Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Tripura FP/TR/MIN/53948/2020 3-TR B 054/2021-SHI Drilling of Exploratory Location ROBM Mining ONGC 3.054 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Nov 2020
Stage-I Approval on : 17 Mar 2022
Compliance Report Submitted by User Agency on : 29 Aug 2022
21 Sep 2022
2 Tripura FP/TR/Approach/148082/2021 No. F.6-1328/FC/For-2021 Diversion of Forest Land for development of approach road towards Sabroom Railway Station from ICP Sabroom Approach Access LAND PORTS AUTHORITY OF INDIA ICP AGARTALA 0.63535 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Nov 2021
Stage-I Approval on : 12 Apr 2022
Compliance Report Submitted by User Agency on : 09 Aug 2022
11 Aug 2022
3 Tripura FP/TR/MIN/21542/2016 3-TR B 116/2019-SHI Drilling of location BMDH Mining ONGC 1.74 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 May 2017
Stage-I Approval on : 17 Mar 2022
Compliance Report Submitted by User Agency on : 02 Aug 2022
10 Aug 2022
4 Tripura FP/TR/MIN/53577/2020 3-TR B 044/2021-SHI Exploration through Drilling, DSA, Waste-pit and Approach Road of Exploratory Location TMAB Mining ONGC 2.63 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Nov 2020
Stage-I Approval on : 23 Dec 2021
Compliance Report Submitted by User Agency on : 08 Jul 2022
25 Jul 2022
5 Tripura FP/TR/REHAB/50745/2020 3-TR C 093/2020-SHI Proposal for diversion of 25.00 ha of forest land for resettlement of Bru Migrants at Mouja- Gachirampara under Tehsil- Anandabazar, Subdivision- Kanchanpur, Dist.- North Tripura in favour of SDM, Kan Rehabilitation SUB-DIVISIONAL MAGISTRATE, KANCHANPUR 25 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Oct 2020
Stage-I Approval on : 25 Jan 2021
Compliance Report Submitted by User Agency on : 02 Jul 2022
11 Jul 2022
6 Tripura FP/TR/MIN/53358/2020 3-TR B 047/2021-SHI Drilling of Exploratory Location SDAH Mining ONGC 2.978 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Nov 2020
Stage-I Approval on : 23 Dec 2021
Compliance Report Submitted by User Agency on : 16 Jun 2022
05 Jul 2022
7 Tripura FP/TR/MIN/65526/2020 3-TR B 048/2021-SHI Exploration through Drilling, Waste Pit and Approach road for Location GODD Mining ONGC 1.56 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Nov 2020
Stage-I Approval on : 23 Dec 2021
Compliance Report Submitted by User Agency on : 02 Jun 2022
05 Jul 2022
8 Tripura FP/TR/TRANS/48165/2020 3-TR C 019/2021-SHI Diversion of 10.4483 Ha of Forest Land for construction of 33kV Pole line from Hezamara Substation to Dhalabil Substation under NERPSIP Tripura. Transmission Line TRIPURA STATE ELECTRICITY CORPORATION LIMITED 10.4483 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 30 Apr 2021
Compliance Report Submitted by User Agency on : 02 Feb 2022
04 Jul 2022
9 Tripura FP/TR/TRANS/48164/2020 3-TR C 013/2021-SHI Diversion of 18.1999 Ha of Forest Land for construction of 33kV Pole line from Jolaibari Substation to Silachari Substation under NERPSIP Tripura. Transmission Line TRIPURA STATE ELECTRICITY CORPORATION LIMITED 18.1999 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 17 Jun 2021
Compliance Report Submitted by User Agency on : 21 May 2022
24 Jun 2022
10 Tripura FP/TR/ROAD/40893/2019 3-TR C 066/2020-SHI Improvement of Gandacherra to Raishyabari road (L-32.00 km)/ Sh:- Widening, Strengthening, Retaining wall, Toe wall etc. Portion from 0.00 km to 28.50 km under RIDF Scheme of NABARD (RIDF-XXI). Road EXECUTIVE ENGINEER, PWD (R&B), AMBASSA DIVISION 23.9443 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Nov 2019
Stage-I Approval on : 15 Feb 2021
Compliance Report Submitted by User Agency on : 27 May 2022
10 Jun 2022
11 Tripura FP/TR/Pipeline/126024/2021 3 TR B 059/2021-SHI Laying of Proposed 18" Ø (Carbon steel) Natural Gas Pipeline along with OFC Conduit From Silchari to Panisagar Pipeline INDRADHANUSH GAS GRID LIMITED 1.8161 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Mar 2021
Stage-I Approval on : 13 Jan 2022
Compliance Report Submitted by User Agency on : 01 Jun 2022
08 Jun 2022
12 Tripura FP/TR/MIN/53710/2020 3-TR B 027/2021-SHI Exploration through Drilling, Waste Pit and DSA for Exploratory Location BMSU Mining ONGC 2.652 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Nov 2020
Stage-I Approval on : 06 Oct 2021
Compliance Report Submitted by User Agency on : 28 Mar 2022
11 Apr 2022
13 Tripura FP/TR/REHAB/142936/2021 3-TR B 045/2021-SHI Proposal for diversion of 5.00 ha. of forest land at Mouja MCRF under Sub-Divisional Magistrate, Longtharai Valley of Dhalai District Rehabilitation REVENUE DEPARTMENT 5 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 May 2021
Stage-I Approval on : 29 Nov 2021
Compliance Report Submitted by User Agency on : 25 Feb 2022
29 Mar 2022
14 Tripura FP/TR/REHAB/145449/2021 3-TR C 058/2021-SHI Proposal for diversion of 10:00 ha. of forest land at Mouja MCRF under Sub-Divisional Magistrate, Longtharai Valley of Dhalai District Rehabilitation REVENUE DEPARTMENT 10 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jul 2021
Stage-I Approval on : 25 Nov 2021
Compliance Report Submitted by User Agency on : 29 Dec 2021
11 Mar 2022
15 Tripura FP/TR/REHAB/145330/2021 3-TR C 050/2021-SHI Proposal for diversion of additional 6.85 Ha. of forest land of Mouja-Damcherra for resettlement of Bru Migrants at location Kaskaupara in favour of SDM, Panisagar under North Tripura Rehabilitation SDM PANISAGAR 6.85 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Jul 2021
Stage-I Approval on : 25 Nov 2021
Compliance Report Submitted by User Agency on : 21 Dec 2021
23 Feb 2022
16 Tripura FP/TR/ROAD/39633/2019 3-TR C 023/2020-SHI Improvement of road from Gandacherra -Raishyabari road at ch:- 18.30 km to Narkelkunja (Length-8.0 km) for easy access for the tourist from Dhalai, North & Unakoti Districts Road EXECUTIVE ENGINEER, PWD (R&B), AMBASSA DIVISION 7.6163 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Apr 2019
Stage-I Approval on : 24 Aug 2020
Compliance Report Submitted by User Agency on : 22 Dec 2021
31 Jan 2022
17 Tripura FP/TR/TRANS/48163/2020 3-TR B 011/2021-SHI Diversion of 2.70 Ha of Forest Land for construction of 33kV Pole line from Jatanbari Substation to Dhalak Substation under NERPSIP Tripura. Transmission Line TRIPURA STATE ELECTRICITY CORPORATION LIMITED 2.705 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jul 2020
Stage-I Approval on : 17 Jun 2021
Compliance Report Submitted by User Agency on : 23 Dec 2021
31 Jan 2022
18 Tripura FP/TR/REHAB/142361/2021 3-TR C 046/2021-SHI Proposal for diversion of 10.05 ha of Forest land of Revenue Mouja Kulai RF Extenstion in favour of SDM, Ambassa under Dhalai District. Rehabilitation SUB-DIVISIONAL MAGISTRATE, AMBASSA SUB-DIVISION 10.05 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jun 2021
Stage-I Approval on : 30 Nov 2021
Compliance Report Submitted by User Agency on : 29 Dec 2021
25 Jan 2022
19 Tripura FP/TR/REHAB/143485/2021 3-TR C 049/2021-SHI Proposal for diversion of additional 15.00 Ha of forest land of Mouja-Damcherra for resettlement of Bru Migrant at location Wainbukcherra-Ranipara in favour of SDM, Panisagar under North Tripura District. Rehabilitation SDM PANISAGAR 15 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jul 2021
Stage-I Approval on : 25 Nov 2021
Compliance Report Submitted by User Agency on : 21 Dec 2021
13 Jan 2022
20 Tripura FP/TR/TRANS/47181/2020 No.F. 6-1251/FC/For-2020 Diversion of 0.99728 Ha of Forest land for construction of 33kV Overhead line from Ambasa to Jawaharnagar under NERPSIP Transmission Line TRIPURA STATE ELECTRICITY CORPORATION LIMITED 0.99728 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Jul 2020
Stage-I Approval on : 03 Mar 2021
Compliance Report Submitted by User Agency on : 22 Dec 2021
31 Dec 2021
21 Tripura FP/TR/ROAD/141993/2021 3-TR B 043/2021-SHI Improvement & Widening to 2-lane with paved shoulder of Kailashahar to Fultali section of NH-208 (Package-I, Km 21.100 to Km 29.200) under Unakoti District Road PMU AGARTALA 0.201891 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 May 2021
Stage-I Approval on : 03 Sep 2021
Compliance Report Submitted by User Agency on : 03 Dec 2021
07 Dec 2021
22 Tripura FP/TR/ROAD/125152/2021 3-TR C 023/2021-SHI Improvement/ widening of two laning with paved shoulder of Kailasahar-Kurti Bridge Section of NH-208A (Km 0.00 to Km 36.460) under North Tripura District in the state of Tripura Road PMU AGARTALA 6.619991 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Mar 2021
Stage-I Approval on : 15 Jul 2021
Compliance Report Submitted by User Agency on : 03 Dec 2021
30 Nov 2021
23 Tripura FP/TR/MIN/21544/2016 3-TR B 095/2020-SHI Drilling of Development location GODA Mining ONGC 3.52 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 May 2017
Stage-I Approval on : 17 Jun 2021
Compliance Report Submitted by User Agency on : 02 Nov 2021
08 Nov 2021
24 Tripura FP/TR/MIN/38526/2019 3-TR B 098/2020-SHI BREB Mining ONGC 1.74 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 May 2019
Stage-I Approval on : 17 Jun 2021
Compliance Report Submitted by User Agency on : 27 Oct 2021
08 Nov 2021
25 Tripura FP/TR/MIN/21543/2016 3-TR B 075/2020-SHI Drilling and Waste Pit of location GODB Mining ONGC 1.74 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 May 2017
Stage-I Approval on : 17 Jun 2021
Compliance Report Submitted by User Agency on : 04 Oct 2021
21 Oct 2021
26 Tripura FP/TR/MIN/38943/2019 3-TR B 072/2020-SHI DRILLING OF EXPLORATORY LOCATION ROBL Mining ONGC 1.783 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Feb 2019
Stage-I Approval on : 17 Jun 2021
Compliance Report Submitted by User Agency on : 29 Sep 2021
21 Oct 2021
27 Tripura FP/TR/MIN/13521/2015 3-TR B 070/2018-SHI Drilling of location TIDD Mining ONGC 1.11 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Jun 2015
Stage-I Approval on : 06 Apr 2021
Compliance Report Submitted by User Agency on : 09 Sep 2021
04 Oct 2021
28 Tripura FP/TR/MIN/13528/2015 3-TR C 011/2018-SHI Drilling of location TIAG Mining ONGC 1.42 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Jun 2015
Stage-I Approval on : 12 Jan 2021
Compliance Report Submitted by User Agency on : 26 Aug 2021
13 Sep 2021
29 Tripura FP/TR/REHAB/49877/2020 3-TR C 064/2020-SHI Settlement & Rehabilitation of Bru migrant families in West Kalajhari RF Mouja of Amarpur Sub-Division of Gomati District in Tripura Rehabilitation SUB-DIVISIONAL MAGISTRATE, AMARPUR SUB-DIVISION, GUMTI DISTRICT 15 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Sep 2020
Stage-I Approval on : 22 Jan 2021
Compliance Report Submitted by User Agency on : 20 Aug 2021
06 Sep 2021
30 Tripura FP/TR/REHAB/50713/2020 3-TR C 094/2020-SHI Proposal for diversion of 25.00 ha of forest land for resettlement of Bru Migrants at Bhandarima of Mouja CCRF in favour of SDM, Kanchanpur under North Tripura District Rehabilitation SUB-DIVISIONAL MAGISTRATE, KANCHANPUR 25 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Oct 2020
Stage-I Approval on : 25 Jan 2021
Compliance Report Submitted by User Agency on : 18 Aug 2021
06 Sep 2021
31 Tripura FP/TR/ROAD/40991/2019 3-TR B 031/2020-SHI Proposal for diversion of 3.080 ha of forest land for improvement / widening of two laning with paved shoulder of Kumarghat-Kailashahar section of NH-208(Km 0.00 to Km 18.622 ) under the state of Tripura Road PMU AGARTALA 3.08 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Jul 2019
Stage-I Approval on : 30 Sep 2020
Compliance Report Submitted by User Agency on : 04 Sep 2021
25 Aug 2021
32 Tripura FP/TR/ROAD/44926/2020 3-TR A 001/2021-SHI Proposal for diversion of forest land for widening/improvement of Vaghmun-Simlung Section of NH-44(A) to 2-Laning with Paved Shoulders under North Tripura District in the state of Tripura Road PMU AGARTALA 58.443115 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Mar 2020
Stage-I Approval on : 05 May 2021
Compliance Report Submitted by User Agency on : 20 Jul 2021
09 Aug 2021
33 Tripura FP/TR/MIN/38549/2019 3-TR B 069/2019-SHI GOAO Mining ONGC 1.863 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Jan 2019
Stage-I Approval on : 09 Nov 2020
Compliance Report Submitted by User Agency on : 15 Jun 2021
22 Jul 2021
34 Tripura FP/TR/ROAD/38344/2019 3-TR A 063/2019-SHI Proposal for diversion of forest land for Improvement & Widening to two laning with paved shoulder of Kanchanpur-Vangmun section of NH44A (KM 46.597 to KM 66.845) under District Forest Officer, North Road PMU AGARTALA 54.372279 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jan 2019
Stage-I Approval on : 26 Aug 2019
Compliance Report Submitted by User Agency on : 31 Dec 2020
08 Jul 2021
35 Tripura FP/TR/MIN/19169/2016 3-TR B 001/2020-SHI Drilling of location BMST Mining ONGC 1.74 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 May 2016
Stage-I Approval on : 09 Nov 2020
Compliance Report Submitted by User Agency on : 04 Jun 2021
30 Jun 2021
36 Tripura FP/TR/MIN/30149/2017 3-TR B 108/2019-SHI Drilling of location ROBJ Mining ONGC 1.721 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Apr 2019
Stage-I Approval on : 26 Nov 2020
Compliance Report Submitted by User Agency on : 21 May 2021
30 Jun 2021
37 Tripura FP/TR/MIN/21546/2016 3-TR B 074/2019-SHI Drilling of location BRMAE Mining ONGC 1.74 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Jun 2017
Stage-I Approval on : 30 Sep 2020
Compliance Report Submitted by User Agency on : 19 May 2021
21 Jun 2021
38 Tripura FP/TR/MIN/38786/2019 3-TR B 073/2019-SHI Drilling and Waste Pit Location BRMAJ Mining ONGC 1.74 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Feb 2019
Stage-I Approval on : 20 Oct 2020
Compliance Report Submitted by User Agency on : 19 May 2021
21 Jun 2021
39 Tripura FP/TR/ROAD/39649/2019 3-TR C 011/2020-SHI Improvement of tourist spot connectivity from Amarpur (Fatiksagar) leading to Chabimura and having access to eco- Tourism centre. Road EXECUTIVE ENGINEER PWD AMARPUR DIVISION 5.3233 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 May 2019
Stage-I Approval on : 17 Jun 2020
Compliance Report Submitted by User Agency on : 06 Apr 2021
19 Apr 2021
40 Tripura FP/TR/ROAD/45466/2020 3-TR C 102/2020-SHI Proposal for diversion of 24.644 ha of forest land improvement / widening of two laning with paved shoulder of Agartala - Khowai section of NH - 108B ( Km 6.500 to Km 45.535 ) under DFO west Tripura & Khowai Road PMU AGARTALA 24.644 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Aug 2020
Stage-I Approval on : 04 Feb 2021
Compliance Report Submitted by User Agency on : 10 Mar 2021
31 Mar 2021
41 Tripura FP/TR/MIN/38162/2019 3-TR B 070/2019-SHI Drilling and Waste Pit Location AMAA Mining ONGC 1.74 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Jan 2019
Stage-I Approval on : 20 Oct 2020
Compliance Report Submitted by User Agency on : 08 Feb 2021
30 Mar 2021
42 Tripura FP/TR/SubStation/37737/2018 3-TR B 046/2019-SHI 33kV Nidaya Substation Sub Station TRIPURA STATE ELECTRICITY CORPORATION LIMITED 0.3299 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Dec 2018
Stage-I Approval on : 16 Mar 2020
Compliance Report Submitted by User Agency on : 02 Nov 2020
19 Mar 2021
43 Tripura FP/TR/SubStation/35778/2018 3-TR B 045/2019-SHI 33/11KV Barpathari Substation Sub Station TRIPURA STATE ELECTRICITY CORPORATION LIMITED 0.2209 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Sep 2018
Stage-I Approval on : 04 Mar 2020
Compliance Report Submitted by User Agency on : 02 Nov 2020
18 Mar 2021
44 Tripura FP/TR/ROAD/33689/2018 3-TR C 073/2018-SHI Diversion of 79.756196 Ha. Forest Land for Improvement and Widening to two lane with paved shoulder of Kailashahar-Teliamura via Khowai section of newly declared NH-208 Ch from 21.100 Km to 127.319 Km in the State of Tripura. Road PMU AGARTALA 79.756196 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 May 2018
Stage-I Approval on : 20 Feb 2019
Compliance Report Submitted by User Agency on : 16 Mar 2021
02 Mar 2021
45 Tripura FP/TR/MIN/21541/2016 3-TR C 007/2018-SHI Drilling of location GOAI Mining ONGC 3.34 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 May 2017
Stage-I Approval on : 06 Nov 2020
Compliance Report Submitted by User Agency on : 08 Feb 2021
01 Mar 2021
46 Tripura FP/TR/ROAD/33134/2018 3-TR C 072/2018-SHI Diversion of 9.955570 Ha. Forest Land for Improvement and Widening to two lane with paved shoulder of newly declared NH-108A (Jolaibari to Belonia Border) for execution on EPC mode in the State of Tripura Road NH CIRCLE 9.95557 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Apr 2018
Stage-I Approval on : 17 Jan 2019
Compliance Report Submitted by User Agency on : 15 Feb 2021
01 Mar 2021
47 Tripura FP/TR/MIN/21545/2016 3-TR B 027/2019-SHI Drilling of location BRMAD Mining ONGC 3.32 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Jun 2017
Stage-I Approval on : 20 Oct 2020
Compliance Report Submitted by User Agency on : 08 Feb 2021
18 Feb 2021
48 Tripura FP/TR/Others/43036/2019 3-TR C 015/2020-SHI Construction of 1000 MT Seed Godown and Office building of the Superintendent of Agriculture, Kakraban Agri Sub-Division Others DEPARTMENT OF AGRICULTURE, GOVT. OF TRIPURA 0.5621 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Nov 2019
Stage-I Approval on : 03 Jun 2020
Compliance Report Submitted by User Agency on : 10 Feb 2021
17 Feb 2021
49 Tripura FP/TR/REHAB/49079/2020 3-TR C 088/2020-SHI Proposal for diversion of 10.00 ha of Forest land of Revenue Mouja Kulai RF Extenstion in favour of SDM, Ambassa under Dhalai District. Rehabilitation SUB-DIVISIONAL MAGISTRATE, AMBASSA SUB-DIVISION 10 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Sep 2020
Stage-I Approval on : 25 Jan 2021
Compliance Report Submitted by User Agency on : 10 Feb 2021
15 Feb 2021
50 Tripura FP/TR/REHAB/49116/2020 3-TR C 073/2020-SHI Proposal for diversion of 10.00 ha. of Forest Land of Mouja Manu-Chailengta Reserve Forest under SDM, Longtharai Valley of Dhalai District. Rehabilitation REVENUE DEPARTMENT 10 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Aug 2020
Stage-I Approval on : 22 Jan 2021
Compliance Report Submitted by User Agency on : 10 Feb 2021
15 Feb 2021