approach Access
|
HQ 56 ROAD CONSTRUCTION COY (BEACON-BRO))
|
0.25
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Jun 2021
|
|
Stage-I Approval on
|
:
|
12 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2025
|
|
|
|
12 Jan 2026
|
|
47
|
Uttarakhand
|
FP/UK/Others/150277/2021
|
8B/UCP/09/19/2022/FC
|
Construction of judiciary building in Ranikhet
|
Others
|
CIVIL JUDGE (J.D.) RANIKHET
|
0.98
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Dec 2021
|
|
Stage-I Approval on
|
:
|
26 Mar 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Dec 2025
|
|
|
|
12 Jan 2026
|
|
48
|
Uttarakhand
|
FP/UK/ROAD/19460/2016
|
8B/UCP/06/166/2020/FC
|
Construction of Motor Road for connecting of Nadgal Village under CM Scheme at District Nainital
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.33
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2016
|
|
Stage-I Approval on
|
:
|
25 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 May 2025
|
|
|
|
09 Jan 2026
|
|
49
|
Himachal Pradesh
|
FP/HP/Others/14799/2015
|
8B/HP/09/90/2017
|
Development of Paragliding Site at Bir Billing in Tehsil Baijnath, District Kangra, Himachal Pradesh
|
Others
|
TOURISM AND CIVIL AVIATION DEPARTMENT
|
0.9925
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Aug 2015
|
|
Stage-I Approval on
|
:
|
22 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Dec 2025
|
|
|
|
09 Jan 2026
|
|
50
|
Tamil Nadu
|
FP/TN/ROAD/28608/2017
|
4-TNB075/2021-CHN
|
L.Malaiyur Forest Road
|
Road
|
RURAL DEVELOPMENT DEPARTMENT
|
1.68
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2017
|
|
Stage-I Approval on
|
:
|
17 Aug 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Dec 2025
|
|
|
|
02 Jan 2026
|
|