Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Uttar Pradesh
|
FP/UP/ROAD/117639/2020
|
8B/UP/06/03/2024/FC
|
Forest Land Proposed for Widening & Strengthening of Chopan-Mahalpur Road to Parsoi Road from Km. No. 0.000 to Km. No. 20.600 Under Road Connectivity Project on Left Wing Extremism Area (RCPLWEA) in Tehsil-Robertsganj, District:Sonbhadra
|
Road
|
PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA
|
15.567
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Dec 2020
|
Stage-I Approval on
|
:
|
05 Aug 2024
|
Compliance Report Submitted by User Agency on
|
:
|
02 Sep 2025
|
|
|
|
15 Sep 2025
|
2
|
Gujarat
|
FP/GJ/IND/29375/2017
|
FC-6/GJC-72/2023-GNR
|
Hazira Capacity Expansion Project (HCEP)
|
Industry
|
Shell Energy India Private Limited
|
12
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2019
|
Stage-I Approval on
|
:
|
05 Nov 2024
|
Compliance Report Submitted by User Agency on
|
:
|
07 May 2025
|
|
|
|
12 Sep 2025
|
3
|
Uttarakhand
|
FP/UK/ROAD/27119/2017
|
8B/UCP/06/57/2018/FC
|
Construction of Harsila to Sima motor road Length(4.00km)
|
Road
|
PWDKAPKOT
|
2.519
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jul 2017
|
Stage-I Approval on
|
:
|
15 May 2021
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jul 2025
|
|
|
|
11 Sep 2025
|
4
|
Himachal Pradesh
|
FP/HP/SubStation/148224/2021
|
FC/HPB/12/178/2022
|
Construction of 33/11 KV Electrical Sub Center Shri Naina Devi Ji which falls in the Jurisdiction of Modar Village, Tehsil Shri Naina Devi Ji at Swarghat, Bilaspur District, H.P
|
Sub Station
|
HIMACHAL PRADESH STATE ELECTRICITY BOARD
|
0.2
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Oct 2021
|
Stage-I Approval on
|
:
|
22 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
20 Aug 2025
|
|
|
|
11 Sep 2025
|
5
|
Himachal Pradesh
|
FP/HP/ROAD/74345/2020
|
FC/HPB/06/152/2022
|
C/O Ambulance road from Fire Brigade road for the building in Daizy Bank Estate Lower Jakhu Shimla Ward No-16 KM 0/0 To 0/45.
|
Road
|
Commissioner MCS
|
0.0112
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Dec 2020
|
Stage-I Approval on
|
:
|
17 Feb 2025
|
Compliance Report Submitted by User Agency on
|
:
|
18 Aug 2025
|
|
|
|
11 Sep 2025
|
6
|
Orissa
|
FP/OR/Others/9825/2015
|
5-ORB428/2020-BHU
|
Barbil - Angul Iron Ore Slurry Pipeline Project
|
Others
|
Jindal Steel & Power Ltd.
|
1.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Jul 2015
|
Stage-I Approval on
|
:
|
24 Sep 2020
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jun 2025
|
|
|
|
08 Sep 2025
|
7
|
Madhya Pradesh
|
FP/MP/ROAD/156438/2022
|
6-MPR038/2023-BHO
|
4 Laning of Indore-Muktainagar Section of NH-753L from Boregaon Buzurg, Khandwa District in MP Design Ch. 139+000 to Muktainagar, Jalgaon District in MH Design Ch. 216+278 (length 77.278 km) under Bharatmala Pariyojana in the state of Madhya Pradesh
|
Road
|
National Highways Authority of India
|
87.5709
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jun 2022
|
Stage-I Approval on
|
:
|
29 Dec 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jan 2024
|
|
|
|
05 Sep 2025
|
8
|
Manipur
|
FP/MN/TRANS/36731/2018
|
3-MN C 105/2019-SHI
|
Construction of 132 KV single circuit transmission line on double circuit towers from Rengpang to Tamenglong under North Eastern Region Power System Improvement Project (NERPSIP)
|
Transmission Line
|
MANIPUR STATE POWER COMPANY LIMITED
|
56.833
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Oct 2018
|
Stage-I Approval on
|
:
|
30 Jan 2020
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2025
|
|
|
|
02 Sep 2025
|
9
|
Punjab
|
FP/PB/Approach/146634/2021
|
9-PBB311/2023-CHA
|
Approach Access Road to B-Site IOCL Retail Outlet
|
Approach Access
|
APPROACH ACCESS FOR INDIAN OIL CORPORATION (IOCL)
|
0.0102
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Aug 2021
|
Stage-I Approval on
|
:
|
29 May 2025
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jul 2025
|
|
|
|
02 Sep 2025
|
10
|
Manipur
|
FP/MN/ROAD/153434/2022
|
3-MNC 055/2022-SHI
|
Forest Proposal for widening / improvement of existing road chakpikarong - sajik - Aiqejang (0 to 19.5 KM) to NHSL specification under project sewak in the state of Manipur
|
Road
|
84 RCC (GREF)
|
22.045
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jun 2022
|
Stage-I Approval on
|
:
|
18 Jan 2023
|
Compliance Report Submitted by User Agency on
|
:
|
29 Apr 2025
|
|
|
|
02 Sep 2025
|
11
|
Uttarakhand
|
FP/UK/ROAD/34380/2018
|
8B/UCP/06/209/2019/FC
|
Kathiyan to Dirnad Motor Road Under PMGSY
|
Road
|
EXECUTIVE ENGINEER
|
3.0835
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jun 2018
|
Stage-I Approval on
|
:
|
06 Aug 2020
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jul 2025
|
|
|
|
01 Sep 2025
|
12
|
Madhya Pradesh
|
FP/MP/IRRIG/30442/2017
|
6-MPR005/2022-BHO
|
Baroda ... Irrigation Project
|
Irrigation
|
WATER RESOURCES DIVISION NO ONE SAGAR
|
21.06
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Nov 2017
|
Stage-I Approval on
|
:
|
09 Dec 2022
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2025
|
|
|
|
31 Aug 2025
|
13
|
Karnataka
|
FP/KA/TRANS/42334/2019
|
F.No.4-KRB1296/2021-BAN
|
Diversion of 0.98Ha of Sonnenahalli Deemed Forest for construction of 400kV D/C Quad Tumkur (Vasantanarsapur) - Yelahanka Transmission line
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED
|
0.98
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Oct 2019
|
Stage-I Approval on
|
:
|
16 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
18 Mar 2024
|
|
|
|
29 Aug 2025
|
14
|
Maharashtra
|
FP/MH/ROAD/148050/2021
|
FC-II/MH-213/2023-NGP
|
Construction of Balkum to Gaimukh DP Road (NH3 Connector Ghodbunder By-Pass) by Thane Municipal Corporation
|
Road
|
THANE MUNICIPAL CORPORATION PWD
|
12.2607
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Oct 2021
|
Stage-I Approval on
|
:
|
24 Nov 2023
|
Compliance Report Submitted by User Agency on
|
:
|
22 Jul 2025
|
|
|
|
29 Aug 2025
|
15
|
Telangana
|
FP/TG/ROAD/120196/2021
|
4-TSB214/2021-HYD
|
Formation of BT road from MRL 13 Chamanpally to Kushnapally of Vemanapally Mandal of Mancherial District - 1.5259 Ha
|
Road
|
PANCHAYAT RAJ ENGINEERING DEPARTMENT
|
1.5259
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jan 2021
|
Stage-I Approval on
|
:
|
30 Oct 2021
|
Compliance Report Submitted by User Agency on
|
:
|
04 Feb 2025
|
|
|
|
28 Aug 2025
|
16
|
Telangana
|
FP/TG/Others/44802/2020
|
4-TSB171/2020-CHN
|
Establishment of APCO 25 tower for Phase II Network in Medchal District - 0.0995 Ha
|
Others
|
TELANGANA STATE POLICE DEPARTMENT
|
0.0995
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2020
|
Stage-I Approval on
|
:
|
09 Nov 2020
|
Compliance Report Submitted by User Agency on
|
:
|
23 Oct 2024
|
|
|
|
28 Aug 2025
|
17
|
Uttarakhand
|
FP/UK/ROAD/10393/2015
|
8B/UCP/06/124/2015-FC
|
Bartoli-Banthok Motor Road(Part I)
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
2.705
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Feb 2015
|
Stage-I Approval on
|
:
|
08 Oct 2015
|
Compliance Report Submitted by User Agency on
|
:
|
02 Jul 2025
|
|
|
|
26 Aug 2025
|
18
|
Uttar Pradesh
|
FP/UP/ROAD/121267/2021
|
8B/UP/06/292/2022/FC
|
Widening & Strengthening of Bhadai Arar to Makarivari Road from Km. No. 0.000 to Km. No. 46.050 Under Road Connectivity Project on Left Wing Extremism Area (RCPLWEA) in Tehsil: Robertsganj, District-Sonbhadra
|
Road
|
PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA
|
18.5193
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Feb 2021
|
Stage-I Approval on
|
:
|
04 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
12 Aug 2025
|
|
|
|
22 Aug 2025
|
19
|
Uttar Pradesh
|
FP/UP/Others/49746/2020
|
8B/UP/06/24/2022/FC
|
Protected Forest land proposed to be diverted for for Entry/Exit of IOCL Retail Outlet on Khajuriya- Paliya Road, (SH-101), At KM. Stone No.117, At Khasra No - 193, Village:- Paidiya, Dist: Lakhimpur
|
Others
|
INDIAN OIL CORPORATION LIMITED BAREILLY
|
0.04674
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Sep 2020
|
Stage-I Approval on
|
:
|
10 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Aug 2025
|
|
|
|
22 Aug 2025
|
20
|
Madhya Pradesh
|
FP/MP/ROAD/157126/2022
|
6-MPB042/2023-BHO
|
Madwa to Raipura Road
|
Road
|
MPRRDA PIU-I PANNA
|
1.9
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jun 2022
|
Stage-I Approval on
|
:
|
22 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
28 Dec 2023
|
|
|
|
22 Aug 2025
|
21
|
Uttar Pradesh
|
FP/UP/Others/25175/2017
|
8B/UP/06/73/2021/FC
|
Forest Land Proposed to be Diverted for HPCL Retail Outlet Exit/Entry Approach on Sultanpur-Kadipur Road (SH-34) At KM. Stone No.(164-165), Gata No.46, Village: Godalpur, Pargana:Aldemau, Tehsil: Jaisinghpur, District: Sultanpur (Uttar Pradesh)
|
Others
|
Hindustan Petroleum Corporation Limited
|
0.075028
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Mar 2017
|
Stage-I Approval on
|
:
|
23 Mar 2023
|
Compliance Report Submitted by User Agency on
|
:
|
12 Aug 2025
|
|
|
|
22 Aug 2025
|
22
|
Chhattisgarh
|
FP/CG/ROAD/119866/2021
|
FC-III/IROCH-04/2022
|
Development of Economic Corridors, Inter-corridors, feeder routes and Coastal Road to improve the efficiency of freight movement in India (Lot-3/Odisha & Jharkhand/Package-2) Raipur-Vishakhapatnam (Ch. 0.000 - Ch. 124.661) in the State of Chhattisgarh under Bharatmala Pariyojana. (Forest Proposal is for between km 42+844 to Km 124.661)
|
Road
|
NHAI PIU DHAMTARI
|
228.0425
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Jan 2021
|
Stage-I Approval on
|
:
|
12 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2025
|
|
|
|
22 Aug 2025
|
23
|
Karnataka
|
FP/KA/WATER/46598/2020
|
4-KRC1477/2023-BAN
|
Laying of water pipeline & ancillary works, in forest land, in Tergaon, Kawalwad & other 91 villages (113 Habitations) in Haliyal Taluka of Uttar Kannada district in favour of "Executive Engineer Rural Drinking Water Supply and Sanitation Division Karwar."
|
Drinking Water
|
ASST EXECUTIVE ENGINEER RURAL DRINKING WATER AND SANITATION SUB DIVISION HALIYAL
|
8.8537
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jun 2020
|
Stage-I Approval on
|
:
|
21 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
25 May 2024
|
|
|
|
21 Aug 2025
|
24
|
Himachal Pradesh
|
FP/HP/Others/145662/2021
|
FC/HPB/09/99/2022
|
Fire Post at Ani
|
Others
|
COMMANDANT HOME GUARDS 7TH BN KULLU
|
0.0768
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Aug 2021
|
Stage-I Approval on
|
:
|
25 Oct 2023
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jul 2025
|
|
|
|
20 Aug 2025
|
25
|
Bihar
|
FP/BR/Approach/140357/2021
|
FP/BR/Approach/140357/2021
|
The proposal for establishment of retail out-let dealership of M/s Indian Oil Corporation Ltd. Location IN BET. KM ST. NO.5&7 ON Akbarnagar-Shahkund Road on SH-85 LHS Wh. Going to Sahkund District Bha
|
Approach Access
|
SUSHIL KUMAR BHAGAT
|
0.0108
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Apr 2021
|
Stage-I Approval on
|
:
|
29 May 2025
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jul 2025
|
|
|
|
18 Aug 2025
|
26
|
Tripura
|
FP/TR/MIN/142678/2021
|
3-TR C 062/2021-SHI
|
Exploration of Drilling Location GOAN
|
Mining
|
ONGC
|
6.131
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 May 2021
|
Stage-I Approval on
|
:
|
10 Feb 2023
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jul 2025
|
|
|
|
18 Aug 2025
|
27
|
Himachal Pradesh
|
FP/HP/ROAD/42526/2019
|
8B/HP/06/37/2021/FC
|
construction of Tanda Kohla Tikkari Kawal Kothi Sidhkothi Via Baba Balak Nath Mandir Thapla Dari ka Nal Sidhyani Road Km.0/0 To 11/340.
|
Road
|
HPPWD
|
2.2876
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Oct 2019
|
Stage-I Approval on
|
:
|
09 Oct 2024
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jun 2025
|
|
|
|
14 Aug 2025
|
28
|
Uttarakhand
|
FP/UK/ROAD/15527/2015
|
8B/UCP/06/09/2017/FC
|
Khand gaon to Rautal Motor road at Chinyalisaur Block
|
Road
|
EXECUTIVE ENGINEER
|
1.525
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Oct 2015
|
Stage-I Approval on
|
:
|
29 Jul 2021
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2024
|
|
|
|
14 Aug 2025
|
29
|
Punjab
|
FP/PB/ROAD/115382/2020
|
9-PBB338-2023-CHA
|
Widening construction of road
|
Road
|
17 HORSE PIN 912617 C/O 56 APO
|
0.858
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Dec 2020
|
Stage-I Approval on
|
:
|
30 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jul 2025
|
|
|
|
14 Aug 2025
|
30
|
Uttar Pradesh
|
FP/UP/ROAD/119900/2021
|
8B/UP/06/316/2022/FC
|
Proposed Road Widening and Strengthening of Saursot Khurd to Sirsiya Road from Km.0.00 to 19.200 Under Rural Road Connectvity Project on Left Wing Extermism Area(CPCPLWEA) in Tehsil:Robertsganj,Dist:Sonbhadra
|
Road
|
PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA
|
11.79
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Feb 2021
|
Stage-I Approval on
|
:
|
04 May 2023
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2025
|
|
|
|
13 Aug 2025
|
31
|
Uttar Pradesh
|
FP/UP/ROAD/118819/2021
|
8B/UP/06/33/2022/FC
|
Proposed forest land to be diverted for Widening & Strengthening of RS Road (Sidhahawa) to Jogendra Road Via Khajura Road from Km. No. 0.000 to Km. No. 20.150 Under Road Connectivity Project on Left Wing Extremism Area (RCPLWEA) in Tehsil-Robertsganj, District-Sonbhadra by PMGSY Division, PWD Sonbhadra
|
Road
|
PMGSY DIVISION PUBLIC WORKS DEPARTMENT SONEBHADRA
|
14.5603
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2021
|
Stage-I Approval on
|
:
|
04 Nov 2022
|
Compliance Report Submitted by User Agency on
|
:
|
08 Aug 2025
|
|
|
|
13 Aug 2025
|
32
|
Maharashtra
|
FP/MH/TRANS/45600/2020
|
FC-III/MH-47/2022-NGP
|
132 KV DC Mul - SICOM Chandrapur Transmission line
|
Transmission Line
|
MSETCL EHV PROJECTS DIVISION CHANDRAPUR
|
44.0397
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 May 2020
|
Stage-I Approval on
|
:
|
02 May 2022
|
Compliance Report Submitted by User Agency on
|
:
|
21 Jul 2025
|
|
|
|
13 Aug 2025
|
33
|
Uttarakhand
|
FP/UK/Others/20905/2016
|
8B/UCP/09/103/2021/FC
|
Construction of Rain Shelter, Mule hut, Gang Hut, Sulabh Souchalya, Washed out Bridle road, Suspension Bridge, Trolley, Helipad etc. on GovindGhat-Ghangriya-Hemkund saheb bridle road.
|
Others
|
PUBLIC WORK DEPARTMENT
|
0.893
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2016
|
Stage-I Approval on
|
:
|
26 Apr 2022
|
Compliance Report Submitted by User Agency on
|
:
|
23 Dec 2024
|
|
|
|
11 Aug 2025
|
34
|
Uttarakhand
|
FP/UK/ROAD/11141/2015
|
8B/UCP/06/87/2016/FC
|
T02 (ODR) to Manjokhi MR
|
Road
|
EXECUTIVE ENGINEER
|
5.659
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Mar 2015
|
Stage-I Approval on
|
:
|
17 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2025
|
|
|
|
11 Aug 2025
|
35
|
Uttarakhand
|
FP/UK/ROAD/13621/2015
|
8B/UCP/06/148/2016/FC
|
construction of Adichaura to Sinni Motor Road Under PMGSY.
|
Road
|
PMGSY
|
10.35
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jun 2015
|
Stage-I Approval on
|
:
|
26 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
24 Jun 2025
|
|
|
|
11 Aug 2025
|
36
|
Uttar Pradesh
|
FP/UP/Others/49462/2020
|
8B/UP/09/94/2023/FC
|
diversion of Reversed forest land for construction of DSTP in scheme of Namami Gange, Agra Sewage (I & D Works) in Agra Uttarpradesh
|
Others
|
YAMUNA POLLUTION CONTROL UNIT I UP JAL NIGAM AGRA
|
0.9024
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Sep 2020
|
Stage-I Approval on
|
:
|
02 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
05 Aug 2025
|
|
|
|
08 Aug 2025
|
37
|
Tamil Nadu
|
FP/TN/OFC/119342/2021
|
4-TNB135/2024-CHN
|
Laying underground OFC along Sokkanathapuram to Maravamadurai route through Ammankuruchi RF in Pudukottai District
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.0107
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jan 2021
|
Stage-I Approval on
|
:
|
13 Nov 2024
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2025
|
|
|
|
08 Aug 2025
|
38
|
Haryana
|
FP/HR/TRANS/41326/2019
|
9-HRB019-2020-CHA
|
Construction of 132 KV S/C Neemwal-Bhagal Line
|
Transmission Line
|
HVPNL KAITHAL
|
0.11583
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jul 2019
|
Stage-I Approval on
|
:
|
20 Jul 2020
|
Compliance Report Submitted by User Agency on
|
:
|
01 May 2025
|
|
|
|
08 Aug 2025
|
39
|
Tamil Nadu
|
FP/TN/OFC/117896/2020
|
4-TNB130/2024-CHN
|
laying underground OFC along Arimalam Rayavaram road stretch along sengirai forest area
|
Optical Fibre Cable
|
JIO DIGITAL FIBRE PRIVATE LIMITED
|
0.165
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Dec 2020
|
Stage-I Approval on
|
:
|
23 Oct 2024
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jun 2025
|
|
|
|
08 Aug 2025
|
40
|
Uttarakhand
|
FP/UK/ROAD/151113/2022
|
8B/UCP/06/73/2022/FC
|
upgradation of existing road to 2 lane configuration of rameswer-gangolighat berinag chaukori kanda bageswer takula almora section of NH-309A from km 133.00 to km170.00(Length 37.00KM)
|
Road
|
EENHRANIHET
|
22.112
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jan 2022
|
Stage-I Approval on
|
:
|
06 Jul 2023
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jul 2025
|
|
|
|
07 Aug 2025
|
41
|
Haryana
|
FP/HR/IRRIG/40972/2019
|
9-HRC048-2020-CHA
|
PARALLEL LINED CHANNEL (PLC) PROJECT FROM RD 0 (DADUPUR HEAD) TO 68220 (HAMIDA HEAD) FOR DIVERSION OF 21.67 HACTARE OF FOREST LAND
|
Irrigation
|
IRRIGATION WATER SERVICES DIVISION DADUPUR
|
22.94
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Jul 2019
|
Stage-I Approval on
|
:
|
25 Feb 2021
|
Compliance Report Submitted by User Agency on
|
:
|
28 Nov 2022
|
|
|
|
07 Aug 2025
|
42
|
Maharashtra
|
FP/MH/ROAD/53479/2020
|
FC-I/MH-214/2021-NGP
|
Pandharpur to Sangola Road, newly declared National Highway (NH-204) with a length of 31.158 km (Old Proposal No. FP/MH/ROAD/32901/2018)
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
2.4
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Nov 2020
|
Stage-I Approval on
|
:
|
26 Feb 2022
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2025
|
|
|
|
05 Aug 2025
|
43
|
Maharashtra
|
FP/MH/Pipeline/157648/2022
|
FC-I/MH-376/2024-NGP
|
Construction of 700 mm underground MIDC regular water supply line from MIDC Water Treatment Plant Poynad to GAIL India Limited Usar for PDH PP Plant
|
Pipeline
|
GAIL INDIA LIMITED
|
3.4151
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jun 2022
|
Stage-I Approval on
|
:
|
14 May 2024
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jun 2025
|
|
|
|
05 Aug 2025
|
44
|
Madhya Pradesh
|
FP/MP/RAIL/154962/2022
|
6-MPR015/2023-BHO
|
Chhotaudepur to Dhar New Broad Gauge railway line project
|
Railway
|
DY.CHIEF ENGINEER (CONSTRUCTION-I)
|
244.039
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Apr 2022
|
Stage-I Approval on
|
:
|
08 Jul 2024
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jan 2025
|
|
|
|
04 Aug 2025
|
45
|
Maharashtra
|
FP/MH/TRANS/44469/2020
|
FC-I/MH335/2023- NGP
|
Diversion of 3.064 ha. Forest land for Proposed 220 K.V. Umred to Ngbhid EHV Transmission Line
|
Transmission Line
|
EXECUTIVE ENGINEER EHV PROJECT DIV I MSETCL NAGPUR
|
3.064
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Feb 2020
|
Stage-I Approval on
|
:
|
21 Mar 2025
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jun 2025
|
|
|
|
04 Aug 2025
|
46
|
Himachal Pradesh
|
FP/HP/Others/37353/2018
|
FC/HPB/09/53/2021
|
C/o Solid waste Management Plant at MC Rohru, Distt. Shimla, H.P.
|
Others
|
EXECUTIVE OFFICER MC ROHRU
|
0.252
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Nov 2018
|
Stage-I Approval on
|
:
|
24 Sep 2024
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jul 2025
|
|
|
|
04 Aug 2025
|
47
|
Haryana
|
FP/HR/ROAD/127722/2021
|
9-HRB157-2023-CHA
|
Neoli Kalan to Durajanpur in Km 0 to 5.770
|
Road
|
EXECUTIVE ENGINEER HISAR
|
0.0858
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Mar 2021
|
Stage-I Approval on
|
:
|
09 Feb 2024
|
Compliance Report Submitted by User Agency on
|
:
|
02 Feb 2025
|
|
|
|
04 Aug 2025
|
48
|
Himachal Pradesh
|
FP/HP/Others/140938/2021
|
FC/HPB/09/60/2021FC/HPB/09/60/2021
|
C/o the Sub Divisional Soil Conservation Officer office building at Bagsiad, Distt. Mandi (H.P).
|
Others
|
AGRICULTURE DEPARTMENT H.P.
|
0.0869
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Apr 2021
|
Stage-I Approval on
|
:
|
05 Mar 2025
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jun 2025
|
|
|
|
01 Aug 2025
|
49
|
Uttar Pradesh
|
FP/UP/Approach/151434/2022
|
8B/UP/06/79/2022/FC
|
HPCL Retail Outlet on Fatehpur-Baberu-Atarra-Naraini-Kartal Marg (SH-71), In KM 23 (Chainage-22.038 to 22.098) on RHS, At Gata No.28K, Village: Devlan, Tehsil: Sadar, District: Fatehpur (Uttar Pradesh
|
Approach Access
|
HINDUSTAN PETROLIUM CORPORATION LIMITED
|
0.276
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Feb 2022
|
Stage-I Approval on
|
:
|
29 Jun 2022
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jul 2025
|
|
|
|
01 Aug 2025
|
50
|
Uttar Pradesh
|
FP/UP/Approach/153199/2022
|
8B/UP/06/148/2023/FC
|
Proposed Hindustan Petroleum Corporation Limited Retail Outlet on Tulsipur-Koylabasa Road (MDR) in Km No. 7 (CH. No. 6.800, LHS) at Gata No–224, Village:-Madarhwa, Tehsil:-Tulsipur, District:- Balrampur
|
Approach Access
|
HPCL RETAIL REGIONAL OFFICE GORAKHPUR
|
0.157853
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Mar 2022
|
Stage-I Approval on
|
:
|
08 Aug 2023
|
Compliance Report Submitted by User Agency on
|
:
|
23 Jun 2025
|
|
|
|
30 Jul 2025
|
|