| Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
|
1
|
Jammu and Kashmir
|
FP/JK/ROAD/52199/2020
|
9-JKB022-2021-JAMMU
|
RIAR TO BAGGAN (PART-II)
|
Road
|
PIU BILLAWAR
|
0.855
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Oct 2020
|
|
Stage-I Approval on
|
:
|
26 Apr 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
18 Dec 2025
|
|
|
|
20 Feb 2026
|
|
2
|
Jammu and Kashmir
|
FP/JK/ROAD/47637/2020
|
9-JKC-056/2021-Jammu
|
MALHAR TO MARHOON (PART-I)
|
Road
|
PIU BILLAWAR
|
6.938
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jul 2020
|
|
Stage-I Approval on
|
:
|
13 Jul 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
26 Nov 2025
|
|
|
|
19 Feb 2026
|
|
3
|
Himachal Pradesh
|
FP/HP/ROAD/151932/2022
|
FC/HPB/48/2023
|
Construction of New 2 Lane with Paved Shoulder of Hamirpur Bypass of NH-88 (New NH-103 & 3 ) (Design Chainage-Km.121+175 to Km.138+295, Design Length-17.120 Km) in the State of Himachal Pradesh
|
Road
|
National Highways Authority of India
|
12.8537
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Feb 2022
|
|
Stage-I Approval on
|
:
|
03 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Jan 2026
|
|
|
|
19 Feb 2026
|
|
4
|
Rajasthan
|
FP/RJ/ROAD/29812/2017
|
8B/RAJ004/2022-JPR
|
Laxmipura-Dora-Dabi-Ranaji Ka Guda NH-12
|
Road
|
ADD. CHIEF ENGINEER PPP PWD
|
32.3264
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
09 Jun 2018
|
|
Stage-I Approval on
|
:
|
31 Dec 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jan 2026
|
|
|
|
18 Feb 2026
|
|
5
|
Delhi
|
FP/DL/ROAD/48557/2020
|
8B/DLI/06/02/2021/FC
|
Construction of 6 Lane access controlled Highway from DND- Faridabad-Ballabhgarh Bypass Junction with Delhi-Vadodara Expressway KMP- Interchange (NH-148 NA) under Bharatmala Pariyojana (Lot-4/Package-
|
Road
|
CMU, MATHURA, NHAI
|
35.16
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2020
|
|
Stage-I Approval on
|
:
|
06 Apr 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Nov 2025
|
|
|
|
18 Feb 2026
|
|
6
|
Orissa
|
FP/OR/RAIL/156513/2022
|
5-ORA626/2024-BHU
|
Jeypore- Malkangiri New BG Line,East Coast Railway.
|
Railway
|
EAST COAST RAILWAY
|
452.705
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Jul 2022
|
|
Stage-I Approval on
|
:
|
14 Mar 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Jan 2026
|
|
|
|
18 Feb 2026
|
|
7
|
Uttar Pradesh
|
FP/UP/ROAD/41235/2019
|
8B/UP/06/38/2020
|
Protected Forest Land Proposed to be diverted for 4-Laning and Strengthening of Bilraya-Panwari Road(SH21) From Ch..399.600 to 427.00, in District:Hamirpur
|
Road
|
EXECUTIVE ENGINEER CONSTRUCTION DIVISION TWO PWD HAMIRPUR
|
49.32
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Jul 2019
|
|
Stage-I Approval on
|
:
|
20 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Nov 2025
|
|
|
|
16 Feb 2026
|
|
8
|
Uttarakhand
|
FP/UK/ROAD/21822/2016
|
8B/UCP/06/94/2019/FC
|
Maroda Banali Motor Road Km 3.00 to Kund Motor Road
|
Road
|
PMGSY ID IIND NEW TEHRI
|
5.1415
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Oct 2016
|
|
Stage-I Approval on
|
:
|
08 Nov 2019
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Dec 2025
|
|
|
|
13 Feb 2026
|
|
9
|
Goa
|
FP/GA/ROAD/19984/2016
|
F.No.GOC1237/2020-BAN
|
FDP:NH-17, Goa
|
Road
|
PUBLIC WORKS DEPARTMENT
|
29.836
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Jun 2016
|
|
Stage-I Approval on
|
:
|
10 Oct 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
17 Dec 2024
|
|
|
|
13 Feb 2026
|
|
10
|
Uttarakhand
|
FP/UK/ROAD/20005/2016
|
8B/UCP/06/59/2021/FC
|
Construction of Darimkhet-Kanyalikot Motor road (Length 5.00)
|
Road
|
PWDKAPKOT
|
1.98
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
13 Jun 2016
|
|
Stage-I Approval on
|
:
|
07 Mar 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 May 2025
|
|
|
|
13 Feb 2026
|
|
11
|
Uttar Pradesh
|
FP/UP/THE/14236/2015
|
8B/UP/08/38/2016/FC
|
WATER PIPELINE CORRIDOR AND APPROACH ROAD FOR MIRZAPUR 1320 MW THERMAL POWER PROJECT
|
Thermal
|
WELSPUN ENERGY UP PRIVATE LIMITED
|
8.3581
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Jul 2015
|
|
Stage-I Approval on
|
:
|
09 Sep 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
31 Dec 2025
|
|
|
|
10 Feb 2026
|
|
12
|
Uttarakhand
|
FP/UK/ROAD/31090/2017
|
8B/UCP/06/112/2018/FC
|
Diversion of forest land for construction of Champawat bypass in Tanakpur Pithoragarh NH 125 (New 09) under Chardham Project.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS
|
8.94
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Mar 2018
|
|
Stage-I Approval on
|
:
|
17 Jul 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Jan 2026
|
|
|
|
09 Feb 2026
|
|
13
|
Uttarakhand
|
FP/UK/ROAD/15461/2015
|
8B/UCP/06/04/2017
|
Jaulkandey-Sisakhani motor road in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
2.2354
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Sep 2015
|
|
Stage-I Approval on
|
:
|
29 Nov 2017
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
06 Feb 2026
|
|
14
|
Chhattisgarh
|
FP/CG/Pipeline/37602/2018
|
FC-I/IROCH-06/2021
|
Singhal Energy Pvt. Ltd.
|
Pipeline
|
SINGHAL ENERGY PRIVATE LIMITED
|
0.117
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
04 Feb 2019
|
|
Stage-I Approval on
|
:
|
26 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Jan 2026
|
|
|
|
06 Feb 2026
|
|
15
|
Maharashtra
|
FP/MH/ROAD/152830/2022
|
FC-II/MH-240/2024-NGP
|
Diversion of 6.3912 Ha of Forest Land for Satana Mangrul Road
|
Road
|
MINISTRY OF ROAD TRANSPORT & HIGHWAYS
|
6.3912
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Mar 2022
|
|
Stage-I Approval on
|
:
|
26 Sep 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
30 Dec 2024
|
|
|
|
06 Feb 2026
|
|
16
|
Uttarakhand
|
FP/UK/ROAD/45296/2020
|
8B/UCP/06/38/2022/FC
|
Satpuli to Srinagar (National Highway-119) Civil Soyam Forest 20.115 Ha., Panchayat Forest 0.151 Ha., Reserved Forest 4.367 Ha., Muck Disposal 7.92 Ha.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAY CANAL ROAD DEHRADUN
|
32.553
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 May 2020
|
|
Stage-I Approval on
|
:
|
16 Feb 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 Dec 2025
|
|
|
|
03 Feb 2026
|
|
17
|
Madhya Pradesh
|
FP/MP/ROAD/30762/2017
|
6-MPC026/2019-BHO
|
Gulganj - Amanganj (NH-43Ext.) KM 0.00 to KM 43.00
|
Road
|
NHMP
|
30.426
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Dec 2017
|
|
Stage-I Approval on
|
:
|
23 Sep 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Jan 2026
|
|
|
|
29 Jan 2026
|
|
18
|
Madhya Pradesh
|
FP/MP/Others/156029/2022
|
6-MPC022/2022-BHO
|
Extension of Acharya Shankar International Institute of Adwaita Vedanta
|
Others
|
GOVT. OF M.P. CULTURE DEPARTMENT
|
17.28
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 May 2022
|
|
Stage-I Approval on
|
:
|
12 Sep 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
29 Jan 2026
|
|
19
|
Madhya Pradesh
|
FP/MP/Others/156029/2022
|
6-MPC022/2022-BHO
|
Extension of Acharya Shankar International Institute of Adwaita Vedanta
|
Others
|
GOVT. OF M.P. CULTURE DEPARTMENT
|
17.28
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 May 2022
|
|
Stage-I Approval on
|
:
|
12 Sep 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Oct 2024
|
|
|
|
29 Jan 2026
|
|
20
|
Bihar
|
FP/BR/Others/141318/2021
|
FP/BR/Others/141318/2021
|
Diversion of 0.01275 ha of forest land for construction of approach road for opening retail outlet of HPCL on Mashrakh-Gauda Bazar SH-90 Road in Saran district of Bihar.
|
Others
|
ABHIMANYU KUMAR
|
0.01275
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Apr 2021
|
|
Stage-I Approval on
|
:
|
21 Aug 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Oct 2025
|
|
|
|
28 Jan 2026
|
|
21
|
Bihar
|
FP/BR/Others/44447/2020
|
FP/BR/Others/44447/2020
|
Diversion of 0.02025 ha of forest land for construction of approach road for opening retail outlet of HPCL on Samastipur-Patori Road in Samastipur district of Bihar.
|
Others
|
DINESH PASWAN
|
0.02025
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
07 Feb 2020
|
|
Stage-I Approval on
|
:
|
15 Jun 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
20 Mar 2025
|
|
|
|
28 Jan 2026
|
|
22
|
Himachal Pradesh
|
FP/HP/ROAD/37858/2018
|
8B/HP/06/90/2020/FC
|
SLAPPER TATAPANI ROAD KM.8/500 TO 61/600
|
Road
|
HIMACHAL PRADESH PUBLIC WORK DEPARTMENT
|
33.3292
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2019
|
|
Stage-I Approval on
|
:
|
24 Feb 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Jan 2026
|
|
|
|
27 Jan 2026
|
|
23
|
Karnataka
|
FP/KA/Others/36295/2018
|
F.No.4-KRB1288/2021-BAN/
|
Construction of Solid Waste Unit and Faecal Sludge treatment Plant at Gokarna
|
Others
|
GRAMA PANCHAYAT GOKARNA
|
0.98
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Oct 2018
|
|
Stage-I Approval on
|
:
|
25 Feb 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
25 Jun 2024
|
|
|
|
23 Jan 2026
|
|
24
|
Karnataka
|
FP/KA/WATER/146299/2021
|
F.No.4-KRC1385/2022-BAN
|
For construction New Tank with Check Dam & Connectivity Road at Sy No.17 (20 New) of Ittigehalli Village, Bhadravathi Division for recharge of Ground Water surrounding of Ittigehalli Villages in favour of EE, KNNL No.3, Bhadra Canal Division, Malebennur.
|
Drinking Water
|
CHIEF ENGINEER KARNATAKA NEERAVARI NIGAM LIMITED UPPER TUNGA PROJECT ZONE SHIVAMOGGA
|
12.1801
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2021
|
|
Stage-I Approval on
|
:
|
03 Mar 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
05 Nov 2025
|
|
|
|
23 Jan 2026
|
|
25
|
Madhya Pradesh
|
FP/MP/ROAD/149532/2021
|
6-MPR015/2022-BHO
|
Constrcution of Bypass on WESTERN side of Gwalior City (design km 0.000 to 27.800)
|
Road
|
PDPIUGWALIOR
|
42.83
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Nov 2021
|
|
Stage-I Approval on
|
:
|
07 May 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Oct 2025
|
|
|
|
20 Jan 2026
|
|
26
|
Karnataka
|
FP/KA/IRRIG/35763/2018
|
4-KRB1221/2020
|
Laying of pipeline to fill 60 tanks of Harpanahalli Taluk from Tungabhadra River
|
Irrigation
|
EXECUTIVE ENGINEER KNNL BHADRA CANAL DIVISION DAVANGERE
|
0.54
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Sep 2018
|
|
Stage-I Approval on
|
:
|
29 Jan 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Aug 2025
|
|
|
|
20 Jan 2026
|
|
27
|
Jammu and Kashmir
|
FP/JK/Approach/44582/2020
|
Fst/Land/Parivesh/38/2020
|
60 mtr single span major pmt bridge at chak nallah
|
Approach Access
|
HQ 56 ROAD CONSTRUCTION COY (BEACON-BRO))
|
0.045
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Feb 2020
|
|
Stage-I Approval on
|
:
|
17 Mar 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2025
|
|
|
|
15 Jan 2026
|
|
28
|
Madhya Pradesh
|
FP/MP/IRRIG/33438/2018
|
6-MPC014/2019-BHO
|
Prabhudhana Tank..
|
Irrigation
|
EXECUTIVE ENGINEER WATER RESOURCES DIVISION NO II BETUL
|
7.002
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
03 May 2018
|
|
Stage-I Approval on
|
:
|
30 May 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
21 Nov 2025
|
|
|
|
13 Jan 2026
|
|
29
|
Uttarakhand
|
FP/UK/ROAD/154869/2022
|
8B/UCP/06/40/2023/FC
|
Construction of road from Km 15 of BaijnathBageshwar motor road to Udalgaon in District Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
0.261
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Apr 2022
|
|
Stage-I Approval on
|
:
|
31 Aug 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Oct 2025
|
|
|
|
13 Jan 2026
|
|
30
|
Uttarakhand
|
FP/UK/ROAD/24737/2017
|
8B/UCP/06/97/2017/FC
|
Construction of 4.00Km long motor road for Kargil Martyr Sri Ramesh Parihar Village-Dungarpur from Amtora Village in District-Bageshwar
|
Road
|
PROVINCIAL DIVISION PWD BAGESHWAR
|
1.991
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
02 Mar 2017
|
|
Stage-I Approval on
|
:
|
11 May 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2024
|
|
|
|
13 Jan 2026
|
|
31
|
Jharkhand
|
FP/JH/TRANS/45077/2020
|
FP/JH/TRANS/45077/2020
|
132kV DC Jamua-Gawan Transmission Line (NIT-253)
|
Transmission Line
|
JUSNL
|
54.407
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Mar 2020
|
|
Stage-I Approval on
|
:
|
09 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jul 2025
|
|
|
|
13 Jan 2026
|
|
32
|
Uttarakhand
|
FP/UK/ROAD/146204/2021
|
8b/UCP/06/17/2022/FC
|
Sumalta to koladungri motor road
|
Road
|
TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR
|
0.861
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Aug 2021
|
|
Stage-I Approval on
|
:
|
11 Dec 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
23 Apr 2025
|
|
|
|
13 Jan 2026
|
|
33
|
Jammu and Kashmir
|
FP/JK/Approach/143480/2021
|
FST-Land/0FC/87/2021-02
|
Construction of 45 m span bridge over Gurai nallah
|
Approach Access
|
HQ 56 ROAD CONSTRUCTION COY (BEACON-BRO))
|
0.25
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Jun 2021
|
|
Stage-I Approval on
|
:
|
12 Nov 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2025
|
|
|
|
12 Jan 2026
|
|
34
|
Uttarakhand
|
FP/UK/Others/150277/2021
|
8B/UCP/09/19/2022/FC
|
Construction of judiciary building in Ranikhet
|
Others
|
CIVIL JUDGE (J.D.) RANIKHET
|
0.98
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
16 Dec 2021
|
|
Stage-I Approval on
|
:
|
26 Mar 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Dec 2025
|
|
|
|
12 Jan 2026
|
|
35
|
Uttarakhand
|
FP/UK/ROAD/19460/2016
|
8B/UCP/06/166/2020/FC
|
Construction of Motor Road for connecting of Nadgal Village under CM Scheme at District Nainital
|
Road
|
PUBLIC WORKS DEPARTMENT
|
1.33
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2016
|
|
Stage-I Approval on
|
:
|
25 Oct 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
07 May 2025
|
|
|
|
09 Jan 2026
|
|
36
|
Himachal Pradesh
|
FP/HP/Others/14799/2015
|
8B/HP/09/90/2017
|
Development of Paragliding Site at Bir Billing in Tehsil Baijnath, District Kangra, Himachal Pradesh
|
Others
|
TOURISM AND CIVIL AVIATION DEPARTMENT
|
0.9925
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Aug 2015
|
|
Stage-I Approval on
|
:
|
22 Jan 2025
|
|
Compliance Report Submitted by User Agency on
|
:
|
03 Dec 2025
|
|
|
|
09 Jan 2026
|
|
37
|
Tamil Nadu
|
FP/TN/ROAD/28608/2017
|
4-TNB075/2021-CHN
|
L.Malaiyur Forest Road
|
Road
|
RURAL DEVELOPMENT DEPARTMENT
|
1.68
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2017
|
|
Stage-I Approval on
|
:
|
17 Aug 2022
|
|
Compliance Report Submitted by User Agency on
|
:
|
10 Dec 2025
|
|
|
|
02 Jan 2026
|
|
38
|
Tamil Nadu
|
FP/TN/OFC/38837/2019
|
4-TNB121/2024-CHN
|
BSNL
|
Optical Fibre Cable
|
BBHARAT SANCHAR NIGAM LIMITED
|
0.045
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 Feb 2019
|
|
Stage-I Approval on
|
:
|
04 Apr 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jul 2025
|
|
|
|
02 Jan 2026
|
|
39
|
Karnataka
|
FP/KA/WATER/48609/2020
|
F.No.4-KRB1481/2023-BAN
|
Work of Construction of Kadugodi GLR (Ground Level Reservoir) in 2.4281 Hac of forest land at Kadugodi Plantation Village, Sy No. 1/P, Bidarahalli Hobali, Bangaluru East Taluk, Bangaluru Urban Dist, Under Contract Package-12 of Cauvery water supply scheme (CWSS) Stage-V Project, JICA Funded in favor of Bangalore Water Supply and Sewerage Board.
|
Drinking Water
|
BANGALORE WATER SUPPLY AND SEWERAGE BOARD
|
2.4281
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Aug 2020
|
|
Stage-I Approval on
|
:
|
03 Apr 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
22 Dec 2025
|
|
|
|
01 Jan 2026
|
|
40
|
Jammu and Kashmir
|
FP/JK/Approach/125807/2021
|
9-JKA-074/2021-Jammu
|
70 mtr pmt br at km 66.95 on BG road (TOTA Br)
|
Approach Access
|
HQ 56 ROAD CONSTRUCTION COY (BEACON-BRO))
|
0.45
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
05 Mar 2021
|
|
Stage-I Approval on
|
:
|
29 Sep 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2025
|
|
|
|
31 Dec 2025
|
|
41
|
Haryana
|
FP/HR/TRANS/147539/2021
|
9-HRB162-2023-CHA
|
Construction of 66KV Transmission line from 220 KV Sub Station Panchgaon to 66 KV sub station Farrukhnagar and Jamalpur district Gurugram Hayana.
|
Transmission Line
|
HVPNL MANESAR
|
0.1539
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Sep 2021
|
|
Stage-I Approval on
|
:
|
30 Apr 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Nov 2025
|
|
|
|
31 Dec 2025
|
|
42
|
Uttarakhand
|
FP/UK/ROAD/47038/2020
|
8B/UCP/06/121/2020/FC
|
C/0 of Link Motor Road from kasardevi (Tiwarikhan) to village Math
|
Road
|
CONSTRUCTION DIVISION PWD ALMORA
|
2.565
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
08 Jul 2020
|
|
Stage-I Approval on
|
:
|
14 Oct 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Sep 2025
|
|
|
|
26 Dec 2025
|
|
43
|
Uttarakhand
|
FP/UK/ROAD/12313/2015
|
8B/UCP/06/180/2016/FC
|
Construction of Ghurshal to Saikot motor road. Under State Sector
|
Road
|
PUBLIC WORK DEPARTMENT
|
0.772
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Apr 2015
|
|
Stage-I Approval on
|
:
|
17 Jan 2018
|
|
Compliance Report Submitted by User Agency on
|
:
|
12 Jul 2024
|
|
|
|
23 Dec 2025
|
|
44
|
Bihar
|
FP/BR/Others/42268/2019
|
FP/BR/Others/42268/2019
|
The Tourism Department , Govt. of Bihar has been promoting tourist for ritual worship in the Maa Mundeshwari Devi temple situated at the top of Mundeshwari Hill in Bhagwanpur Block under Kaimur Distri
|
Others
|
BIHAR RAJYA PUL NIRMAN NIGAM LTD WORKS DIVISION ARA
|
1.3094
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Sep 2019
|
|
Stage-I Approval on
|
:
|
30 Aug 2024
|
|
Compliance Report Submitted by User Agency on
|
:
|
01 Sep 2025
|
|
|
|
23 Dec 2025
|
|
45
|
Haryana
|
FP/HR/TRANS/41327/2019
|
9-HRB001-2020-CHA
|
Construction of 220 KV D/C Kaithal (PGCIL)
|
Transmission Line
|
HVPNL KAITHAL
|
0.457
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Jul 2019
|
|
Stage-I Approval on
|
:
|
24 Jul 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
14 Nov 2025
|
|
|
|
23 Dec 2025
|
|
46
|
Uttarakhand
|
FP/UK/ROAD/48583/2020
|
8B/UCP/06/172/2020/FC
|
Gauchar Sidoli to Panai M/R
|
Road
|
TEMPORARY DIVISION PUBLIC WORKS DEPARTMENT GAUCHAR
|
0.26
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2020
|
|
Stage-I Approval on
|
:
|
31 Dec 2020
|
|
Compliance Report Submitted by User Agency on
|
:
|
24 Sep 2025
|
|
|
|
23 Dec 2025
|
|
47
|
Haryana
|
FP/HR/ROAD/48568/2020
|
9-HRB076-2021-CHA
|
Construction of 6 Lane access controlled Highway from DND- Faridabad-Ballabhgarh Bypass Junction with Delhi-Vadodara Expressway KMP- Interchange (NH-148 NA) under Bharatmala Pariyojana (Lot-4/Pkg-I)
|
Road
|
CMU, MATHURA, NHAI
|
3.9
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
10 Aug 2020
|
|
Stage-I Approval on
|
:
|
22 Jun 2021
|
|
Compliance Report Submitted by User Agency on
|
:
|
06 Nov 2025
|
|
|
|
23 Dec 2025
|
|
48
|
Andhra Pradesh
|
FP/AP/RAIL/149334/2021
|
4-APB167/2022-VIJ
|
Proposal for Diversion of 1.36 Ha. Forest Land for Construction of new double line and electrification of track between Guntur and Guntakal stations at Dhone (Rly Km.325/4 to 329/2) in Comp.No. 238 & 239 of North Dhone RF, in Dhone Range, Kurnool Division in favour of S.C. Railway, under FC Act 1980.
|
Railway
|
SOUTH CENTRAL RAILWAY,GUNTAKAL.
|
2.21
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
15 Nov 2021
|
|
Stage-I Approval on
|
:
|
21 Jun 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
27 May 2025
|
|
|
|
18 Dec 2025
|
|
49
|
Maharashtra
|
FP/MH/ROAD/118805/2021
|
FC-III/MH-51/2022-NGP
|
Upgradation of NH 353 C From Ashti to Sironcha in Section Allaplli to Sironcha
|
Road
|
NATIONAL HIGHWAY DIVISION GADCHIROLI
|
132.102
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
11 Jan 2021
|
|
Stage-I Approval on
|
:
|
30 Jan 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2025
|
|
|
|
17 Dec 2025
|
|
50
|
Maharashtra
|
FP/MH/ROAD/119248/2021
|
FC-III/MH-54/2022-NGP
|
Up-gradation to2/4 lane with paved shoulder configuration of Gadichiroli-Sironcha of NH- 353 C in the State of Maharashtra by Ministry of Road Transport & Highways from Ashti to Sironcha in Gadhciroli
|
Road
|
NATIONAL HIGHWAY DIVISION GADCHIROLI
|
54.274
|
APPROVED
|
|
Proposal received(at Nodal Officer)electronically on
|
:
|
12 Jan 2021
|
|
Stage-I Approval on
|
:
|
21 Nov 2023
|
|
Compliance Report Submitted by User Agency on
|
:
|
09 Dec 2025
|
|
|
|
17 Dec 2025
|
|