Ministry of Environment,Forest and Climate Change
Government of India
Jharkhand
State Forest Department
List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)
Help
Using this report, you can view details of proposals (Received on or after 15th July 2014) .Click on   to print
 
Proposal Year :
Region : State :
Category : Status of the Proposal :
Enter value for Search :
Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Jharkhand FP/JH/TRANS/30026/2017 FP/JH/TRANS/30026/2017 JUSNL-132 KVDC-Khunti Tamar LIne(NIT-217) Transmission Line JUSNL 6.77 APPROVED
Proposal received(at Nodal Officer)electronically on : 03 Nov 2017
Stage-I Approval on : 03 May 2019
Compliance Report Submitted by User Agency on : 04 Jul 2019
19 Aug 2022
2 Jharkhand FP/JH/ROAD/36700/2018 FP/JH/ROAD/36700/2018 4 lanning of NH-80 From design km. 215.000 to km 257.718 (Existing km 215.000 to km. 260) of the section from Mirzachauki to Farakka in the state of jharkhand (pKg-1) Road PIU SAHIBGANJ 4.3973 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Jan 2019
Stage-I Approval on : 15 Jan 2021
Compliance Report Submitted by User Agency on : 04 Jul 2022
19 Aug 2022
3 Jharkhand FP/JH/TRANS/43511/2019 FP/JH/Trans/43511/2019 66 kV Transmission Line from Godda TPP to Water Intake System at Sahibganj Transmission Line ADANI POWER JHARKHAND LIMITED 8.72581 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Dec 2019
Stage-I Approval on : 28 Dec 2021
Compliance Report Submitted by User Agency on : 23 Mar 2022
16 Jun 2022
4 Jharkhand FP/JH/SubStation/49170/2020 FP/JH/SUBSTATION/49170/2020 JSBAY II Sub Station JBVNL ELECTRIC SUPPLY DIVISION SAHIBGANJ 0.3723 APPROVED
Proposal received(at Nodal Officer)electronically on : 04 Sep 2020
Stage-I Approval on : 23 Nov 2021
Compliance Report Submitted by User Agency on : 07 Jan 2022
27 May 2022
5 Jharkhand FP/JH/Others/31385/2018 FP/JH/Others/31385/2018 Augmentation of Paradip-Haldia-Durgapur LPG Pipeline and its extension up to Patna and Muzaffarpur Others Indian Oil Corporation Limited (Pipelines Division) 13.5735 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Jan 2018
Stage-I Approval on : 31 May 2019
Compliance Report Submitted by User Agency on : 09 Jul 2019
12 Apr 2022
6 Jharkhand FP/JH/MIN/29167/2017 8-23/2019-FC Tubed Coal Mine Mining DAMODAR VALLEY CORPORATION 162.394 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Sep 2017
Stage-I Approval on : 13 Nov 2019
Compliance Report Submitted by User Agency on : 07 Feb 2022
28 Mar 2022
7 Jharkhand FP/JH/SCH/36884/2018 vanbhumi-48/2019 200 BEDDED BOYS & GIRLS RESIDENTIAL SCHOOL & HOSTEL BARIYATU, BARIKHAP School ITDA DEPARTMENT LATEHAR 1.99 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Nov 2018
Stage-I Approval on : 18 Sep 2019
Compliance Report Submitted by User Agency on : 03 Sep 2021
14 Feb 2022
8 Jharkhand FP/JH/RAIL/23964/2017 FP/JH/RAIL/23964/2017 HANSDIHA - GODDA NEW RAIL LINE Railway DY CHIEF ENGINEER CONSTRUCTION BHAGALPUR 2.54 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Mar 2017
Stage-I Approval on : 23 Aug 2018
Compliance Report Submitted by User Agency on : 09 Dec 2021
03 Jan 2022
9 Jharkhand FP/JH/TRANS/12972/2015 FP/JH/TRANS/12972/2015 220 kV D/C Rupnarayanpur- Dumka Transmission line of Jharkhand Govt. Transmission Line JHARKHAND URJA SANCHARAN NIGAM LIMITED 4.8821 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 May 2015
Stage-I Approval on : 13 Jul 2015
Compliance Report Submitted by User Agency on : 11 Oct 2021
30 Dec 2021
10 Jharkhand FP/JH/ROAD/38065/2019 FP/JH/ROAD/38065/2019 BALANCE WORK OF 4/6 LANNING OF RANCHI-RARGAON SECTION OF NH-33 FROM KM113.730 TO KM140.00 IN THE STATE OF JHARKHAND UNDER NHDP-III ON EPC (ITEM RATE CONTRACT) PACKAGE-I. Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU RANCHI 2.301 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Jan 2019
Stage-I Approval on : 22 Jan 2020
Compliance Report Submitted by User Agency on : 14 Sep 2020
13 Dec 2021
11 Jharkhand FP/JH/TRANS/34382/2018 FP/JH/TRANS/34382/2018 400 kV D/C (Quad) From Adani Power Jharkhand Limited, Godda TPP to Indian Border at Mohabbatpur, Maldah, West Bengal towards Bogra, Bangladesh Transmission Line Transmission Line ADANI POWER JHARKHAND LIMITED 66.2862 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Jun 2018
Stage-I Approval on : 29 Jan 2021
Compliance Report Submitted by User Agency on : 16 Apr 2021
20 Oct 2021
12 Jharkhand FP/JH/ROAD/35395/2018 FP/JH/Road/35395/2018 NH-75 Sec. IV Rehla/Garhwa Bypass Road National Highways Authority of India 4.2735 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Aug 2018
Stage-I Approval on : 27 Sep 2019
Compliance Report Submitted by User Agency on : 16 Apr 2021
07 Oct 2021
13 Jharkhand FP/JH/TRANS/33110/2018 FP/JH/TRANS/33110/2018 765 kV D/C Ranchi-Medinipur Transmission Line Transmission Line POWERDRID MEDINIPUR-JEERAT TRANSMISSION LIMITED 44.069 APPROVED
Proposal received(at Nodal Officer)electronically on : 12 Apr 2018
Stage-I Approval on : 22 Aug 2019
Compliance Report Submitted by User Agency on : 01 Oct 2020
30 Sep 2021
14 Jharkhand FP/JH/Pipeline/38146/2019 FP/JH/Pipeline/38146/2019 30" Haldia Barauni Pipeline Pipeline Indian Oil Corporation Limited (Pipelines Division) 8.7926 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Jan 2019
Stage-I Approval on : 07 Apr 2020
Compliance Report Submitted by User Agency on : 05 Mar 2021
31 Aug 2021
15 Jharkhand FP/JH/RAIL/33154/2018 FP/JH/RAIL/33154/2018 Dedicated Freight Corridor Railway DFCCIL 8.6199 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Apr 2018
Stage-I Approval on : 30 Jun 2020
Compliance Report Submitted by User Agency on : 22 Oct 2020
10 Aug 2021
16 Jharkhand FP/JH/TRANS/16674/2015 Vanbhumi-20/2016 220 kV D/C Ramchandrapur- Chaibasa Transmission Line Transmission Line JHARKHAND URJA SANCHARAN NIGAM LIMITED 4.672 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Nov 2015
Stage-I Approval on : 21 Sep 2016
Compliance Report Submitted by User Agency on : 16 Dec 2020
28 Jul 2021
17 Jharkhand FP/JH/SubStation/38286/2019 vanbhumi-41/2019 132/33 KV GSS Petarwar Bokaro Sub Station JUSNL RANCHI 4.04 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Jan 2019
Stage-I Approval on : 16 Aug 2019
Compliance Report Submitted by User Agency on : 16 Mar 2021
28 Jul 2021
18 Jharkhand FP/JH/SubStation/40007/2019 vanbhumi-45/2019 CHATTARPUR SUB-STATION Sub Station JUSNL DALTANGANJ 2.43 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Apr 2019
Stage-I Approval on : 04 Sep 2019
Compliance Report Submitted by User Agency on : 23 Nov 2020
28 Jul 2021
19 Jharkhand FP/JH/ROAD/19908/2016 Van bhumi-03/2017 Gumla Bypass Road EXECUTIVE ENGINEER NATIONAL HIGHWAYS DIVISION GUMLA 7.65 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Jul 2016
Stage-I Approval on : 01 Sep 2017
Compliance Report Submitted by User Agency on : 14 Jul 2020
27 Jul 2021
20 Jharkhand FP/JH/TRANS/33007/2018 FP/JH/TRANS/33007/2018 400 KV ESSAR-Latehar Transmission Line JUSNL 73.166 APPROVED
Proposal received(at Nodal Officer)electronically on : 09 Apr 2018
Stage-I Approval on : 22 Aug 2019
Compliance Report Submitted by User Agency on : 11 Dec 2019
30 Jun 2021
21 Jharkhand FP/JH/TRANS/40693/2019 FP/JH/TRANS/40693 33 KV Transmissin line Dadi to Giddi Transmission Line JHARKHAND BIJLI VITRAN NIGAM LIMITED 8.828 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jun 2019
Stage-I Approval on : 17 Dec 2019
Compliance Report Submitted by User Agency on : 11 Nov 2020
23 Jun 2021
22 Jharkhand FP/JH/TRANS/23704/2017 FP/JH/TRANS/23704/2017 220 KV Transmission Line Pakri Barwadih- Chattibariatu, Hazaribag Transmission Line NTPC PBCMP 46.25 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Jan 2017
Stage-I Approval on : 09 Jul 2018
Compliance Report Submitted by User Agency on : 07 Apr 2021
03 Jun 2021
23 Jharkhand FP/JH/Others/34904/2018 FP/JH/Others/34904/2018 ONGC BOKARO , Networking Project Others ONGC KOLKATA 16.357 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Jul 2018
Stage-I Approval on : 04 Mar 2020
Compliance Report Submitted by User Agency on : 18 Mar 2021
22 Mar 2021
24 Jharkhand FP/JH/MIN/25031/2017 FP/JH/MIN/25031/2017 Amlo Opencast Project Mining CENTRAL COALFIELDS LIMITED 39.663 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Mar 2017
Stage-I Approval on : 13 Nov 2019
Compliance Report Submitted by User Agency on : 20 May 2020
05 Mar 2021
25 Jharkhand FP/JH/RAIL/36817/2018 FP/JH/RAIL/36817/2018 Doubling of railway line between Lodhma to Govindpur Railway station Railway SOUTH EASTERN RAILWAY 7.959 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Oct 2018
Stage-I Approval on : 07 Apr 2020
Compliance Report Submitted by User Agency on : 09 Feb 2021
24 Feb 2021
26 Jharkhand FP/JH/Others/32773/2018 FP/JH/Others/32773/2018 Construction of Water Pipeline Others ADANI POWER JHARKHAND LIMITED 13.3293 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Mar 2018
Stage-I Approval on : 28 Jun 2019
Compliance Report Submitted by User Agency on : 04 Mar 2020
29 Jan 2021
27 Jharkhand FP/JH/RAIL/18085/2016 FP/JH/RAIL/18085/2016 Dedicated freight Corridor Railway DFCCIL 89.688 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Feb 2016
Stage-I Approval on : 18 Sep 2018
Compliance Report Submitted by User Agency on : 11 Dec 2019
29 Dec 2020
28 Jharkhand FP/JH/TRANS/31279/2018 FP/JH/TRANS/31279/2018 JUSNL-132Kv-DC-Sahebganj-Rajmahal Transmission Line(NIT-42) Transmission Line JUSNL 11.695 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 Mar 2018
Stage-I Approval on : 27 Jun 2019
Compliance Report Submitted by User Agency on : 24 Dec 2019
22 Dec 2020
29 Jharkhand FP/JH/SubStation/35829/2018 vanbhumi-39/2019 132/33 KV KURDEG GSS SUBSTATION Sub Station JUSNL RANCHI 2.89 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Sep 2018
Stage-I Approval on : 03 Oct 2019
Compliance Report Submitted by User Agency on : 29 Oct 2020
07 Dec 2020
30 Jharkhand FP/JH/SubStation/35830/2018 vanbhumi-42/2019 132/33 KV GSS KOLEBIRA Sub Station JUSNL RANCHI 3.32 APPROVED
Proposal received(at Nodal Officer)electronically on : 08 Sep 2018
Stage-I Approval on : 03 Oct 2019
Compliance Report Submitted by User Agency on : 29 Oct 2020
07 Dec 2020
31 Jharkhand FP/JH/ROAD/18607/2016 FP/JH/ROAD/18607/2016 WIDENING TO 2*LANE & IMPROVEMENT WORK FROM KM-62 TO 116 OF NH-75 (E) Road NH WING RCD RANCHI JHARKHAND 12.488 APPROVED
Proposal received(at Nodal Officer)electronically on : 11 Apr 2016
Stage-I Approval on : 26 Sep 2018
Compliance Report Submitted by User Agency on : 09 Jul 2020
27 Nov 2020
32 Jharkhand FP/JH/ROAD/16883/2015 FP/JH/ROAD/16883/2015 4-laning of Barhi-Koderma section (km 0.0 to km 27.665) of NH-31 Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU RANCHI 12.362 APPROVED
Proposal received(at Nodal Officer)electronically on : 07 Dec 2015
Stage-I Approval on : 27 Sep 2018
Compliance Report Submitted by User Agency on : 13 Jul 2020
04 Aug 2020
33 Jharkhand FP/JH/TRANS/33572/2018 FP/JH/TRANS/33572/2018 NIT NO-JUSNL/44 RATU TO PATRATU TRANSMISSION LINE. Transmission Line JUSNL RANCHI 13.8028 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 May 2018
Stage-I Approval on : 23 Jul 2019
Compliance Report Submitted by User Agency on : 20 May 2020
08 Jul 2020
34 Jharkhand FP/JH/RAIL/11342/2015 FP/JH/RAIL/11342/2015 Dedicated Freight Corridor Railway DFCCIL 2.2227 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Apr 2015
Stage-I Approval on : 10 Nov 2017
Compliance Report Submitted by User Agency on : 17 Sep 2019
11 Jun 2020
35 Jharkhand FP/JH/RAIL/11157/2015 FP/JH/RAIL/11157/2015 Dedicated Freight Corridor Railway DFCCIL 1.7936 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Mar 2015
Stage-I Approval on : 10 Nov 2017
Compliance Report Submitted by User Agency on : 17 Sep 2019
05 May 2020
36 Jharkhand FP/JH/SubStation/39788/2019 Vanbhumi-33/2019 Construction of 132/33 KV Power Grid –substation Sub Station JHARKHAND URJA SANCHARAN NIGAM LIMITED 3.44 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Apr 2019
Stage-I Approval on : 16 Jul 2019
Compliance Report Submitted by User Agency on : 10 Dec 2019
05 Mar 2020
37 Jharkhand FP/JH/TRANS/34023/2018 FP/JH/TRANS/34023/2018 NIT NO-JUSNL/44 HAPHUA TO KATIA TRANSMISSION LINE Transmission Line JUSNL RANCHI 9.019 APPROVED
Proposal received(at Nodal Officer)electronically on : 05 Jun 2018
Stage-I Approval on : 22 Aug 2019
Compliance Report Submitted by User Agency on : 04 Feb 2020
03 Mar 2020
38 Jharkhand FP/JH/TRANS/33768/2018 Vanbhumi-01/2019 JUSNL Godda -Dumka 220 KV DC Transmission Line Transmission Line JUSNL 4.5012 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 May 2018
Stage-I Approval on : 27 Mar 2019
Compliance Report Submitted by User Agency on : 09 Jul 2019
19 Dec 2019
39 Jharkhand FP/JH/SubStation/35726/2018 Vanbhumi-19/2019 Construction of 132/33 KV G/S/S under transmission circle, Hazaribag in village Nawadih, Bishnugarh, Hazaribag, Jharkhand Sub Station JHARKHAND URJA SANCHARAN NIGAM LIMITED 4.048 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Sep 2018
Stage-I Approval on : 13 Jun 2019
Compliance Report Submitted by User Agency on : 19 Nov 2019
17 Dec 2019
40 Jharkhand FP/JH/TRANS/38851/2019 vanbhumi-35/2019 220 kV D/C JASIDIH- DUMKA TRANSMISSION LINE Transmission Line JUSNL 4.3565 APPROVED
Proposal received(at Nodal Officer)electronically on : 14 Feb 2019
Stage-I Approval on : 02 Aug 2019
Compliance Report Submitted by User Agency on : 06 Nov 2019
17 Dec 2019
41 Jharkhand FP/JH/ENCRH/28953/2017 FP/JH/ENCRH/28953/2017 Welfare Hostel for Girls Encroachments DWO DUMKA 1.246 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Sep 2017
Stage-I Approval on : 30 Nov 2018
Compliance Report Submitted by User Agency on : 20 Mar 2020
10 Dec 2019
42 Jharkhand FP/JH/RAIL/26435/2017 FP/JH/RAIL/26435/2017 Jarangdih to Danea & Danea to Ranchi Road doubling Rail Line Project Railway EAST CENTRAL RAILWAY 45.623 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 May 2017
Stage-I Approval on : 18 Sep 2018
Compliance Report Submitted by User Agency on : 05 Feb 2019
17 Sep 2019
43 Jharkhand FP/JH/ROAD/21144/2016 Van bhumi-36/2016 Widening & Strengthing and re-construction of Ramrekha Dham Upto Chhattishgarh Border Road. Road ROAD CONSTRUCTION DEPARTMENT JHARKHAND 7.771 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Aug 2016
Stage-I Approval on : 27 Jan 2017
Compliance Report Submitted by User Agency on : 11 Apr 2019
13 Aug 2019
44 Jharkhand FP/JH/TRANS/29979/2017 FP/JH/TRANS/29979/2017 JUSNL NIT42 (132 kv giridih Jamua Transmission line) Transmission Line JUSNL 22.708 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Nov 2017
Stage-I Approval on : 12 Mar 2019
Compliance Report Submitted by User Agency on : 09 Jul 2019
01 Aug 2019
45 Jharkhand FP/JH/ROAD/30610/2017 Vanbhumi-18/2018 Construction of NH-33 ( Pipla more) to Gobindpur Anna more via Ghorabandha Road Road E E JAMSHEDPUR 16.75 APPROVED
Proposal received(at Nodal Officer)electronically on : 19 Dec 2017
Stage-I Approval on : 06 Dec 2018
Compliance Report Submitted by User Agency on : 29 Jun 2019
16 Jul 2019
46 Jharkhand FP/JH/ROAD/16179/2015 FP/JH/ROAD/16179/2015 Section of NH-33 from km 224+162 to km 225+775 Road NATIONAL HIGHWAYS AUTHORITY OF INDIA PIU RANCHI 3.0507 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Oct 2015
Stage-I Approval on : 15 Nov 2016
Compliance Report Submitted by User Agency on : 18 Sep 2018
18 Mar 2019
47 Jharkhand FP/JH/IND/28557/2017 FP/JH/IND/28557/2017 BPCL OIL DEPOT AT RADHANAGAR, BOKARO Industry BPCL BOKARO 28.19 APPROVED
Proposal received(at Nodal Officer)electronically on : 01 Sep 2017
Stage-I Approval on : 26 Sep 2018
Compliance Report Submitted by User Agency on : 28 Jan 2019
18 Mar 2019
48 Jharkhand FP/JH/Others/19996/2016 Van bhumi-35/2016 Battalion Camping Site, CRPF Others CENTRAL RESERVE POLICE FORCE 4.97 APPROVED
Proposal received(at Nodal Officer)electronically on : 15 Jun 2016
Stage-I Approval on : 04 Apr 2017
Compliance Report Submitted by User Agency on : 10 Sep 2018
10 Dec 2018
49 Jharkhand FP/JH/Others/22938/2016 Van bhumi-09/2017 CONSTRUCTION OF 132/33KV GRID SUB-STATION AT CHATRA Others JHARKHAND URJA SANCHARAN NIGAM LIMITED 4.04 APPROVED
Proposal received(at Nodal Officer)electronically on : 10 Dec 2016
Stage-I Approval on : 29 May 2017
Compliance Report Submitted by User Agency on : 07 Jun 2018
06 Jul 2018
50 Jharkhand FP/JH/Others/20982/2016 Van bhumi-13/2017 132/33KV Grid Sub-station at Saria in Giridih District Others JHARKHAND URJA SANCHARAN NIGAM LIMITED 4.05 APPROVED
Proposal received(at Nodal Officer)electronically on : 13 Aug 2016
Stage-I Approval on : 01 Jun 2017
Compliance Report Submitted by User Agency on : 07 Jun 2018
27 Jun 2018
12