| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Tamil Nadu
|
FP/TN/ROAD/28608/2017
|
4-TNB075/2021-CHN
|
L.Malaiyur Forest Road
|
Road
|
RURAL DEVELOPMENT DEPARTMENT
|
1.68
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2017
|
|
Stage-I Approval on
|
:
|
17 Aug 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Dec 2025
|
|
|
|
02 Jan 2026
|
|
2
|
Tamil Nadu
|
FP/TN/OFC/38837/2019
|
4-TNB121/2024-CHN
|
BSNL
|
Optical Fibre Cable
|
BBHARAT SANCHAR NIGAM LIMITED
|
0.045
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Feb 2019
|
|
Stage-I Approval on
|
:
|
04 Apr 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2025
|
|
|
|
02 Jan 2026
|
|
3
|
Karnataka
|
FP/KA/WATER/48609/2020
|
F.No.4-KRB1481/2023-BAN
|
Work of Construction of Kadugodi GLR (Ground Level Reservoir) in 2.4281 Hac of forest land at Kadugodi Plantation Village, Sy No. 1/P, Bidarahalli Hobali, Bangaluru East Taluk, Bangaluru Urban Dist, Under Contract Package-12 of Cauvery water supply scheme (CWSS) Stage-V Project, JICA Funded in favor of Bangalore Water Supply and Sewerage Board.
|
Drinking Water
|
BANGALORE WATER SUPPLY AND SEWERAGE BOARD
|
2.4281
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Aug 2020
|
|
Stage-I Approval on
|
:
|
03 Apr 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Dec 2025
|
|
|
|
01 Jan 2026
|
|
4
|
Jammu and Kashmir
|
FP/JK/Approach/125807/2021
|
9-JKA-074/2021-Jammu
|
70 mtr pmt br at km 66.95 on BG road (TOTA Br)
|
Approach Access
|
HQ 56 ROAD CONSTRUCTION COY (BEACON-BRO))
|
0.45
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Mar 2021
|
|
Stage-I Approval on
|
:
|
29 Sep 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2025
|
|
|
|
31 Dec 2025
|
|
5
|
Haryana
|
FP/HR/TRANS/147539/2021
|
9-HRB162-2023-CHA
|
Construction of 66KV Transmission line from 220 KV Sub Station Panchgaon to 66 KV sub station Farrukhnagar and Jamalpur district Gurugram Hayana.
|
Transmission Line
|
HVPNL MANESAR
|
0.1539
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Sep 2021
|
|
Stage-I Approval on
|
:
|
30 Apr 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Nov 2025
|
|
|
|
31 Dec 2025
|
|
6
|
Uttarakhand
|
FP/UK/ROAD/47038/2020
|
8B/UCP/06/121/2020/FC
|
C/0 of Link Motor Road from kasardevi (Tiwarikhan) to village Math
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
2.565
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jul 2020
|
|
Stage-I Approval on
|
:
|
14 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Sep 2025
|
|
|
|
26 Dec 2025
|
|
7
|
Uttarakhand
|
FP/UK/ROAD/12313/2015
|
8B/UCP/06/180/2016/FC
|
Construction of Ghurshal to Saikot motor road. Under State Sector
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.772
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2015
|
|
Stage-I Approval on
|
:
|
17 Jan 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2024
|
|
|
|
23 Dec 2025
|
|
8
|
Bihar
|
FP/BR/Others/42268/2019
|
FP/BR/Others/42268/2019
|
The Tourism Department , Govt. of Bihar has been promoting tourist for ritual worship in the Maa Mundeshwari Devi temple situated at the top of Mundeshwari Hill in Bhagwanpur Block under Kaimur Distri
|
Others
|
BIHAR RAJYA PUL NIRMAN NIGAM LTD WORKS DIVISION ARA
|
1.3094
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Sep 2019
|
|
Stage-I Approval on
|
:
|
30 Aug 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Sep 2025
|
|
|
|
23 Dec 2025
|
|
9
|
Haryana
|
FP/HR/TRANS/41327/2019
|
9-HRB001-2020-CHA
|
Construction of 220 KV D/C Kaithal (PGCIL)
|
Transmission Line
|
HVPNL KAITHAL
|
0.457
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jul 2019
|
|
Stage-I Approval on
|
:
|
24 Jul 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Nov 2025
|
|
|
|
23 Dec 2025
|
|
10
|
Uttarakhand
|
FP/UK/ROAD/48583/2020
|
8B/UCP/06/172/2020/FC
|
Gauchar Sidoli to Panai M/R
|
Road
|
TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR
|
0.26
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2020
|
|
Stage-I Approval on
|
:
|
31 Dec 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Sep 2025
|
|
|
|
23 Dec 2025
|
|
11
|
Haryana
|
FP/HR/ROAD/48568/2020
|
9-HRB076-2021-CHA
|
Construction of 6 Lane access controlled Highway from DND- Faridabad-Ballabhgarh Bypass Junction with Delhi-Vadodara Expressway KMP- Interchange (NH-148 NA) under Bharatmala Pariyojana (Lot-4/Pkg-I)
|
Road
|
CMU, MATHURA, NHAI
|
3.9
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2020
|
|
Stage-I Approval on
|
:
|
22 Jun 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Nov 2025
|
|
|
|
23 Dec 2025
|
|
12
|
Andhra Pradesh
|
FP/AP/RAIL/149334/2021
|
4-APB167/2022-VIJ
|
Proposal for Diversion of 1.36 Ha. Forest Land for Construction of new double line and electrification of track between Guntur and Guntakal stations at Dhone (Rly Km.325/4 to 329/2) in Comp.No. 238 & 239 of North Dhone RF, in Dhone Range, Kurnool Division in favour of S.C. Railway, under FC Act 1980.
|
Railway
|
SOUTH CENTRAL RAILWAY,GUNTAKAL.
|
2.21
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Nov 2021
|
|
Stage-I Approval on
|
:
|
21 Jun 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2025
|
|
|
|
18 Dec 2025
|
|
13
|
Maharashtra
|
FP/MH/ROAD/118805/2021
|
FC-III/MH-51/2022-NGP
|
Upgradation of NH 353 C From Ashti to Sironcha in Section Allaplli to Sironcha
|
Road
|
NATIONAL HIGHWAY DIVISION GADCHIROLI
|
132.102
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2021
|
|
Stage-I Approval on
|
:
|
30 Jan 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2025
|
|
|
|
17 Dec 2025
|
|
14
|
Maharashtra
|
FP/MH/ROAD/119248/2021
|
FC-III/MH-54/2022-NGP
|
Up-gradation to2/4 lane with paved shoulder configuration of Gadichiroli-Sironcha of NH- 353 C in the State of Maharashtra by Ministry of Road Transport & Highways from Ashti to Sironcha in Gadhciroli
|
Road
|
NATIONAL HIGHWAY DIVISION GADCHIROLI
|
54.274
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jan 2021
|
|
Stage-I Approval on
|
:
|
21 Nov 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2025
|
|
|
|
17 Dec 2025
|
|
15
|
Madhya Pradesh
|
FP/MP/IRRIG/150918/2022
|
6-MPR002/2024-BHO
|
Kuwajhagar Tank Project
|
Irrigation
|
Madhya Pradesh Water Resources Department
|
20.512
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jan 2022
|
|
Stage-I Approval on
|
:
|
26 Jul 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Nov 2025
|
|
|
|
16 Dec 2025
|
|
16
|
Andhra Pradesh
|
FP/AP/RAIL/154617/2022
|
4-APB213/2023-VIJ
|
Proposal for Diversion of 3.21 Ha. Forest land for construction of New Double line and Electrification of track between Guntur and Guntakal stations at Konided & Panyam (Rly.Km.275-281 & 285-288) in Comp.No.145, 147, 137 & 138 of Panyam RF in Kurnool Range, Kurnool Division in favour of S.C.Railway under FC Act 1980.
|
Railway
|
SOUTH CENTRAL RAILWAY,GUNTAKAL.
|
3.21
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Apr 2022
|
|
Stage-I Approval on
|
:
|
26 Jun 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2025
|
|
|
|
16 Dec 2025
|
|
17
|
Haryana
|
FP/HR/ROAD/27251/2017
|
9-HRB062-2018-CHA
|
construction of Ring road from Tauru road to Alwar road via Engineering College, Medical College and Navodaya School Bai in Nuh Distt. (C.M. Announcement 15242)
|
Road
|
PWD BANDR MEWAT
|
1.8239232
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Aug 2017
|
|
Stage-I Approval on
|
:
|
20 Aug 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Sep 2025
|
|
|
|
16 Dec 2025
|
|
18
|
Karnataka
|
FP/KA/TRANS/152682/2022
|
F. No.4-KRC1468/2023-BAN
|
Construction of 137.701 Kms of 400 KV Quad D/C Koppal PS- Narendra (New) Transmission Line passing through forest land in Sy No. 50/1 Mannerala Village and Sy No. 70/1,70/2, 70/3, 71, 73 and 89 of Mavinaitagi Village, Hanamasagara Hobli, Kushtagi Taluk, Koppal District for a length of 1.644 Kms (7.562 Ha.) by Koppal-Narendra Transmission Limited
|
Transmission Line
|
KOPPAL-NARENDRA TRANSMISSION LIMITED
|
7.562
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Feb 2022
|
|
Stage-I Approval on
|
:
|
02 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Sep 2025
|
|
|
|
15 Dec 2025
|
|
19
|
Telangana
|
FP/TG/ROAD/47266/2020
|
4-TSB226/2021-HYD
|
Improvement of existing road from earthen road to BT standards from Laxmipur to Baddampally in Mancherial District - 4.8408 Ha
|
Road
|
PANCHAYAT RAJ ENGINEERING DEPARTMENT
|
4.8408
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Jul 2020
|
|
Stage-I Approval on
|
:
|
15 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jul 2023
|
|
|
|
15 Dec 2025
|
|
20
|
Orissa
|
FP/OR/IRRIG/12731/2015
|
5-ORC307/2017-BHU
|
Sono Barrage Project
|
Irrigation
|
MAYURBHANJ INVESTIGATION DIVISION DEPARTMENT OF WATER RESOURCES ODISHA
|
14.928
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Oct 2015
|
|
Stage-I Approval on
|
:
|
04 Aug 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Nov 2025
|
|
|
|
10 Dec 2025
|
|
21
|
Madhya Pradesh
|
FP/MP/IRRIG/38634/2019
|
6-MPB005/2022-BHO
|
Bahuti Canal Scheme
|
Irrigation
|
Madhya Pradesh Water Resources Department
|
1.4002
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Mar 2019
|
|
Stage-I Approval on
|
:
|
05 Jul 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Sep 2022
|
|
|
|
09 Dec 2025
|
|
22
|
Madhya Pradesh
|
FP/MP/Others/38197/2019
|
6-MPB060/2020-BHO
|
Neoteric Education Society Institute & Rehabilitation Center for Paralysis & Paraplegic
|
Others
|
NEOTERIC EDUCATION AND SERVICE SOCIETY
|
0.99
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2019
|
|
Stage-I Approval on
|
:
|
18 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Aug 2025
|
|
|
|
09 Dec 2025
|
|
23
|
Himachal Pradesh
|
FP/HP/HYD/37189/2018
|
8B/HP/01/71/2020/FC
|
Kasol Hydro Power Project
|
Hydel
|
MS BEENA BUTAIL PALMPUR
|
1.496448
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Nov 2018
|
|
Stage-I Approval on
|
:
|
12 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Nov 2025
|
|
|
|
05 Dec 2025
|
|
24
|
Uttarakhand
|
FP/UK/ROAD/9480/2015
|
8B/UCP/06/85/2016/FC
|
Constt. of Bagdawar Bend to Duni Veer Singgiya Motor Road
|
Road
|
PUBLIC WORKS DEPARTMENT
|
3.78
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Jan 2015
|
|
Stage-I Approval on
|
:
|
19 Jul 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Oct 2025
|
|
|
|
04 Dec 2025
|
|
25
|
Uttarakhand
|
FP/UK/ROAD/38366/2019
|
8B/UCP/06/85/2020/FC
|
Construction of Dewal kheta MR Km-10(suyalkot) to Mopata Link motor road under PMGSY.
|
Road
|
RES PMGSY KARANPERAYAG
|
3.008
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Feb 2019
|
|
Stage-I Approval on
|
:
|
14 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2025
|
|
|
|
04 Dec 2025
|
|
26
|
Madhya Pradesh
|
FP/MP/ROAD/152685/2022
|
6-MPB015/2022-BHO
|
Suktanawad-Jhirpanjariya road
|
Road
|
PWD DIVISION BURHANPUR
|
2.38
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Feb 2022
|
|
Stage-I Approval on
|
:
|
01 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jul 2023
|
|
|
|
04 Dec 2025
|
|
27
|
Haryana
|
FP/HR/Approach/149450/2021
|
9-HRB154-2023-CHA
|
M/s Panchkula Foils
|
Approach Access
|
M/S PANCHKULA FOILS
|
0.0084
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Nov 2021
|
|
Stage-I Approval on
|
:
|
10 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
04 Oct 2024
|
|
|
|
04 Dec 2025
|
|
28
|
Uttarakhand
|
FP/UK/ROAD/11292/2015
|
8B/UCP/06/222/2015
|
Construction of Farsali Palli To Kharkanatoli
|
Road
|
PMGSY
|
8.931
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Mar 2015
|
|
Stage-I Approval on
|
:
|
14 Mar 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2025
|
|
|
|
04 Dec 2025
|
|
29
|
Uttarakhand
|
FP/UK/ROAD/21140/2016
|
8B/UCP/06/118/2018/FC
|
Sahid Hari Singh Tuolbudhand to Ratkhal Motor Road Sanction Under CM Ghosana no. 492/201
|
Road
|
EXECUTIVE ENGINEER
|
2.52
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Aug 2016
|
|
Stage-I Approval on
|
:
|
29 Sep 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Aug 2025
|
|
|
|
02 Dec 2025
|
|
30
|
Karnataka
|
FP/KA/ROAD/142140/2021
|
F.No.4-KRB1347/2022-BAN/
|
Dviersion of 0.06 Ha of forest land in sy no 14 of Benavalli, Village, Kerehalli Hobali, Hosanagara taluk Shivamogga dist, (Shivamogga forest division) for construction of low cost ROB and Birur-Talguppa section great seperator at Km 105/100-200 and Km 133/700-800 in favour of Assistant divisional engineer, Shivmaogga
|
Road
|
ASSISTANT DIVISIONAL ENGINEER SHIVAMOGGA
|
0.06
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 May 2021
|
|
Stage-I Approval on
|
:
|
24 Mar 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2025
|
|
|
|
02 Dec 2025
|
|
31
|
Rajasthan
|
FP/RJ/ROAD/149560/2021
|
8B/RAJ017/2023-JPR
|
“Construction of Widening ,Strengthening on SH-32A From Jhameshwarji to Jagat Road KM Stone No-67/0 to 80/0, Tehsil–Girwa, District -Udaipur (Rajasthan)”
|
Road
|
PUBLIC WORKS DEPARTMENT RAJASTHAN
|
6.75
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Dec 2021
|
|
Stage-I Approval on
|
:
|
30 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jan 2025
|
|
|
|
01 Dec 2025
|
|
32
|
Kerala
|
FP/KL/ROAD/38879/2019
|
F.No.4-KLB1255/2020-BAN/
|
REHABILITATION & UPGRADATION of NH 85 from Km 119/017 to 161/300(Design chainage Km 119/017 to 160/800) Bodimettu to Munnar on EPC mode in the State of Kerala
|
Road
|
ASSISTANT EXECUTIVE ENGINEER NH SUBDIVISION
|
1.495
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 Sep 2019
|
|
Stage-I Approval on
|
:
|
09 Apr 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Aug 2025
|
|
|
|
01 Dec 2025
|
|
33
|
Madhya Pradesh
|
FP/MP/ROAD/155399/2022
|
6-MPB031/2023-BHO
|
Construction of road from KM28 of T01 to Banjaritola under RCPLWEA scheme
|
Road
|
MPRRDA PIU-1 BALAGHAT
|
1.523
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 May 2022
|
|
Stage-I Approval on
|
:
|
22 Nov 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2024
|
|
|
|
30 Nov 2025
|
|
34
|
Madhya Pradesh
|
FP/MP/ROAD/156133/2022
|
6-MPR020/2023-BHO
|
Godri Harranala Via Dugali road under RCPLWEA Scheme
|
Road
|
MPRRDA PIU ONE BALAGHAT
|
7.56
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
01 Jun 2022
|
|
Stage-I Approval on
|
:
|
13 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Mar 2024
|
|
|
|
30 Nov 2025
|
|
35
|
Madhya Pradesh
|
FP/MP/ROAD/155479/2022
|
6-MPR025/2023-BHO
|
Benegaon sitapar nandora Borban road construction under RCPLWEA scheme
|
Road
|
MPRRDA PIU-1 BALAGHAT
|
7.29
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2022
|
|
Stage-I Approval on
|
:
|
14 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Mar 2024
|
|
|
|
30 Nov 2025
|
|
36
|
Maharashtra
|
FP/MH/TRANS/48241/2020
|
FC-II/MH-201-2022-NGP
|
220kv DC Line Padghe _ Wada & Kolshet - Wada To Kudus S/S Electrical Transmission line
|
Transmission Line
|
MAHATRANSCO
|
12.0225
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Aug 2020
|
|
Stage-I Approval on
|
:
|
29 Aug 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
11 Nov 2025
|
|
|
|
30 Nov 2025
|
|
37
|
Andhra Pradesh
|
FP/AP/ROAD/33887/2018
|
4-APC134/2021-VIJ
|
Diversion of 11.03 Ha in Kadapa Forest Division for Upgradation of NH-167B from Km 43/097 to 99/103 i.e from Porumamilla to Chandrasekhara Puram to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
11.03
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2018
|
|
Stage-I Approval on
|
:
|
11 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jul 2025
|
|
|
|
28 Nov 2025
|
|
38
|
Andhra Pradesh
|
FP/AP/ROAD/33887/2018
|
4-APC134/2021-VIJ
|
Diversion of 11.03 Ha in Kadapa Forest Division for Upgradation of NH-167B from Km 43/097 to 99/103 i.e from Porumamilla to Chandrasekhara Puram to two lanes with paved shoulders under NHDP IV in the State of Andhra Pradesh.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
11.03
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 May 2018
|
|
Stage-I Approval on
|
:
|
11 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
29 Jul 2025
|
|
|
|
28 Nov 2025
|
|
39
|
Madhya Pradesh
|
FP/MP/ROAD/124534/2021
|
6-MPR014/2023-BHO
|
Harrai - Bijouri Road
|
Road
|
MPRDC CHHINDWARA DIVISION
|
6.372
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Mar 2021
|
|
Stage-I Approval on
|
:
|
07 May 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Nov 2025
|
|
|
|
27 Nov 2025
|
|
40
|
Jharkhand
|
FP/JH/TRANS/41236/2019
|
FP/JH/TRANS/41236/2019
|
Construction of 400 kV D/C North Karanpura to Gaya transmission line (Jharkhand Portion)
|
Transmission Line
|
NORTH KARANPURA TRANSCO LIMITED
|
197.0115
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Jul 2019
|
|
Stage-I Approval on
|
:
|
06 Jun 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Oct 2025
|
|
|
|
26 Nov 2025
|
|
41
|
Sikkim
|
FP/SK/IND/31954/2018
|
3-SKB054/2020/SHI
|
Diversion of 1.58 ha of forest land of construction of security & admin block at Rorathang East Sikkim by Cipla II Ltd.
|
Industry
|
CIPLA
|
1.58
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Mar 2018
|
|
Stage-I Approval on
|
:
|
10 Dec 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jul 2025
|
|
|
|
26 Nov 2025
|
|
42
|
Uttarakhand
|
FP/UK/ROAD/41083/2019
|
8B/UCP/06/105/2021/FC
|
Construction of Udamanda to Talla-Bingarh-Khoonigaad-Kumeda Motor Road in Block Pokhari in District Chamoli under State Sector
|
Road
|
OFFICE OF THE EXECUTIVE ENGINEER CONSTRUCTION DIVISION PUBLIC WORKS DEPARTMENT POKHARI
|
2.51
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jul 2019
|
|
Stage-I Approval on
|
:
|
16 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 Aug 2025
|
|
|
|
24 Nov 2025
|
|
43
|
Jammu and Kashmir
|
FP/JK/ROAD/45330/2020
|
9-JKA-009/2022-Jammu
|
Improvement and upgradation of Mantalai Dudu road KM 1st to 5th
|
Road
|
EXECUTIVE ENGINEER PWD(R AND B) DIVISION UDHAMPUR
|
0.28
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 May 2020
|
|
Stage-I Approval on
|
:
|
13 Apr 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2024
|
|
|
|
23 Nov 2025
|
|
44
|
Uttar Pradesh
|
FP/UP/TRANS/42524/2019
|
8B/UP/04/169/2020
|
765 kV Ghatampur-Hapur S/C Transmission Line
|
Transmission Line
|
GHATAMPUR TRANSMISSION LIMITED
|
16.5761
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Dec 2019
|
|
Stage-I Approval on
|
:
|
24 Dec 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Nov 2025
|
|
|
|
21 Nov 2025
|
|
45
|
Uttar Pradesh
|
FP/UP/ROAD/35985/2018
|
8B/UP/06/97/2019/FC
|
0.310 Ha. PF Land Proposed to Transfer, for construction of Bridge and aproach road for Bridge, by Bridge Corporation along the Muzaffarnagr-Jansath Roadh (SH-12A) Km. 15 to 16 near village Kawal at U
|
Road
|
UTTAR PRADESH STATE BRIDGE CORRPORATION LTD CONSTRUCTION UNIT SAHARANPUR
|
0.31
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Sep 2018
|
|
Stage-I Approval on
|
:
|
29 Nov 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 Oct 2025
|
|
|
|
21 Nov 2025
|
|
46
|
Himachal Pradesh
|
FP/HP/ROAD/37428/2018
|
8b/hp/06/07/2021
|
C/O TANDI SIRIM BATAHAN ROAD KM 0/0 TO 4/00
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
1.6231
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Dec 2018
|
|
Stage-I Approval on
|
:
|
21 Jan 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Oct 2025
|
|
|
|
21 Nov 2025
|
|
47
|
Telangana
|
FP/TG/ROAD/59453/2020
|
4-TSC234/2022-HYD
|
Improvement and Widening to Two Lane with Paved shoulder from km 0.0 to km 49.0 of NH 161B on Nizampet-Narayankhed-Bider Road in Sangareddy distirct -15.592 Ha
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
15.592
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Nov 2020
|
|
Stage-I Approval on
|
:
|
16 Feb 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Oct 2023
|
|
|
|
20 Nov 2025
|
|
48
|
Orissa
|
FP/OR/Pipeline/148595/2021
|
5-ORB557/2023-BHU
|
Dhamra - Haldia Pipeline Project (Odisha)
|
Pipeline
|
GAIL (INDIA) LIMITED (DHPL-OD)
|
1.849
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Oct 2021
|
|
Stage-I Approval on
|
:
|
08 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Apr 2025
|
|
|
|
20 Nov 2025
|
|
49
|
Maharashtra
|
FP/MH/TRANS/38296/2019
|
FC-II/MH-216/2023-NGP
|
construction of220KV Kalmeshwar - Warud transmission Line
|
Transmission Line
|
MAHARASHTRA STATE ELECTRICITY TRANSMISSION COMPANY LTD CIN NO U40109MH2005SGC153646
|
6.076
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Feb 2019
|
|
Stage-I Approval on
|
:
|
20 Mar 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Sep 2025
|
|
|
|
20 Nov 2025
|
|
50
|
Himachal Pradesh
|
FP/HP/ROAD/150882/2022
|
FC/HPB/06/06/144/2022
|
Construction of Ghat Paucha Pai Road
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
2.462
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Jan 2022
|
|
Stage-I Approval on
|
:
|
01 Mar 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2025
|
|
|
|
20 Nov 2025
|
|